Items with Index Term: prefabrication
Abdelaal, A; Ma, J; Zhang, H; Shobeiri, V and Xie, Y M (2026) Bio-stabilized modular rammed earth blocks for sustainable and aesthetic construction. Construction Innovation, 26(9), pp. 1-20. ISSN 1471-4175
Adjei, S D (2016) Review of waste management in the UK construction industry. PhD thesis, University of Wolverhampton, UK.
Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(2), pp. 573-600. ISSN 0969-9988
Ajayi, S; Brinklow-Harris, J; Alaka, H A and Dauda, J A (2019) Managing the benefits and impediments to offsite construction in the UK construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.
Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.
Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599
Akmam Syed Zakaria, S; Gajendran, T; Rose, T and Brewer, G (2018) Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: A review. Architectural Engineering and Design Management, 14(1-2), pp. 3-26. ISSN 1745-2007
Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007
Alhawamdeh, M and Lee, A (2025) A systematic review and meta-synthesis of the barriers of offsite construction projects. International Journal of Construction Management, 25(9), pp. 1087-1099. ISSN 1562-3599
Alinaitwe, H M (2009) Prioritising lean construction barriers in Uganda's construction industry. Journal of Construction in Developing Countries, 14(1), pp. 15-30. ISSN 1823-6499
Almughrabi, F M; Samarasinghe, D A S and Rotimi, F E (2021) Analysis of skill shortages in prefabricated residential construction: A case for New Zealand. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193
Astrand, R N (2003) Selection model to choose innovative building systems for progressive housing with special reference to metro Manila, Philippines. PhD thesis, McGill University, Canada.
Ayinla, K O; Cheung, F and Tawil, A R (2020) Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system. Construction Innovation, 20(2), pp. 223-246. ISSN 1471-4175
Azhar, S; Lukkad, M Y and Ahmad, I (2013) An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique. International Journal of Construction Education and Research, 9(3), pp. 203-225. ISSN 1557-8771
Badawy, M.; Ibrahim, A.; Hamdy, K. and Aljohani, A. (2026) A comparative analysis of barriers to prefabricated construction adoption in emerging economies: A dual fuzzy-cb-SEM and PLS-SEM approach. International Journal of Construction Management, 26(9), pp. 1978-1998. ISSN 1562-3599
Bailey, D (2016) A performance evaluation of mainstream timber framed and traditional masonry housing in the UK. PhD thesis, University of Nottingham, UK.
Bakhaty, Y and Kaluarachchi, Y (2020) Critical success factors, barriers and challenges for adopting offsite prefabrication: A systematic literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Bamana, F; Lehoux, N and Cloutier, C (2019) Simulation of a construction project: Assessing impact of just-in-time and lean principles. Journal of Construction Engineering and Management, 145(5): 05019005, ISSN 0733-9364
Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180
Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.
Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099
Besklubova, S; Zhong, R Y and Tan, B Q (2025) An integrated model of a prefabrication hub feasibility assessment: A Hong Kong case. International Journal of Construction Management, 25(11), pp. 1300-1312. ISSN 1562-3599
Bhatia, A; Moselhi, O and Han, S (2025) Hybrid optimization approach for scheduling in panelized construction manufacturing. Journal of Construction Engineering and Management, 151(8): 04025107, ISSN 0733-9364
Birchmore, R; Davies, K; Etherington, P; Tait, R and Pivac, A (2017) Overheating in Auckland homes: Testing and interventions in full-scale and simulated houses. Building Research & Information, 45(1-2), pp. 157-175. ISSN 0961-3218
Blismas, N; Wakefield, R and Hauser, B (2010) Concrete prefabricated housing via advances in systems technologies: Development of a technology roadmap. Engineering, Construction and Architectural Management, 17(1), pp. 99-110. ISSN 0969-9988
Blismas, N G; Pendlebury, M; Gibb, A and Pasquire, C (2005) Constraints to the use of off-site production on construction projects. Architectural Engineering and Design Management, 1(3), pp. 153-162. ISSN 1745-2007
Brege, S; Stehn, L and Nord, T (2014) Business models in industrialized building of multi-storey houses. Construction Management and Economics, 32(1-2), pp. 208-226. ISSN 01446193
Cai, J; Li, Z; Dou, Y and Li, T (2023) Investigating adoption of high prefabrication level technologies for enterprises: An integrated model. Building Research & Information, 51(6), pp. 648-666. ISSN 0961-3218
Carmody, S; Spillane, J P and Clarke, N (2022) Barriers to the implementation of modular construction in Ireland: A case study from an Irish small and medium-sized enterprise perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Chan, P W and Moehler, R (2007) Developing a 'road-map' to facilitate employers' role in engaging with the skills development agenda. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Chan, T K (2011) Comparison of precast construction costs: Case studies in Australia and Malaysia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chauhan, Krishna (2024) Prefabrication in construction: A systemic approach to impact and implementation. DScTech thesis, Aalto University, Finland.
Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364
Chiang, Y H and Lok, L K L (2006) Sustainable advantages and corporate strategies: The case of prefabrication in Hong Kong. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chiang, Y H; Tang, B S and Wong, F (2008) Volume building as competitive strategy. Construction Management and Economics, 26(2), pp. 161-176. ISSN 1466433X
Choi, J O; Chen, X B and Kim, T W (2019) Opportunities and challenges of modular methods in dense urban environment. International Journal of Construction Management, 19(2), pp. 93-105. ISSN 1562-3599
Clarke, L and Wall, C (2000) Craft versus industry: The division of labour in European housing construction. Construction Management and Economics, 18(6), pp. 689-698. ISSN 01446193
Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.
Cruz Ortiz, M R P (2019) Expanding modular design: All-rise mass timber residences in Hawaii. DArch thesis, University of Hawai'i at Manoa, USA.
Dave, Malay (2019) High performance prefab housing: towards an evaluation framework for design, sustainability and affordability. PhD thesis, University of New South Wales, Australia.
Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dawood, N N; Hobbs, B and Fanning, A (1999) Standardization of brickwork construction: Process identification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364
Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(2), pp. 165-177. ISSN 1466433X
Doe, Robert (2017) Integration of computational design tools in the design and production of prefabricated homes. PhD thesis, University of Sydney, Australia.
Dowsett, R M; Green, M S and Harty, C F (2022) Speculation beyond technology: Building scenarios through storytelling. Buildings & Cities, 3(1), pp. 534-553. ISSN 2632-6655
Du, H; Han, Q; Sun, J and Wang, C C (2023) Adoptions of prefabrication in residential sector in China: Agent-based policy option exploration. Engineering, Construction and Architectural Management, 30(4), pp. 1697-1725. ISSN 0969-9988
Du, Q; Zhang, Y; Zeng, L; Ma, Y and Li, S (2025) Dynamic assessment of the abatement effects of the low-carbon practices in the prefabricated building supply chain. Engineering, Construction and Architectural Management, 32(7), pp. 4918-4945. ISSN 0969-9988
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2007) The UK construction industry: A review of black country skills demand. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Ekanayake, E M A C; Xue, J; Shen, G Q and Kumaraswamy, M M (2021) Dynamic supply chain vulnerability analysis of Hong Kong-Zhuhai-Macao Bridge construction: A topic modelling approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Elnaas, H; Ashton, P and Gidado, K (2009) Decision making process for using off-site manufacturing systems for housing projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Fagbenro, R. K.; Sunindijo, R. Y. and Illankoon, C. (2026) Prefabrication in construction: A pathway to improved mental health and well-being for workers. Engineering, Construction and Architectural Management, 33(15), pp. 249-275. ISSN 0969-9988
Farrow, C B (2016) Problem-solving styles in the Southeast construction industry. EdD thesis, Auburn University, USA.
Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364
Feldmann, F G (2022) Novel perspectives on sustainable value creation: Challenging the status quo by implementing advanced technologies into supply chain processes. PhD thesis, Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Germany.
Fisher, A (2014) Late modern industry: The politics, rhetoric, and design of industrialized housing in France, 1954-1981. PhD thesis, Northwestern University, USA.
Forsman, S; Björngrim, N; Bystedt, A; Laitila, L; Bomark, P and Öhman, M (2012) Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(4), pp. 464-491. ISSN 1471-4175
Forsythe, P J and Sepasgozar, S M E (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(4), pp. 578-598. ISSN 0969-9988
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Gan, X L; Chang, R D; Langston, C and Wen, T (2019) Exploring the interactions among factors impeding the diffusion of prefabricated building technologies: Fuzzy cognitive maps. Engineering, Construction and Architectural Management, 26(3), pp. 535-553. ISSN 0969-9988
Gao, M Y; Han, J; Yang, Y; Tiong, R L K; Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(9): 04024117, ISSN 0733-9364
Gao, S; Jin, R and Lu, W (2020) Design for manufacture and assembly in construction: A review. Building Research & Information, 48(5), pp. 538-550. ISSN 0961-3218
Gao, S; Low, S P and Nair, K (2018) Design for manufacturing and assembly (DFMA): A preliminary study of factors influencing its adoption in Singapore. Architectural Engineering and Design Management, 14(6), pp. 440-456. ISSN 1745-2007
Gee, S (2019) The development of an innovative, lean, mobile factory system to manufacture timber frame closed panels in temporary locations for use in the Assembly of Houses in the Affordable Rented Sector. PhD thesis, University of Liverpool, UK.
Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.
Golabchi, A; Han, S; Seo, J; Han, S; Lee, S and Al-Hussein, M (2015) An automated biomechanical simulation approach to ergonomic job analysis for workplace design. Journal of Construction Engineering and Management, 141(8): 04015020, ISSN 0733-9364
Gong, C; Xu, H; Xiong, F; Zuo, J and Dong, N (2023) Factors impacting BIM application in prefabricated buildings in China with DEMATEL-ISM. Construction Innovation, 23(1), pp. 19-37. ISSN 1471-4175
Goodier, C and Gibb, A (2007) Future opportunities for offsite in the UK. Construction Management and Economics, 25(6), pp. 585-595. ISSN 1466433X
Gosling, J; Pero, M; Schoenwitz, M; Towill, D and Cigolini, R (2016) Defining and categorizing modules in building projects: An international perspective. Journal of Construction Engineering and Management, 142(11): 04016062, ISSN 0733-9364
Grenzfurtner, W and Gronalt, M (2021) Continuous improvement of the industrialised housebuilding order fulfilment process. Construction Innovation, 21(1), pp. 22-39. ISSN 1471-4175
Gumusburun Ayalp, G and Ay, I (2021) Model validation of factors limiting the use of prefabricated construction systems in Turkey. Engineering, Construction and Architectural Management, 28(9), pp. 2610-2636. ISSN 0969-9988
Görsch, Christopher (2024) Learning to see flow: A worker-centric exploration towards task planning and control in construction. DSc thesis, Aalto University, Finland.
Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364
Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364
Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364
Hassan, N M and Alashwal, A (2025) Developing a model for the implementation of designing out waste in construction. Architectural Engineering and Design Management, 21(1), pp. 154-170. ISSN 1745-2007
He, Q; Wu, Z; Li, S; Li, H and Wang, Y (2023) Two decades of the evolution of China's green building policy: Insights from text mining. Building Research & Information, 51(2), pp. 158-178. ISSN 0961-3218
Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364
Heljedal M, P F (2013) Sustainable intermodal transportation of prefabricated construction materials. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Hinze, J and Olbina, S (2009) Empirical analysis of the learning curve principle in prestressed concrete piles. Journal of Construction Engineering and Management, 135(5), pp. 425-431. ISSN 0733-9364
Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.
Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.
Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364
Ishai, E (1989) Architectural and economic considerations in the design of prefabricated facade components (exterior walls). Construction Management and Economics, 7(3), pp. 189-202. ISSN 01446193
Jaillon, L and Poon, C S (2008) Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), pp. 953-966. ISSN 1466433X
Jaillon, L and Poon, C S (2010) Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), pp. 1025-1042. ISSN 1466433X
Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Jansson, G; Söderholm, E and Johnsson, H (2008) Design process organisation at industrial house builders: A case study of two timber housing companies in Sweden. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Jayawardana, J; Sandanayake, M; Jayasinghe, S; Kulatunga, A and Zhang, G (2025) Key barriers and mitigation strategies towards sustainable prefabricated construction: A case of developing economies. Engineering, Construction and Architectural Management, 32(7), pp. 4796-4833. ISSN 0969-9988
Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.
Ji, W; Abourizk, S M; Zaïane, O R and Li, Y (2018) Complexity analysis approach for prefabricated construction products using uncertain data clustering. Journal of Construction Engineering and Management, 144(8): 04018063, ISSN 0733-9364
Ji, Y; Qi, K; Qi, Y; Li, Y; Li, H X; Lei, Z and Liu, Y (2020) BIM-based life-cycle environmental assessment of prefabricated buildings. Engineering, Construction and Architectural Management, 27(8), pp. 1703-1725. ISSN 0969-9988
Jia, A. Y. and Luk, C. W. (2026) From techno-optimism to value co-creation: A circular value system analysis on the modular transitional housing programme in Hong Kong. Construction Management and Economics, 44(7), pp. 537-563. ISSN 0144-6193
Jin, R; Hancock, C M; Tang, L and Wanatowski, D (2017) BIM investment, returns, and risks in China's AEC industries. Journal of Construction Engineering and Management, 143(12): 04017089, ISSN 0733-9364
Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988
Johnson, H M; Singh, A and Young, R H F (1998) Fall protection analysis for workers on residential roofs. Journal of Construction Engineering and Management, 124(5), pp. 418-428. ISSN 0733-9364
Johnsson, H (2013) Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics, 31(9), pp. 941-958. ISSN 1466433X
Johnsson, H and Meiling, J H (2009) Defects in offsite construction: Timber module prefabrication. Construction Management and Economics, 27(7), pp. 667-681. ISSN 1466433X
Johnsson, H and Sardén, Y (2008) Industrialised timber housing: From trial to production. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kaasalainen, T and Huuhka, S (2016) Homogenous homes of Finland: 'Standard' flats in non-standardized blocks. Building Research & Information, 44(3), pp. 229-247. ISSN 0961-3218
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.
Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.
Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(1), pp. 89-104. ISSN 01446193
Karunaratne, Roshan (2022) Optimisation of prefabricated modular-integrated residential construction using hybrid customisation methods. PhD thesis, University of Melbourne, Australia.
Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175
Katebi, A; Mohammadhosseini, A; Najmeddin, M and Homami, P (2024) The moderating impact of organizational readiness, competitive pressure and compatibility on the cost of using precast concrete components. Journal of Financial Management of Property and Construction, 29(2), pp. 274-294. ISSN 1366-4387
Keath, M (1983) The development of school construction systems in Hertfordshire 1946-64. PhD thesis, University of Greenwich, UK.
Kempton, J and Fergusson, S (2004) Potential of prefabricated pods to extend houses: Initial feasibility study for social housing. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.
Khalili, A and Chua, D K (2014) Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of Construction Engineering and Management, 140(2): 04013052, ISSN 0733-9364
Knerr, D G (1996) "The house America has been waiting for": The Lustron Experiment in factory-made housing, 1946-1954. PhD thesis, University of Cincinnati, USA.
Koch, C and Bertelsen, N H (2011) The devil in the detail: The story of a sustainable trail blazer. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Kordestani Ghalenoei, N; Babaeian Jelodar, M; Paes, D and Sutrisna, M (2024) Challenges of offsite construction and BIM implementation: Providing a framework for integration in New Zealand. Smart and Sustainable Built Environment, 13(4), pp. 780-808. ISSN 2046-6099
Kriklenko, E (2020) Complex bending-active structures from continuous flexible planar sheets or a hybrid structure introducing the use of spacer fabrics. Architectural Engineering and Design Management, 17(3-4), pp. 1-22. ISSN 1745-2007
Kwok, T W and Chang, S (2025) Comprehensive evaluation of digital technology's effects on the supply chain of prefabricated construction. Engineering, Construction and Architectural Management, 32(8), pp. 5350-5370. ISSN 0969-9988
Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988
Lachance, E; Lehoux, N and Blanchet, P (2023) A simulation model to analyze different automation scenarios in a mixed-assembly manufacturing line: Timber-frame prefabrication industry. Journal of Construction Engineering and Management, 149(10): 04023091, ISSN 0733-9364
Larsson, J; Eriksson, P E; Olofsson, T and Simonsson, P (2014) Industrialized construction in the Swedish infrastructure sector: Core elements and barriers. Construction Management and Economics, 32(1-2), pp. 83-96. ISSN 01446193
Lavikka, R; Chauhan, K; Peltokorpi, A and Seppänen, O (2021) Value creation and capture in systemic innovation implementation: Case of mechanical, electrical and plumbing prefabrication in the Finnish construction sector. Construction Innovation, 21(4), pp. 837-856. ISSN 1471-4175
Lavikka, R; Seppänen, O; Peltokorpi, A and Lehtovaara, J (2020) Fostering process innovations in construction through industry–university consortium. Construction Innovation, 20(4), pp. 569-586. ISSN 1471-4175
Levander, E and Sardén, Y (2009) Maintenance and operating costs in off-site timber framed housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Li, T.; Ling, F. Y. Y.; Li, Z.; Dou, Y. and Guo, Z. (2026) Portfolio optimization of prefabricated interior building component systems: A multistakeholder perspective. Journal of Construction Engineering and Management, 152(9): 04026154, ISSN 0733-9364
Li, D; Li, X; Feng, H; Wang, Y and Fan, S (2022) ISM-based relationship among critical factors that affect the choice of prefabricated concrete buildings in China. International Journal of Construction Management, 22(6), pp. 977-992. ISSN 1562-3599
Li, H; Luo, X and Skitmore, M (2020) Intelligent hoisting with car-like mobile robots. Journal of Construction Engineering and Management, 146(12): 04020136, ISSN 0733-9364
Liang, R; Li, R and Chong, H Y (2023) Sustainable supplier selection for prefabricated megaprojects during COVID-19: A novel large group decision-making model. Building Research & Information, 51(5), pp. 533-554. ISSN 0961-3218
Lim, H W and Ma, X (2026) Improving mental wellbeing of project supervisors: Shifting from project-focused to process-focused construction practices. Journal of Construction Engineering and Management, 152(1): 04025229, ISSN 0733-9364
Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.
