Items with Index Term: philosophy

Number of items: 357.

Abdou, A; Lewis, J and Radaideh, M (2003) An internet-based decision support system for healthcare project appraisal: A conceptual proposal. Construction Innovation, 3(3), pp. 145-155. ISSN 1471-4175

Abdulhadi, N H (1997) Simulation as a tool for re-engineering construction processes. PhD thesis, University of Colorado at Boulder, USA.

Abdullah Habib, S N H (2017) Critical success factors and contractual risks for Private Finance 2 projects implementing building information modelling. PhD thesis, University of Salford, UK.

Abedmousa, M (2023) Reframing construction labour productivity in a colonisation context: the West Bank as an example. PhD thesis, University of Westminster, UK.

Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.

Aboagye-Nimo, E; Wood, H and Collison, J (2019) Complexity of women's modern-day challenges in construction. Engineering, Construction and Architectural Management, 26(11), pp. 2550-2565. ISSN 0969-9988

Abu Awwad, K (2020) The implementation of building information modelling Level 2 in the UK construction industry: the case of small and medium enterprises. PhD thesis, Coventry University, UK.

Acheampong, A; Adjei, E K; Adade-Boateng, A O; Kissi, E; Manu, P and Atibila, D W (2025) Exploring the multidimensional challenges in integrating design for safety (dfs) in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 23(5), pp. 1483-1500. ISSN 1726-0531

Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Adzroe, E K (2015) A study of e-business technology transfer via foreign direct investment in the Ghanaian construction industry. PhD thesis, University of Salford, UK.

Agbaxode, P D K (2022) A framework to improve design documentation quality using integrated project delivery (IPD) approach. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2025) Capabilities required of the conventional project delivery (CPD) approach in producing quality design documentation: The Ghanaian construction industry perspective. Journal of Engineering, Design and Technology, 23(2), pp. 682-701. ISSN 1726-0531

Agbulos, A; Mohamed, Y; Al-Hussein, M; Abourizk, S and Roesch, J (2006) Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. Journal of Construction Engineering and Management, 132(3), pp. 291-299. ISSN 0733-9364

Ahaotu, S M (2018) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahaotu, Sylvia M (2019) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.

Al Dairi, J S S (2017) The design and development of a knowledge-based lean six sigma maintenance system for sustainable buildings. PhD thesis, University of Bradford, UK.

Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.

Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.

Al-Bizri, S and Gray, C (2010) Management framework for technology clusters implementation. Construction Management and Economics, 28(7), pp. 771-782. ISSN 1466433X

Al-Musleh, A M (2011) Development of a framework for total quality management principles in the construction companies with special reference to the construction companies in the state of Qatar. PhD thesis, Queen Mary University of London, UK.

Al-Rabady, R. (2026) Decolonising time: Vernacular villages and the politics of heritage temporality. Buildings & Cities, 7(1), pp. 740-756. ISSN 2632-6655

Al-Sudairi, A A (2000) Evaluation of construction processes: Traditional practices versus lean principles. PhD thesis, University of Colorado at Boulder, USA.

Al-Zubi, M (2011) The impact of organizational culture on knowledge sharing in the construction sector in Jordan. PhD thesis, University of Salford, UK.

Albalkhy, W and Sweis, R (2022) Assessing lean construction conformance amongst the second-grade Jordanian construction contractors. International Journal of Construction Management, 22(5), pp. 900-912. ISSN 1562-3599

Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.

Alhalafi, M (2021) Develop a lean project management framework for the construction companies in order to improve the time and cost efficiencies of their construction operations. PhD thesis, De Montfort University, UK.

Ali, S A A; Arun, C and Krishnamurthy, K (2021) Re-defining flow in construction process for facilitating the identification and quantification of generic overruns existing in construction industry today. International Journal of Construction Management, 21(2), pp. 113-130. ISSN 1562-3599

Alotaibi, S S (2016) The international contractor's decision to invest: a strategic risk management decision model for public private partnership projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Amadi, A I and Higham, A (2019) Putting context to numbers: A geotechnical risk trajectory to cost overrun extremism. Construction Management and Economics, 37(4), pp. 217-237. ISSN 01446193

Amarah, Burhan (2016) Development of a triple bottom line stakeholder satisfaction model. PhD thesis, Bond University, Australia.

Ameh, J O and Odusami, K T (2010) Nigerian building professionals' ethical ideology and perceived ethical judgement. Construction Economics and Building, 10(3), pp. 1-13. ISSN 2204-9029

Ameyaw, C; Adjei-Kumi, T and Owusu-Manu, D-G (2015) Exploring value for money (VfM) assessment methods of public-private partnership projects in Ghana: A theoretical framework. Journal of Financial Management of Property and Construction, 20(3), pp. 268-285. ISSN 1366-4387

Anumba, C J (1989) An integrated two and three dimensional data structure for a structural engineering CAD system. PhD thesis, University of Leeds, UK.

Arayici, Y; Tokdemir, O B and Kassem, M (2023) A quantitative, evidence-based analysis of correlations between lean construction and building information modelling. Smart and Sustainable Built Environment, 12(5), pp. 975-1001. ISSN 2046-6099

Arowosafe, O; Ceranic, B and Dean, A M (2015) A sustainable infrastructure delivery model: Value added strategy in the Nigerian construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Arviso, B (2022) Development of the project definition rating index (PDRI) for tribal building projects. PhD thesis, Arizona State University, USA.

Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.

Aslam, M; Gao, Z and Smith, G (2021) Development of lean approaching sustainability tools (LAST) matrix for achieving integrated lean and sustainable construction. Construction Economics and Building, 21(3), pp. 176-197. ISSN 2204-9029

Aslam, M; Gao, Z and Smith, G (2022) Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, 22(8), pp. 1559-1570. ISSN 1562-3599

Aslan, Zaki M (2008) The design of protective structures for the conservation and presentation of archaeological sites. PhD thesis, University College London, UK.

