Items with Index Term: power plant
Abraham, D M and Joanne Yeh, M H (1999) Breakwater construction: An effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(2), pp. 145-154. ISSN 0969-9988
Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.
Alsulaiman, Y; Bowles, G and Ogunlana, S (2014) Evaluating risk management in independent water and power plant projects in Saudi Arabia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Alsulaiman, Y S (2015) Risk management in Independent Water and Power Plant (IWPP) projects in Saudi Arabia: a grounded theory study to improve effectiveness. PhD thesis, Heriot-Watt University, UK.
Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218
Attarzadeh, M; Chua, D K H; Beer, M and Abbott, E L S (2017) Options-based negotiation management of PPP-BOT infrastructure projects. Construction Management and Economics, 35(11-12), pp. 676-692. ISSN 0144-6193
Ayadi, A; Nasraoui, H; Driss, Z; Bouabidi, A and Abid, M S (2018) Unsteady state of a solar chimney power plant accoupled with a turbine: Case study. Journal of Engineering, Design and Technology, 16(2), pp. 244-255. ISSN 1726-0531
Bakatjan, S; Arikan, M and Tiong, R L K (2003) Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Engineering and Management, 129(1), pp. 89-97. ISSN 0733-9364
Choi, B (2003) Topics in risk-based design and performance evaluation of structures. PhD thesis, North Carolina State University, USA.
Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364
Du, J; Zhao, D and Zhang, O (2019) Impacts of human communication network topology on group optimism bias in capital project planning: A human-subject experiment. Construction Management and Economics, 37(1), pp. 44-60. ISSN 01446193
Dzeng, R J and Tommelein, I D (1997) Boiler erection scheduling using product models and case-based reasoning. Journal of Construction Engineering and Management, 123(3), pp. 338-347. ISSN 0733-9364
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
Fu, Y (2021) Institutional complexity and organizational responses: a case study of Chinese construction firms. PhD thesis, University of Hong Kong, Hong Kong.
Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.
Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X
Hanna, K E; Morcous, G and Tadros, M K (2009) Effectiveness of class c fly ash on mitigating alkali-silica reaction in concrete pavement. International Journal of Construction Education and Research, 5(3), pp. 167-181. ISSN 1557-8771
Hassanein, A A G and Afify, H M F (2006) Contractors' risk identification behaviour: A case study. Journal of Construction Procurement, 12(1),
Islam, M S; Mohandes, S R; Mahdiyar, A; Fallahpour, A and Olanipekun, A O (2022) A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management, 148(8): 04022073, ISSN 0733-9364
Islam, M S; Nepal, M and Skitmore, M (2025) Structuring risks for a comprehensive understanding of cost overruns in power plant projects. Construction Innovation, 25(3), pp. 1014-1032. ISSN 1471-4175
Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364
Islam, Muhammad Saiful (2019) Modelling cost overrun risks in power plant projects. PhD thesis, Queensland University of Technology, Australia.
Joubert, G D and Raji, A K (2025) Development and validation of a real-time testbed for renewable energy integration studies: South African grid code case study. Journal of Engineering, Design and Technology, 23(1), pp. 1-20. ISSN 1726-0531
Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.
Khamseh, A and Marei, P (2020) Designing a model developed to assess the capabilities of technological innovation in Iranian construction of power plant equipment industries. Journal of Engineering, Design and Technology, 18(5), pp. 1241-1249. ISSN 1726-0531
Kristinsdottir, A (2012) Risks and decision making in development of new power plant projects. PhD thesis, Massachusetts Institute of Technology, USA.
Lee, S-H (2012) Management of building energy consumption and energy supply network on campus scale. PhD thesis, Georgia Institute of Technology, USA.
Li, J and Zou, P X W (2011) Fuzzy AHP-based risk assessment methodology for PPP projects. Journal of Construction Engineering and Management, 137(12), pp. 1205-1209. ISSN 0733-9364
Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.
Murtaza, M B; Fisher, D J and Skibniewski, M J (1993) Knowledge-based approach to modular construction decision support. Journal of Construction Engineering and Management, 119(1), pp. 115-130. ISSN 0733-9364
Naghashian, M H (2015) Generalised cost benefit analysis for large infrastructure projects: the case of the Channel Tunnel rail link. PhD thesis, University of Birmingham, UK.
Ospina-Alvarado, A M and Castro-Lacouture, D (2010) Holistic analysis of fuel cells for residential construction in the rural USA. Construction Innovation, 10(1), pp. 60-74. ISSN 1471-4175
Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.
O’connor, J T and Caraway, P H (1993) Need for specification format that accommodates engineered projects. Journal of Construction Engineering and Management, 119(4), pp. 757-768. ISSN 0733-9364
Pathirage, C and Al-Khaili, K (2016) Disaster vulnerability of emirati energy sector and barriers to enhance resilience. Built Environment Project and Asset Management, 6(4), pp. 403-414. ISSN 2044-124X
Prasittisopin, L. (2026) Power plant waste (fly ash, bottom ash, biomass ash) management for promoting circular economy in sustainable construction: Emerging economy context. Smart and Sustainable Built Environment, 15(3), pp. 1341-1365. ISSN 2046-6099
Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.
Seethapathy, S and Henderson, J H (2017) Management of construction waste in nuclear and thermal power plant projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 19-46. ISSN 1823-6499
Seo, J; Haas, C T; Saidi, K and Sreenivasan, S V (2000) Graphical control interface for construction and maintenance equipment. Journal of Construction Engineering and Management, 126(3), pp. 210-218. ISSN 0733-9364
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Sherman, R; Parrish, K and Lamanna, A (2021) Identifying and categorizing risks incumbent in us nuclear power plant construction. Journal of Construction Engineering and Management, 147(4): 02018, ISSN 0733-9364
Singh, T; Kalra, M and Misra, A K (2020) Simplified probabilistic seismic assessment of dampers in tall and braced structures in buildings. Journal of Engineering, Design and Technology, 18(5), pp. 1037-1052. ISSN 1726-0531
Stemp, B A and Walewski, J (2011) Lampson transi-lift mobile crane: Concept, design, and use. Journal of Construction Engineering and Management, 137, pp. 785-792. ISSN 0733-9364
Sun, J; Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), pp. 284-303. ISSN 2044-124X
Tatum, C B and Cottrell, T E (1983) Resident engineering in power plant construction. Journal of Construction Engineering and Management, 109(2), pp. 224-232. ISSN 0733-9364
Tiong, R L K (1995) Competitive advantage of equity in BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 282-289. ISSN 0733-9364
Toosi, H; Ghaaderi, M A and Shokrani, Z (2022) Comparative study of academic research on project management in Iran and the world with text mining approach and tf–idf method. Engineering, Construction and Architectural Management, 29(3), pp. 1553-1583. ISSN 0969-9988
Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (1999) Political risks: Analysis of key contract clauses in China's BOT project. Journal of Construction Engineering and Management, 125(3), pp. 190-197. ISSN 0733-9364
Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Evaluation and management of foreign exchange and revenue risks in China's BOT projects. Construction Management and Economics, 18(2), pp. 197-207. ISSN 01446193
Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Foreign exchange and revenue risks: Analysis of key contract clauses in China's BOT project. Construction Management and Economics, 18(3), pp. 311-320. ISSN 01446193
Wang, S Q; Tiong, R L K; Ting, S K; Chew, D and Ashley, D (1998) Evaluation and competitive tendering of BOT power plant project in China. Journal of Construction Engineering and Management, 124(4), pp. 333-341. ISSN 0733-9364
Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.
Up a level