Lin, T; Lyu, S; Yang, R J and Tivendale, L (2022) Offsite construction in the Australian low-rise residential buildings application levels and procurement options. Engineering, Construction and Architectural Management, 29(1), pp. 110-140. ISSN 0969-9988
Lin, Tong (2025) Offsite construction in the Australian low-rise residential buildings: Application levels and procurement options. PhD thesis, RMIT University, Australia.
Lindgren, J and Koch, C (2021) Does industrialised housing drive sustainable transition? Swedish experiences. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Lines, B C and Smithwick, J B (2019) Best practices for organizational change management within electrical contractors. International Journal of Construction Education and Research, 15(2), pp. 136-159. ISSN 1557-8771
Linner, T and Bock, T (2012) Evolution of large-scale industrialisation and service innovation in Japanese prefabrication industry. Construction Innovation, 12(2), pp. 156-178. ISSN 1471-4175
Liu, D; Lu, W and Niu, Y (2018) Extended technology-acceptance model to make smart construction systems successful. Journal of Construction Engineering and Management, 144(6): 04018035, ISSN 0733-9364
Liu, G; Huang, R; Li, K; Shrestha, A and Fu, X (2022) Greenhouse gas emissions management in prefabrication and modular construction based on earned value management. Journal of Construction Engineering and Management, 148(6): 04022034, ISSN 0733-9364
Liu, G; Nzige, J H and Li, K (2019) Trending topics and themes in offsite construction(OSC) research: The application of topic modelling. Construction Innovation, 19(3), pp. 343-366. ISSN 1471-4175
Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364
Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364
Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.
Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988
Lobo, Y and Wilkinson, S (2006) The effects of occupational licensing on skills needs in the building industry: Evidence from New Zealand. Construction Economics and Building, 6(2), pp. 55-63. ISSN 2204-9029
Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.
Lowe, J (1997) Labour productivity trends for the UK construction sector. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Lowe, J (2023) Technical and organisational change in UK construction. Journal of Construction Business and Management, 6(2), pp. 50-61. ISSN 2521-0165
Lu, W; Ghansah, F A and Xu, J (2023) A category and index hybrid (cih) approach to measuring the level of prefabrication. International Journal of Construction Management, 23(15), pp. 2658-2669. ISSN 1562-3599
Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007
Luo, Y (2008) Decision support for prefabrication strategy selection on building systems. PhD thesis, Pennsylvania State University, USA.
Ma, S; Li, Z; Li, L; Zhang, S and Zheng, R (2024) Deciphering the key characteristics of on-site industrialized construction: Inspiration from China. Journal of Construction Engineering and Management, 150(4): 05024003, ISSN 0733-9364
Ma, S; Li, Z and Shen, Y (2025) Decision-making framework for selecting sustainable prefabricated residential building technology schemes under minimum assembly rate constraints. Journal of Construction Engineering and Management, 151(8): 04025100, ISSN 0733-9364
Mahapatra, K and Gustavsson, L (2008) Multi-storey timber buildings: Breaking industry path dependency. Building Research & Information, 36(6), pp. 638-648. ISSN 0961-3218
Mandala, R S K and Nayaka, R R (2025) A state of art review on time, cost and sustainable benefits of modern construction techniques for affordable housing. Construction Innovation, 25(2), pp. 363-380. ISSN 1471-4175
Masood, R; Roy, K; González, V A; Lim, J B P and Nasir, A R (2024) A supply chain perspective of prefabricated housebuilding diffusion in New Zealand. Engineering, Construction and Architectural Management, 31(7), pp. 2697-2720. ISSN 0969-9988
Maxwell, Duncan William (2018) The case for design-value in industrialised house building platforms: Product to ecosystem. PhD thesis, University of Sydney, Australia.
McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2002) Implications for the effect of standardization and pre-assembly on health, safety and accident causality: Preliminary results. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication. PhD thesis, Luleå University of Technology, Sweden.
Meiling, J and Johnsson, H (2008) Feedback in industrialised housing: Why does it not happen? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.
Montali, J; Overend, M; Pelken, P M and Sauchelli, M (2018) Knowledge-based engineering in the design for manufacture of prefabricated façades: Current gaps and future trends. Architectural Engineering and Design Management, 14(1-2), pp. 78-94. ISSN 1745-2007
Mosaner, Fabio Ferreira Lins (2021) Design and process in architectural production: João filgueiras lima (lelé) and the centro de tecnologia da rede sarah (ctrs). PhD thesis, Universidade de São Paulo, Brazil.
Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029
Mostafa, S; Kim, K P; Tam, V W Y and Rahnamayiezekavat, P (2020) Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice. International Journal of Construction Management, 20(2), pp. 146-156. ISSN 1562-3599
Mostafa, S; Tam, V W; Dumrak, J and Mohamed, S (2020) Leagile strategies for optimizing the delivery of prefabricated house building projects. International Journal of Construction Management, 20(8), pp. 867-881. ISSN 1562-3599
Munaro, M R and Tavares, S F (2025) Design for adaptability and disassembly: Guidelines for building deconstruction. Construction Innovation, 25(2), pp. 665-687. ISSN 1471-4175
Mwamila, B L M and Karumuna, B L (1999) Semi-prefabrication concrete techniques in developing countries. Building Research & Information, 27(3), pp. 165-182. ISSN 0961-3218
Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.
Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.
Nasirian, A; Arashpour, M; Abbasi, B and Akbarnezhad, A (2019) Optimal work assignment to multiskilled resources in prefabricated construction. Journal of Construction Engineering and Management, 145(4): 1627, ISSN 0733-9364
Niu, Y; Lu, W; Liu, D; Chen, K C; Anumba, C A and Huang, G G (2017) An sco-enabled logistics and supply chain-management system in construction. Journal of Construction Engineering and Management, 143(3): 04016103, ISSN 0733-9364
O'Connor, J T; O'Brien, W J and Choi, J O (2014) Critical success factors and enablers for optimum and maximum industrial modularization. Journal of Construction Engineering and Management, 140(6): 4014012, ISSN 0733-9364
O'Hegarty, R; McCarthy, A; O'hagan, J; Thanapornpakornsin, T; Raffoul, S and Kinnane, O (2025) Understanding the embodied carbon credentials of modern methods of construction. Buildings & Cities, 6(1), pp. 70-89. ISSN 2632-6655
Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.
Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Othman, A A E and Saad, A S M (2026) A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt. Construction Innovation, 26(2), pp. 395-420. ISSN 1471-4175
Ovrawah, Victor (2025) Automated prefabrication in the Australian residential building sector: Current state of development and adoption barriers. PhD thesis, Bond University, Australia.
Pan, M; Yang, Y; Zheng, Z and Pan, W (2022) Artificial intelligence and robotics for prefabricated and modular construction: A systematic literature review. Journal of Construction Engineering and Management, 148(9): 03122004, ISSN 0733-9364
Pan, W; Dainty, A R J and Gibb, A G F (2012) Establishing and weighting decision criteria for building system selection in housing construction. Journal of Construction Engineering and Management, 138(11), pp. 1239-1250. ISSN 0733-9364
Pan, W; Gibb, A G F and Dainty, A R J (2012) Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management, 138(11), pp. 1331-1340. ISSN 0733-9364
Pan, W and Pan, M (2023) Rethinking lean synergistically in practice for construction industry improvements. Engineering, Construction and Architectural Management, 30(7), pp. 2669-2690. ISSN 0969-9988
Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.
Pheng, L S and Chuan, C J (2001) Just-in-time management of precast concrete components. Journal of Construction Engineering and Management, 127(6), pp. 494-501. ISSN 0733-9364
Piroozfar, P A E and Farr, E R P (2015) Visual perception and the choice of systemised building façades. Architectural Engineering and Design Management, 11(1), pp. 65-81. ISSN 1745-2007
Popovic, D (2020) The development and use of product platforms in single-family industrialized house building. PhD thesis, Jönköping University, Sweden.
Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.
Pradhananga, P; Elzomor, M and Santi Kasabdji, G (2021) Identifying the challenges to adopting robotics in the US construction industry. Journal of Construction Engineering and Management, 147(5): 0733, ISSN 0733-9364
Qasem, A and Almohassen, A S (2025) A virtual reality-based constructability index for construction projects. Construction Innovation, 25(2), pp. 442-460. ISSN 1471-4175
Qi, Liang (2022) Towards understanding the diffusion and adoption of innovation in the Australian construction industry. PhD thesis, RMIT University, Australia.
Ramaji, I J and Memari, A M (2016) Product architecture model for multistory modular buildings. Journal of Construction Engineering and Management, 142(10): 04016047, ISSN 0733-9364
Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099
Rausch, C; Sanchez, B and Haas, C (2021) Topology optimization of architectural panels to minimize waste during fabrication: Algorithms for panel unfolding and nesting. Journal of Construction Engineering and Management, 147(7): 2089, ISSN 0733-9364
Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.
Ren, S; Qiang, G; Tang, S; Zhang, C; Hyung-Joon, S and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(2), pp. 287-302. ISSN 1745-2007
Robinson, A; Gibb, A G and Austin, S A (2012) Standardisation of specification driven buildings with serial and repeat order designs. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.
