Items with Index Term: planning process

Number of items: 161.

Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.

Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.

Abubaker, A E (2010) Improvement of project planning in Libya. PhD thesis, University of Newcastle upon Tyne, UK.

Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.

Ahmed, S M; Sang, L P and Torbica, Ž M (2003) Use of quality function deployment in civil engineering capital project planning. Journal of Construction Engineering and Management, 129(4), pp. 358-368. ISSN 0733-9364

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction. PhD thesis, University of Alberta, Canada.

Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531

Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.

Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531

Alqarni, M (2017) Developing a framework to improve the implementation of geospatial technology in the planning and delivery of infrastructure for residential areas in Saudi Arabia: a case study of Riyadh city. PhD thesis, Northumbria University, UK.

Altawil, Shadi N A (2017) Multi-level knowledge extraction and modeling to support job hazard analysis process for oil and gas pipeline projects. PhD thesis, University of Alberta, Canada.

Amany, A; Taghizade, K and Noorzai, E (2020) Investigating conflicts of expert contractors using the last planner system in building information modeling process. Journal of Engineering, Design and Technology, 18(6), pp. 1381-1402. ISSN 1726-0531

Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.

Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175

Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 0969-9988

Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.

Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.

Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099

Balloffet, A F (1992) Applications of decision support systems in water resources planning: The goal-setting stage. PhD thesis, Colorado State University, USA.

Barnes, C J (1999) A methodology for the concurrent design of products and their assembly sequence. PhD thesis, Cranfield University, UK.

Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades. PhD thesis, University of California, Berkeley, USA.

Bausman, D C (2002) An empirical investigation of the relationship between strategic planning and performance of large construction firms. PhD thesis, Heriot-Watt University, UK.

Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.

Chang, Y; Wilkinson, S; Seville, E and Potangaroa, R (2010) Resourcing for a resilient post-disaster reconstruction environment. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 65-83. ISSN 1759-5916

Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175

Choe, Sooyoung (2015) 4-dimensional process-aware site-specific construction safety planning. PhD thesis, University of Texas at Austin, USA.

Choi, K C (1992) An object-oriented historical cost information base to support concurrent engineering. PhD thesis, University of California, Berkeley, USA.

Chua, D K H and Goh, Y M (2004) Incident causation model for improving feedback of safety knowledge. Journal of Construction Engineering and Management, 130(4), pp. 542-551. ISSN 0733-9364

Cohenca-Zall, D; Laufer, A; Shapira, A and Howell, G A (1994) Process of planning during construction. Journal of Construction Engineering and Management, 120(3), pp. 561-578. ISSN 0733-9364

Comelli, T; Pelling, M; Hope, M; Ensor, J; Filippi, M E; Menteşe, E Y and McCloskey, J (2024) Normative future visioning: A critical pedagogy for transformative adaptation. Buildings & Cities, 5(1), pp. 83-100. ISSN 2632-6655

Cutrim, Sérgio Sampaio (2017) Port planning and governance in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

Dawood, I (2010) Decision support system (DSS) model to facilitate strategic planning of the housing industry in the developing world. PhD thesis, University of Salford, UK.

De Filippi, Giancarlo Azevedo (2017) Method for production planning and management of time in real estate projects. PhD thesis, Universidade de São Paulo, Brazil.

Delgado-Arvelo, Y (2012) An investigation into the data collection process for the development of cost models. PhD thesis, De Montfort University, UK.

Easa, S M and Hossain, K M A (2008) New mathematical optimization model for construction site layout. Journal of Construction Engineering and Management, 134(8), pp. 653-662. ISSN 0733-9364

Egger, C S (2015) Sewer rehabilitation planning under uncertainty. PhD thesis, ETH Zürich, Switzerland.

Elliott, B R (2000) Investigation of the construction scheduling communication process: Problems, foreman's role, means of improvement and use of information technology. PhD thesis, University of Florida, USA.

