Items with Index Term: performance-based
Abdel Aziz, A M (2007) A survey of the payment mechanisms for transportation DBFO projects in British columbia. Construction Management and Economics, 25(5), pp. 529-543. ISSN 1466433X
Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364
Abdurezake, S K; Mengistu, D G; Abdela, S A and Tesfaye, B Z (2026) Construction professionals' retention practice in construction companies. International Journal of Construction Management, 26(3), pp. 365-380. ISSN 1562-3599
Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988
Aho, I (2013) Value-added business models: Linking professionalism and delivery of sustainability. Building Research & Information, 41(1), pp. 110-114. ISSN 0961-3218
Aigwi, I E; Nwadike, A N; Le, A T H; Rotimi, F E; Sorrell, T; Jafarzadeh, R and Rotimi, J (2022) Prioritising optimal underutilised historical buildings for adaptive reuse: A performance-based MCDA framework validation in auckland, New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 181-204. ISSN 2046-6099
Al Hashmi, E (2016) Fire engineering in sustainable buildings: an evaluation for the application of performance-based design in Abu Dhabi. PhD thesis, University of Central Lancashire, UK.
Al-Hashimy, H N H (2025) The relationship between financial management strategies and firm financial performance: the moderating role of firm size. Journal of Financial Management of Property and Construction, 30(2), pp. 295-317. ISSN 1366-4387
Al-Remal, A M (2013) Risk-based design of structures for fire. PhD thesis, University of Edinburgh, UK.
Albano, L D (1992) An axiomatic approach to performance-based design. PhD thesis, Massachusetts Institute of Technology, USA.
Allam, A S; Bassioni, H; Ayoub, M and Kamel, W (2024) A framework for obtaining a BIM-compatible design solution based on quantitative decisions on building performance. International Journal of Construction Management, 24(11), pp. 1176-1190. ISSN 1562-3599
Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X
Almeida, N; Sousa, V; Alves Dias, L and Branco, F (2010) A framework for combining risk-management and performance-based building approaches. Building Research & Information, 38(2), pp. 157-174. ISSN 0961-3218
Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364
Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave? PhD thesis, University of Reading, UK.
Ang, G; Groosman, M and Scholten, N P M (2005) Dutch performance-based approach to building regulations and public procurement. Building Research & Information, 33(2), pp. 107-119. ISSN 0961-3218
Anondho, B; Soeleiman, L; Latief, Y and Mochtar, K (2023) The influence of external factors on construction project performance based on estimated duration in Jakarta. International Journal of Construction Management, 23(13), pp. 2270-2278. ISSN 1562-3599
Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Apu, N and Sinha, R (2020) Seismic fragility assessment of ductile reinforced concrete building frames. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 425-442. ISSN 1759-5916
Arashpour, M; Heidarpour, A; Akbar Nezhad, A; Hosseinifard, Z; Chileshe, N and Hosseini, R (2020) Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality. Construction Management and Economics, 38(6), pp. 502-514. ISSN 01446193
Attah, Tobenna Vincent (2025) GPA as a predictor of safety practices among U.S. College construction interns. PhD thesis, University of Arizona Global Campus, USA.
Aviram Traubita, A (2009) Structural response and cost characterization of bridge construction using seismic performance enhancement strategies. PhD thesis, University of California, Berkeley, USA.
Azcarate Aguerre, J F (2023) Facades-as-a-service: A cross-disciplinary model for the (re)development of circular building envelopes. PhD thesis, Delft University of Technology, Netherlands.
Aziz, A M A (2008) Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(5), pp. 507-529. ISSN 1466433X
Bakens, W; Foliente, G and Jasuja, M (2005) Engaging stakeholders in performance-based building: Lessons from the performance-based building (PeBBu) network. Building Research & Information, 33(2), pp. 149-158. ISSN 0961-3218
Banerjee, S (2007) Statistical, empirical and mechanistic fragility analysis of concrete bridges. PhD thesis, University of California, Irvine, USA.