Sadeghi, J; Ahmadi, A and Phipps, R (2026) Internet of things in construction: Trends and adoption insights from a scientometric perspective. International Journal of Construction Management, 26(1), pp. 113-130. ISSN 1562-3599
Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364
Said, H (2015) Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering and Management, 141(12): 04015045, ISSN 0733-9364
Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364
Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364
Sandagomika, H; Bazli, M and Arashpour, M (2026) Quantifying embodied carbon reductions through mixed reality integration in prefabrication: A Monte Carlo-enhanced life cycle approach. Journal of Construction Engineering and Management, 152(5): 04026051, ISSN 0733-9364
Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364
Sarden, Y and Stehn, L (2006) Industrialisation as a tool for reducing uncertainty in construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Schoenwitz M, G J and Naim M, P A (2013) How to build what buyers want: Unveiling customer preferences for prefabricated homes. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Shafei, H; Rahman, R A and Lee, Y S (2024) Effectiveness evaluation of Construction 4.0 technologies in improving built environment resilience. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 530-550. ISSN 1759-5916
Shahzad, W M; Reddy, S M; Kahandawa, R and Rotimi, J O B (2024) Benefits, constraints and enablers of modular offsite construction (MOSC) in New Zealand high-rise buildings. Engineering, Construction and Architectural Management, 31(10), pp. 4042-4061. ISSN 0969-9988
Shang, G; Pheng, L S and Gina, O L T (2021) Understanding the low adoption of prefabrication prefinished volumetric construction (ppvc) among SMEs in Singapore: From a change management perspective. International Journal of Building Pathology and Adaptation, 39(5), pp. 685-701. ISSN 23984708
Sharif, M M; Chuo, S and Haas, C T (2022) Rapid 3D quality control in prefabrication using a 3D digital-templates framework. Journal of Construction Engineering and Management, 148(11): 04022117, ISSN 0733-9364
Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Singh, A (2002) Lean engineering for mass housing: Design, manufacture and site erection. Journal of Construction Research, 3(1), pp. 97-122. ISSN 1609-9451
Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364
Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175
Steinhardt, D; Manley, K; Bildsten, L and Widen, K (2020) The structure of emergent prefabricated housing industries: A comparative case study of Australia and Sweden. Construction Management and Economics, 38(6), pp. 483-501. ISSN 01446193
Steinhardt, D A and Manley, K (2016) Exploring the beliefs of Australian prefabricated house builders. Construction Economics and Building, 16(2), pp. 27-41. ISSN 2204-9029
Sun, W (2023) A self-localized smart hardhat system for construction 4.0. PhD thesis, Columbia University, USA.
Sundling, R; Olander, S; Wallentén, P; Burke, S; Bernardo, R and Blomsterberg, Å (2019) Lifecycle profit analysis of prefabricated multi-active façades. International Journal of Building Pathology and Adaptation, 37(5), pp. 565-578. ISSN 23984708
Suárez, J L; Gosselin, L and Lehoux, N (2023) Analysing value creation in social housing construction in remote communities: application to nunavik (Canada). Built Environment Project and Asset Management, 13(4), pp. 493-508. ISSN 2044-124X
Suárez, J L; Gosselin, L and Lehoux, N (2023) Optimizing modularity of prefabricated residential plumbing systems for construction in remote communities. Journal of Construction Engineering and Management, 149(1): 05022017, ISSN 0733-9364
Tam, V W Y and Hao, J J L (2014) Prefabrication as a mean of minimizing construction waste on site. International Journal of Construction Management, 14(2), pp. 113-121. ISSN 1562-3599
Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531
Tavares, V M M (2022) Life cycle assessment of prefabricated buildings towards a building stock approach. PhD thesis, Universidade de Coimbra, Portugal.
Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(8), pp. 885-896. ISSN 1466433X
Taylor, M D (2022) A definition and valuation of the UK offsite construction sector: Ten years on. International Journal of Construction Management, 22(15), pp. 2877-2885. ISSN 1562-3599
Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Uggla, G (2021) Model and reality: Connecting BIM and the built environment. PhD thesis, KTH Royal Institute of Technology, Sweden.
Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193
Verburg, Willem Hendrik (2021) The development of a design-for-assembly method for construction and infrastructure projects. PhD thesis, University of Twente, Netherlands.
Vernikos V K, N R and Goodier Ci, R P C (2013) Implementing an offsite construction strategy: A UK contracting organisation case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Vestin, A; Säfsten, K and Löfving, M (2021) Smart factories for single-family wooden houses – a practitioner’s perspective. Construction Innovation, 21(1), pp. 64-84. ISSN 1471-4175
Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364
Wang, M; Altaf, M S; Al-Hussein, M and Ma, Y (2020) Framework for an IoT-based shop floor material management system for panelized homebuilding. International Journal of Construction Management, 20(2), pp. 130-145. ISSN 1562-3599
Wang, M; Wang, C C; Zlatanova, S; Shen, X and Brilakis, I (2024) A streamlined laser scanning verticality check method for installation of prefabricated wall panels. Journal of Construction Engineering and Management, 150(11): 04024159, ISSN 0733-9364
Wang, Mudan (2023) Digital technology adoption for improving efficiency of prefabrication construction in China: An application of laser scanning. PhD thesis, University of New South Wales, Australia.
