Items with Index Term: planner
A. Mohy, A.; Bassioni, H. A.; Elgendi, E. O. and Hassan, T. M. (2026) Modeling spatiotemporal hazard dynamics for construction safety using graph attention networks. Journal of Engineering, Design and Technology, ISSN 1726-0531
Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.
Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Abd Elsalam, M F (2021) Breaking through the classical determinants in the field of hyper urban planning. Construction Innovation, 21(4), pp. 818-836. ISSN 1471-4175
Abdalla, S B; Mushtaha, E; Rashid, M; Opoku, A; Hamad, R; Dweiri, F and Elmualim, A (2023) Pre-design CSFs (critical success factors) of building projects for dubai's development boom. Built Environment Project and Asset Management, 13(3), pp. 359-374. ISSN 2044-124X
Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.
Abubaker, A E (2010) Improvement of project planning in Libya. PhD thesis, University of Newcastle upon Tyne, UK.
Abudu, H. D.; Mewomo, M. C.; Adjei, K. O. and Bondinuba, F. K. (2026) An emergency response framework for improving crisis management in facilities: PLS-SEM approach. International Journal of Disaster Resilience in the Built Environment, ISSN 1759-5908
Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988
Ackerman Jr., P J (2014) Condition assessment, indices, and risk-based decision-making for public school infrastructure management. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Adedayo, O; Michieletto, M; Bamidele, E and Ntigulirwa, M (2020) Application of hybrid green fences for security in public building designs in Nigeria: Lessons from Kigali, Rwanda and Abuja, Nigeria. Journal of Construction in Developing Countries, 25(1), pp. 147-162. ISSN 1823-6499
Adeyeye, K and Emmitt, S (2017) Multi-scale, integrated strategies for urban flood resilience. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 494-520. ISSN 1759-5916
Adibfar, A (2020) Bridge digital twins: Fusion of intelligent transportation systems (ITS) sensor data and bridge information modeling (BRIM) for interoperability. PhD thesis, University of Florida, USA.
Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.
Aghajamali, K; Nekouvaght Tak, A; Taghaddos, H; Mousaei, A; Behzadipour, S and Hermann, U (2023) Planning of mobile crane walking operations in congested industrial construction sites. Journal of Construction Engineering and Management, 149(7): 04023047, ISSN 0733-9364
Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.
Ahmad, A M (2014) The use of refurbishment, flexibility, standardisation and BIM to support the design of a change-ready healthcare facility. PhD thesis, Loughborough University, UK.
Ahmadi, S Y; Lather, J I; Wittich, C E and Madson, K (2025) Current and future trends for resilient inland waterway transportation systems during flood disruptions. Journal of Construction Engineering and Management, 151(6): 04025046, ISSN 0733-9364
Aigwi, I E; Nwadike, A N; Le, A T H; Rotimi, F E; Sorrell, T; Jafarzadeh, R and Rotimi, J (2022) Prioritising optimal underutilised historical buildings for adaptive reuse: A performance-based MCDA framework validation in auckland, New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 181-204. ISSN 2046-6099
Al Hattab, M; Zankoul, E; Barakat, M and Hamzeh, F (2018) Crane overlap and operational flexibility: Balancing utilization, duration, and safety. Construction Innovation, 18(1), pp. 43-63. ISSN 1471-4175
Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.
Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.
Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(2), pp. 151-161. ISSN 1466433X
Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364
Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.
Alhusban, A A; Alhusban, S A and Al-Betawi, Y N (2019) Assessing the impact of urban Syrian refugees on the urban fabric of Al Mafraq city architecturally and socially. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 99-129. ISSN 1759-5916
Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.
Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: A comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(2), pp. 159-173. ISSN 0969-9988
Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.
Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193
Almashaqbeh, M and El-Rayes, K (2022) Minimizing transportation cost of prefabricated modules in modular construction projects. Engineering, Construction and Architectural Management, 29(10), pp. 3847-3867. ISSN 0969-9988
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Alomari, K A; Gambatese, J A and Tymvios, N (2018) Risk perception comparison among construction safety professionals: Delphi perspective. Journal of Construction Engineering and Management, 144(12): 04018107, ISSN 0733-9364
Alsherfawi Aljazaerly, A; Okyere, S A; Mensah, S L; Abunyewah, M; Frimpong, L K and Kita, M (2026) Towards a socially sustainable built environment: A comparative assessment of urban neighbourhoods in Istanbul. Smart and Sustainable Built Environment, 15(1), pp. 343-363. ISSN 2046-6099
Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.
Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364
Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.
Alves, J. L.; Almeida Filho, A. T. D.; Bradaschia, F. and Palha, R. P. (2026) Solarisbim.AI: Smart sustainable building planning with BIM-based solar-production estimation using machine-learning radiation forecasts. Journal of Construction Engineering and Management, 152(6): 04026076, ISSN 0733-9364
Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.
Anderies, J M (2014) Embedding built environments in social-ecological systems: Resilience-based design principles. Building Research & Information, 42(2), pp. 130-142. ISSN 0961-3218
Angel, S; Lamson-Hall, P and Blanco, Z G (2021) Anatomy of density: Measurable factors that constitute urban density. Buildings & Cities, 2(1), pp. 264-282. ISSN 2632-6655
Anspach, J A; Sharma, V and Madathil, K C (2024) Hospital design planning: unscheduled trauma ER visits impacting inpatient space allocation. Building Research & Information, 52(7), pp. 836-850. ISSN 0961-3218
Aranda-Mena, G (2003) Mapping workers' cognitive structures of construction site hazards. PhD thesis, University of Reading, UK.
Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193
Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X
Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364
Askarizad, R; Dadashpour, A; Faghirnavaz, J; He, J and Safari, H (2023) Organizing worn-out neighborhoods with the new-urbanism approach using mixed methods in rudsar, Northern Iran. Smart and Sustainable Built Environment, 12(1), pp. 128-155. ISSN 2046-6099
Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364
Baggott S R, O D and Georgakis P, K J (2013) Risk and security challenges on further and higher education campuses. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Bahmani, H; Ao, Y; Yang, D; Wang, D; Li, M; Long, Y and Peng, P (2025) Implications for improving evacuation safety in primary school corridors: A video-based analysis on evacuees' speed and density. Engineering, Construction and Architectural Management, 32(12), pp. 8472-8493. ISSN 0969-9988
Bai, Y (1996) Planning and control model for robotic bridge painting. PhD thesis, North Carolina State University, USA.
Bai, Y (2007) Intelligent painting process planner for robotic bridge painting. Journal of Construction Engineering and Management, 133(4), pp. 335-342. ISSN 0733-9364
Baird, T. D.; Tural, E.; Kniola, D. J.; Pingel, T. J. and Abaid, N. (2026) Building as common property: Examining ostrom's model in an innovative university residence hall. Building Research & Information, 54(4), pp. 393-409. ISSN 0961-3218
Bakry, I; Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(6), pp. 782-800. ISSN 0969-9988
Ball, M (1987) Economic change in the British construction industry. PhD thesis, University of London, Birkbeck, UK.
Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988
Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.
Balloffet, A F (1992) Applications of decision support systems in water resources planning: The goal-setting stage. PhD thesis, Colorado State University, USA.
