Items with Index Term: package
Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364
Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599
Abdul-Aziz, A R and Chwee Ngoh Tan, A M Y (1998) GATT, GATS and the global construction industry. Engineering, Construction and Architectural Management, 5(1), pp. 31-37. ISSN 0969-9988
Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.
Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364
Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599
Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.
Adebayo, S O (1991) A study of the maintenance management of public buildings in Nigeria. PhD thesis, University of Lagos, Nigeria.
Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.
Adel, R; Megahed, N; Hassan, A M and Shahda, M (2025) Evolution of the courtyard to the skycourt: A bibliometric analysis of research trends. International Journal of Building Pathology and Adaptation, 43(2), pp. 257-280. ISSN 2398-4708
Adetunji, I O (2006) Sustainable construction: a web-based performance assessment tool. EngD thesis, Loughborough University, UK.
Adeyemi, H O; Adejuyigbe, S B; Ismaila, S O and Adekoya, A F (2015) Low back pain assessment application for construction workers. Journal of Engineering, Design and Technology, 13(3), pp. 419-434.
Agumba, J N (2013) A construction health and safety performance improvement model for South African small and medium enterprises. PhD thesis, University of Johannesburg, South Africa.
Aibinu, A A; Dassanayake, D; Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(2), pp. 190-213. ISSN 0969-9988
Ajayi, O O; Koleoso, H; Ajayi, M and Faremi, O (2019) Maintenance performance of prison facilities in Southwestern Nigeria. Journal of Construction Business and Management, 3(2), pp. 26-34. ISSN 2521-0165
Akeel, N F (1989) A database tool for statistically based construction cost estimate. PhD thesis, University of Colorado at Boulder, USA.
Al Awad, O S (2015) The uptake of advanced IT with specific emphasis on BIM by SMEs in the Jordanian construction industry. PhD thesis, University of Salford, UK.
Al Shamsi, H A A (2015) A framework for group leadership in the construction industry in Abu Dhabi. PhD thesis, University of Wolverhampton, UK.
Al-Hazmi, T A (1999) Project procurement system selection model (with particular reference to Saudi Arabia). PhD thesis, Loughborough University, UK.
Al-Qayoudhi, S. A. S.; Kamal, E. M. and Said, I. (2026) Improving total quality management implementation at the University of Technology and Applied Sciences in the Sultanate of Oman. Journal of Construction in Developing Countries, 30(Supp.), pp. 15-37. ISSN 1823-6499
Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
Alamri, R (2019) Development of a model for health and safety management in Saudi Arabian oil and gas construction projects. PhD thesis, University of Wolverhampton, UK.
Alhashedi, E; Zhang, H and Lin, Y (2026) Adaptive estimation and management of cost contingencies in EPC projects. Journal of Construction Engineering and Management, 152(5): 04026056, ISSN 0733-9364
Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622-635. ISSN 23984708
Alkharmany, A (2017) Project management: The effect of saudi national culture on the attitudes of key stakeholders towards delay in construction projects in Saudi Arabia. PhD thesis, University of Brighton, UK.
Alkinani, H (2014) Models of training needs assessment for the Iraqi construction industry. PhD thesis, University of Salford, UK.
Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988
Alrashidi, M (2021) Multiple perspective of public-private partnership project success: the case of Kuwaiti public housing initiative. PhD thesis, University of Salford, UK.
Alsakini, W (2012) Two models for managing the virtualisation of construction management firms in the context of Finnish construction markets. PhD thesis, Aalto University, Finland.
Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.
Amirudin, R B (1998) The application of a knowledge-based engineering approach to the structural design of steel framed office buildings. PhD thesis, University of Reading, UK.
Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599
Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.
Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(4), pp. 369-381. ISSN 01446193
Asiedu, E M and Mkansi, M (2023) Critical factors contributing to budget overruns in Ghana's telecommunication industry construction projects. Journal of Construction in Developing Countries, 28(2), pp. 265-293. ISSN 1823-6499
Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs. PhD thesis, University of Dundee, UK.