Emuze, F; Norgbey, W S and Smallwood, J (2015) Provincial roads capex programme in South Africa: Planning and management inadequacies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364

Filippi, Giancarlo Azevedo de (2017) Method for production planning and deadline management of real estate ventures. PhD thesis, Universidade de São Paulo, Brazil.

Flores, M and Mourgues, C (2024) Impact of using a formalized methodology for conflict detection based on 4D-BIM. Journal of Construction Engineering and Management, 150(7): 04024059, ISSN 0733-9364

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

George, R (2007) Information flow to support front end planning. PhD thesis, Clemson University, USA.

Ghosh, S; Dickerson, D E and Mills, T (2019) Effect of the Last Planner system® on social interactions among project participants. International Journal of Construction Education and Research, 15(2), pp. 100-117. ISSN 1557-8771

Gibson, G E; Kaczmarowski, J H and Lore, H E (1995) Preproject-planning process for capital facilities. Journal of Construction Engineering and Management, 121(3), pp. 312-318. ISSN 0733-9364

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Haidar, A (2011) Analysis and optimization of megaproject performance. PhD thesis, University of Florida, USA.

Hamour, O A A R (1978) Project selection and planning in developing countries. PhD thesis, Swansea University, UK.

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Hamzeh, F R; Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(2), pp. 61-71. ISSN 01446193

Hanna, A S and Skiffington, M A (2010) Effect of preconstruction planning effort on sheet metal project performance. Journal of Construction Engineering and Management, 136(2), pp. 235-241. ISSN 0733-9364

Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.

Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.

Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364

Horney, J; Simon, M C; Ricchetti-Masterson, K and Berke, P (2016) Resident perception of disaster recovery planning priorities. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 330-343. ISSN 1759-5916

Hu, F; Liao, R and Chen, J (2023) Calculation methods to optimize the number of pedestals and evaluate production plans for precast yards fabricating prestressed bridge beams and precast segments for poststressed segmental erection. Journal of Construction Engineering and Management, 149(1): 04022146, ISSN 0733-9364

Hurtado, K (2018) An andragogically-centered schema for a heuristic approach to post-collegiate development in the built environment. PhD thesis, Arizona State University, USA.

Iskandarani, H; Proverbs, D G and Xiao, H (2023) Towards improving the design and planning of post-conflict housing reconstruction projects: A conceptual framework. Built Environment Project and Asset Management, 13(2), pp. 253-269. ISSN 2044-124X

Ismail, Z A (2023) Improving failure risk by better planning and safety for precast beam-to-column connection elements using physical internet-enabled building information modeling technology: A Malaysian case study. International Journal of Building Pathology and Adaptation, 41(3), pp. 517-532. ISSN 23984708

Jepson, A S (2009) Investigating cultural relationships within the festival planning and construction process in a local community festival context. PhD thesis, University of Derby, UK.

Johansen, A; Collins, D; Temeljotov-Salaj, A and Hagehaugen, G (2022) By the fjord: Successful public and private collaboration in a neighbourhood redevelopment project in Norway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 156-165. ISSN 17514304

Jones, K; Desai, A; Brosnan, N; Cooper, J and Ali, F (2017) Built asset management climate change adaptation model. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 263-274. ISSN 1759-5916

Joutsiniemi, A; Vaattovaara, M and Airaksinen, J (2021) Empowered by planning law: Unintended outcomes in the Helsinki region. Buildings & Cities, 2(1), pp. 837-855. ISSN 2632-6655

Jung, Y (1997) Information systems planning methodology for the construction industry. PhD thesis, University of Texas at Austin, USA.

Khamaksorn, A; Nimmolrat, A; Mahat, N and Thinnukool, O (2023) An IDEF0 functional planning model for the development of an asset management framework: A case study of chiang mai university. Journal of Construction in Developing Countries, 28(1), pp. 133-150. ISSN 1823-6499

Kim, J (2007) Temporary structure planning ontology. PhD thesis, Stanford University, USA.