Aye, L and Fuller, R J (2005) An evaluation of a proposed ventilation system for melbourne's CH2 building. Construction Economics and Building, 5(2), pp. 47-57. ISSN 2204-9029

Azhar, S; Ahmad, I and Sein, M K (2010) Action research as a proactive research method for construction engineering and management. Journal of Construction Engineering and Management, 136(1), pp. 87-98. ISSN 0733-9364

Baden-Hellard, R (1996) The partnering philosophy: A procurement strategy for satisfaction through a teamwork solution to project quality. Journal of Construction Procurement, 2(1), pp. 41-55. ISSN 1358-9180

Bageis, A S O (2008) Contractors' decision to bid: development of a bid/no bid strategic decision model. PhD thesis, Heriot-Watt University, UK.

Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.

Bajjou, M S and Chafi, A (2018) Lean construction implementation in the Moroccan construction industry: Awareness, benefits and barriers. Journal of Engineering, Design and Technology, 16(4), pp. 533-556. ISSN 1726-0531

Bani Ismail, L (2012) An evaluation of the implementation of total quality management within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.

Bani Ismail, Loiy (2012) An evaluation of the implementation of total quality management (TQM) within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.

Barth, Karina Bertotto (2023) Performance measurement systems to support the implementation of the lean philosophy in production management in construction. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Bataw, A (2016) On the integration of building information modelling in undergraduate civil engineering programmes in the United Kingdom. PhD thesis, University of Manchester, UK.

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bendi, D (2017) Developing an offsite readiness framework for Indian construction organisations. PhD thesis, University of Salford, UK.

Berenyi, R O (2001) The conservation of buildings: A philosophical examination. PhD thesis, University of Salford, UK.

Bhatnagar, S; Jacob, G; Devkar, G; Rybkowski, Z K; Arefazar, Y and Obulam, R (2023) A systematic review of lean simulation games in the construction industry. Architectural Engineering and Design Management, 19(6), pp. 701-719. ISSN 1745-2007

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Biesenthal, Christopher (2013) Projects as arenas for pragmatic management practices : Improvisation, capabilities and change. PhD thesis, University of Technology Sydney, Australia.

Boakye Danquah, C; Acheampong, A and Adjei-Kumi, T (2022) Level of awareness of formwork design in the Ghanaian construction industry; enabling future technology application. Journal of Engineering, Design and Technology, 20(4), pp. 1015-1039. ISSN 1726-0531

Bolomope, M T; Nwadike, A N and Aigwi, I E (2025) Managing supply chain disruptions in the construction industry: An institutional approach. Journal of Financial Management of Property and Construction, 30(2), pp. 212-231. ISSN 1366-4387

Boznos, D (1998) The use of computerised maintenance management systems to support team-based maintenance. PhD thesis, Cranfield University, UK.

Brady, L (2019) An investigation into the management of energy performance for building services systems: design to operation. PhD thesis, Liverpool John Moores University, UK.

Brand, M C and Davenport, P (2011) Proposal for a "dual scheme" model of statutory adjudication for the Australian building and construction industry. International Journal of Law in the Built Environment, 3(3), pp. 252-268. ISSN 1756-1450

Brandalise, F M P; Formoso, C T and Viana, D D (2022) Development of a typology for understanding visual management concepts and their relationships. Journal of Construction Engineering and Management, 148(7): 04022041, ISSN 0733-9364

Brandon, P (2012) Sustainable development: Ignorance is fatal: what don't we know? Smart and Sustainable Built Environment, 1(1), pp. 14-28. ISSN 2046-6099

Buckingham, P (2007) International process plant contracts for use on other performance-based projects. Construction Management and Economics, 25(7), pp. 709-713. ISSN 1466433X

Cairns, G (2008) Advocating an ambivalent approach to theorizing the built environment. Building Research & Information, 36(3), pp. 280-289. ISSN 0961-3218

Cameron, I (1999) A goal setting approach to the practice of safety management in the construction industry: Three case studies. PhD thesis, University of Manchester, UK.

Capper, P N (1995) The adjudicator under NEC 2nd edition: A new approach to disputes. Engineering, Construction and Architectural Management, 2(4), pp. 317-326. ISSN 0969-9988

Cartwright, N (2016) Scientific models versus social reality. Building Research & Information, 44(3), pp. 334-337. ISSN 0961-3218

Castillo, G; Alarcón, L F and González, V A (2015) Implementing lean production in copper mining development projects: Case study. Journal of Construction Engineering and Management, 141(1): 05014013, ISSN 0733-9364

Cavill, C A (2014) Fitness for purpose evaluation of stables in current use in the UK. PhD thesis, University of Salford, UK.

Challender, J; Farrell, P and Sherratt, F (2014) Partnering in practice: An analysis of collaboration and trust. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(6), pp. 255-264. ISSN 17514304

Challender J, F P S F (2013) Collaborative procurement: An exploration of practice and trust in times of austerity. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.

Chau, C K; Lee, W L; Yik, F W H and Burnett, J (2000) Towards a successful voluntary building environmental assessment scheme. Construction Management and Economics, 18(8), pp. 959-968. ISSN 01446193

Chen, G; Chen, J; Tang, Y; Li, Q and Luo, X (2022) Identifying effective collaborative behaviors in building information modeling-enabled construction projects. Journal of Construction Engineering and Management, 148(6): 04022026, ISSN 0733-9364

Cheng, M Y and Tsai, M H (2003) Reengineering of construction management process. Journal of Construction Engineering and Management, 129(1), pp. 105-114. ISSN 0733-9364

Chileshe, N (2006) Investigating practitioner's understanding of TQM in small and medium construction companies. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chileshe, N (2007) Quality management concepts, principles, tools and philosophies: A valid methodology for deployment within UK construction-related SMEs. Journal of Engineering, Design and Technology, 5(1), pp. 49-67. ISSN 1726-0531

Chinowsky, P S and Meredith, J E (2000) Strategic management in construction. Journal of Construction Engineering and Management, 126(1), pp. 1-9. ISSN 0733-9364

Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364

Consoli, G (2006) The architect's dilemma: A self reflection in understanding prison design and construction in private prison projects. Construction Economics and Building, 6(2), pp. 1-10. ISSN 2204-9029

Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.

Croome, D J (1978) Building environmental engineering. PhD thesis, Loughborough University, UK.