Batista Silveira Dos Santos, L F (2020) Efficient modeling strategies for performance-based building design supported by daylight and building energy simulations. PhD thesis, University of California, Berkeley, USA.
Beh, H J; Rashidi, A; Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(7), pp. 2854-2877. ISSN 0969-9988
Bencze, O C; Dasmohapatra, S and Tilotta, D C (2012) A concept for a performance-based rating system for home resilience: ReScU. International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 148-165. ISSN 1759-5916
Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364
Booth, Peter Charles (2023) Digitally integrated material practice: Computational methods of engaging non-standardised plantation hardwood in architecture. PhD thesis, University of Technology Sydney, Australia.
Bridge, C and Carnemolla, P (2014) An enabling BIM block library: An online repository to facilitate social inclusion in Australia. Construction Innovation, 14(4), pp. 477-492. ISSN 1471-4175
Bröchner, J and Silfwerbrand, J (2019) Performance of performance specifications in design-build highway projects. Construction Economics and Building, 19(2), pp. 111-125. ISSN 2204-9029
Buckingham, P (2007) International process plant contracts for use on other performance-based projects. Construction Management and Economics, 25(7), pp. 709-713. ISSN 1466433X
Bukhari, Fakhri A (2011) A hierarchical evolutionary algorithmic design (head) system for generating and evolving building design models. PhD thesis, Queensland University of Technology, Australia.
Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes. PhD thesis, Indiana State University, USA.
Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.
Cardin, M-A (2011) Quantitative performance-based evaluation of a procedure for flexible design concept generation. PhD thesis, Massachusetts Institute of Technology, USA.
Cass, N (2018) Energy-related standards and UK speculative office development. Building Research & Information, 46(6), pp. 615-635. ISSN 0961-3218
Chen, K W; Teitelbaum, E; Meggers, F; Pantelic, J and Rysanek, A (2021) Exploring membrane-assisted radiant cooling for designing comfortable naturally ventilated spaces in the tropics. Building Research & Information, 49(5), pp. 483-495. ISSN 0961-3218
Chow, L K and Ng, S T (2003) Performance-based evaluation for engineering consultants: A study of assessment criteria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chung, K H Y (2022) Data fusion, hedonic pricing, and blockchains: Lowering investment barriers for sustainable infrastructure. PhD thesis, University of Michigan, USA.
Clevenger, C M (2010) Design guidance: Assessing process challenge, strategy, and exploration. PhD thesis, Stanford University, USA.
Comerio, M C (2004) Public policy for reducing earthquake risks: A US perspective. Building Research & Information, 32(5), pp. 403-413. ISSN 0961-3218
Cooper, J (2015) Sustainable building maintenance within social housing. PhD thesis, University of Greenwich, UK.
Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.
Damnjanovic, I and Zhang, Z (2008) Risk-based model for valuation of performance-specified pavement maintenance contracts. Journal of Construction Engineering and Management, 134(7), pp. 492-500. ISSN 0733-9364
Dandago, A A; Yamusa, M A; Lawal, H S; Abubakar, M; Abdullahi, M and Zailani, B M (2025) Impact of uncertainty factors on the performance of building renovation projects. Journal of Engineering, Design and Technology, 23(6), pp. 1875-1897. ISSN 1726-0531
De Wilde, P J C J (2004) Computational support for the selection of energy saving building components. PhD thesis, Delft University of Technology, Netherlands.
Demirkesen, S and Tezel, A (2022) Investigating major challenges for industry 4.0 adoption among construction companies. Engineering, Construction and Architectural Management, 29(3), pp. 1470-1503. ISSN 0969-9988
Duncan, J (2005) Performance-based building: Lessons from implementation in New Zealand. Building Research & Information, 33(2), pp. 120-127. ISSN 0961-3218
Edwards, D J and Holt, G D (2006) Hand-arm vibration controls: A perspective based on performance and cost dimensions. Journal of Financial Management of Property and Construction, 11(1), pp. 21-32. ISSN 1366-4387
El Asmar, L (2019) Assessing experiential learning in construction education by modeling student performance. PhD thesis, Arizona State University, USA.