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Lather, J I (2019) A hybrid modeling approach using discrete event simulation and layout optimization for healthcare layout planning problems. PhD thesis, Pennsylvania State University, USA.

Laufer, A (1992) A micro view of the project planning process. Construction Management and Economics, 10(1), pp. 31-43. ISSN 01446193

Laufer, A; Shapira, A; Cohenca-Zall, D and Howell, G A (1993) Prebid and preconstruction planning process. Journal of Construction Engineering and Management, 119(3), pp. 426-444. ISSN 0733-9364

Lee, Y (2020) A methodology to align the logistical requirements of prefabricated wall panels. PhD thesis, Stanford University, USA.

Legeby, A and Pech, C (2023) Social values and social infrastructures: A multi-perspective approach to place. Buildings & Cities, 4(1), pp. 801-816. ISSN 2632-6655

Lei, Zhen (2015) Automated simulation model for crane motion planning in heavy industrial projects. PhD thesis, University of Alberta, Canada.

Leistner, S; Honold, C; Maierhofer, M; Haase, W; Blandini, L; Sobek, W; Roth, D; Binz, H and Menges, A (2022) Research on integral design and planning processes for adaptive buildings. Architectural Engineering and Design Management, 18(3), pp. 241-260. ISSN 1745-2007

Levitt, R E; Kartam, N A and Kunz, J C (1988) Artificial intelligence techniques for generating construction project plans. Journal of Construction Engineering and Management, 114(3), pp. 329-343. ISSN 0733-9364

Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364

Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.

Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X

Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364

Lin, K L and Haas, C T (1996) Multiple heavy lifts optimization. Journal of Construction Engineering and Management, 122(4), pp. 354-362. ISSN 0733-9364

Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.

Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771

Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.

Livingstone, N; Fiorentino, S and Short, M (2021) Planning for residential 'value'? London's densification policies and impacts. Buildings & Cities, 2(1), pp. 203-219. ISSN 2632-6655

Lv, X and El-Gohary, N M (2016) Discovering context-specific integration practices for integrating NEPA into statewide and metropolitan project planning processes. Journal of Construction Engineering and Management, 142(11): 04016056, ISSN 0733-9364

Mahammedi, C.; Mahdjoubi, L.; Booth, C.; Butt, T. E. and Al-mhdawi, M. K. S. (2026) The design and validation of a decision support system (DSS) for the preliminary risk assessment of brownfield sites (prabs). Smart and Sustainable Built Environment, 15(3), pp. 1255-1276. ISSN 2046-6099

Mantle, E J (2007) An evaluation of 3d building modelling and visualisation packages for enhancing public participation within the planning process. PhD thesis, University of Glamorgan, UK.

Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Marteinsson, B (2005) Service life estimation in building design: A development of the factor method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Martinez-Avila, C and Olander, S (2024) Stakeholder participation in the implementation of urban property development projects. Construction Management and Economics, 42(10), pp. 926-941. ISSN 01446193

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Melzner, J; Zhang, S; Teizer, J and Bargstädt, H J (2013) A case study on automated safety compliance checking to assist fall protection design and planning in building information models. Construction Management and Economics, 31(6), pp. 661-674. ISSN 1466433X

Menches, C L (2006) Effect of pre-construction planning on electrical project performance. PhD thesis, University of Wisconsin - Madison, USA.

Menches, C L and Hanna, A S (2006) Conceptual planning process for electrical construction. Journal of Construction Engineering and Management, 132(12), pp. 1306-1313. ISSN 0733-9364

Menches, C L; Hanna, A S; Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), pp. 855-869. ISSN 01446193

Meyer, M A; Hendricks, M; Newman, G D; Masterson, J H; Cooper, J T; Sansom, G; Gharaibeh, N; Horney, J; Berke, P; van Zandt, S and Cousins, T (2018) Participatory action research: Tools for disaster resilience education. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 402-419. ISSN 1759-5916

Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.

Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.

