Items with Index Term: parameter-estimation
Andrawus, J; Watson, J and Kishk, M (2007) Maintenance optimisation of wind turbines: Lessons for the built environment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Ashdown, M M A; Crawley, J; Biddulph, P; Wingfield, J; Lowe, R and Elwell, C A (2020) Characterising the airtightness of dwellings: Its improvement over time and relationship to construction technique. International Journal of Building Pathology and Adaptation, 38(1), pp. 89-106. ISSN 23984708
Back, W E; Boles, W W and Fry, G T (2000) Defining triangular probability distributions from historical cost data. Journal of Construction Engineering and Management, 126(1), pp. 29-37. ISSN 0733-9364
Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364
Cui, X (2002) Delay time modelling and software development. PhD thesis, University of Salford, UK.
Dursun, O and Stoy, C (2011) Time-cost relationship of building projects: Statistical adequacy of categorization with respect to project location. Construction Management and Economics, 29(1), pp. 97-106. ISSN 1466433X
Ebiloma, D O (2024) A digital twin maintenance management model for public hospital buildings in Nigeria. PhD thesis, University of Johannesburg, South Africa.
Huchuk, B; Gunay, H B; O'Brien, W and Cruickshank, C A (2016) Model-based predictive control of office window shades. Building Research & Information, 44(4), pp. 445-455. ISSN 0961-3218
Li, F G N; Smith, A Z P; Biddulph, P; Hamilton, I G; Lowe, R; Mavrogianni, A; Oikonomou, E; Raslan, R; Stamp, S; Stone, A; Summerfield, A J; Veitch, D; Gori, V and Oreszczyn, T (2015) Solid-wall U-values: Heat flux measurements compared with standard assumptions. Building Research & Information, 43(2), pp. 238-252. ISSN 0961-3218
Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364
Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.
Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.
Reigle, J A (2000) Development of an integrated project-level pavement management model using risk analysis. PhD thesis, West Virginia University, USA.
Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364
Tsai, M-T (2008) Real option-based procurement for transportation services. PhD thesis, University of California, Irvine, USA.
Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(6), pp. 477-491. ISSN 1466433X
Up a level