Elmousalami, H H; Elyamany, A H and Ibrahim, A H (2018) Predicting conceptual cost for field canal improvement projects. Journal of Construction Engineering and Management, 144(11): 04018102, ISSN 0733-9364
Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance. PhD thesis, North Dakota State University, USA.
Esmaili, O (2014) Developing a rapid seismic performance based rating system in safety assessment of buildings. PhD thesis, University of California, Irvine, USA.
Figliola, A (2023) Digital workflow for climate resilient building façade generation. Building Research & Information, 51(3), pp. 257-278. ISSN 0961-3218
Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Flint, M M (2014) A modular framework for performance-based durability engineering. PhD thesis, Stanford University, USA.
Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364
Fuller, J; Brown, C J and Crowley, R (2018) Performance-based maintenance contracting in Florida: Evaluation by surveys, statistics, and content analysis. Journal of Construction Engineering and Management, 144(2): 05017021, ISSN 0733-9364
Gann, D M; Wang, Y and Hawkins, R (1998) Do regulations encourage innovation? The case of energy efficiency in housing. Building Research & Information, 26(5), pp. 280-296. ISSN 0961-3218
Greenwood, D and Wu, S (2012) Establishing the association between collaborative working and construction project performance based on client and contractor perceptions. Construction Management and Economics, 30(4), pp. 299-308. ISSN 1466433X
Greenwood, J P (2007) An examination of the performance based building code on the design of a commercial building. Construction Economics and Building, 7(1), pp. 37-44. ISSN 2204-9029
Gruneberg, S (2013) Strategy framework for post-construction contractor services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Gruneberg, S L; Hughes, W P and Ancell, D J (2007) Risk under performance-based contracting in the UK construction sector. Construction Management and Economics, 25(7), pp. 691-699. ISSN 1466433X
Hammond, D; Dempsey, J J; Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: A case study. Building Research & Information, 33(2), pp. 128-141. ISSN 0961-3218
Hardie, M; Allen, J and Newell, G (2013) Environmentally driven technical innovation by Australian construction SMEs. Smart and Sustainable Built Environment, 2(2), pp. 179-191. ISSN 2046-6099
Hariri-Ardebili, M A (2015) Performance based earthquake engineering of concrete dams. PhD thesis, University of Colorado at Boulder, USA.
Haugbølle, K; Larsen, J N and Nielsen, J (2019) Construction productivity revisited: Towards measuring performance of construction output. Engineering, Construction and Architectural Management, 26(5), pp. 794-813. ISSN 0969-9988
Haupt, T C (2003) A study of management attitudes to a performance approach to construction worker safety. Journal of Construction Research, 4(1), pp. 87-100. ISSN 1609-9451
Hong, T (2005) Life-cycle cost assessment model of composite materials in construction. PhD thesis, Purdue University, USA.
Hopkin, D J (2011) The fire performance of engineered timber products and systems. EngD thesis, Loughborough University, UK.
Hou, Y and Wang, H (2026) Collusion prevention under different forms of performance-based subsidies during the operational period in PPP highway projects. Construction Management and Economics, 44(2), pp. 98-118. ISSN 0144-6193
Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X
Hunhevicz, J J (2022) Exploring the potential of blockchain and cryptoeconomics for the construction industry. DSc thesis, ETH Zürich, Switzerland.
Ibrahim, Y M; Ibrahim, A M and Kabir, B (2009) Geographic diversification, performance, and the risk profile of UK construction firms. Journal of Engineering, Design and Technology, 7(2), pp. 171-185. ISSN 1726-0531
Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction. PhD thesis, University of Florida, USA.
Jiang, A and Zhu, Y (2012) Impact of incentives and system efficiency on the life cycle cost of photovoltaic systems. International Journal of Construction Education and Research, 8(3), pp. 204-222. ISSN 1557-8771
Jones, K; Desai, A; Brosnan, N; Cooper, J and Ali, F (2017) Built asset management climate change adaptation model. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 263-274. ISSN 1759-5916
Joyner, M D (2021) Resilience-based performance evaluation and design of buildings for multiple hazards. PhD thesis, Northeastern University, USA.
