Items with Index Term: planning method

Number of items: 60.

Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364

Baniassadi, F; Alvanchi, A and Mostafavi, A (2018) A simulation-based framework for concurrent safety and productivity improvement in construction projects. Engineering, Construction and Architectural Management, 25(11), pp. 1501-1515. ISSN 0969-9988

Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.

Cao, S; Duan, H; Guo, S; Wu, J; Ai, T and Jiang, H (2024) BIM-based task planning method for wheeled-legged rebar binding robot. Architectural Engineering and Design Management, 20(3), pp. 656-672. ISSN 1745-2007

Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.

El Sawalhi, N I and Yazgi, A N (2021) House of quality: A method to identify landscape design requirements. Construction Innovation, 21(3), pp. 441-455. ISSN 1471-4175

Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304

Farahani, A; Wallbaum, H and Dalenbäck, J O (2020) Cost-optimal maintenance and renovation planning in multifamily buildings with annual budget constraints. Journal of Construction Engineering and Management, 146(3): 04020009, ISSN 0733-9364

Farran, M and Zayed, T (2012) New life-cycle costing approach for infrastructure rehabilitation. Engineering, Construction and Architectural Management, 19(1), pp. 40-60. ISSN 0969-9988

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Gharaie, E; Wakefield, R and Blismas, N (2010) Explaining the increase in the Australian average house completion time: Activity-based versus workflow-based approach. Construction Economics and Building, 10(4), pp. 34-49. ISSN 2204-9029

Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.

Hamour, O A A R (1978) Project selection and planning in developing countries. PhD thesis, Swansea University, UK.

Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364

Hübner, F; Volk, R; Kühlen, A and Schultmann, F (2017) Review of project planning methods for deconstruction projects of buildings. Built Environment Project and Asset Management, 7(2), pp. 212-226. ISSN 2044-124X

Kang, S-C (2006) Computer planning and simulation of construction erection processes using single or multiple cranes. PhD thesis, Stanford University, USA.

Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.

Kim, J (2007) Temporary structure planning ontology. PhD thesis, Stanford University, USA.

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.

Kim, T; Lee, D; Cha, M; Lim, H; Lee, M; Cho, H and Kang, K I (2020) Simulation-based lift planning model for the lift transfer operation system. Journal of Construction Engineering and Management, 146(9): 04020098, ISSN 0733-9364

Lee, Y (2020) A methodology to align the logistical requirements of prefabricated wall panels. PhD thesis, Stanford University, USA.

Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364

Lienhard, J and Eversmann, P (2021) New hybrids–from textile logics towards tailored material behaviour. Architectural Engineering and Design Management, 17(3-4), pp. 169-174. ISSN 1745-2007

Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364

Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.

Lingard, H; Cooke, T and Gharaie, E (2013) The how and why of plant-related fatalities in the Australian construction industry. Engineering, Construction and Architectural Management, 20(4), pp. 365-380. ISSN 0969-9988

Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A new productivity benchmarking system connected to well-designed labour apprenticeship framework for construction projects. Construction Economics and Building, 23(3-4), pp. 125-142. ISSN 2204-9029

Mehran Mahmoudi, M; Seyed Hossein Hosseini, N and Rahimi, F (2024) Integrating complete disassembly planning with deconstructability assessment to facilitate designing deconstructable buildings. Architectural Engineering and Design Management, 20(1), pp. 150-167. ISSN 1745-2007

Morgan, D C (1986) Site layout and construction planning. PhD thesis, University of Nottingham, UK.