Crowley, L G and Hancher, D E (1995) Evaluation of competitive bids. Journal of Construction Engineering and Management, 121(2), pp. 238-245. ISSN 0733-9364

Da Rocha, C G; Wijayaratna, K; Jong, K and Haller, D (2023) Examining off-site construction from a flow viewpoint. Journal of Construction Engineering and Management, 149(3): 05023001, ISSN 0733-9364

Daget, Y T and Zhang, H (2020) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(1), pp. 296-320. ISSN 0969-9988

Dauber, V F (2001) Classical lean constructs and their transferability to the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.

De La Garza, J M and Pishdad-Bozorgi, P (2018) Workflow process model for flash track projects. Journal of Construction Engineering and Management, 144(6): 06018001, ISSN 0733-9364

Diaz-Murillo, M (1993) A strategy for the implementation of quality function deployment in the design-construction industry. PhD thesis, Texas A&M University, USA.

Dike, I U and Kapogiannis, G (2014) A conceptual model for improving construction supply chain performance. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Dikko, K (2013) Establishing status of Nigerian building design firms based on European construction institute total quality management matrix. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ding, S; Hu, H; Chai, Z and Wang, W (2024) Secure and formalized blockchain-IPFS information sharing in precast construction from the whole supply chain perspective. Journal of Construction Engineering and Management, 150(1): 04023150, ISSN 0733-9364

Dispoto, W A (2009) Selection and prioritization of leadership attributes: Creating a leadership model for the domestic construction industry. PhD thesis, Capella University, USA.

Donegan, H A; Dodd, F J and Warren, A (1996) A consensus strategy for post-occupancy assessment in school design. Journal of Financial Management of Property and Construction, 1(3), pp. 53-70. ISSN 1366-4387

Dorée, A G (1997) Construction procurement by Dutch municipalities. Journal of Construction Procurement, 3(3), pp. 78-88. ISSN 1358-9180

Dozzi, P; Hartman, F; Tidsbury, N and Ashrafi, R (1996) More-stable owner-contractor relationships. Journal of Construction Engineering and Management, 122(1), pp. 30-35. ISSN 0733-9364

Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.

Edum-Fotwe, F T (1995) A framework for improving the strategic management of construction contractors. PhD thesis, Loughborough University, UK.

Egan, C M (1989) An evaluation of the effectiveness of the Mankato State university construction management program. EdD thesis, University of Alabama, USA.

Egbelakin, T; Wilkinson, S; Potangaroa, R and Ingham, J (2013) Improving regulatory frameworks for earthquake risk mitigation. Building Research & Information, 41(6), pp. 677-689. ISSN 0961-3218

El-Diraby, T E (2012) Epistemology of construction informatics. Journal of Construction Engineering and Management, 138(1), pp. 53-65. ISSN 0733-9364

Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175

Emmitt, S (2005) Integrating teaching and research in an architectural technology undergraduate model. Journal of Engineering, Design and Technology, 3(2), pp. 164-179. ISSN 1726-0531

Emmitt, S; Christoffersen, A K and Sander, D (2004) Design management: A value based approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Emmitt, S and West, B (2003) Incorporating research into an undergraduate module: Learning to detail from first (ecologically sound) principles. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Engida Woldemichael, D. and Mohd Hashim, F. (2011) A framework for functionbased conceptual design support system. Journal of Engineering, Design and Technology, 9(3), pp. 250-272. ISSN 1726-0531

Engida Woldemichael, D and Mohd Hashim, F (2011) A framework for function-based conceptual design support system. Journal of Engineering, Design and Technology, 9(3), pp. 250-272. ISSN 1726-0531

English, J (2002) Managing cultural differences to improve industrial efficiency. Building Research & Information, 30(3), pp. 196-204. ISSN 0961-3218

Eom, C S J; Yun, S H and Paek, J H (2008) Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), pp. 842-851. ISSN 0733-9364

Fadhil Dulaimi, M (2005) The challenge of customer orientation in the construction industry. Construction Innovation, 5(1), pp. 3-12. ISSN 1471-4175

Fahid, S (2007) An investigation of the effectiveness of total quality management in the UK construction industry: An empirical study. PhD thesis, Heriot-Watt University, UK.

Fang, Y; Daniel, E I and Li, S (2021) Conceptual framework for lean construction ambidexterity in project-based organizations. Construction Management and Economics, 39(10), pp. 824-838. ISSN 01446193

Farmer, G and Guy, S (2010) Making morality: Sustainable architecture and the pragmatic imagination. Building Research & Information, 38(4), pp. 368-378. ISSN 0961-3218

Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364

Fernández-Solís, J L (2008) The systemic nature of the construction industry. Architectural Engineering and Design Management, 4(1), pp. 31-46. ISSN 1745-2007

Fialho, Beatriz Campos (2021) Design for smart maintenance enabled by BIM and IoT. PhD thesis, Universidade de São Paulo, Brazil.

Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Flores Salas, A (2016) Evaluation of the use of lightweight concrete panels for post disaster house reconstruction using Building Information Modelling. PhD thesis, University of Manchester, UK.

Forster, A M; Carter, K; Banfill, P F G and Kayan, B (2011) Green maintenance for historic masonry buildings: An emerging concept. Building Research & Information, 39(6), pp. 654-664. ISSN 0961-3218

Fox, S (2009) Applying critical realism to information and communication technologies: A case study. Construction Management and Economics, 27(5), pp. 465-472. ISSN 1466433X

Francis, T J; Geens, A J and Littlewood, J (2010) Is facilities management fundamental to the conservation of heritage buildings and their contents? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Fraser, C and Zarkada-Fraser, A (2001) The philosophy, structure and objectives of research and development in Japan. Construction Management and Economics, 19(8), pp. 831-840. ISSN 01446193

Gajendran, T; Brewer, G; Runeson, G and Dainty, A (2011) Investigating informality in construction: Philosophy, paradigm and practice. Construction Economics and Building, 11(2), pp. 84-98. ISSN 2204-9029

Gallardo, C A S; Granja, A D and Picchi, F A (2014) Productivity gains in a line flow precast concrete process after a basic stability effort. Journal of Construction Engineering and Management, 140(4): B4013004, ISSN 0733-9364

Ganiyu, S (2021) Developing a Bim-Knowledge (Bim-K) framework for improved decision-making in building construction projects. PhD thesis, London South Bank University, UK.

Gao, S (2013) The toyota way model: An implementation framework for large Chinese construction firms. PhD thesis, National University of Singapore, Singapore.

