Items with Index Term: placing

Number of items: 134.

Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.

Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364

Adio, Obafemi Adekunle (2022) An automated knowledge-based decision support system for managing non-conformances on australia's large infrastructure projects. PhD thesis, University of Melbourne, Australia.

Akanmu, A; Olayiwola, J and Olatunji, O A (2020) Musculoskeletal disorders within the carpentry trade: Analysis of timber flooring subtasks. Engineering, Construction and Architectural Management, 27(9), pp. 2577-2590. ISSN 0969-9988

Al Niyadi, R (2024) Public relations mediation in citizen engagement for Oman’s nation-building: The case of Oman vision 2040. PhD thesis, Lancaster University, UK.

Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364

Alikhani, H and Latifi, M (2024) Evaluation of the healing performance of hot-mix asphalt containing waste steel shavings under different microwave induction healing cycles. Journal of Construction Engineering and Management, 150(1): 04023153, ISSN 0733-9364

Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: A comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(2), pp. 159-173. ISSN 0969-9988

Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988

Almadhoob, Huda Mohamed Ali Hasan Husain (2020) Self-organising networks in complex infrastructure projects: the case of London Bank Station Capacity Upgrade Project. PhD thesis, University College London, UK.

Anson, M and Siu, M F F (2020) Augmented balance point diagrams for matching site and concrete-supply resources. Journal of Construction Engineering and Management, 146(4): 04020021, ISSN 0733-9364

Anson, M; Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(3), pp. 237-250. ISSN 01446193

Anson, M and Wang, S Q (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering and Management, 124(2), pp. 116-124. ISSN 0733-9364

Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988

Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175

Babangida, I (2014) Hierarchical structuring and evaluation of risks, uncertainties and technical challenges faced by building refurbishment contractors. PhD thesis, University of Bolton, UK.

Babangida, I; Olubodun, F and Kangwa, J (2012) Building refurbishment: Holistic evaluation of barriers and opportunities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Badger, W; Sullivan, K; Wiezel, A and Bopp, P H (2009) Profiling the leadership of project managers. International Journal of Construction Education and Research, 5(2), pp. 121-146. ISSN 1557-8771

Bambrick, B (1994) Construction of an island. Journal of Construction Engineering and Management, 120(1), pp. 223-227. ISSN 0733-9364

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Beavers, J E; Moore, J R; Rinehart, R and Schriver, W R (2006) Crane-related fatalities in the construction industry. Journal of Construction Engineering and Management, 132(9), pp. 901-910. ISSN 0733-9364

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

Bew, M D (2017) Engineering better social outcomes through requirements management & integrated asset data processing. PhD thesis, University of Salford, UK.

Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.

Bilec, Melissa M (2007) A hybrid life cycle assessment model for construction processess. PhD thesis, University of Pittsburgh, USA.

Bina, K and Moghadas, N (2021) BIM-abm simulation for emergency evacuation from conference hall, considering gender segregation and architectural design. Architectural Engineering and Design Management, 17(5-6), pp. 361-375. ISSN 1745-2007

Burke, C K A (2015) Generating social value through public sector construction procurement: A study of local authorities and SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), pp. 203-216. ISSN 01446193

Cai, H; Rahman, A; Su, X and Zhang, H (2014) A GIS-microscopic simulation approach for optimizing road barrier placement and configuration in university campus emergency evacuation. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 362-379. ISSN 1759-5916

Carlsson, V and Koch, C (2014) Shall we dance? Encounters for energy renovation of single family houses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.

Casady, C B and Baxter, D (2020) Pandemics, public-private partnerships (PPPs), and force majeure: COVID-19 expectations and implications. Construction Management and Economics, 38(12), pp. 1077-1085. ISSN 01446193

Celik, T (1989) Improving concrete quality by using an expert system. PhD thesis, Loughborough University, UK.

Chandra, Shailja (2006) Investigating green building assessment tools: a risk-analysis based approach. PhD thesis, University of New South Wales, Australia.

