Items with Index Term: percent plan complete

Number of items: 12.

Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364

Fernandez-Solis, J L; Porwal, V; Lavy, S; Shafaat, A; Rybkowski, Z K; Son, K and Lagoo, N (2013) Survey of motivations, benefits, and implementation challenges of last planner system users. Journal of Construction Engineering and Management, 139(4), pp. 354-360. ISSN 0733-9364

Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Hamzeh, F R; Zankoul, E and Rouhana, C (2015) How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration? Construction Management and Economics, 33(4), pp. 243-258. ISSN 01446193

Jiang, L; Zhong, H; Chen, J; Cheng, J; Chen, S; Gong, Z; Lun, Z; Zhang, J and Su, Z (2023) Study on the construction workforce management based on lean construction in the context of COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3310-3329. ISSN 0969-9988

Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.

Majumdar, T (2024) Pmc: A classification of production metrics found useful by AEC professionals. PhD thesis, Stanford University, USA.

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193

Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175

Zaeri, F; Rotimi, J O B; Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(3), pp. 324-339. ISSN 1471-4175