Gao, S; Jin, R and Lu, W (2020) Design for manufacture and assembly in construction: A review. Building Research & Information, 48(5), pp. 538-550. ISSN 0961-3218

Gehrig, G B (1985) Organizational practices and theories: Alignment of construction executive's beliefs with company policies. PhD thesis, Colorado State University, USA.

George, K M (2019) Key performance indicators' effects on public sector infrastructure project efficiency in Grenada. DPA thesis, Walden University, USA.

Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Hosseini, M R (2021) Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (sbts) in the developing countries. Construction Innovation, 21(4), pp. 685-707. ISSN 1471-4175

Ghosh, A; Edwards, D J; Hosseini, M R; Al-Ameri, R; Abawajy, J and Thwala, W D (2021) Real-time structural health monitoring for concrete beams: A cost-effective 'industry 4.0' solution using piezo sensors. International Journal of Building Pathology and Adaptation, 39(2), pp. 283-311. ISSN 23984708

Ginigaddara, B; Gajendran, T and Beard, C (2025) A critical review of quantity surveying education in an offsite construction perspective: strategies for up-skilling. Construction Innovation, 25(4), pp. 1058-1084. ISSN 1471-4175

Gkeredakis, E (2009) Explaining the distinctiveness of coordination through an in-depth study of a major construction project. PhD thesis, University of Liverpool, UK.

Gledson, B (2022) Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction. Construction Innovation, 22(4), pp. 1085-1103. ISSN 1471-4175

Gledson, B J (2017) Innovation diffusion within the UK construction sector: a study of the adoption of 4D BIM. PhD thesis, Northumbria University, UK.

Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.

Gowri, K and Depanni, S (1998) The health and safety expert system (HASES): An expert system framework for building inspections. Engineering, Construction and Architectural Management, 5(1), pp. 92-101. ISSN 0969-9988

Greenberg, D G (1978) Fixing things: A phenomenological study of ten persons. PhD thesis, Union Institute and University, USA.

Grosse, H (2018) Investigating trust in the German construction industry: a contractor's autoethnographic exploration of trust and Le?vinas. PhD thesis, University of Gloucestershire, UK.

Grosse, H (2019) Lévinas' ethics in practice: A construction contractor’s account. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Gunning, J G (1997) The costs and benefits of achieving business excellence in construction organisations. Journal of Financial Management of Property and Construction, 2(1), pp. 45-58. ISSN 1366-4387

Gunning, J G (2004) An analysis of the impact of the revised: Bs en ISO 9001:2000 upon the ready mixed concrete industry of the United Kingdom. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gunning, J G (2008) Towards a more playful approach to construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Habib, S N H A (2017) Critical success factors and contractual risks for Private Finance 2 (PF2) projects implementing building information modelling (BIM). PhD thesis, University of Salford, UK.

Hamid, M Y (2009) The feasibility of a process protocol for facilities management: An exploratory investigation in a higher education institution in the United Kingdom. PhD thesis, University of Salford, UK.

Hansen, G K and Olsson, N O E (2011) Layered project-layered process: Lean thinking and flexible solutions. Architectural Engineering and Design Management, 7(2), pp. 70-84. ISSN 1745-2007

Harriss, C (1998) Why research without theory is not research a reply to Seymour, Crook and Rooke. Construction Management and Economics, 16(1), pp. 113-116. ISSN 01446193

Harvey, E (2019) Rethinking construction safety. PhD thesis, Loughborough University, UK.

Hietajärvi, A-M and Aaltonen, K (2018) The formation of a collaborative project identity in an infrastructure alliance project. Construction Management and Economics, 36(1), pp. 1-21. ISSN 0144-6193

Hill, C J; Howarth, T A P; McNamara, E T and Watson, P (1997) A TQM approach to construction education. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Holden, M A (2022) The digital historic structure report (DHSR): Modern construction management for cultural heritage preservation. PhD thesis, University of Florida, USA.

Holt, G D and Goulding, J S (2014) Conceptualisation of ambiguous-mixed-methods within building and construction research. Journal of Engineering, Design and Technology, 12(2), pp. 244-262. ISSN 1726-0531

Holt, G D; Proverbs, D G and Whitehouse, L (2001) A survey of public sector procurement in England. Journal of Construction Procurement, 7(1), pp. 3-10. ISSN 1358-9180

Howarth, T A P (1997) A Gadamerian hermeneutic approach to ethnographic construction research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases. PhD thesis, Brunel University, UK.

Hudson, D N (1997) Benchmarking construction project execution. PhD thesis, University of Texas at Austin, USA.

Hughes, B; Edwards, D J; Martek, I; Chileshe, N and Thwala, W D (2022) Assessing the "clerk of works" role in delivering quality affordable housing: A UK case study. Smart and Sustainable Built Environment, 11(4), pp. 996-1016. ISSN 2046-6099

Hughes, W P (1997) Construction management contracts: Law and practice. Engineering, Construction and Architectural Management, 4(1), pp. 59-79. ISSN 0969-9988

Hugill, D J (2001) An examination of project management team meetings in railway construction. PhD thesis, University of Manchester, UK.

Hussien, A (2017) ARGILE: a conceptual framework combining augmented reality with agile philosophy for the UK construction industry. PhD thesis, Liverpool John Moores University, UK.

Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria. PhD thesis, Loughborough University, UK.

Jaafari, A and Schub, A (1990) Surviving failures: Lessons from field study. Journal of Construction Engineering and Management, 116(1), pp. 68-86. ISSN 0733-9364

Jaafari, A L I and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(3), pp. 235-255. ISSN 0969-9988

Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175

Jagger, N S B (2017) Skill requirements of the low carbon transition. PhD thesis, University of Sussex, UK.

Jijingi, A T (2019) A BIM-enabled procurement framework in new buildings for the Nigerian architecture, engineering and construction industry. PhD thesis, University of Portsmouth, UK.

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.

Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.

Kakitahi, J M; Alinaitwe, H M; Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(2), pp. 238-251.

Kakitahi, J M; Alinaitwe, H M; Landin, A and Mudaaki, S P (2015) A study of non-compliance with quality requirements in Uganda. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 22-42. ISSN 17514304

Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175

Kalu, U G (2003) Optimizing the participation of suppliers and subcontractors in managing construction projects using concurrent engineering philosophy. PhD thesis, Golden Gate University, USA.

Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.

Khadour, L and Darkwa, J (2008) Tqem in the UK construction industry: Some key findings from a survey. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Khalfan, M; McDermott, P and Cooper, R (2004) Integrating the supply chain within construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029

Kim, S B (2002) Assessment of CII knowledge implementation at the organizational level. PhD thesis, University of Texas at Austin, USA.

Kissi, E; Aigbavboa, C and Kuoribo, E (2023) Emerging technologies in the construction industry: Challenges and strategies in Ghana. Construction Innovation, 23(2), pp. 383-405. ISSN 1471-4175

Koehn, E and Datta, N K (2003) Quality, environmental, and health and safety management systems for construction engineering. Journal of Construction Engineering and Management, 129(5), pp. 562-569. ISSN 0733-9364

Kokkonen, A and Alin, P (2016) Practitioners deconstructing and reconstructing practices when responding to the implementation of BIM. Construction Management and Economics, 34(7-8), pp. 578-591. ISSN 01446193

Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Kuoribo, E; Amoah, P; Kissi, E; Edwards, D J; Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(3), pp. 969-990. ISSN 1726-0531

Labib, Y A M (2017) Lean framework for assessing construction logistics in Jordan. PhD thesis, University of Salford, UK.

Laovisutthichai, V. and Lu, W. (2026) Design for excellence (dfx) in architecture, engineering, and construction: Definition, necessity, and knowledge management-based framework. Architectural Engineering and Design Management, 22(1), pp. 188-205. ISSN 1745-2007

Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304

Laughton, C (1998) Evaluation and prediction of tunnel boring machine performance in variable rock masses. PhD thesis, University of Texas at Austin, USA.

Lavelle, D; Hendry, J and Steel, G (2007) The selection of subcontractors: Is price the major factor. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Lawani, K; McKenzie-Govan, S; Hare, B; Sherratt, F and Cameron, I (2022) Skill shortage of bricklayers in Scotland. Journal of Engineering, Design and Technology, 20(1), pp. 321-338. ISSN 1726-0531

Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(2), pp. 119-144. ISSN 01446193

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 2. Construction Management and Economics, 1(3), pp. 233-268. ISSN 01446193

Li, H; Guo, H L; Li, Y and Skitmore, M (2012) From IKEA model to the lean construction concept: A solution to implementation. International Journal of Construction Management, 12(4), pp. 47-63. ISSN 1562-3599

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(1), pp. 106-133. ISSN 1471-4175

Liu, H; Jazayeri, E and Dadi, G B (2017) Establishing the influence of owner practices on construction safety in an operational excellence model. Journal of Construction Engineering and Management, 143(6): 04017005, ISSN 0733-9364

Liu, J; Low, S P and Zhang, Q (2018) Enterprise risk management practices of top ENR international contractors. International Journal of Construction Management, 18(5), pp. 364-374. ISSN 1562-3599

Lloyd, E (2022) Aesthetic value in the built environment. PhD thesis, Cardiff University, UK.

London, B C K and Gajendran, T (2010) Diffusing cultural awareness and maturity in lean managed organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

London, K (2010) Multi-market industrial organizational economic models for the internationalization process by small and medium enterprise construction design service firms. Architectural Engineering and Design Management, 6(2), pp. 132-152. ISSN 1745-2007

Loosemore, M (1998) Social network analysis: Using a quantitative tool within an interpretative context to explore the management of construction crises. Engineering, Construction and Architectural Management, 5(4), pp. 315-326. ISSN 0969-9988

Loosemore, M and Reid, S (2019) The social procurement practices of tier-one construction contractors in Australia. Construction Management and Economics, 37(4), pp. 183-200. ISSN 01446193

Lopes, J (2003) The relationship between construction outputs and GDP: Long-run trends from Portugal. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Lopez, R; Chong, H Y; Wang, X and Graham, J (2016) Technical review: Analysis and appraisal of four-dimensional building information modeling usability in construction and engineering projects. Journal of Construction Engineering and Management, 142(5): 06015005, ISSN 0733-9364

Love, P E D; Edwards, D J and Smith, J (2016) Rework causation: Emergent theoretical insights and implications for research. Journal of Construction Engineering and Management, 142(6): 04016010, ISSN 0733-9364

Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(2), pp. 139-149. ISSN 01446193

Low, S P and Gao, S (2011) The application of the just-in-time philosophy in the Chinese construction industry. Journal of Construction in Developing Countries, 16(1), pp. 91-111. ISSN 1823-6499

Lu, S and Sexton, M G (2004) Appropriate research design for investigating innovation in small knowledge-intensive professional service firms. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007

Luo, J; Zhang, H and Sher, W (2021) A mixed method for measuring incompatibilities between manufacturing approaches and off-site construction. Engineering, Construction and Architectural Management, 28(9), pp. 2516-2548. ISSN 0969-9988

Mace, B K (2001) A production control model for commercial construction. PhD thesis, Pennsylvania State University, USA.

Mahmud, A T; Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: A systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(1), pp. 29-56. ISSN 1366-4387

Majava, J; Haapasalo, H and Aaltonen, K (2019) Elaborating factors affecting visual control in a big room. Construction Innovation, 19(1), pp. 34-47. ISSN 1471-4175

Mak, M Y and Ng, S T (2008) Feng shui: An alternative framework for complexity in design. Architectural Engineering and Design Management, 4(1), pp. 58-72. ISSN 1745-2007

Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193

Mannarino, J A (2001) Evaluation of the construction management delivery system and establishing a model for selection: A qualitative approach. PhD thesis, State University of New York at Buffalo, USA.

Maqsood, T; Walker, D H T and Finegan, A (2004) Project histories and project learning: A knowledge management challenge. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Maqsood, Tayyab (2006) Role of knowledge management in supporting innovation and learning in construction. PhD thesis, RMIT University, Australia.

Marsh, D; Bryde, D and Graham, A (2014) Perceptions of the value and viability of implementing lean construction with business information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Martin, J W (1999) Adult education philosophies and teaching styles of construction management faculty of the associated schools of construction. EdD thesis, Oklahoma State University, USA.