Morad, A A and Beliveau, Y J (1991) Knowledge-based planning system. Journal of Construction Engineering and Management, 117(1), pp. 1-12. ISSN 0733-9364

Moura, A C M; Morais, C F and Gonçalves Mello, T A (2024) Geodesign and sustainable development goals in the environmental parameterization of the iron quadrangle region, Brazil: An academic experience. International Journal of Building Pathology and Adaptation, 42(2), pp. 294-317. ISSN 23984708

Mustapha, Z (2017) An integrated health and safety compliance model for the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.

Nielsen, S B; Hoffmann, B; Quitzau, M B and Elle, M (2009) Mobilizing the courage to implement sustainable design solutions: Danish experiences. Architectural Engineering and Design Management, 5(1-2), pp. 53-61. ISSN 1745-2007

Nnaji, C; Lee, H W; Karakhan, A and Gambatese, J (2018) Developing a decision-making framework to select safety technologies for highway construction. Journal of Construction Engineering and Management, 144(4): 04018016, ISSN 0733-9364

Novak, V M; Fernandez-Anez, N and Shiraishi, K (2017) Rethinking resilience planning: From problems to potential. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 412-424. ISSN 1759-5916

Okonta, U; Hosseinian-Far, A and Sarwar, D (2025) A systemic approach to sustainable railway infrastructure planning: The case study of milton keynes. Smart and Sustainable Built Environment, 14(2), pp. 407-428. ISSN 2046-6099

Oliver, A and Pearl, D S (2018) Rethinking sustainability frameworks in neighbourhood projects: A process-based approach. Building Research & Information, 46(5), pp. 513-527. ISSN 0961-3218

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Otto, H T (1985) The economics of the construction sector of the ussr. PhD thesis, University of Houston, USA.

Oyediran, H (2025) Robot-integrated 4D building information modeling (4D BIM): Framework for planning safe autonomous construction operations in dynamic environments. PhD thesis, University of Nebraska - Lincoln, USA.

Palliyaguru, R; Amaratunga, D and Haigh, R (2010) Integration of "disaster risk reduction" into infrastructure reconstruction sector: Policy vs practise gaps. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 277-296. ISSN 1759-5916

Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.

Pan, W; Gibb, A F and Dainty, A R J (2007) Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), pp. 183-194. ISSN 1466433X

Pan, W; Gibb, A G F and Dainty, A R J (2008) Leading UK housebuilders' utilization of offsite construction methods. Building Research & Information, 36(1), pp. 56-67. ISSN 0961-3218

Peña-Mora, F and Li, M (2001) Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management, 127(1), pp. 1-17. ISSN 0733-9364

Pheng, L S; Arain, F M and Fang, J W Y (2011) Applying just-in-time principles in the delivery and management of airport terminal buildings. Built Environment Project and Asset Management, 1(1), pp. 104-121. ISSN 2044-124X

Phua, F (2006) Examining the effects of senior executives' perceived environmental uncertainty on the strategic functions of construction firms. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Pratama, L A (2023) Immersive visualization intervention on pull planning. PhD thesis, University of Washington, USA.

Puddicombe, M S (2006) The limitations of planning: The importance of learning. Journal of Construction Engineering and Management, 132(9), pp. 949-955. ISSN 0733-9364

Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.

Raisbeck, P (2017) Tribes, warlords and transformers: An institutional logics model of the architectural profession. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Riley, D R (1994) Modeling the space behavior of construction activities. PhD thesis, Pennsylvania State University, USA.

Roggema, R and Van Den Dobbelsteen, A (2012) Swarm planning for climate change: An alternative pathway for resilience. Building Research & Information, 40(5), pp. 606-624. ISSN 0961-3218

Sadeghpour, F; Moselhi, O and Alkass, S T (2006) Computer-aided site layout planning. Journal of Construction Engineering and Management, 132(2), pp. 143-151. ISSN 0733-9364

Senaratne, S and Jayarathna, T (2012) Quality planning process of construction contractors: Case studies in Sri Lanka. Journal of Construction in Developing Countries, 17(1), pp. 103-115. ISSN 1823-6499

Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364

Sherman, R; Gibson, G E; Merrow, E and Parrish, K (2021) Examining the impact of rate-of-return regulation on capital project planning. Journal of Construction Engineering and Management, 147(8): 04021080, ISSN 0733-9364

Shibeika, A; Davies, R and Gray, C (2009) Care pathways and the built environment: Conceptual framework for understanding. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(4), pp. 1005-1025. ISSN 1471-4175

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.