Cheng, M Y and Yang, S C (2001) GIS-based cost estimates integrating with material layout planning. Journal of Construction Engineering and Management, 127(4), pp. 291-299. ISSN 0733-9364

Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.

Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel company v. John laing. Construction Management and Economics, 25(7), pp. 701-708. ISSN 1466433X

Downey, M (2014) Selection and adoption of low and zero carbon technologies in social housing: a socio-technical network approach. PhD thesis, University of Reading, UK.

Dunlop, P and Smith, S (2000) Stochastic modelling of concrete operations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

Dutta, A (2020) An in-depth investigation of the effects of work-related factors on the development of knee musculoskeletal disorders among construction roofers. PhD thesis, West Virginia University, USA.

Dutta, A; Breloff, S P; Dai, F; Sinsel, E W; Warren, C M and Wu, J Z (2020) Identifying potentially risky phases leading to knee musculoskeletal disorders during shingle installation operations. Journal of Construction Engineering and Management, 146(3): 04019118, ISSN 0733-9364

Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988

Eftekhari, M M (1996) Ventilator air flow measurement in new houses. Building Research & Information, 24(3), pp. 176-182. ISSN 0961-3218

El Ghazali, Y (2013) Implications of RFID in a supply chain: Process, knowledge management and performance. PhD thesis, Ecole Polytechnique, Montreal, Canada.

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364

Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007

Fletcher, S L (2001) Developing disassembly strategies for buildings to reduce the lifetime environmental impacts by applying a systems approach. PhD thesis, University of Sheffield, UK.

Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gaddala, K and Raju, P S (2020) Optimal location of UPQC for power quality improvement: Novel hybrid approach. Journal of Engineering, Design and Technology, 18(6), pp. 1519-1541. ISSN 1726-0531

Gambatese, J A (2003) Controlled concrete demolition using expansive cracking agents. Journal of Construction Engineering and Management, 129(1), pp. 98-104. ISSN 0733-9364

Ghoddousi, P; Bahrami, N; Chileshe, N and Hosseini, M R (2014) Mapping site-based construction workers' motivation: Expectancy theory approach. Construction Economics and Building, 14(1), pp. 60-77. ISSN 2204-9029

Gonsalves, N; Ogunseiju, O R and Akanmu, A A (2024) Activity recognition from trunk muscle activations for wearable and non-wearable robot conditions. Smart and Sustainable Built Environment, 13(6), pp. 1370-1385. ISSN 2046-6099

Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364

Herbert, M (2000) Performance and the virtual team. PhD thesis, Loughborough University, UK.

Higham, A and Thomson, C (2015) An evaluation of construction professionals sustainability literacy in North West England. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Hinze, J and Parker, R (1988) Productivity study on extruded concrete curbing operations. Journal of Construction Engineering and Management, 114(2), pp. 256-262. ISSN 0733-9364

Hinze, J and Wiegand, F (1992) Role of designers in construction worker safety. Journal of Construction Engineering and Management, 118(4), pp. 677-684. ISSN 0733-9364

Holden, S L (2021) Land, materials, and construction site: Decommodification through alternative construction. PhD thesis, University of Manchester, UK.

Hong, Y; Hammad, A W A; Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(2), pp. 154-183. ISSN 0969-9988

Hopkin, T; Lu, S L; Rogers, P and Sexton, M G (2014) Placing defects at the heart of high quality new homes: The learning perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Horne, M; Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(2), pp. 96-108. ISSN 0961-3218

Jayawardane, A K; Price, A D and Harris, F C (1995) Measurement of brickwork and blockwork productivity: Part A: Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Building Research & Information, 23(2), pp. 81-86. ISSN 0961-3218

Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988

Kishk, M and Oladunjoye, B (2009) Risk assessment and allocation in Nigerian oil and gas projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Koutsomarkos, V (2023) Developing a fire robustness index for the built environment. PhD thesis, University of Edinburgh, UK.