Bansal, V K and Pal, M (2009) Extended GIS for construction engineering by adding direct sunlight visualisations on buildings. Construction Innovation, 9(4), pp. 406-419. ISSN 1471-4175
Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599
Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Berghauser Pont, M; Haupt, P; Berg, P; Alstäde, V and Heyman, A (2021) Systematic review and comparison of densification effects and planning motivations. Buildings & Cities, 2(1), pp. 378-401. ISSN 2632-6655
Berker, T and Woods, R (2025) Resistance against zero-emission neighbourhood infrastructuring: Key lessons from Norway. Buildings & Cities, 6(1), pp. 345-358. ISSN 2632-6655
Bernal, D M; Laitinen, J; Shevchenko, H; Ivanova, O; Pelsmakers, S and Nisonen, E (2026) Spatial (in)justice shaping the home as a space of work. Buildings & Cities, 7(1), pp. 161-175. ISSN 2632-6655
Bosher, L; Dainty, A; Carrillo, P; Glass, J and Price, A (2007) Integrating disaster risk management into construction: A UK perspective. Building Research & Information, 35(2), pp. 163-177. ISSN 0961-3218
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Brady, L and Hanmer-Dwight, R (2016) The management and control of energy at the design stage of buildings. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Bragadin, M A and Kähkönen, K (2016) Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. ISSN 01446193
Bullen, P and Love, P (2011) A new future for the past: A model for adaptive reuse decision-making. Built Environment Project and Asset Management, 1(1), pp. 32-44. ISSN 2044-124X
Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193
Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988
Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364
Carnemolla, P; Mackinnon, K; Darcy, S and Almond, B (2025) Public toilets for accessible and inclusive cities: Disability, design and maintenance from the perspective of wheelchair users. Smart and Sustainable Built Environment, 14(6), pp. 1729-1751. ISSN 2046-6099
Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chand, A M and Loosemore, M (2016) Hospital disaster management's understanding of built environment impacts on healthcare services during extreme weather events. Engineering, Construction and Architectural Management, 23(3), pp. 385-402. ISSN 0969-9988
Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988
Chandra, V and Loosemore, M (2011) Communicating about organizational culture in the briefing process: Case study of a hospital project. Construction Management and Economics, 29(3), pp. 223-231. ISSN 1466433X
Chang, D Y-M (1986) RESQUE: A resource based simulation system for construction process planning. PhD thesis, University of Michigan, USA.
Chapman, C (2023) Green and grey drainage infrastructure: costs and benefits of reducing surface water flood risk. PhD thesis, University of Oxford, UK.
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.
Chitengi, H S (2015) Deriving lessons for urban planning and housing delivery from the resilience of informal housing systems in Zambia. PhD thesis, University of Dundee, UK.
Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.
Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.
Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364
Chowdhury, S; Ren, Z; Rouhana, F; Wang, J and Zhu, J (2024) Exploring sustainability in resource management: Implementation of a water-energy-human nexus framework at a university campus. Journal of Construction Engineering and Management, 150(10): 04024140, ISSN 0733-9364
Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X
Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.
Close, R and Loosemore, M (2014) Breaking down the site hoardings: Attitudes and approaches to community consultation during construction. Construction Management and Economics, 32(7-8), pp. 816-828. ISSN 01446193
Crowther, J and Ajayi, S O (2021) Impacts of 4D BIM on construction project performance. International Journal of Construction Management, 21(7), pp. 724-737. ISSN 1562-3599
Curvelo Magdaniel, F T J (2016) Technology campuses and cities: A study on the relation between innovation and the built environment at the urban area level. PhD thesis, Delft University of Technology, Netherlands.
Curwell, S; Deakin, M; Cooper, I; Paskaleva-Shapira, K; Ravetz, J and Babicki, D (2005) Citizens' expectations of information cities: Implications for urban planning and design. Building Research & Information, 33(1), pp. 55-66. ISSN 0961-3218
Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement. PhD thesis, Nottingham Trent University, UK.
Daniel, E I; Pasquire, C and Dickens, G (2014) Social perspective of planning in construction: The UK experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Daniel, E I; Pasquire, C; Dickens, G and Ballard, H G (2017) The relationship between the last planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(3), pp. 407-425. ISSN 0969-9988
Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.
Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988
Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988
Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193
De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach. PhD thesis, Aston University, UK.
Delaney, F T (2003) Effectiveness of mergers and acquisitions and corporate financial performance in construction. PhD thesis, Edinburgh Napier University, UK.
Deshmukh, A; Oh, E H and Hastak, M (2011) Impact of flood damaged critical infrastructure on communities and industries. Built Environment Project and Asset Management, 1(2), pp. 156-175. ISSN 2044-124X
Dharia, N V (2015) Scaffolding sentiment: Money, labor, and love in India's real estate and construction industry. PhD thesis, Harvard University, USA.
Dizdaroglu, D; Yigitcanlar, T and Dawes, L (2012) A micro-level indexing model for assessing urban ecosystem sustainability. Smart and Sustainable Built Environment, 1(3), pp. 291-315. ISSN 2046-6099
Doherty, M M (2022) Exploring the expansion of planners' engagement capabilities via accessing the data from a building information model for public consultation. PhD thesis, Northumbria University, UK.
Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.
Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Du, J; Wang, Q and Shi, Q (2019) Description-experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, 26(6), pp. 1151-1170. ISSN 0969-9988
Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.
Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.
Dunlop, P G and Smith, S D (2002) Simulation analysis of the UK concrete delivery and placement process: A tool for planners. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2022) Low-cost housing demand-supply gap: Government housing planners perspective on possible solutions. International Journal of Construction Management, 22(9), pp. 1736-1745. ISSN 1562-3599
Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988
Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599
Eizak Shiri, F (2015) Planning intentionality and its implications for project planned time. PhD thesis, University of Manchester, UK.
El Meouche, R; Abunemeh, M; Hijaze, I; Mebarki, A and Shahrour, I (2018) Developing optimal paths for evacuating risky construction sites. Journal of Construction Engineering and Management, 144(2): 04017099, ISSN 0733-9364
El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364
El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193
El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.
Emhemed, A E (2005) Comprehensive approach to housing legislation: with reference to housing in Libya. PhD thesis, Heriot-Watt University, UK.
Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. I: Analysis at the fundamental level. Journal of Construction Engineering and Management, 141(8): 04015021, ISSN 0733-9364
Esmaili, O (2014) Developing a rapid seismic performance based rating system in safety assessment of buildings. PhD thesis, University of California, Irvine, USA.
Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364
Fang, Y and Ng, S T (2011) Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(3), pp. 259-281. ISSN 1471-4175
Faniran, O O; Oluwoye, J O and Lenard, D J (1998) Interactions between construction planning and influence factors. Journal of Construction Engineering and Management, 124(4), pp. 245-256. ISSN 0733-9364
Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193
Flores, M and Mourgues, C (2024) Impact of using a formalized methodology for conflict detection based on 4D-BIM. Journal of Construction Engineering and Management, 150(7): 04024059, ISSN 0733-9364
Francis, A (2013) The chronographical approach for construction project modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 188-204. ISSN 17514312
Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304
Freitas, Márcia Regina de (2008) Computacional tool for support planning and elaboration of construction site layout. PhD thesis, Universidade de São Paulo, Brazil.