Assad, A; Moselhi, O and Zayed, T (2021) Resilience-driven sustainability-based rehabilitation planning for water distribution networks. Journal of Construction Engineering and Management, 147(8): 04021079, ISSN 0733-9364
Ayodele, T T (2022) Cost-effective retrofit packages for low-middle income residential buildings in Nigeria. PhD thesis, De Montfort University, UK.
Badamasi, A A; Aryal, K R; Makarfi, U U and Dodo, M (2022) Drivers and barriers of virtual reality adoption in UK AEC industry. Engineering, Construction and Architectural Management, 29(3), pp. 1307-1318. ISSN 0969-9988
Baggett, B L (1988) Analysis of the role of financial engineering in the marketing of major international construction projects. DBA thesis, George Washington University, USA.
Baker, Scott William (1997) Risk management in major projects. PhD thesis, University of Edinburgh, UK.
Bappa Salisu, J (2016) The impact of compensation on public sector construction workers in Jigawa State of Nigeria. PhD thesis, University of Wolverhampton, UK.
Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.
Battikha, M G (2002) Qualicon: Computer-based system for construction quality management. Journal of Construction Engineering and Management, 128(2), pp. 164-173. ISSN 0733-9364
Beliveau, Y J; Dixit, S S; Dal, T and Morad, A A (1993) Multitask motion planning for material handling in construction. Journal of Construction Engineering and Management, 119(1), pp. 180-191. ISSN 0733-9364
Bell, L C and McCullouch, B G (1983) Microcomputer spreadsheet applications. Journal of Construction Engineering and Management, 109(2), pp. 214-223. ISSN 0733-9364
Bijivemula, S K R; Sai, S J and Chepuri, A (2024) A structural equation model of stakeholder roles in the implementation of green construction strategies in the Indian construction industry. International Journal of Construction Management, 24(5), pp. 486-494. ISSN 1562-3599
Bingol, B N and Polat, G (2015) Time-cost-quality trade-off model for subcontractor selection using discrete particle swarm optimization algorithm. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364
Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.
Blay-Armah A, R A (2013) The impact of varying asset specificities of subcontractors on relationships development in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Blismas, N G and Dainty, A R J (2003) Computer-aided qualitative data analysis: Panacea or paradox? Building Research & Information, 31(6), pp. 455-463. ISSN 0961-3218
Boadu, Elijah Frimpong (2022) A framework for promoting health and safety through procurement in the construction industry in developing countries: A case of Ghana. PhD thesis, University of New South Wales, Australia.
Boamah, F A; Zhang, J and Miah, M H (2023) The impact of tacit knowledge sharing on the success of construction companies operations. Journal of Engineering, Design and Technology, 21(6), pp. 1767-1784. ISSN 1726-0531
Boamah, F A; Zhang, J; Shehzad, M U; Sherani, S and Wen, D (2024) Exploring the impact of social capitals and knowledge creation on construction firms performance in the COVID-19 era. Journal of Engineering, Design and Technology, 22(2), pp. 404-421. ISSN 1726-0531
Boeing Singh, L and Kalidindi, S N (2009) Criteria influencing debt financing of Indian PPP road projects: A case study. Journal of Financial Management of Property and Construction, 14(1), pp. 34-60. ISSN 1366-4387
Botti, A and Ramos, M (2017) Adapting the design of a new care home development for a changing climate. International Journal of Building Pathology and Adaptation, 35(4), pp. 417-433.
Boyd, P; Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: Incorporating building integrated photovoltaics. Construction Management and Economics, 33(5-6), pp. 349-360. ISSN 01446193
Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.