Kumaraswamy, M M (1997) Productivity matters. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Li, J J (2023) A socio-technical framework to guide implementation and value realisation of distributed ledger technologies (DLT) in the construction sector. PhD thesis, Northumbria University, UK.

Lingard, H and Francis, V (2005) The decline of the 'traditional' family: Work-life benefits as a means of promoting a diverse workforce in the construction industry of Australia. Construction Management and Economics, 23(10), pp. 1045-1057. ISSN 01446193

Lingard, H; Pink, S; Hayes, J; McDermott, V and Harley, J (2016) Using participatory video to understand subcontracted construction workers' safety rule violations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364

Lu, S L; Sexton, M G; Abbott, C and Jones, V (2007) What are the key turning points in female career progression? The case of a senior manager in a small construction firm. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Mahdavinejad, M; Bemanian, M; Abolvardi, G and Elhamian, S M (2012) Analyzing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 133-147. ISSN 1759-5916

Mamari, M A; Khan, H M; Al Saadi, S and Al Hashim, A (2025) Impact of windcatcher on the thermal comfort and indoor air quality in a modern house. Building Research & Information, 53(1-2), pp. 204-219. ISSN 0961-3218

McWhirter, N and Shealy, T (2020) Case-based flipped classroom approach to teach sustainable infrastructure and decision-making. International Journal of Construction Education and Research, 16(1), pp. 3-23. ISSN 1557-8771

Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Melete, Refiloe (2024) An analysis of the effectiveness of the infrastructure delivery management system in the South African government. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Mirzaee, A M; Hosseini, M R; Martek, I; Rahnamayiezekavat, P and Arashpour, M (2023) Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: Case studies from Iran. Engineering, Construction and Architectural Management, 30(4), pp. 1481-1495. ISSN 0969-9988

Mohammed, R E (2007) An exploratory system dynamics model to investigate the relationships between errors that occur in construction documents in Saudi Arabia and their possible causes. PhD thesis, Heriot-Watt University, UK.

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Moselhi, O; Fazio, P and Hason, S (1992) Automation of concrete slab-on-grade construction. Journal of Construction Engineering and Management, 118(4), pp. 731-748. ISSN 0733-9364

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.

Mzyece, D (2015) An investigation into the implementation of the Construction (Design and Management) Regulations in the construction industry. PhD thesis, University of Wolverhampton, UK.

O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Pandian, A N and Palanivelu, A (2021) Metaheuristic optimization based placement of svcs with multiple objectives. Journal of Engineering, Design and Technology, 19(6), pp. 1586-1600. ISSN 1726-0531

Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599

Peng, J L; Yen, T; Lin, Y; Wu, K L and Chen, W F (1997) Performance of scaffold frame shoring under pattern loads and load paths. Journal of Construction Engineering and Management, 123(2), pp. 138-145. ISSN 0733-9364

Phraknoi, N (2022) Supply chain finance adoption: three is a crowd in entangled relationships. PhD thesis, Lancaster University, UK.

Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364

Price, T (2010) Site waste management plans, the designer and the CDM principal contractor. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(2), pp. 174-181. ISSN 0969-9988

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193

Pérez, C T and Bastos Costa, D (2021) Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulations. Engineering, Construction and Architectural Management, 28(8), pp. 2222-2247. ISSN 0969-9988

Ramos, N M M and De Freitas, V P (2009) Experimental determination of the hygroscopic inertia of building materials. Building Research & Information, 37(3), pp. 293-299. ISSN 0961-3218

Rawlinson, F and Farrell, P (2008) Construction: A culture for concern? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Rupasinghe, C S and De Silva Weliange, S (2024) Climate change adaptation and mitigation at individual level: Knowledge and attitudes among school teachers in Kalutara district. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 395-408. ISSN 1759-5916

Sadiqi, Zabihullah (2014) Post-disaster reconstruction projects: A logical framework for community participation. PhD thesis, Queensland University of Technology, Australia.