Friedrich, D (2022) Consumer and expert behaviour towards biobased wood-polymer building products: A comparative multi-factorial study according to theory of planned behaviour. Architectural Engineering and Design Management, 18(1), pp. 73-92. ISSN 1745-2007
Fuentes-Del-burgo, J; Fernández, J P R and Navarro-Astor, E (2024) Kanban applied to construction: A literature review. Construction Economics and Building, 24(4-5), pp. 43-57. ISSN 2204-9029
Gansmo, H J (2012) Municipal planning of a sustainable neighbourhood: Action research and stakeholder dialogue. Building Research & Information, 40(4), pp. 493-503. ISSN 0961-3218
Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364
Garakani, S A; Lak, A and Niyasati, M (2020) Toward sustainable development in post-flood relocation of rural settlements in Iran. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 359-377. ISSN 1759-5916
Garmston, H; Pan, W and de Wilde, P (2012) Decision-making in façade selection for multi-storey buildings. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Garmston, H M (2017) Decision-making in the selection of retrofit facades for non-domestic buildings. PhD thesis, University of Plymouth, UK.
Ghaffour, W; Ouissi, M N and Velay Dabat, M A (2021) Analysis of urban thermal environments based on the perception and simulation of the microclimate in the historic city of Tlemcen. Smart and Sustainable Built Environment, 10(2), pp. 141-168. ISSN 2046-6099
Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364
Gharehbaghi, K; McManus, K; Hurst, N; Robson, K and Myers, M (2020) Complexities in mega rail transportation projects: “Sydney metro” and “Melbourne metro rail” insight. Journal of Engineering, Design and Technology, 18(5), pp. 973-990. ISSN 1726-0531
Gholami, M; Mofidi Shemirani, M and Fayaz, R (2018) A modelling methodology for a solar energy-efficient neighbourhood. Smart and Sustainable Built Environment, 7(1), pp. 117-132. ISSN 2046-6099
Gilmour D, B D F R I J T A (2013) A knowledge map of sustainability for urban redevelopment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193
Giupponi, N and Thomson, C (2020) The implication of advances in community mapping through spatial information technologies for urban regeneration projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.
Glendinning, M (1991) 'Give the people homes!': Britain's multi-storey housing drive. PhD thesis, University of Edinburgh, UK.
Godoy-Shimizu, D; Steadman, P and Evans, S (2021) Density and morphology: From the building scale to the city scale. Buildings & Cities, 2(1), pp. 92-113. ISSN 2632-6655
Gomez Villanueva, Sulyn Cossett (2023) Behavior-based quality system (bbqs). PhD thesis, University of California, USA.
Gonzales, S (2022) Corporate and project governance requiring certification for meeting planned. DBA thesis, Northcentral University, USA.
Goodess, C; Berk, S; Ratna, S B; Brousse, O; Davies, M; Heaviside, C; Moore, G and Pineo, H (2021) Climate change projections for sustainable and healthy cities. Buildings & Cities, 2(1), pp. 812-836. ISSN 2632-6655
Greed, C and Reeves, D (2005) Mainstreaming equality into strategic spatial policy making: Are town planners losing sight of gender? Construction Management and Economics, 23(10), pp. 1059-1070. ISSN 01446193
Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.
Gupta, R and Gregg, M (2013) Preventing the overheating of English suburban homes in a warming climate. Building Research & Information, 41(3), pp. 281-300. ISSN 0961-3218
Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Task planning and control in construction: Revealing workers as early and late planners. Construction Management and Economics, 42(5), pp. 431-450. ISSN 01446193
Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.
Hallowell, M R; Hardison, D and Desvignes, M (2016) Information technology and safety: Integrating empirical safety risk data with building information modeling, sensing, and visualization technologies. Construction Innovation, 16(3), pp. 323-347. ISSN 1471-4175
Hamour, O A A R (1978) Project selection and planning in developing countries. PhD thesis, Swansea University, UK.
Hamstead, Z; Coseo, P; Alkhaled, S; Boamah, E F; Hondula, D M; Middel, A and Rajkovich, N (2020) Thermally resilient communities: Creating a socio-technical collaborative response to extreme temperatures. Buildings & Cities, 1(1), pp. 218-232. ISSN 2632-6655
Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.
Hamzeh, F R; Zankoul, E and Rouhana, C (2015) How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration? Construction Management and Economics, 33(4), pp. 243-258. ISSN 01446193
Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.
Handa, V K (1996) Construction engineers driving into the 21st century. Journal of Construction Engineering and Management, 122(1), pp. 1-6. ISSN 0733-9364
Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control. PhD thesis, Iowa State University, USA.
Hassan, F U; Le, T and Le, C (2023) Automated approach for digitalizing scope of work requirements to support contract management. Journal of Construction Engineering and Management, 149(4): 04023005, ISSN 0733-9364
Hassanain, M A (2007) Post-occupancy indoor environmental quality evaluation of student housing facilities. Architectural Engineering and Design Management, 3(4), pp. 249-256. ISSN 1745-2007
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2007) Project manager's decision aid for a radical project cycle reduction. Journal of Construction Engineering and Management, 133(6), pp. 437-446. ISSN 0733-9364
Hautamäki, R; Kulmala, L; Ariluoma, M and Järvi, L (2025) How urban green infrastructure contributes to carbon neutrality. Buildings & Cities, 6(1), pp. 272-280. ISSN 2632-6655
Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364
Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364
Herzog, H W and Schlottmann, A M (1988) Local business cycle severity and induced labour mobility: The case of the construction workforce. Construction Management and Economics, 6(3), pp. 247-258. ISSN 01446193
Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hopkins, O S (2004) Planning rural water supply systems in developing countries: The case of Rwanda. PhD thesis, University of North Carolina at Chapel Hill, USA.
Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364
Horvath, A (1997) Estimation of environmental implications of construction materials and designs using life cycle assessment techniques. PhD thesis, Carnegie Mellon University, USA.
Hoxha, V (2026) Examining the nexus of building regulations, urban planning, and housing prices and affordability: Insights from prishtina, Kosovo. International Journal of Building Pathology and Adaptation, 44(1), pp. 126-142. ISSN 2398-4708
Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175
Hurst, B E (2014) The effect of organizational commitment on project outcomes under common agency. PhD thesis, Capella University, USA.
Hwang, S; Park, M; Lee, H S; Lee, S and Kim, H (2015) Postdisaster interdependent built environment recovery efforts and the effects of governmental plans: Case analysis using system dynamics. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X
Ibarra, G (2016) The meaning of 'social' in Mexican social housing: A study of housing developments in Mazatlán, Mexico. PhD thesis, University of Sheffield, UK.
Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364
Ilesanmi, O O; Oke, A E; Moyanga, D T; Aliu, J and Ojo, L D (2025) Innovative strategies to prevent flooding in buildings and infrastructure in Nigeria. International Journal of Disaster Resilience in the Built Environment, 16(5), pp. 688-710. ISSN 1759-5908
Ingirige, B; Haigh, R; Malalgoda, C and Palliyaguru, R (2008) Exploring good practice knowledge transfer related to post-tsunami housing (re-)construction in Sri Lanka. Journal of Construction in Developing Countries, 13(2), pp. 21-42. ISSN 1823-6499
Isaton, Camila (2023) A collaborative risk identification model with cost risk simulation: A case study of a port logistics storage yard. PhD thesis, Universidade Federal de Santa Catarina, Brazil.
Itzhak-Ben-shalom, H.; Saroglou, T.; Multanen, V.; Vanunu, A.; Karnieli, A.; Katoshevski, D.; Davidovitch, N. and Meir, I. A. (2025) Environmental variables and air quality: Implications for planning and public health. Buildings & Cities, 6(1), pp. 597-618. ISSN 2632-6655
Jaafari, A and Mateffy, V K (1990) Realistic model for equipment replacement. Journal of Construction Engineering and Management, 116(3), pp. 514-532. ISSN 0733-9364
Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.