Ju, C (2015) A study of institutional complexity and contractors' safety management strategies. PhD thesis, University of Hong Kong, Hong Kong.
Ju, C and Rowlinson, S (2014) Institutional determinants of construction safety management strategies of contractors in Hong Kong. Construction Management and Economics, 32(7-8), pp. 725-736. ISSN 01446193
Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988
Kashiwagi, D; Chong, N; Costilla, M; McMenimen, F and Egbu, C (2004) Impact of six sigma on construction performance. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kashiwagi, D; Egbu, C; Kovel, J and Badger, W W (2004) Leadership vs. Management in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kashiwagi, D; Parmar, D and Savicky, J (2004) Traditional low-bid procurement system versus performance information procurement system (pips) in construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kashiwagi, D T (1991) Development of a performance based design/procurement system for nonstructural facility systems. PhD thesis, Arizona State University, USA.
Kashiwagi, D T and Mayo, R E (2001) Best value procurement in construction using artificial intelligence. Journal of Construction Procurement, 7(2), pp. 42-59. ISSN 1358-9180
Kashiwagi, D T; Slater, C and Kashiwagi, M (2002) 'Just in time' information for performance based systems. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.
Kim, T W and Fischer, M (2014) Ontology for representing building users' activities in space-use analysis. Journal of Construction Engineering and Management, 140(8): 04014035, ISSN 0733-9364
Kliewer, J E (1994) Development of performance based test procedures for asphalt mixtures. PhD thesis, Oregon State University, USA.
Lam, J C and Hui, S C M (1996) A review of building energy standards and implications for Hong Kong. Building Research & Information, 24(3), pp. 131-140. ISSN 0961-3218
Lam, P T I; Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: A case study. Construction Management and Economics, 22(1), pp. 25-34. ISSN 01446193
Lee, K H (2004) Site-specific load models and hazards for probability-based design. PhD thesis, Oregon State University, USA.
Lemma, M; Tarsi, M and Carbonari, A (2025) Development of a framework to track life safety levels of occupants in the event of a fire in buildings. Architectural Engineering and Design Management, 21(4), pp. 681-704. ISSN 1745-2007
Lisø, K R; Myhre, L; Kvande, T; Thue, J V and Nordvik, V (2007) A Norwegian perspective on buildings and climate change. Building Research & Information, 35(4), pp. 437-449. ISSN 0961-3218
Lopez-Ordoñez, C; Garcia-Nevado, E; Coch, H and Morganti, M (2025) Heat stress in social housing districts: Tree cover-built form interaction. Buildings & Cities, 6(1), pp. 415-432. ISSN 2632-6655
Lundin, J A (2005) Safety in case of fire: The effect of changing regulations. PhD thesis, Lund University, Sweden.
Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Lützkendorf, T and Lorenz, D (2006) Using an integrated performance approach in building assessment tools. Building Research & Information, 34(4), pp. 334-356. ISSN 0961-3218
Lützkendorf, T and Speer, T M (2005) Alleviating asymmetric information in property markets: Building performance and product quality as signals for consumers. Building Research & Information, 33(2), pp. 182-195. ISSN 0961-3218
Mah, D E (2011) Framework for rating the sustainability of the residential construction practice. PhD thesis, University of Alberta, Canada.
Mahdjoubi, L and A-Rahman, M A (2012) Effects of multimedia characteristics on novice CAD learners practice performance. Architectural Engineering and Design Management, 8(3), pp. 214-225. ISSN 1745-2007
Mahmoud, A S; Sanni-Anibire, M O and Hassanain, M A (2017) Performance-based fire safety evacuation of an auditorium facility using a theoretical calculation method. International Journal of Building Pathology and Adaptation, 35(2), pp. 124-138.
