Items with Index Term: pre-qualification
Acheamfour, V K; Adjei-Kumi, T and Kissi, E (2023) Contractor selection: A review of qualification and pre-qualification systems. International Journal of Construction Management, 23(2), pp. 338-348. ISSN 1562-3599
Acheamfour, V K; Kissi, E and Adjei-Kumi, T (2019) Ascertaining the impact of contractors pre-qualification criteria on project success criteria. Engineering, Construction and Architectural Management, 26(4), pp. 618-632. ISSN 0969-9988
Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599
Bakheet, M T (1995) Contractors' risk assessment system. PhD thesis, Georgia Institute of Technology, USA.
Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.
Doloi, H (2009) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), pp. 1245-1263. ISSN 1466433X
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
Fung, I W H and Tam, V W Y (2013) Development of an empirical model for selecting accident prevention measures for construction managers. International Journal of Construction Management, 13(1), pp. 39-51. ISSN 1562-3599
Holt, G D; Olomolaiye, P O and Harris, F C (1994) Evaluating performance potential in the selection of construction contractors. Engineering, Construction and Architectural Management, 1(1), pp. 29-50. ISSN 0969-9988
Jafari, A (2013) A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(7), pp. 746-760. ISSN 1466433X
Kapote, M M and Pimplikar, S S (2025) Identification of challenges and shortcomings in the selection of bidders on road projects in India: a study. International Journal of Construction Management, 25(7), pp. 760-769. ISSN 1562-3599
Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988
Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988
Lam, K C; Hu, T S and Ng, S T (2005) Using the principal component analysis method as a tool in contractor pre-qualification. Construction Management and Economics, 23(7), pp. 673-684. ISSN 01446193
Lam, K C; Thomas Ng, S; Hu, T; Skitmore, M and Cheung, S O (2000) Decision support system for contractor pre-qualification: Artificial neural network model. Engineering, Construction and Architectural Management, 7(3), pp. 251-266. ISSN 0969-9988
Lingard, H; Hughes, W P and Chinyio, E (1998) The impact of contractor selection method on transaction costs: a review. Journal of Construction Procurement, 4(2), pp. 89-102. ISSN 1358-9180
Mahamadu, A M; Manu, P; Mahdjoubi, L; Booth, C; Aigbavboa, C and Abanda, F H (2020) The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 24-48. ISSN 0969-9988
Mahamadu, A-M (2017) Development of a decision support framework to aid selection of construction supply chain organisations for BIM-enabled projects. PhD thesis, University of the West of England, Bristol, UK.
Mahamadu, A-M; Mahdjoubi, L and Booth, C A (2017) Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(5), pp. 326-343. ISSN 1745-2007
Marwan, A E (2019) Integrating building information modeling to project management consultants' role and practice in UAE. PhD thesis, Heriot-Watt University, UK.
Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), pp. 471-484. ISSN 1466433X
Mills, Anthony John (2002) Client and contractor attitudes to prequalification and selection processes for construction work. PhD thesis, University of Melbourne, Australia.
Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.
Ng, S T; Kumaraswamy, M and Chow, L K (2001) Selecting consultants through combined technical and fee assessment: A Hong Kong study. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Palaneeswaran, E and Kumaraswamy, M M (1999) Dynamic contractor pre-qualification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Ramachandra, T and Rotimi, J O B (2015) Causes of payment problems in the New Zealand construction industry. Construction Economics and Building, 15(1), pp. 43-55. ISSN 2204-9029
Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Smallwood, J (2005) The role of optimum health and safety (H&S) in construction marketing. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Smallwood, J (2007) The influence of architectural designers on construction ergonomics. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Tengberg, C S (2022) A design-build contractor risk assessment framework for new technical solutions in the construction industry. PhD thesis, Chalmers University of Technology, Sweden.
Thomas Ng, S; Skitmore, R M and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(2), pp. 155-165. ISSN 0969-9988
Upstill-Goddard, J D (2016) Towards a framework to enable construction small and medium-sized enterprises (SMEs) to manage sustainability. EngD thesis, Loughborough University, UK.
Wang, M (2014) Sensitivity analysis and evolutionary optimization for building design. PhD thesis, Loughborough University, UK.
Wong, C H; Holt, G D and Harris, P T (1999) UK construction clients' opinions of the contractor selection process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Yu, H; Heesom, D; Oloke, D; Buckley, K and Proverbs, D (2007) A knowledge-based decision-support system for health and safety competence assessment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Up a level