Jamshed, A; Rana, I A; McMillan, J M and Birkmann, J (2019) Building community resilience in post-disaster resettlement in Pakistan. International Journal of Disaster Resilience in the Built Environment, 10(4), pp. 301-315. ISSN 1759-5916
Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning. PhD thesis, University of Wisconsin - Madison, USA.
Jarkas, A M (2012) Factors influencing power-trowelling productivity of concrete surface floors. Journal of Engineering, Design and Technology, 10(1), pp. 34-51. ISSN 1726-0531
Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.
Jayakody, C; Malalgoda, C I; Amaratunga, D; Haigh, R; Liyanage, C; Hamza, M; Witt, E and Fernando, N (2022) Addressing housing needs of the displaced people promoting resilient and sustainable communities. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 368-385. ISSN 1759-5916
Jayakody, R R J C and Amaratunga, D (2021) Guiding factors for planning public open spaces to enhance coastal cities' disaster resilience to tsunamis. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 471-483. ISSN 1759-5916
Jayalath, C. D. and Kulatunga, U. (2026) Bridging human behaviour and public transport policies: Applying the extended theory of planned behaviour for sustainable urban mobility. Smart and Sustainable Built Environment, pp. 1-21. ISSN 2046-6099
Jergeas, G and Der Put, J V (2001) Benefits of constructability on construction projects. Journal of Construction Engineering and Management, 127(4), pp. 281-290. ISSN 0733-9364
Jia, A Y; Gao, S S and Kvan, T (2017) Markets, professions and firms of the construction industry: The changing roles of architects in response to vertical integration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Johansen, D E and Greenwood, D J (1999) Hard, soft or lean? Planning on medium-sized construction projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Johansen, E (2002) The application of a pilot pull planning system to construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), pp. 1305-1314. ISSN 1466433X
John, G A (2000) A virtual environment for safety-integrated site layout design and organisation. PhD thesis, Teesside University, UK.
John, V (2012) Derivation of reliable simplification strategies for the comparative LCA of individual and "typical" newly built Swiss apartment buildings. DSc thesis, ETH Zürich, Switzerland.
Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.
Jordan, E (2012) Pathways to community recovery: A qualitative comparative analysis of post-disaster outcomes. PhD thesis, University of Colorado at Boulder, USA.
Kader, A S A (1997) Cost modelling for inland waterway transport systems. PhD thesis, Liverpool John Moores University, UK.
Kahaduwa, A and Rajapakse, L (2022) Review of climate change impacts on reservoir hydrology and long-term basin-wide water resources management. Building Research & Information, 50(5), pp. 515-526. ISSN 0961-3218
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Kang, S-C (2006) Computer planning and simulation of construction erection processes using single or multiple cranes. PhD thesis, Stanford University, USA.
Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988
Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988
Karim, M A (1998) Development of a systems approach to planning, design and operations of intermodal passenger transfer facilities to increase the mobility and safety of older travelers. PhD thesis, West Virginia University, USA.
Karki, T K (2020) Flood resilience in Malaysian cities: A case study of two towns in Johor state. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 329-342. ISSN 1759-5916
Karpen, S (2013) The role of task openness in forming completion time estimates. PhD thesis, Indiana University, USA.
Kartam, N A-F (1989) Investigating the utility of artificial intelligence techniques for automatic generation of construction project plans. PhD thesis, Stanford University, USA.
Kempton, J (2009) Modern methods of construction: Maintenance issues in the registered social landlord sector. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.
Khan, M I; Khan, S; Khan, U and Haleem, A (2023) Modeling the big data challenges in context of smart cities: an integrated fuzzy ISM-DEMATEL approach. International Journal of Building Pathology and Adaptation, 41(2), pp. 422-453. ISSN 23984708
Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.
Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531
Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364
Kim, J (2007) Temporary structure planning ontology. PhD thesis, Stanford University, USA.
Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.
Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Kim, S (1998) Sustainable building practices: minimising the life-cycle environmental impact of high-rise apartments in Korea. PhD thesis, University of Edinburgh, UK.
Kim, T; Lee, D; Cha, M; Lim, H; Lee, M; Cho, H and Kang, K I (2020) Simulation-based lift planning model for the lift transfer operation system. Journal of Construction Engineering and Management, 146(9): 04020098, ISSN 0733-9364
Kinawy, S N (2017) Customizing information delivery for citizens in transportation infrastructure projects: Towards active community participation in decision-making. PhD thesis, University of Toronto, Canada.
King, D; Gurtner, Y; Firdaus, A; Harwood, S and Cottrell, A (2016) Land use planning for disaster risk reduction and climate change adaptation: Operationalizing policy and legislation at local levels. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 158-172. ISSN 1759-5916
Kipling, J; Newton, R and Ormerod, M (2011) Accessing emergency rest centres in the UK: Lessons learnt. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 47-58. ISSN 1759-5916
Klanšek, U (2016) Mixed-integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3): 04015088, ISSN 0733-9364
Koch, C (2004) Operations management on the construction site: Developing a human resource and knowledge oriented alternative to lean construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Koch, C; Gottlieb, S C; Rönn, M and Braide, A (2021) The quandaries of design developer competitions. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives. PhD thesis, Stanford University, USA.
Kostourou, F (2021) Housing growth: Impacts on density, space consumption and urban morphology. Buildings & Cities, 2(1), pp. 55-78. ISSN 2632-6655
Kumar, N.; Modi, S. and Kumar, P. (2026) The Kedarnath tragedy of 2013: Intersections of natural fury and human negligence in the Himalayan region. International Journal of Disaster Resilience in the Built Environment, pp. 1-13. ISSN 1759-5908
Kuo, Y. C. (2026) Interactive relationships among factors influencing skilled labor shortages in the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2625-2648. ISSN 0969-9988
Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.
Lall, A B and Sethi, G (2024) Operationalising energy sufficiency for low-carbon built environments in urbanising India. Buildings & Cities, 5(1), pp. 645-661. ISSN 2632-6655
Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193
Lam, K C; Ning, X and Lam, M C K (2009) Conjoining MMAS to GA to solve construction site layout planning problem. Journal of Construction Engineering and Management, 135(10), pp. 1049-1057. ISSN 0733-9364
Lam, K C; Ning, X and Ng, T (2007) The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25(4), pp. 359-374. ISSN 1466433X
Lam, K C; So, A T P; Hu, T; Ng, T; Yuen, R K K; Lo, S M; Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(1), pp. 63-76. ISSN 01446193
Lam, Ka-Chi (1997) The optimisation of financial decisions in a contracting firm. PhD thesis, University of New South Wales, Australia.
Lan, R; Adenuga, O and Awolusi, I (2025) Impact of construction project failure on key project stakeholders: Assessing the perspectives of professionals in Lagos metropolis. Construction Economics and Building, 25(3-4), pp. 90-120. ISSN 2204-9029
Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.
Lather, J I (2019) A hybrid modeling approach using discrete event simulation and layout optimization for healthcare layout planning problems. PhD thesis, Pennsylvania State University, USA.
Lawani, K; Thomson, C; Hare, B and Duplicki, A (2024) Unpacking the perceptions of high-density living and zoning laws: A case of Philadelphia area, USA. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, S (2000) Spatial model and decentralized path planning for construction automation. PhD thesis, University of Wisconsin - Madison, USA.