Songer, A D (1992) Toward an improved understanding of public sector design-build planning. PhD thesis, University of California, Berkeley, USA.

Stanley, Hannah J (2017) Airport planning and stakeholder engagement: An international comparison. PhD thesis, Queensland University of Technology, Australia.

Stickley, A; Christensen, S; Duncan, W D and Buchbach, J (2016) Predictive technology and natural hazards: Risk for Australian planning authorities? International Journal of Law in the Built Environment, 8(1), pp. 42-55. ISSN 1756-1450

Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Subbiah, A (2012) An investigation of the factors influencing the success of construction planning for the 2012 olympic stadium: An ethnographic study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.

Sunarharum, T M; Sloan, M and Susilawati, C (2014) Re-framing planning decision-making: Increasing flood resilience in Jakarta. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 230-242. ISSN 1759-5916

Sundling, R (2019) A development process for extending buildings vertically – based on a case study of four extended buildings. Construction Innovation, 19(3), pp. 367-385. ISSN 1471-4175

Sunikka-Blank, M; Purohit, R and Samuel, F (2025) Co-curation as civic practice in community engagement. Buildings & Cities, 6(1), pp. 899-916. ISSN 2632-6655

Syal, M G; Grobler, F; Willenbrock, J H and Parfitt, M K (1992) Construction project planning process model for small-medium builders. Journal of Construction Engineering and Management, 118(4), pp. 651-666. ISSN 0733-9364

Tanguy, A; Breton, C; Blanchet, P and Amor, B (2020) Characterising the development trends driving sustainable neighborhoods. Buildings & Cities, 1(1), pp. 164-181. ISSN 2632-6655

Tanratanawong, S (2001) A neural network model to forecast construction output in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.

Tanratanawong, S and Scott, S (2000) A neural network model to forecast national construction output. Journal of Financial Management of Property and Construction, 5(1-2), pp. 65-77. ISSN 1366-4387

Tapper, H (1997) Welfare assessment of public investment in a CGE model. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Thomas, H R and Bluedorn, A C (1986) Case study of organizational changes. Journal of Construction Engineering and Management, 112(3), pp. 358-369. ISSN 0733-9364

Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364

Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.

Thunberg, M; Fredriksson, A; Danielsson, J; Hyll, H; Sandberg, E and Westin, A (2017) Planning in construction: How are the different planning processes linked? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Visscher, H; Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(4), pp. 269-279. ISSN 1471-4175

Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.

Whelton, M G (2004) The development of purpose in the project definition phase of construction projects: Implications for project management. PhD thesis, University of California, Berkeley, USA.

Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, Luleå University of Technology, Sweden.

Xu, W; Cong, J and Proverbs, D G (2023) Evaluation of infrastructure resilience. International Journal of Building Pathology and Adaptation, 41(2), pp. 378-400. ISSN 23984708

Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(5), pp. 417-426. ISSN 01446193

Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(6): 04024048, ISSN 0733-9364

Yaworsky, R A (1994) Risk planning for large and BOT projects: A holistic framework. PhD thesis, University of British Columbia, Canada.

Zwikael, O (2009) Critical planning processes in construction projects. Construction Innovation, 9(4), pp. 372-387. ISSN 1471-4175

van der Kuil, P A v d (2023) Investorenarchitektur. The planning, organisation and control of architectural quality in commercial real estate. PhD thesis, Technische Universitaet Berlin, Germany.

This list was generated on Sat Aug 22 01:43:18 2026 UTC.