Items with Index Term: preliminaries
Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364
Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193
Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193
Disney, O and Fahlstedt, O (2021) Site overheads: The lost dimension of improved productivity? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193
Lim, B; Nepal, M P; Skitmore, M and Xiong, B (2016) Drivers of the accuracy of developers' early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 21(1), pp. 4-20. ISSN 1366-4387
Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.
Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Serugga, J; Kagioglou, M; Edwards, D; Talebi, S and Johns, N (2024) Key influences to cost modelling and analysis in off-site construction: Research trends and gap analysis. Architectural Engineering and Design Management, 20(6), pp. 1335-1356. ISSN 1745-2007
Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988
Up a level