Matthews, J and Rowlinson, S (1999) Partnering: Incorporating safety management. Engineering, Construction and Architectural Management, 6(4), pp. 347-357. ISSN 0969-9988

Mba, M F B and Agumba, J N (2018) Critical success factors influencing performance outcome of joint venture construction projects in South Africa: Comparison of first and second order models. Construction Economics and Building, 18(3), pp. 74-94. ISSN 2204-9029

McDermott, P and Khalfan, M M A (2006) Achieving supply chain integration within construction industry. Construction Economics and Building, 6(2), pp. 44-54. ISSN 2204-9029

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

McLean, W P (2004) Inspector discretion and industry compliance in the street-level implementation of building codes. PhD thesis, University of New Orleans, USA.

Memecan, S (1983) A theoretical framework for technology of building. PhD thesis, University of Pennsylvania, USA.

Mitchell Finnigan, S J (2020) Human-centred smart buildings: Reframing smartness through the lens of human-building interaction. PhD thesis, University of Newcastle upon Tyne, UK.

Mohamad, M I (1999) The application of concurrent engineering philosophy to the construction industry. PhD thesis, Loughborough University, UK.

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Mootanah, D P (1999) A holistic approach to the management of risk and value in project management. PhD thesis, Anglia Polytechnic University, UK.

Moradi, S and Kähkönen, K (2022) Success in collaborative construction through the lens of project delivery elements. Built Environment Project and Asset Management, 12(6), pp. 973-991. ISSN 2044-124X

Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Moshood, T D; Rotimi, F E and Rotimi, J O B (2022) An integrated paradigm for managing efficient knowledge transfer: Towards a more comprehensive philosophy of transferring knowledge in the construction industry. Construction Economics and Building, 22(3), pp. 65-98. ISSN 2204-9029

Moyo, Cynthia; Moyo, Tirivavi and Mudombo, Mabel Vongai (2026) Integrating sustainable materials into construction: A review of Zimbabwe’s model building by-laws. Journal of Construction Business and Management, 8(S1), pp. 99-110. ISSN 2521-0165

Mubarak, A M (2018) The relationship between determinants of risk governance assurance and efficacy of the public projects in the government of Dubai from the perspective of internal audit function. PhD thesis, British University in Dubai, UAE.

Murphy, M (2016) Exploration of the synergies between activity theory and the dmaic method in evaluating construction processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda. PhD thesis, University of Newcastle, Australia.

Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: A FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(2), pp. 177-187. ISSN 0969-9988

Newaz, M T (2019) The psychological contract to measure safety outcomes on construction sites. PhD thesis, University of Newcastle, Australia.

Nicholas, J; Holt, G D and Mihsein, M (2000) Predicting materials suppliers' bad debt. Journal of Construction Research, 1(2), pp. 159-167. ISSN 1609-9451

Nicol, J F and Wilson, M (2011) A critique of European Standard EN 15251: Strengths, weaknesses and lessons for future standards. Building Research & Information, 39(2), pp. 183-193. ISSN 0961-3218

Njoku, A I (2014) Evaluation of the impact of adherence to project governance principles on the outcome of large infrastructure projects implemented in developing economies, with Nigeria as an example. PhD thesis, University of Bradford, UK.

O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175

Odiba, E; Demian, P and Ruikar, K (2021) Development of a conceptual framework for effective quality management practices in construction organisations. Journal of Construction Business and Management, 5(1), pp. 1-16. ISSN 2521-0165

Ogwueleka, A C (2015) Evaluation of incentive mechanisms on performance-based contracting systems in South Africa and Nigeria. PhD thesis, University of Pretoria, South Africa.

Ojiako, U; Mashele, T and Chipulu, M (2014) Ubuntu within the South African construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 83-90. ISSN 17514304

Ojiako, U; Park, J H; Williams, T; Marshall, A and Chipulu, M (2014) What is best value in public sector building construction? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 209-219. ISSN 17514304

Olatokun, E O (2017) Requirement elicitation using knowledge capturing techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.

Olatokun, E O (2017) Requirement elicitation using knowledge capturing (kc) techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.

Olatunji, O A (2014) Views on building information modelling, procurement and contract management. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 117-126. ISSN 17514304

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Onaran, B E (1996) The construction of professional identity in architecture and landscape architecture: Convictions about skills, knowledge, and professional roles in design. PhD thesis, University of Wisconsin - Madison, USA.

Opoku, A and Mills, S A (2019) Exploring the use of standardised design in addressing the shortage of primary school places in the UK. Journal of Engineering, Design and Technology, 17(2), pp. 383-401. ISSN 1726-0531

Opoku, D G J; Agyekum, K and Ayarkwa, J (2022) Drivers of environmental sustainability of construction projects: A thematic analysis of verbatim comments from built environment consultants. International Journal of Construction Management, 22(6), pp. 1033-1041. ISSN 1562-3599

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Ostwald, M J (2010) Ethics and the auto-generative design process. Building Research & Information, 38(4), pp. 390-400. ISSN 0961-3218

Osundiran, Adeola Oluwatoyin and Makgopa, Tshehla (2026) Port efficiency: The application of blockchain technology in the construction material supply chain. Journal of Construction Business and Management, 8(S1), pp. 48-61. ISSN 2521-0165

Othman, N A (2010) An exploratory study into the implementation of safety management systems of Malaysian contractors in processing plants. PhD thesis, Loughborough University, UK.

Owusu-Manu, D G; Debrah, C; Oduro-Ofori, E; Edwards, D J and Antwi-Afari, P (2021) Attributable indicators for measuring the level of greenness of cities in developing countries: lessons from Ghana. Journal of Engineering, Design and Technology, 19(3), pp. 625-646. ISSN 1726-0531

Paiva, A G C (1996) A framework for the evaluation of quality of dwellings. PhD thesis, University of Bristol, UK.

Palmer, A C (1992) An investigative study of value engineering in the United States of America and its relationship to United Kingdom cost control procedures. PhD thesis, Loughborough University, UK.

Pan, W and Arif, M (2011) Manufactured construction: Revisiting the construction-manufacturing relations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Papadonikolaki, E (2016) Alignment of partnering with construction it: Exploration and synthesis of network strategies to integrate BIM-enabled supply chains. PhD thesis, Delft University of Technology, Netherlands.

