Items with Index Term: pipeline construction

Number of items: 33.

Adams, C D (1995) Procurement of microtunnelling projects. PhD thesis, University of Manchester, UK.

Al-Tabbaa, O and Rustom, R (2011) General framework for designing multi-use simulation modules for estimating project durations. Construction Innovation, 11(3), pp. 321-337. ISSN 1471-4175

Almalki, M; Salman, B; Salem, O and Ammoury, M (2026) A decision-support framework for accelerated wastewater pipeline construction: Integrating economic, social, environmental, and technical criteria. Journal of Construction Engineering and Management, 152(3): 04025263, ISSN 0733-9364

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Altawil, Shadi N A (2017) Multi-level knowledge extraction and modeling to support job hazard analysis process for oil and gas pipeline projects. PhD thesis, University of Alberta, Canada.

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193

Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599

Awakul, P and Ogunlana, S O (2002) The effect of attitudinal differences on interface conflicts in large scale construction projects: A case study. Construction Management and Economics, 20(4), pp. 365-377. ISSN 01446193

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Boudet, H S; Jayasundera, D C and Davis, J (2011) Drivers of conflict in developing country infrastructure projects: Experience from the water and pipeline sectors. Journal of Construction Engineering and Management, 137(7), pp. 498-511. ISSN 0733-9364

Boussabaine, A H; Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(3), pp. 213-224. ISSN 0969-9988

Carlin, M C (2014) A comparative analysis of horizontal directional drilling construction methods in mainland China. PhD thesis, Arizona State University, USA.

Chao, Q; Rotimi, F E and Rotimi, J O B (2021) International construction joint ventures as a resourcing model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 28-37. ISSN 17514304

Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.

Francom, T C (2015) Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects. PhD thesis, Arizona State University, USA.

Fu, Y (2021) Institutional complexity and organizational responses: a case study of Chinese construction firms. PhD thesis, University of Hong Kong, Hong Kong.

Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988

Kraidi, Layth (2020) Development of an integrated risk management framework for oil and gas pipeline projects. PhD thesis, Liverpool John Moores University, UK.

Lu, W and Wang, H (2014) Organizational responses to institutional pressures in international infrastructure projects: A transnational pipeline project case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Matar, M; Osman, H; Georgy, M; Abou-Zeid, A and Elsaid, M (2020) Evaluating the environmental performance of pipeline construction using systems modelling. Construction Management and Economics, 38(8), pp. 689-714. ISSN 01446193

Ozturk, A (2010) Management of trans-boundary mega-projects in the post-cold war Eurasia: The case studies of GAP water and Baku-Ceyhan pipeline projects. PhD thesis, Keele University, UK.

Patel, T; Scheepbouwer, E and van der Walt, J D (2025) Optimizing infrastructure procurement: A predictive model for procurement delivery method selection in New Zealand context. International Journal of Construction Management, 25(14), pp. 1736-1748. ISSN 1562-3599

Phuangcharoen, Warasak (2004) Controversy in Thailand over natural gas pipeline construction. PhD thesis, University of New South Wales, Australia.

Shahin, A; Abourizk, S M and Mohamed, Y (2011) Modeling weather-sensitive construction activity using simulation. Journal of Construction Engineering and Management, 137(3), pp. 238-246. ISSN 0733-9364

Sherman, R; Gibson, G E; Merrow, E and Parrish, K (2021) Examining the impact of rate-of-return regulation on capital project planning. Journal of Construction Engineering and Management, 147(8): 04021080, ISSN 0733-9364

Sherman, Rachael Paige (2020) Assessing the impact of regulation on the performance of power and pipeline projects. PhD thesis, Arizona State University, USA.

Shi, J and Abourizk, S (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(4), pp. 489-498. ISSN 01446193

Ueki, M; Haas, C T and Seo, J (1999) Decision tool for microtunneling method selection. Journal of Construction Engineering and Management, 125(2), pp. 123-131. ISSN 0733-9364

Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: The case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), pp. 3395-3414. ISSN 0969-9988

Welch, G P (2015) Right-of-way: Equal employment opportunity on the trans Alaska oil pipeline, 1968-1977. PhD thesis, Duke University, USA.

Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.

Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193

This list was generated on Sat Aug 22 01:48:16 2026 UTC.