Brocklehurst, F; Morgan, E; Greer, K; Wade, J and Killip, G (2021) Domestic retrofit supply chain initiatives and business innovations: An international review. Buildings & Cities, 2(1), pp. 533-549. ISSN 2632-6655
Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X
Brodetskaia, I; Sacks, R and Shapira, A (2013) Stabilizing production flow of interior and finishing works with reentrant flow in building construction. Journal of Construction Engineering and Management, 139(6), pp. 665-674. ISSN 0733-9364
Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.
Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.
Cemesova, A (2013) Enhancing BIM-based data transfer to support the design of low energy buildings. PhD thesis, Cardiff University, UK.
Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.
Chan, D W M; Chan, A P C; Lam, P T I and Wong, J M W (2010) Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction. Journal of Construction Engineering and Management, 136(5), pp. 495-507. ISSN 0733-9364
Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193
Charef, R (2019) A BIM-based framework to integrate a sustainable end-of-life into the asset lifecycle: towards the circular economy. PhD thesis, Coventry University, UK.
Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Che Wan Putra, C W F (1998) CAPE construction application protocol for data transfer: a building data model. PhD thesis, University of Salford, UK.
Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X
Chen, Yuxuan (2024) Investigation of faults in air-conditioning systems in commercial buildings: Occurrence, diagnostic validation, and energy impacts. PhD thesis, University of Nebraska - Lincoln, USA.
Chileshe, N; Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(2), pp. 134-157. ISSN 0969-9988
Choi, J and Song, H (2014) Evaluation of the modular method for industrial plant construction projects. International Journal of Construction Management, 14(3), pp. 171-180. ISSN 1562-3599
Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364
Chowdhury, A A (1994) An object-oriented finite element formulation for construction simulation. PhD thesis, Lehigh University, USA.
Christian, J and Mir, S U (1987) Use of integrated microcomputer package for formwork design. Journal of Construction Engineering and Management, 113(4), pp. 603-610. ISSN 0733-9364
Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193
Collinge, W (2020) Stakeholder engagement in construction: Exploring corporate social responsibility, ethical behaviors, and practices. Journal of Construction Engineering and Management, 146(3): 04020003, ISSN 0733-9364
Collins, A; Blondel, A A; Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), pp. 835-850. ISSN 2044-124X
Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.
Cox, I D; Morris, J P; Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(4), pp. 427-439. ISSN 01446193
Cozens, P; Waters, J and Neale, R (2002) A virtual reality approach to personal safety and the design of built environment facilities. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Dada, J O (2017) An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors. Engineering, Construction and Architectural Management, 24(6), pp. 1269-1280. ISSN 0969-9988
Dainty, A R J; Bagilhole, B M and Neale, R H (1997) Analytical strategies for dealing with qualitative data in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Davies, P J (2015) Assessing initial embodied energy in UK non-domestic construction projects. EngD thesis, Loughborough University, UK.
Davies, P J; Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: A contractor's perspective. Construction Management and Economics, 32(3), pp. 290-308. ISSN 01446193
De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach. PhD thesis, Aston University, UK.
Dejahang, F (2004) Determinants of productivity on construction sites. PhD thesis, London South Bank University, UK.
Denny-Smith, G (2021) How compliance imperatives stifle the impact of social procurement. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Djebbar, K E B and Mokhtari, A (2025) Evaluation of the level of awareness of the inhabitants on the importance of the energy retrofitting of buildings: Case study of Tlemcen (Algeria). International Journal of Building Pathology and Adaptation, 43(2), pp. 209-256. ISSN 2398-4708
Doan, D. T.; Albsoul, H.; Shobha, A. R.; GhaffarianHoseini, A. and Ghaffarianhoseini, A. (2026) An integrated challenge-strategy framework for construction waste management in New Zealand: Behavioural and organisational challenges and strategies. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988
Dodd, J and Langford, D A (1990) Construction management on one large project in London: A case study. Construction Management and Economics, 8(4), pp. 385-398. ISSN 01446193
Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165
Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499
Du, H; Han, Q and De Vries, B (2025) The effects of social influence on low-cost and high-cost household energy-efficient product adoption: A case study in wuhan. Smart and Sustainable Built Environment, 14(6), pp. 1908-1926. ISSN 2046-6099
Duerr, D (1990) Lift of Shippingport reactor pressure vessel. Journal of Construction Engineering and Management, 116(1), pp. 188-197. ISSN 0733-9364
Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364
Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364
Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2007) The UK construction industry: A review of black country skills demand. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Elbarkouky, M M G; Fayek, A R; Siraj, N B and Sadeghi, N (2016) Fuzzy arithmetic risk analysis approach to determine construction project contingency. Journal of Construction Engineering and Management, 142(12): 04016070, ISSN 0733-9364
Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364
Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175
Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599
Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988
Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.