Lee, Y (2020) A methodology to align the logistical requirements of prefabricated wall panels. PhD thesis, Stanford University, USA.
Legnér, M; Leijonhufvud, G and Tunefalk, M (2020) Energy policy and conservation planning in Sweden: A longitudinal evaluation. International Journal of Building Pathology and Adaptation, 38(4), pp. 555-572. ISSN 23984708
Leino, J L (2008) Community and private sector approaches to development in Kenya. PhD thesis, University of California, Berkeley, USA.
Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193
Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364
Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.
Li, H; Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), pp. 429-446. ISSN 1471-4175
Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364
Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.
Lin, Y; Wu, D; Wang, X; Wang, X and Gao, S (2012) Statics-based simulation approach for two-crane lift. Journal of Construction Engineering and Management, 138(10), pp. 1139-1149. ISSN 0733-9364
Liu, C and Li, Y (2016) Measuring eco-roof mitigation on flash floods via GIS simulation. Built Environment Project and Asset Management, 6(4), pp. 415-427. ISSN 2044-124X
Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364
Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364
Livingstone, N; Fiorentino, S and Short, M (2021) Planning for residential 'value'? London's densification policies and impacts. Buildings & Cities, 2(1), pp. 203-219. ISSN 2632-6655
Lomas, K J (2021) Summertime overheating in dwellings in temperate climates. Buildings & Cities, 2(1), pp. 487-494. ISSN 2632-6655
Lombardi, P and Ferretti, V (2015) New spatial decision support systems for sustainable urban and regional development. Smart and Sustainable Built Environment, 4(1), pp. 45-66. ISSN 2046-6099
Lowry, M B (2008) An online analytic-deliberative approach to public participation for transportation investment decisions. PhD thesis, University of Washington, USA.
Lu, W (2010) Improved SWOT approach for conducting strategic planning in the construction industry. Journal of Construction Engineering and Management, 136(12), pp. 1317-1328. ISSN 0733-9364
Lundgren, R (2023) Social life cycle assessment of adaptive reuse. Buildings & Cities, 4(1), pp. 334-351. ISSN 2632-6655
Lühr, G J; Bosch-Rekveldt, M and Radujković, M (2023) The last-planner-system's impact on project culture. Journal of Engineering, Design and Technology, 21(5), pp. 1303-1322. ISSN 1726-0531
Lützkendorf, T (2020) The role of carbon metrics in supporting built-environment professionals. Buildings & Cities, 1(1), pp. 662-672. ISSN 2632-6655
Lützkendorf, T and Lorenz, D (2011) Capturing sustainability-related information for property valuation. Building Research & Information, 39(3), pp. 256-273. ISSN 0961-3218
Ma, L (2022) A BIM-based life cycle assessment tool of embodied energy and environmental impacts of reinforced concrete tall buildings. PhD thesis, Illinois Institute of Technology, USA.
MacKenzie, A (2017) Planning for the redevelopment after a fire event. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 344-356. ISSN 1759-5916
Mahadkar, S; Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(2), pp. 127-145. ISSN 2044-124X
Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988
Mahmoodi, A. and Easa, S. M. (2026) A multi-objective matheuristic framework for sustainable truck-UAV last-mile delivery in smart urban built environments. Smart and Sustainable Built Environment, pp. 1-48. ISSN 2046-6099
Maldonado-Fortunet, F (2002) Sustainable development criteria for the evaluation of highway projects. PhD thesis, Georgia Institute of Technology, USA.
Manewa, R M A S (2012) Economic considerations for adaptability in buildings. PhD thesis, Loughborough University, UK.
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A new productivity benchmarking system connected to well-designed labour apprenticeship framework for construction projects. Construction Economics and Building, 23(3-4), pp. 125-142. ISSN 2204-9029
Maraqa, M J; Sacks, R and Spatari, S (2021) Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projects. Engineering, Construction and Architectural Management, 28(8), pp. 2176-2198. ISSN 0969-9988
Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Martinez, J G; Yeung, T; Sacks, R; Shahaf, Y and Sharoni, L O (2023) Situational awareness in construction using a serious game. Journal of Construction Engineering and Management, 149(3): 04022183, ISSN 0733-9364
Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599
Mavahebi Tabatabai, G.; Tahsildoost, M.; Ardekani, A. and Zomorodian, Z. S. (2026) Optimizing urban block layouts and density distribution: A generative design framework for neighborhood performance. Smart and Sustainable Built Environment, 15(5), pp. 1722-1750. ISSN 2046-6099
Mawdesley, M J; A-Jibouri, S H; Askew, W H and Patterson, D E (2002) A model for the automated generation of earthwork planning activities. Construction Innovation, 2(4), pp. 249-268. ISSN 1471-4175
Mawdesley, M J; Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(2), pp. 83-89. ISSN 0969-9988
Mayer, Z and Kazakidis, V (2007) Decision making in flexible mine production system design using real options. Journal of Construction Engineering and Management, 133(2), pp. 169-180. ISSN 0733-9364
McCord, J; McCord, M; McCluskey, W; Davis, P T; McIlhatton, D and Haran, M (2014) Effect of public green space on residential property values in Belfast metropolitan area. Journal of Financial Management of Property and Construction, 19(2), pp. 117-137. ISSN 1366-4387
McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries. DSc thesis, George Washington University, USA.
McDermott, V and Holdsworth, S (2017) Fringe benefits? Planning, building and the development of community in a neo-liberal landscape. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Melbourne, R E (1996) Advance base construction by civilian contractors in war zones. PhD thesis, University of Southern California, USA.
Mendes, J M; Tavares, A O and Santos, P P (2020) Social vulnerability and local level assessments: A new approach for planning. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 15-43. ISSN 1759-5916
Meriläinen, S and Tervo, A (2025) The changing typology of urban apartment buildings in Aurinkolahti. Buildings & Cities, 6(1), pp. 50-69. ISSN 2632-6655
Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Minchin Jr, R E (2009) Fall and rise of the largest construction manager-at-risk transportation construction project ever. Journal of Construction Engineering and Management, 135(9), pp. 930-938. ISSN 0733-9364
Mirmoghtadaee, M; Abdi, M H and Eslamlou, M S (2025) Managing uncertainties in fault avoidance zone of urban areas: A case study of karaj, Iran. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 275-288. ISSN 1759-5908
Mohtat, N and Zargar, A H I (2018) Sustainability evaluation of post-disaster housing reconstruction after 55 years: Rudak Village, Iran. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 294-316. ISSN 1759-5916
Morad, A A and Beliveau, Y J (1991) Knowledge-based planning system. Journal of Construction Engineering and Management, 117(1), pp. 1-12. ISSN 0733-9364
Moradpour, N; Pourahmad, A; Hataminejad, H; Ziari, K and Sharifi, A (2023) An overview of the state of urban resilience in Iran. International Journal of Disaster Resilience in the Built Environment, 14(2), pp. 154-184. ISSN 1759-5916
Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.
Muslimin, R. and Brasier, N. (2026) An analysis of outdoor thermal comfort impact on pedestrian walking patterns at sub-hour timescales with agent-based modelling. Smart and Sustainable Built Environment, 15(3), pp. 1149-1176. ISSN 2046-6099
Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats. PhD thesis, Purdue University, USA.
Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364
Newton, A J (1995) The planning and management of detailed building design. PhD thesis, Loughborough University, UK.