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A constructive system to assess the performance-based grading of construction labour through work-based training components and applications. Construction Economics and Building, 23(3-4), pp. 107-124. ISSN 2204-9029
Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2023) A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, 13(1), pp. 36-55. ISSN 2044-124X
Matthews, J and Rowlinson, S (1999) Partnering: Incorporating safety management. Engineering, Construction and Architectural Management, 6(4), pp. 347-357. ISSN 0969-9988
May, Christopher Alan (2026) Development of a benchmark building condition index utilizing discrete facility subsets for use in risk prioritization analysis. PhD thesis, Old Dominion University, USA.
Mazen, A M (2023) The extent to which the national and organisational culture contributes to delays of Libyan construction projects. PhD thesis, Bournemouth University, UK.
Meacham, B; Bowen, R; Traw, J and Moore, A (2005) Performance-based building regulation: Current situation and future needs. Building Research & Information, 33(2), pp. 91-106. ISSN 0961-3218
Meacham, B J (2000) A process for identifying, characterizing, and incorporating risk concepts into performance-based building and fire regulation development. PhD thesis, Clark University, USA.
Meacham, B J (2010) Accommodating innovation in building regulation: Lessons and challenges. Building Research & Information, 38(6), pp. 686-698. ISSN 0961-3218
Meacham, B J (2016) Sustainability and resiliency objectives in performance building regulations. Building Research & Information, 44(5-6), pp. 474-489. ISSN 0961-3218
Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655
Meacham, B J and van Straalen, I J (2018) A socio-technical system framework for risk-informed performance-based building regulation. Building Research & Information, 46(4), pp. 444-462. ISSN 0961-3218
Medimagh, S and Triki, A (2019) The PPP performance based on the co-creation with customers. Built Environment Project and Asset Management, 9(5), pp. 642-654. ISSN 2044-124X
Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364
Mirahadi, S (2020) EvacuSafe: A smart evacuation management system for buildings. PhD thesis, University of Toronto, Canada.
Mohyin, N A; Dainty, A R J and Carrillo, P M (2009) Managing knowledge workers commitment in small construction professional firms. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Montali, J (2019) Digitised engineering knowledge for prefabricated fac?ades. PhD thesis, University of Cambridge, UK.
Mourshed, M (2006) Interoperability-based optimisation of architectural design. PhD thesis, Loughborough University, UK.
Ng, C W (2024) Enhancing the performance of the adoption of building information modelling (BIM) and common data environment (CDE) using risk management and performance contract techniques. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(2), pp. 186-200. ISSN 0969-9988
Ng, S T and Wong, Y M W (2007) Payment and audit mechanisms for non private-funded PPP-based infrastructure maintenance projects. Construction Management and Economics, 25(9), pp. 915-923. ISSN 1466433X
Nwadike, A N and Wilkinson, S (2022) An evidence-based framework validation for building code improvement in New Zealand. Engineering, Construction and Architectural Management, 29(8), pp. 3072-3090. ISSN 0969-9988
O'Sullivan, D T J (2005) Improving building performance by tracking performance metrics using an IFC data model. PhD thesis, University College Cork, Ireland.
Ogwueleka, A C (2015) Evaluation of incentive mechanisms on performance-based contracting systems in South Africa and Nigeria. PhD thesis, University of Pretoria, South Africa.
Oxman, R (2007) A performance-based model in digital design: Per-formative: design beyond aesthetic. Architectural Engineering and Design Management, 3(3), pp. 169-180. ISSN 1745-2007
Ozener, O O (2009) Studio education for integrated practice using building information modeling. PhD thesis, Texas A&M University, USA.
Pacheco, Christofer M (2026) Hard hats and second chances: A phenomenological study of employer support in construction-based reintegration. DBA thesis, University of South Florida, USA.
Pan, Q (2007) System identification of constructed civil engineering structures and uncertainty. PhD thesis, Drexel University, USA.
Panthi, K (2009) A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts. PhD thesis, Florida International University, USA.