Sai Bharadwaj, B and Chennupati, S K (2023) Pli cancellation in ecg signal using intrinsic time scale decomposition with adaptive gain control. Journal of Engineering, Design and Technology, 21(6), pp. 1725-1745. ISSN 1726-0531

Sajjad, M; Jayasinghe, C and Perera, P (2024) Damage assessment automation for single storey detached masonry houses: a probabilistic approach. Building Research & Information, 52(5), pp. 551-563. ISSN 0961-3218

Santamaria Carrera, J L (2017) Quantifying the effect of construction site factors on concrete quality, costs and production rates. PhD thesis, University of New Mexico, USA.

Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.

Schünemann, C; Olfert, A; Schiela, D; Gruhler, K and Ortlepp, R (2020) Mitigation and adaptation in multifamily housing: Overheating and climate justice. Buildings & Cities, 1(1), pp. 36-55. ISSN 2632-6655

Sherratt, F; Sherratt, S and Ivory, C (2020) Challenging complacency in construction management research: The case of PPPs. Construction Management and Economics, 38(12), pp. 1086-1100. ISSN 01446193

Sherrin, C; McAllister, P and Nanda, A (2015) The persistence of distance: A macro-level perspective on European cross-border real estate development flows. Journal of Financial Management of Property and Construction, 20(2), pp. 147-169. ISSN 1366-4387

Short, K M (2013) The impact of experiential learning: Assessing the outcomes of internship experiences for students entering the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364

Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175

Singh, M M; Sawhney, A and Borrmann, A (2019) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(1), pp. 15-31. ISSN 1562-3599

Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364

Smallwood, J (2005) The role of optimum health and safety (H&S) in construction marketing. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Smyth, H (2010) Construction industry performance improvement programmes: The UK case of demonstration projects in the 'continuous improvement' programme. Construction Management and Economics, 28(3), pp. 255-270. ISSN 1466433X

Sobuz, M H R; Meraz, M M; Saha, A; Akid, A S M; Hasan, N M S; Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(3), pp. 718-738. ISSN 1726-0531

Sourav, M M I; Russedul Islam, M; Mohibur Rahman, S and Istiak Jahan, M (2025) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: Scenario of Bangladesh. Engineering, Construction and Architectural Management, 32(6), pp. 3883-3913. ISSN 0969-9988

Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.

Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193

Turner, P L (2017) A realist exploration of small firm tendering for public sector contracts: a micro-foundational study of capability. PhD thesis, Manchester Metropolitan University, UK.

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wang, S Q and Anson, M (2000) Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology. Construction Management and Economics, 18(3), pp. 363-372. ISSN 01446193

Waqar, A; Othman, I and Mansoor, M S (2026) Effect of human-centric technology adoption on sustainable construction success: A partial least square modeling. International Journal of Building Pathology and Adaptation, 44(1), pp. 36-54. ISSN 2398-4708

Wefki, H; Salah, M; Elbeltagi, E; Elsheikh, A and Khallaf, R (2025) A generative design-based optimization model for multi-objective construction site layout planning. Engineering, Construction and Architectural Management, 32(8), pp. 5429-5455. ISSN 0969-9988

Winch, G and Campagnac, E (1995) The organization of building projects: An Anglo/French comparison. Construction Management and Economics, 13(1), pp. 3-14. ISSN 01446193

Winch, G M (2003) Models of manufacturing and the construction process: The genesis of re-engineering construction. Building Research & Information, 31(2), pp. 107-118. ISSN 0961-3218

Woodhead, R (1997) Exploring the hurdle rate in preparation for a value management workshop planning session. Journal of Financial Management of Property and Construction, 2(2), pp. 21-38. ISSN 1366-4387

Wright, J A (2005) An assessment of competitive advantage and market opportunities of UK construction companies operating in Europe. PhD thesis, University of Leeds, UK.

Ye, K; Zhu, W; Shan, Y and Li, S (2015) Effects of market competition on the sustainability performance of the construction industry: China case. Journal of Construction Engineering and Management, 141(9): 4015025, ISSN 0733-9364

Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364

This list was generated on Sat Aug 22 02:19:53 2026 UTC.