Ng, S T; Shi, J and Fang, Y (2009) Enhancing the logistics of construction materials through activity-based simulation approach. Engineering, Construction and Architectural Management, 16(3), pp. 224-237. ISSN 0969-9988
Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364
Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X
Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364
Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.
Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193
Nnaji, C; Lee, H W; Karakhan, A and Gambatese, J (2018) Developing a decision-making framework to select safety technologies for highway construction. Journal of Construction Engineering and Management, 144(4): 04018016, ISSN 0733-9364
Oke, A E; Aghimien, D O; Aigbavboa, C O and Akinradewo, O I (2020) Appraisal of the drivers of smart city development in South Africa. Construction Economics and Building, 20(2), pp. 109-126. ISSN 2204-9029
Okonta, U; Hosseinian-Far, A and Sarwar, D (2025) A systemic approach to sustainable railway infrastructure planning: The case study of milton keynes. Smart and Sustainable Built Environment, 14(2), pp. 407-428. ISSN 2046-6099
Oladapo, O and Liyanage, C L (2010) Control of healthcare associated infections: A concerted effort. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531
Op den Bosch, A (1994) Design/construction processes simulation in real-time object-oriented environments. PhD thesis, Georgia Institute of Technology, USA.
Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ornstein, S W and Ono, R (2010) Post-occupancy evaluation and design quality in Brazil: Concepts, approaches and an example of application. Architectural Engineering and Design Management, 6(1), pp. 48-67. ISSN 1745-2007
Orstavik, F (2018) Negotiating and knowing built quality. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Osadare, A F (2022) Relationship between cost, schedule overruns, and project success in the nuclear construction industry in the United Kingdom. PhD thesis, Walden University, USA.
Osundiran, Adeola Oluwatoyin and Makgopa, Tshehla (2026) Port efficiency: The application of blockchain technology in the construction material supply chain. Journal of Construction Business and Management, 8(S1), pp. 48-61. ISSN 2521-0165
Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 0969-9988
Oyediran, H (2025) Robot-integrated 4D building information modeling (4D BIM): Framework for planning safe autonomous construction operations in dynamic environments. PhD thesis, University of Nebraska - Lincoln, USA.
Pakjouei, S; Aryankhesal, A; Kamali, M; Seyedin, H and Heidari, M (2021) Positive effects of earthquake from the perspective of people with physical disability in Iran. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 157-169. ISSN 1759-5916
Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.
Patlakas, P (2022) Techniques for the utilisation and management of post occupancy evaluation data by non-experts. PhD thesis, Birmingham City University, UK.
Patterson, D E (1997) Earthworks planning for linear construction projects. PhD thesis, University of Nottingham, UK.
Peckham, G E (1971) The systems approach to school construction: the potential benefits, the necessary conditions, and the implications for Michigan schools. PhD thesis, Michigan State University, USA.
Perkinson, G M; Sanvido, V E and Grobler, F (1994) A facility programming information framework. Engineering, Construction and Architectural Management, 1(1), pp. 69-84. ISSN 0969-9988
Picchi, P; Verzandvoort, S; Geneletti, D; Hendriks, K and Stremke, S (2022) Deploying ecosystem services to develop sustainable energy landscapes: A case study from the Netherlands. Smart and Sustainable Built Environment, 11(3), pp. 422-437. ISSN 2046-6099
Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364
Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029
Power, W; Sinnott, D and Lynch, P (2022) Accelerating construction project delivery using agile's integrated system of principles and methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029
Price, A D F and Lu, J (2013) Impact of hospital space standardization on patient health and safety. Architectural Engineering and Design Management, 9(1), pp. 49-61. ISSN 1745-2007
Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance. PhD thesis, University of Florida, USA.
Qian, Q K (2010) Government's roles and measures needed in China for promoting building energy efficiency (bee). International Journal of Construction Management, 10(4), pp. 119-138. ISSN 1562-3599
Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.
Rahmayati, Y (2016) Reframing "building back better" for post-disaster housing design: A community perspective. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 344-360. ISSN 1759-5916
Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099
Rasmy, M O; Abu Atta, T A L and Mohamed Ibrahim, A A (2022) Sustainable strategy to create multisector or unisector smart economic hubs. Smart and Sustainable Built Environment, 11(3), pp. 692-716. ISSN 2046-6099
RazaviAlavi, S and AbouRizk, S (2022) A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects. Journal of Engineering, Design and Technology, 20(4), pp. 866-886. ISSN 1726-0531
Rebello, K; Jaggi, K; Costello, S; Blake, D; Oo, M; Hughes, J and Egbelakin, T (2019) Testing a criticality framework for road networks in Auckland, New Zealand. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 36-51. ISSN 1759-5916
Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364
Rezakhani, P (2023) Empirical study of housing recovery and property abandonment following valley fire in California: Insights from neighborhood characteristics and building attributes. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 628-639. ISSN 1759-5916
Riel, Paul E (2015) Campus planners' preferences for residence hall project delivery methods. EdD thesis, University of North Florida, USA.
Rigoni, C; Oliveira, S; Romice, O; Moreno-Rangel, A and Chatzimichali, A (2026) Towards a new neighbourhood-scale climate risk-adaptation approach. Buildings & Cities, 7(1), pp. 360-377. ISSN 2632-6655
Roberts, W E (1985) An analysis of conflict arising between architects and school personnel when planning, designing, and constructing school facilities. EdD thesis, Northern Arizona University, USA.
Rogerson, J H; Morris, J P and Jared, G E M (2000) Development of a generic design-decision planner. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988
Rose, F M and Chang, J (2023) Urban data: Harnessing subjective sociocultural data from local newspapers. Buildings & Cities, 4(1), pp. 369-385. ISSN 2632-6655
Rwamamara, R; Norberg, H; Olofsson, T and Lagerqvist, O (2010) Using visualization technologies for design and planning of a healthy construction workplace. Construction Innovation, 10(3), pp. 248-266. ISSN 1471-4175
Sacks, R; Rozenfeld, O and Rosenfeld, Y (2009) Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management, 135(8), pp. 726-736. ISSN 0733-9364
Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.
Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Sailer, K; Utley, M; Pachilova, R; Fouad, A T Z; Li, X; Jayaram, H and Foster, P J (2025) Lanes, clusters, sightlines: Modelling patient flow in medical clinics. Buildings & Cities, 6(1), pp. 201-218. ISSN 2632-6655
Sakka, Z I and El-Sayegh, S M (2007) Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 124-130. ISSN 0733-9364
Salah, M; Elbeltagi, E and Elsheikh, A (2024) Optimization of construction site layout using BIM generative design. International Journal of Construction Management, 24(3), pp. 314-322. ISSN 1562-3599
Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364
Salter, J; Lu, Y; Kim, J C; Kellett, R; Girling, C; Inomata, F and Krahn, A (2020) Iterative 'what-if' neighborhood simulation: Energy and emissions impacts. Buildings & Cities, 1(1), pp. 293-307. ISSN 2632-6655
Sanni-Anibire, M O and Adenle, Y A (2024) Residential satisfaction of vertical urban settlements in Hong Kong. Journal of Engineering, Design and Technology, 22(6), pp. 1705-1722. ISSN 1726-0531
Sanvido, V; Grobler, F; Parfitt, K; Guvenis, M and Coyle, M (1992) Critical success factors for construction projects. Journal of Construction Engineering and Management, 118(1), pp. 94-111. ISSN 0733-9364
Saratsis, E; Dogan, T and Reinhart, C F (2017) Simulation-based daylighting analysis procedure for developing urban zoning rules. Building Research & Information, 45(5), pp. 478-491. ISSN 0961-3218
Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988
Schiffer, A; Greene, M; Khalid, R; Foulds, C; Vidal, C A; Chatterjee, M; Dhar-Bhattacharjee, S; Edomah, N; Sule, O; Palit, D and Yesutanbul, A N (2022) Brokering gender empowerment in energy access in the Global South. Buildings & Cities, 3(1), pp. 619-637. ISSN 2632-6655
Schiller, G; Blum, A; Hecht, R; Oertel, H; Ferber, U and Meinel, G (2021) Urban infill development potential in Germany: Comparing survey and GIS data. Buildings & Cities, 2(1), pp. 36-54. ISSN 2632-6655
Schiller, G; Gruhler, K and Xie, X (2020) Assessing the efficiency of indoor and outdoor access-related infrastructure. Buildings & Cities, 1(1), pp. 56-69. ISSN 2632-6655
Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.
Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364
Schünemann, C; Dshemuchadse, M and Scherbaum, S (2025) A systemic decision-making model for energy retrofits. Buildings & Cities, 6(1), pp. 511-526. ISSN 2632-6655
Scott, J R (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value. PhD thesis, Robert Gordon University, UK.
Scott, J R; Edge, M; Laing, R and Martin, P (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Seo, S; Aramaki, T; Hwang, Y and Hanaki, K (2004) Fuzzy decision-making tool for environmental sustainable buildings. Journal of Construction Engineering and Management, 130(3), pp. 415-423. ISSN 0733-9364
Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364
Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X
Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364
Shahedi, F. and Abrishami, S. (2026) Adaptive construction scheduling with AI in 4D/5D BIM: Integrating weather data and activity-based costing. Smart and Sustainable Built Environment, pp. 1-15. ISSN 2046-6099
Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.
Shapira, A and Schexnayder, C J (1999) Selection of mobile cranes for building construction projects. Construction Management and Economics, 17(4), pp. 519-527. ISSN 01446193
Sharma, N K; Hargreaves, T and Pallett, H (2023) Social justice implications of smart urban technologies: An intersectional approach. Buildings & Cities, 4(1), pp. 315-333. ISSN 2632-6655
Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599
Sheikhkhoshkar, M; Bril El Haouzi, H; Aubry, A and Hamzeh, F (2024) An advanced exploration of functionalities as the underlying principles of construction control metrics. Smart and Sustainable Built Environment, 13(3), pp. 644-676. ISSN 2046-6099
Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364
Shoaib Khan, M; Kim, J; Park, S; Lee, S and Seo, J (2021) Methodology for voxel-based earthwork modeling. Journal of Construction Engineering and Management, 147(10): 04021111, ISSN 0733-9364
Shooshtarian, S and Ridley, I (2016) Determination of acceptable thermal range in outdoor built environments by various methods. Smart and Sustainable Built Environment, 5(4), pp. 352-371. ISSN 2046-6099
Silva-Jauregui, D (1982) The economics of capacity expansion in the mexican cement industry. PhD thesis, Northwestern University, USA.
Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(4), pp. 1005-1025. ISSN 1471-4175
Silwal, A.; Rouhanizadeh, B.; Safapour, E. and Ricks, M. (2026) Sustainable transportation infrastructure: Comparative analysis and a comprehensive decision-support tool. Built Environment Project and Asset Management, 16(3), pp. 616-636. ISSN 2044-124X
Sing, M; Chan, J; Liu, H and Ngai, N N H (2023) Developing an analytic hierarchy process-based decision model for modular construction in urban areas. Journal of Engineering, Design and Technology, 21(4), pp. 1212-1229. ISSN 1726-0531
Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364
Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.
Smadi, O G (2000) Knowledge-based expert system pavement management optimization. PhD thesis, Iowa State University, USA.
Smiley, J P; Dainty, A and Fernie, S (2014) Construction policy research: Beware reason masquerading as truth. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Sohrabi, M (2025) Statistical methods for enhanced coastal flood risk assessment and adaptation planning. PhD thesis, University of Alabama, USA.
Soltani, A R (2004) A multi-objective intelligent transportation system in construction sites. PhD thesis, University of Salford, UK.
Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Soomro, B A and Shah, N (2022) Environmental concerns among the entrepreneurs: A disaster resilience and environment building during the second wave of the COVID-19. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 516-530. ISSN 1759-5916
Sousa, R L (2010) Risk analysis for tunneling projects. PhD thesis, Massachusetts Institute of Technology, USA.
Spoormans, L and Pereira Roders, A (2020) Methods in assessing the values of architecture in residential neighbourhoods. International Journal of Building Pathology and Adaptation, 39(3), pp. 490-506. ISSN 23984708
Stanitsa, A; Hallett, S H and Jude, S (2024) The challenges of implementing evidence-based strategies to inform building and urban design decisions: A view from current practice. Journal of Engineering, Design and Technology, 22(4), pp. 1099-1118. ISSN 1726-0531
Stellacci, S; Domingos, L and Resende, R (2024) Integrated computational approaches for energy retrofit of historical buildings in extreme climate environments. International Journal of Building Pathology and Adaptation, 42(1), pp. 114-132. ISSN 23984708
Stephan, A and Crawford, R H (2014) A comprehensive life cycle water analysis framework for residential buildings. Building Research & Information, 42(6), pp. 685-695. ISSN 0961-3218
Stockings, W H (2002) The process of construction planning. PhD thesis, Eindhoven University of Technology, Netherlands.
Stollmann, J (2016) Neighbourhood resilience in mass housing: Co-production via research-by-design. Building Research & Information, 44(7), pp. 737-753. ISSN 0961-3218
Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Sundling, R (2019) A development process for extending buildings vertically – based on a case study of four extended buildings. Construction Innovation, 19(3), pp. 367-385. ISSN 1471-4175
Taleb, H M and Abumoeilak, L (2021) An assessment of different courtyard configurations in urban communities in the United Arab Emirates. Smart and Sustainable Built Environment, 10(1), pp. 67-89. ISSN 2046-6099
Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193
Taneja, P (2013) The flexible port. PhD thesis, Delft University of Technology, Netherlands.
Tarpio, J and Lehtovuori, P (2026) Horizontal building extensions: Potential in Finnish blocks of flats. Buildings & Cities, 7(1), pp. 445-466. ISSN 2632-6655
Tarpio, J; de la Rosa, R C and Pelsmakers, S (2025) Promoting resilience in Finland: Built environment professionals' perspectives. Building Research & Information, 53(3), pp. 305-322. ISSN 0961-3218
Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599
Teller, J (2021) Urban density and covid-19: Towards an adaptive approach. Buildings & Cities, 2(1), pp. 150-165. ISSN 2632-6655
Thakore, A Y; Iyer, M; Mishra, G and Doshi, S (2024) Resilient WASH development for urban poor: The case of Ahmedabad slums. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 19-44. ISSN 1759-5916
Thorpe, D and Karan, E (2008) Method for calculating schedule delay considering weather conditions. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599
Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364
Tomkins, C D (2008) Allocation and pricing of water resources. PhD thesis, Stanford University, USA.