Park, H; Meacham, B J; Dembsey, N A and Goulthorpe, M (2014) Integration of fire safety and building design. Building Research & Information, 42(6), pp. 696-709. ISSN 0961-3218
Perez-Bella, J M; Dominguez-Hernandez, J; Cano-Suñen, E; Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(6), pp. 723-736. ISSN 0961-3218
Petcherdchoo, A (2004) Maintaining condition and safety of deteriorating bridges by probabilistic models and optimization. PhD thesis, University of Colorado at Boulder, USA.
Pinero, J C (2003) A framework for monitoring performance-based road maintenance. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Queiroz, N; Fernandes, L and Fernando Oscar Ruttkay, P (2024) Comparison of fast daylighting climate-based simulation methods for parametric design: Two-phase, three-phase method and path tracing. Architectural Engineering and Design Management, 20(3), pp. 559-577. ISSN 1745-2007
Rahouti, A; Datoussaïd, S and Descamps, T (2018) Safety assessment of a high-rise dormitory in case of fire. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 84-95. ISSN 1759-5916
Raji, B (2018) Sustainable high-rises: Design strategies for energy-efficient and comfortable tall office buildings in various climates. PhD thesis, Delft University of Technology, Netherlands.
Ramirez Flores, R A (2015) A stochastic approach for pavement condition projections and budget needs for the MTC pavement management system. PhD thesis, University of Texas at El Paso, USA.
Reischl, J N (2009) Toward a theory of morality: An empirical study of cognitive moral development in market channel dyads in the construction industry using the defining issues test. DBA thesis, Nova Southeastern University, USA.
Rohman, M A (2022) Assessment of the government's role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(2), pp. 239-258. ISSN 1366-4387
Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175
Sayın, S and Çelebi, G (2020) A practical approach to performance-based building design in architectural project. Building Research & Information, 48(4), pp. 446-468. ISSN 0961-3218
Schade, J (2013) A design process perspective on the energy performance of buildings. PhD thesis, Luleå University of Technology, Sweden.
Schade, J; Olofsson, T and Schreyer, M (2011) Decision-making in a model-based design process. Construction Management and Economics, 29(4), pp. 371-382. ISSN 1466433X
Scharpff, J; Schraven, D; Volker, L; Spaan, M T J and de Weerdt, M M (2021) Can multiple contractors self-regulate their joint service delivery? A serious gaming experiment on road maintenance planning. Construction Management and Economics, 39(2), pp. 99-116. ISSN 01446193
Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.
Sexton, M and Barrett, P (2005) Performance-based building and innovation: Balancing client and industry needs. Building Research & Information, 33(2), pp. 142-148. ISSN 0961-3218
Shang, L and Abdel Aziz, A M (2020) Stackelberg game theory-based optimization model for design of payment mechanism in performance-based PPPs. Journal of Construction Engineering and Management, 146(4): 04020029, ISSN 0733-9364
Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.
Sharp, M and Jones, K (2012) Perceived inefficiency in social housing maintenance. Construction Innovation, 12(4), pp. 414-428. ISSN 1471-4175
Shi, X.; Ke, Y.; Wu, X.; Gong, X. and Zhang, J. (2026) How performance-based are China's public-private partnership road projects? A KPI framework and scoring method. Built Environment Project and Asset Management, 14, pp. 1-21. ISSN 2044-124X
Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM). PhD thesis, Virginia Polytechnic Institute and State University, USA.
Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, K (2023) Cost comparison of highway rest area operations: In-house workforce versus outsourcing methods. Journal of Construction Engineering and Management, 149(8): 04023062, ISSN 0733-9364
Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364
Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda. PhD thesis, University of London, UK.
Stehn, L (2002) Environmental labelling of timber-framed dwellings and their building components. Building Research & Information, 30(4), pp. 248-254. ISSN 0961-3218
Stellacci, S; Domingos, L and Resende, R (2024) Integrated computational approaches for energy retrofit of historical buildings in extreme climate environments. International Journal of Building Pathology and Adaptation, 42(1), pp. 114-132. ISSN 23984708
Straub, A (2011) Maintenance contractors acting as service innovators. Construction Innovation, 11(2), pp. 179-189. ISSN 1471-4175
Straub, A D (2010) Competences of maintenance service suppliers servicing end-customers. Construction Management and Economics, 28(11), pp. 1187-1195. ISSN 1466433X
Sun, Y; Djouani, K; van Wyk, B J; Wang, Z and Siarry, P (2014) Hypothesis testing-based adaptive PSO. Journal of Engineering, Design and Technology, 12(1), pp. 89-101. ISSN 1726-0531
Thalagala Achchi Maddumage, Kasun G (2021) Methodology to predict construction contractors' performance using non-price measures. PhD thesis, Western Sydney University, Australia.
Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation. PhD thesis, University of Michigan, USA.
Toprakli, A. Y. and Satir, M. S. (2026) Evaluating the impact of gender segregation and egress design on mosque evacuation performance: An abm study. Architectural Engineering and Design Management, 22(2), pp. 402-425. ISSN 1745-2007
Trinius, W and Sjöström, C (2005) Service life planning and performance requirements. Building Research & Information, 33(2), pp. 173-181. ISSN 0961-3218
Von Kluge, P. N.; Doumia, B. and Sengha, G. G. (2026) Nonlinear soil-structure interaction effects on eccentric seismic pounding and torsional response of adjacent buildings: Experimental validation and reduced-order modelling. Architectural Engineering and Design Management, 22(3), pp. 809-843. ISSN 1745-2007
Wanigarathna, N; Sherratt, F; Price, A and Austin, S (2016) Healthcare designers' use of prescriptive and performance-based approaches. Architectural Engineering and Design Management, 12(6), pp. 427-441. ISSN 1745-2007
Wibowo, A and Sundermeier, M (2020) Developing a fuzzy value-for-money analysis model for annuity-based public-private partnership infrastructure projects under consideration of risk mitigation capability. Journal of Construction Engineering and Management, 146(7): 04020081, ISSN 0733-9364
Wilkinson, P; Glockling, J; Bouchlaghem, D and Ruikar, K (2013) Using business impact analyses to enhance resilient fire engineering building design. Architectural Engineering and Design Management, 9(4), pp. 229-249. ISSN 1745-2007
Williams, P (1995) A regulation evaluation system: A decision support system for the building code of Australia. Construction Management and Economics, 13(3), pp. 197-208. ISSN 01446193
Winn, K R (2014) Inter-scalar multivariable decision making framework for the architectural envelope. PhD thesis, Rensselaer Polytechnic Institute, USA.
Wong, J-M (2008) Extending performance-based design methods by applying structural engineering design patterns. PhD thesis, University of California, Berkeley, USA.
Wu, D.; Wang, T.; Chan, P. and Gruis, V. (2026) Integration of circular economy principles into Dutch social housing procurement: Technological, organizational and environmental practices, challenges and development potentials. Smart and Sustainable Built Environment, pp. 1-21. ISSN 2046-6099
Yin, Y-J (2010) Risk analysis of light-frame wood construction due to multiple hazards. PhD thesis, Michigan Technological University, USA.
Yuan, J; Li, X; Ke, Y; Xu, W; Xu, Z and Skibniewski, M (2020) Developing a building information modeling-based performance management system for public-private partnerships. Engineering, Construction and Architectural Management, 27(8), pp. 1727-1762. ISSN 0969-9988
Zailani, B M; Ibrahim, Y M; Abdullahi, M; Dania, A and Abubakar, M (2023) Constructing the team: A personality-based perspective to team absorptive capacity. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Zani, A; Speroni, A; Mainini, A G; Zinzi, M; Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: The potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(1), pp. 256-279. ISSN 1471-4175
Zekri, M M and Razali, M N (2020) Volatility dynamics of Malaysian listed property companies within the Asian public property markets by using a switching regime approach. Journal of Financial Management of Property and Construction, 25(1), pp. 5-39. ISSN 1366-4387
Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks. PhD thesis, Purdue University, USA.
Zhang, X (2006) Markov-based optimization model for building facilities management. Journal of Construction Engineering and Management, 132(11), pp. 1203-1211. ISSN 0733-9364
Up a level