Wasim, M; Vaz Serra, P and Ngo, T D (2022) Design for manufacturing and assembly for sustainable, quick and cost-effective prefabricated construction–a review. International Journal of Construction Management, 22(15), pp. 3014-3022. ISSN 1562-3599
Wong, P S P; Whelan, B and Holdsworth, S (2021) Are contractors ready for greater use of prefabrication in projects? An empirical analysis on the role of unlearning and counter-knowledge. International Journal of Construction Management, 21(4), pp. 353-368. ISSN 1562-3599
Wong, P S P; Zwar, C and Gharaie, E (2017) Examining the drivers and states of organizational change for greater use of prefabrication in construction projects. Journal of Construction Engineering and Management, 143(7): 04017020, ISSN 0733-9364
Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.
Wu, H; Qian, Q K; Straub, A and Visscher, H (2021) Stakeholder perceptions of transaction costs in prefabricated housing projects in China. Journal of Construction Engineering and Management, 147(1): 04020145, ISSN 0733-9364
Wu, Hongjuan (2021) Challenges of prefabricated housing in China: Supply chain, stakeholders, and transaction costs. PhD thesis, Delft University of Technology, Netherlands.
Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.
Wu, P; Feng, Y and Zhong, Y (2012) Identification and reduction of non-value adding activities in the precast concrete construction projects in Singapore. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Xiang, Y; Opoku, A and Florez-Perez, L (2021) Carbon emissions optimisation in prefabrication construction: A review of current design integrated approaches. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Xiao, L; Mokhtar, N A and Sulaiman, M K A M (2025) Enhancing profitability and cost efficiency in China's construction industry. Construction Economics and Building, 25(3-4), pp. 1-21. ISSN 2204-9029
Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029
Yao, Y and Gurmu, A (2025) Consumer education strategies for overcoming prefabricated housing challenges in China: A systematic review. Built Environment Project and Asset Management, 15(3), pp. 717-732. ISSN 2044-124X
Yevu, S K; Owusu, E K; Chan, A P C; Oti-Sarpong, K; Wuni, I Y and Tetteh, M O (2023) Systematic review on the integration of building information modelling and prefabrication construction for low-carbon building delivery. Building Research & Information, 51(3), pp. 279-300. ISSN 0961-3218
Yi, W; Wang, H; Zhen, L and Liu, Y (2023) Automated generation of horizontal precast slab stacking plans. Journal of Construction Engineering and Management, 149(12): 04023121, ISSN 0733-9364
Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193
Yu, J; Chan, A; Wang, B; Liu, Y and Wang, J (2023) A mixed-methods study of the critical success factors in the development of assembled buildings in steel structure projects in China. International Journal of Construction Management, 23(13), pp. 2288-2297. ISSN 1562-3599
Yunus, R and Yang, J (2012) Critical sustainability factors in industrialised building systems. Construction Innovation, 12(4), pp. 447-463. ISSN 1471-4175
Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.
Zhang, S; Zhong, B; Wu, H; Tang, B and Sepasgozar, S M E (2026) Impact of industry 4.0 digital technologies on optimal construction strategies: Owner preference perspective on construction service perception and unreliability costs. Journal of Construction Engineering and Management, 152(1): 04025222, ISSN 0733-9364
Zhang, Xuan (2025) Coordination and optimization of prefabricated building supply chain for sustainability development. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Zhang, Xueyan (2024) Integrate blockchain to optimize the prefabrication supply chain management. PhD thesis, Griffith University, Australia.
Zhang, Y; Liu, Y; Yu, R; Zuo, J and Dong, N (2025) Managing the high capital cost of prefabricated construction through stakeholder collaboration: A two-mode network analysis. Engineering, Construction and Architectural Management, 32(1), pp. 556-577. ISSN 0969-9988
Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364
Zhou, J; Tam, V W Y; Qin, Y and Illankoon, C (2024) A critical review and comparative analysis of cost management on prefabricated construction research (2000–2022). International Journal of Construction Management, 24(9), pp. 997-1006. ISSN 1562-3599
Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.
Zolghadr, Ali (2023) Innovative offsite construction uptake in the housebuilding sector: A systemic approach to economic justifiability for volume builders. PhD thesis, RMIT University, Australia.
Ågren, R and Wing, R D (2014) Five moments in the history of industrialized building. Construction Management and Economics, 32(1-2), pp. 7-15. ISSN 01446193
Up a level