Papadonikolaki, E and Wamelink, H (2017) Inter- and intra-organizational conditions for supply chain integration with BIM. Building Research & Information, 45(6), pp. 649-664. ISSN 0961-3218

Parkin, A; Herrera, M and Coley, D A (2020) Net-zero buildings: When carbon and energy metrics diverge. Buildings & Cities, 1(1), pp. 86-99. ISSN 2632-6655

Parsanezhad, P (2019) Towards a BIM-enabled facility management: Promises, obstacles and requirements. PhD thesis, KTH Royal Institute of Technology, Sweden.

Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X

Pathirage, C P (2007) A structured approach to manage the tacit knowledge of construction employees. PhD thesis, University of Salford, UK.

Pheng, L S and Chuan, C J (2001) Just-in-time management of precast concrete components. Journal of Construction Engineering and Management, 127(6), pp. 494-501. ISSN 0733-9364

Pheng, L S and Hui, M S (1999) The application of JIT philosophy to construction: A case study in site layout. Construction Management and Economics, 17(5), pp. 657-668. ISSN 01446193

Pheng, L S and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics, 16(6), pp. 621-635. ISSN 01446193

Preece, C N and Khalil, I I M (2000) Preliminary research into internal marketing as a strategic business philosophy in construction contracting. Journal of Construction Research, 1(1), pp. 9-17. ISSN 1609-9451

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364

Proverbs, D G and Holt, G D (1999) The strive for productivity and quality: Views of UK project managers. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Pudney, Steven Grant (2010) Asset renewal decision modelling with application to the water utility industry. PhD thesis, Queensland University of Technology, Australia.

Pérez, C T and Bastos Costa, D (2021) Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulations. Engineering, Construction and Architectural Management, 28(8), pp. 2222-2247. ISSN 0969-9988

Pérez, C T and Costa, D (2018) Developing a taxonomy of transportation waste in construction production processes. Built Environment Project and Asset Management, 8(5), pp. 434-448. ISSN 2044-124X

Raidén, A B and Räisänen, C (2018) Conceptualising behavioural ambidexterity and the effects on individual well-being. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.

Reaney, M; Griffith, A; Watson, P A and Ellis, C (2000) Optimizing functional relationships for new residential developments. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Riggs, L S (1988) Educating construction managers. Journal of Construction Engineering and Management, 114(2), pp. 279-285. ISSN 0733-9364

Robinson, H S (2000) A critical systems approach to infrastructure investment and resource management in developing countries. PhD thesis, London South Bank University, UK.

Robinson, J and Cole, R J (2015) Theoretical underpinnings of regenerative sustainability. Building Research & Information, 43(2), pp. 133-143. ISSN 0961-3218

Rooke, J A; Koskela, L and Seymour, D (2007) Producing things or production flows? Ontological assumptions in the thinking of managers and professionals in construction. Construction Management and Economics, 25(10), pp. 1077-1085. ISSN 1466433X

Rosso, L L (1998) The current status of four-year undergraduate construction education programs in the United States. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Ruddock, L and Lopes, J (2006) The construction sector and economic development: The 'Bon curve'. Construction Management and Economics, 24(7), pp. 717-723. ISSN 1466433X

Ruge, G and Mackintosh, L (2020) Facilitating reflective practice: Developing built environment educators' capacity for teaching and learning. Construction Economics and Building, 20(3), pp. 160-174. ISSN 2204-9029

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Saad, N M (2016) The influence of safety culture on safety performance in Saudi Arabian construction industry. PhD thesis, University of Salford, UK.

Salvatierra-Garrido, J (2012) Conceptualising value for construction: experience from social housing projects in Chile. PhD thesis, Loughborough University, UK.

Salvatierra-Garrido, J; Pasquire, C and Thorpe, T (2008) Social housing in Chile: Opportunities to apply value concept in early stage of projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sarosa, W (2001) Infrastructure -based community development: Theory and practice of sustainable development at the local level with a participant-observation of three pilot projects in rural villages of Java, Indonesia. PhD thesis, University of California, Berkeley, USA.

Sarshar, M; Haigh, R and Amaratunga, D (2004) Improving project processes: Best practice case study. Construction Innovation, 4(2), pp. 69-82. ISSN 1471-4175

Sassi, P (2009) Closed loop material cycle construction: defining and assessing closed loop material cycle construction as a component of a comprehensive approach to sustainable material design in the context of sustainable building. PhD thesis, Cardiff University, UK.

Sayed, E (2022) Biomimetic intelligence for systemic innovation in the built environment. PhD thesis, University of Northumbria at Newcastle, UK.

Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.

Scott, D and Pang, C K (1999) Helping professionals make good use of the internet. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Scott, L and Shaurette, M (2012) Developing an understanding of research principles to support post-graduate education in the built environment. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Scott, L M (2016) Theory and research in construction education: The case for pragmatism. Construction Management and Economics, 34(7-8), pp. 552-560. ISSN 01446193

Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.

Seni, D A (2000) From scientific management to process engineering: The spontaneous theory of technological value in the design of work in organizations. Journal of Construction Research, 1(2), pp. 91-98. ISSN 1609-9451

Sexton, M G (2000) Sustainable built environments and construction activity through dynamic research agendas. PhD thesis, University of Salford, UK.

Shabha, G; Barber, F and Laycock, P (2023) A qualitative assessment of the impact of smart homes and environmentally beneficial technologies on the UK 2050 net-zero carbon emission target. Smart and Sustainable Built Environment, 12(2), pp. 341-360. ISSN 2046-6099

Sherratt, F (2014) Exploring 'zero target' safety programmes in the UK construction industry. Construction Management and Economics, 32(7-8), pp. 737-748. ISSN 01446193

Sherratt, F and Leicht, R (2020) Unpacking ontological perspectives in CEM research: Everything is biased. Journal of Construction Engineering and Management, 146(2): 04019101, ISSN 0733-9364

Simukonda, W and Emuze, F (2024) Safety impacts of design for manufacturing and assembly techniques in off-site construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 16-24. ISSN 17514304

Singh, A; Kumar, V; Mittal, A and Verma, P (2024) Identifying critical challenges to lean construction adoption. Construction Innovation, 24(1), pp. 67-105. ISSN 1471-4175

Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.