Tommelein, I D (2022) Work density method for takt planning of construction processes with nonrepetitive work. Journal of Construction Engineering and Management, 148(12): 04022134, ISSN 0733-9364
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Tran, C N N; Tam, V W Y; Le, K N and Illankoon, I M C S (2023) Environmental impacts assessment for Australian buildings: Thermal resistance and environmental impacts relationship. International Journal of Construction Management, 23(2), pp. 243-252. ISSN 1562-3599
Tran, C N N; Tat, T T H; Tam, V W Y and Tran, D H (2023) Factors affecting intelligent transport systems towards a smart city: A critical review. International Journal of Construction Management, 23(12), pp. 1982-1998. ISSN 1562-3599
Tsai, S L; Ochiai, C; Deng, C Z and Tseng, M H (2022) A sustainable post-disaster housing development framework for an indigenous hao-cha community in Taiwan: Considering culture and livelihood in housing extensions. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 583-600. ISSN 1759-5916
Tähtinen, L and Toivonen, S (2025) Expanding horizons: A framework for developing futures-oriented resilience in the built environment. Building Research & Information, 53(3), pp. 281-304. ISSN 0961-3218
Ueki, M; Haas, C T and Seo, J (1999) Decision tool for microtunneling method selection. Journal of Construction Engineering and Management, 125(2), pp. 123-131. ISSN 0733-9364
Ugulu, R; Arewa, A and Stephen, A (2019) Relationship between labour productivity and curved wall construction in high-rise building projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Van de Ruitenbeek, H K M (2012) Evolutionary, unconscious design support for the architectural, engineering and construction industry. PhD thesis, Delft University of Technology, Netherlands.
Villa, S B; Vasconcellos, P B; De Bortoli, K C R and De Araujo, L B (2022) Lack of adaptability in Brazilian social housing: Impacts on residents. Buildings & Cities, 3(1), pp. 376-397. ISSN 2632-6655
Vyas, G S; Jha, K N and Patel, D A (2016) Enhancement of greenness of new construction using the DEA. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wallhagen, M; Malmqvist, T and Eriksson, O (2017) Professionals' knowledge and use of environmental assessment in an architectural competition. Building Research & Information, 45(4), pp. 426-442. ISSN 0961-3218
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364
Wernsman, M G (2008) The process of designing and constructing an accessible residence hall for people with disabilities on a public university campus. PhD thesis, Colorado State University, USA.
Wesz, J G B; Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(2), pp. 134-152. ISSN 0969-9988
Whelton, M G (2004) The development of purpose in the project definition phase of construction projects: Implications for project management. PhD thesis, University of California, Berkeley, USA.
Wild, A (2001) The Phillips Report on building: 1950. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Wild, A (2002) "False coherence" and "cohesive fragmentation" in construction's post-war corporatism 1945-70. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Williams, L M (2000) Strategic decision support for project portfolio management in the public sector. PhD thesis, University of California, Los Angeles, USA.
Williams, P (2014) Growing houses and trees: Integrating biodiversity conservation and urbanisation: An Australian case study. International Journal of Law in the Built Environment, 6(1-2), pp. 152-173. ISSN 1756-1450
Wilson, M T (2020) Assessing voluntary resilience standards and impacts of flood risk information. Building Research & Information, 48(1), pp. 84-100. ISSN 0961-3218
Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364
Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029
Wong, P F; Chia, F C; Kiu, M S and Lou, E C W (2022) Potential integration of blockchain technology into smart sustainable city (ssc) developments: A systematic review. Smart and Sustainable Built Environment, 11(3), pp. 559-574. ISSN 2046-6099
Wong, P F; Tan, X Y and Lou, E C W (2025) Assessing the adoption of blockchain technology in smart sustainable cities: Insights from construction practitioners in Malaysia. International Journal of Construction Education and Research, 21(2), pp. 141-163. ISSN 1557-8771
Woodhead, W D and Salomonsson, G D (1983) A computer based system for recording and analysing building site labour input. Construction Papers, 2(2), pp. 47-52. ISSN 0144-8587
Wu, Y; Azmi, A; Ibrahim, R; Ghafar, A A and Salih, S A (2025) Creating a sustainable urban ecosystem: The Azheke village model. Smart and Sustainable Built Environment, 14(4), pp. 1150-1171. ISSN 2046-6099
Xu, W; Zhang, Y; Proverbs, D and Zhong, Z (2024) Enhancing the resilience of road networks to flooding. International Journal of Building Pathology and Adaptation, 42(2), pp. 213-236. ISSN 23984708
Xue, X; Tan, X and Fan, H (2026) Mapping the trajectories of digital technology innovation in the construction industry: An integrated spnp and louvain approach. Engineering, Construction and Architectural Management, 33(1), pp. 477-508. ISSN 0969-9988
Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.
Yang, I T; Hsieh, Y M and Kung, L O (2012) Parallel computing platform for multiobjective simulation optimization of bridge maintenance planning. Journal of Construction Engineering and Management, 138(2), pp. 215-226. ISSN 0733-9364
Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193
Yang, Y; Li, Y; Kral, K; Hupert, N and Dogan, T (2021) Urban design attributes and resilience: COVID-19 evidence from New York city. Buildings & Cities, 2(1), pp. 618-636. ISSN 2632-6655
Yu, J; Ma, G and Cai, S (2019) Disparities in the provision of aging-friendly communities in old and new urban neighborhoods in China. Engineering, Construction and Architectural Management, 26(7), pp. 1277-1293. ISSN 0969-9988
Yu, J; Ma, G; Ding, W; Mao, J and Wang, J (2022) Structural model for the relationships between age-friendly communities and quality of life of older adults in hefei, China. Engineering, Construction and Architectural Management, 29(3), pp. 1376-1395. ISSN 0969-9988
Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.
Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X
Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364
Zakariya, K; Ibrahim, P H and Abdul Wahab, N A (2019) Conceptual framework of rural landscape character assessment to guide tourism development in rural areas. Journal of Construction in Developing Countries, 24(1), pp. 85-99. ISSN 1823-6499
Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988
Zhang, P; Sing, M C P; Chan, A P C and Liu, H J (2026) Utilizing deep learning for the extraction of cost risk factors from project risk registers: Enhancing contingency estimation. Journal of Construction Engineering and Management, 152(5): 04026049, ISSN 0733-9364
Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364
Zhao, H (2017) Distributed building information modeling in multidisciplinary collaboration. DSc thesis, ETH Zürich, Switzerland.
Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364
Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364
Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.
Zhou, W; Heesom, D; Georgakis, P and Tah, J H M (2014) User-centred design for collaborative 4D modelling. Construction Innovation, 14(4), pp. 493-517. ISSN 1471-4175
Zhou, Y; Wang, D; Liu, G; Wang, J and Li, K (2017) A method for tenant selection of China's construction industrial parks through industrial symbiosis. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Zhuang, T.; Ji, H.; Wang, Y.; Wu, H. and Zeng, M. (2026) How to promote co-production of neighborhood regeneration in China? An evolutionary game approach to government and resident-initiated projects. Engineering, Construction and Architectural Management, 33(3), pp. 2268-2297. ISSN 0969-9988
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.
Zouein, P P and Tommelein, I D (1999) Dynamic layout planning using a hybrid incremental solution method. Journal of Construction Engineering and Management, 125(6), pp. 400-408. ISSN 0733-9364
af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
du Toit, J and Wagner, C (2020) The effect of housing type on householders' self-reported participation in recycling. Smart and Sustainable Built Environment, 9(4), pp. 395-412. ISSN 2046-6099
ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175
Up a level