Nikolic, D; Castronovo, F and Leicht, R (2021) Teaching BIM as a collaborative information management process through a continuous improvement assessment lens: A case study. Engineering, Construction and Architectural Management, 28(8), pp. 2248-2269. ISSN 0969-9988

O'Brien, W J and Fischer, M A (2000) Importance of capacity constraints to construction cost and schedule. Journal of Construction Engineering and Management, 126(5), pp. 366-373. ISSN 0733-9364

Raisbeck, P (2017) Tribes, warlords and transformers: An institutional logics model of the architectural profession. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Riley, D R and Sanvido, V E (1995) Patterns of construction-space use in multistory buildings. Journal of Construction Engineering and Management, 121(4), pp. 464-473. ISSN 0733-9364

Riley, D R and Sanvido, V E (1997) Space planning method for multistory building construction. Journal of Construction Engineering and Management, 123(2), pp. 171-180. ISSN 0733-9364

Sanchez, B and Haas, C (2018) Capital project planning for a circular economy. Construction Management and Economics, 36(6), pp. 303-312. ISSN 01446193

Sawhney, A and AbouRizk, S M (1995) HSM-simulation-based planning method for construction projects. Journal of Construction Engineering and Management, 121(3), pp. 297-303. ISSN 0733-9364

Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364

Shi, M; Wang, J; Li, Q; Cui, B; Guan, S and Zeng, T (2022) Accelerated earth-rockfill dam compaction by collaborative operation of unmanned roller fleet. Journal of Construction Engineering and Management, 148(7): 04022046, ISSN 0733-9364

Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.

Son, J (2011) An integrated model of evolution of project teams in large-scale construction projects. PhD thesis, University of Washington, USA.

Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.

Sunarharum, T M; Sloan, M and Susilawati, C (2014) Re-framing planning decision-making: Increasing flood resilience in Jakarta. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 230-242. ISSN 1759-5916

Tommelein, I D (2022) Work density method for takt planning of construction processes with nonrepetitive work. Journal of Construction Engineering and Management, 148(12): 04022134, ISSN 0733-9364

Viklund Tallgren, M; Roupe, M and Johansson, M (2015) An empowered collaborative planning method in a Swedish construction company: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wang, Q; Zuo, W; Guo, Z; Li, Q; Mei, T and Qiao, S (2020) BIM voxelization method supporting cell-based creation of a path-planning environment. Journal of Construction Engineering and Management, 146(7): 04020080, ISSN 0733-9364

Wee, T P Y (2019) Product planning of manufactured construction products. PhD thesis, Imperial College London, UK.

Wickenberg, J (2004) Exploring the shadows of project management. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Wilkinson, P; Glockling, J; Bouchlaghem, D and Ruikar, K (2013) Using business impact analyses to enhance resilient fire engineering building design. Architectural Engineering and Design Management, 9(4), pp. 229-249. ISSN 1745-2007

Wong, M O; Zhang, Z and Pan, W (2024) Multiuser virtual reality-enabled collaborative heavy lift planning in construction. Journal of Construction Engineering and Management, 150(4): 04024022, ISSN 0733-9364

Yang, J; Wu, Y and Li, D (2024) Block planning based on grid's topology for the dismantling of long-span spatial lattice structures. Journal of Construction Engineering and Management, 150(9): 04024118, ISSN 0733-9364

Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364

Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364

Zeng, N; Ye, X; Liu, Y and König, M (2024) BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment. Engineering, Construction and Architectural Management, 31(8), pp. 3069-3096. ISSN 0969-9988

Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.

Zhou, R.; Li, H.; Hu, W.; Meng, T.; Lu, H.; Wu, Y.; Chen, Y.; Cao, D. and Wang, F. Y. (2026) Integrated dual-crane positioning and lifting planning in extreme conditions: A critical states and spatial constraint optimization approach. Journal of Construction Engineering and Management, 152(6): 04026072, ISSN 0733-9364

Zhou, C; Li, R; Xiong, X; Li, J and Gao, Y (2023) Optimization of triage time and sample delivery path in health infrastructure to combat COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3620-3644. ISSN 0969-9988

Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.

Zhu, X.; Ma, J.; Chen, W. and Tan, Y. (2026) Llm-querybc: An llm-based regulation query system for textual and tabular information in building codes. Journal of Construction Engineering and Management, 152(6): 04026075, ISSN 0733-9364

Zhu, Q; Zhou, T; Xia, P and Du, J (2022) Robot planning for active collision avoidance in modular construction: Pipe skids example. Journal of Construction Engineering and Management, 148(10): 04022114, ISSN 0733-9364

This list was generated on Sat Aug 22 01:52:03 2026 UTC.