Siva, J and Gajendran, T (2023) The hidden barriers to social value delivery in megaprojects: Investigating the decision-making environment. Built Environment Project and Asset Management, 13(4), pp. 610-628. ISSN 2044-124X

Smith, C R (2001) Procuring the urban house in paradise. PhD thesis, Liverpool John Moores University, UK.

Sommerville, J; Farquhason, S and Campbell, C (2000) The potential influence of institutional investors on construction organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Strasheim, B and Hugo, F (2013) A programme for continuing professional development of managers in the construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 313-322. ISSN 17514312

Sturk, R (1998) Engineering geological information: Its value and impact on tunnelling. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tan, T; Lu, W; Tan, G; Xue, F; Chen, K; Xu, J; Wang, J and Gao, S (2020) Construction-oriented design for manufacture and assembly guidelines. Journal of Construction Engineering and Management, 146(8): 04020085, ISSN 0733-9364

Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand. PhD thesis, University of Newcastle upon Tyne, UK.

Tennant, S and Langford, D (2005) Construction management teams & project performance: A diagnostic toolkit. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tennant, S and Langford, D (2006) Team performance measurement: Let's reward teamwork. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Tennant, S and Langford, D (2008) The construction project balanced scorecard. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tetteh, M O; Chan, A P C; Mohandes, S R and Agyemang, D Y (2023) Diagnosing critical barriers to international construction joint ventures success in the developing country of Ghana. Construction Innovation, 23(5), pp. 1151-1185. ISSN 1471-4175

Thomson, C and El-Haram, M (2014) Potential and implications of sustainability action plans: Lessons from the Greater Middlehaven Regeneration Project. Built Environment Project and Asset Management, 4(1), pp. 108-122. ISSN 2044-124X

Tinker, A and Burt, R (2004) "Greening" the construction curriculum. International Journal of Construction Education and Research, 1(1), pp. 26-33. ISSN 1557-8771

Tobi, S U M and Amaratunga, D (2010) Social enterprise applications in an urban facilities management setting. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tsemo, V (2015) An investigation of CSR as a source of corporate political power. PhD thesis, University of Wolverhampton, UK.

Tweed, C (2013) Socio-technical issues in dwelling retrofit. Building Research & Information, 41(5), pp. 551-562. ISSN 0961-3218

Valente, C P; Brandalise, F M P and Formoso, C T (2019) Model for devising visual management systems on construction sites. Journal of Construction Engineering and Management, 145(2): 04018138, ISSN 0733-9364

Vine, R (2018) The intelligent client: learning to govern through numbers at Heathrow. PhD thesis, University of Sussex, UK.

Vorster, M C and De la Garza, J M (1990) Consequential equipment costs associated with lack of availability and downtime. Journal of Construction Engineering and Management, 116(4), pp. 656-669. ISSN 0733-9364

Wafai, M H M H (2005) Developing a methodology for technology transfer of advanced IT solutions in the construction sector. PhD thesis, University of Salford, UK.

Wang, L-H (2005) Vertical process integration in design and manufacturing of hardwood products. PhD thesis, University of Missouri - Columbia, USA.

Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.

Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988

Ward, A D (2016) Development of a contextualised understanding of the diffusion of innovation among quantity surveyors in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Wedawatta, G and Ingirige, B (2016) A conceptual framework for understanding resilience of construction SMEs to extreme weather events. Built Environment Project and Asset Management, 6(4), pp. 428-443. ISSN 2044-124X

Wedawatta, H G (2013) Resilience of construction SMEs to extreme weather events. PhD thesis, University of Salford, UK.

Wilson Jr, J M and Koehn, E (2000) Safety management: Problems encountered and recommended solutions. Journal of Construction Engineering and Management, 126(1), pp. 77-79. ISSN 0733-9364

Wong, C H; Holt, G D and Harris, P (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences. Engineering, Construction and Architectural Management, 8(4), pp. 257-271. ISSN 0969-9988

Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.

Wu, S; Steel, G and Greenwood, D (2009) Measuring the associations between collaborative working and project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Wuni, I. Y. and Eshun, B. T. B. (2026) A state-of-the-art review of the application of interpretive structural modelling in construction management studies. International Journal of Construction Management, 26(10), pp. 2116-2136. ISSN 1562-3599

Wuni, I Y; Shen, G Q and Antwi-Afari, M F (2023) Exploring the design risk factors for modular integrated construction projects. Construction Innovation, 23(1), pp. 213-228. ISSN 1471-4175

Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988

Yapa Mudiyanselage, S. D. Y. B.; Perera, B. A. K. S. and Kavirathna, A. S. (2026) Adaptability of design out waste concept to minimise waste in modular construction: A qualitative delphi study. Smart and Sustainable Built Environment, pp. 1-33. ISSN 2046-6099

Yembi Renault, B; Agumba, J N and Ansary, N (2021) Regression analysis of the influence of demographic characteristics using risk management practices within South African small and medium construction enterprises. Journal of Engineering, Design and Technology, 19(6), pp. 1505-1529. ISSN 1726-0531

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.

Zami, M S (2010) Understanding the factors that influence the adoption of stabilised earth by construction professionals to address the Zimbabwe urban low cost housing crisis. PhD thesis, University of Salford, UK.

Zami, M S (2021) Enablers supporting acceptance of earth-based material in UK urban housing sector. Architectural Engineering and Design Management, 17(1-2), pp. 92-109. ISSN 1745-2007

Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364

Zhang, N (2001) A computer-based environment for preliminary structural design, design collaboration and design automation of tall buildings. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, X; Cui, T and Lan, J (2024) Spatial logic of scientific research: An exploratory and quantitative analysis of 42 scientific research buildings sited in America and Europe. Architectural Engineering and Design Management, 20(4), pp. 850-867. ISSN 1745-2007

Zhang, Yanjing (2019) Transdisciplinary practice in the contemporary architectural profession. PhD thesis, University of Sydney, Australia.

Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.

van Hoof, J; Rutten, P G S; Struck, C; Huisman, E R C M and Kort, H S M (2015) The integrated and evidence-based design of healthcare environments. Architectural Engineering and Design Management, 11(4), pp. 243-263. ISSN 1745-2007

Özorhon, B (2007) Modeling the performance of international construction joint ventures. PhD thesis, Middle East Technical University, Turkey.

This list was generated on Sat Aug 22 02:07:02 2026 UTC.