Ellis, R C T (2001) Lessons in project management. PhD thesis, Loughborough University, UK.
Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.
Enegbuma, W I; Aliagha, G U; Ali, K N and Badiru, Y Y (2016) Confirmatory strategic information technology implementation for building information modelling adoption model. Journal of Construction in Developing Countries, 21(2), pp. 113-129. ISSN 1823-6499
Essah, E A; Sanders, C H; Baker, P and Kalagasidis, A S (2009) Condensation and moisture transport in cold roofs: Effects of roof underlay. Building Research & Information, 37(2), pp. 117-128. ISSN 0961-3218
Evans, S; Godoy-Shimizu, D; Steadman, P; Amrith, S; Humphrey, D and Ruyssevelt, P (2023) Getting to net zero: Islington's social housing stock. Buildings & Cities, 4(1), pp. 524-544. ISSN 2632-6655
Ewin, N A; Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(2), pp. 109-133. ISSN 01446193
Fageha, M K and Aibinu, A A (2014) Prioritising project scope definition elements in public building projects. Construction Economics and Building, 14(3), pp. 18-33. ISSN 2204-9029
Fageha, Mohammed Kamal (2014) Managing stakeholders' participation to improve project scope definition completeness and enhance project outcome. PhD thesis, University of Melbourne, Australia.
Fapohunda, J A (2009) Operational framework for optimal utilisation of construction resources during the production process. PhD thesis, Sheffield Hallam University, UK.
Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364
Fateminia, Seyed Hamed (2023) Determining and managing contingency reserve throughout the lifecycle of construction projects. PhD thesis, University of Alberta, Canada.
Ferreira, M; Almeida, M; Rodrigues, A and Silva, S M (2016) Comparing cost-optimal and net-zero energy targets in building retrofit. Building Research & Information, 44(2), pp. 188-201. ISSN 0961-3218
Finch, E F (1989) A requisite decision model for the selection of mechanical and electrical services in buildings. PhD thesis, University of Reading, UK.
Finegan, E; Kelly, G and O’Sullivan, G (2020) Comparative analysis of passivhaus simulated and measured overheating frequency in a typical dwelling in Ireland. Building Research & Information, 48(6), pp. 681-699. ISSN 0961-3218
Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364
Fortune, C and Hinks, J (1998) Strategic building project price forecasting models in use: Paradigm shift postponed. Journal of Financial Management of Property and Construction, 3(1), pp. 5-26. ISSN 1366-4387
Fortune, C and Lees, M (2000) Strategic cost advice and the effect of cognitive error. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Foster, M E (1997) Energy conservation in the United Kingdom housing sector: An exploration of technical and social issues. PhD thesis, Open University, UK.
Foster, R D (1982) Does pictorial documentation improve construction cost control? PhD thesis, Texas A&M University, USA.
Fu, W K; Drew, D S and Lo, H P (2003) Competitiveness of inexperienced and experienced contractors in bidding. Journal of Construction Engineering and Management, 129(4), pp. 388-395. ISSN 0733-9364
Fu, X (2010) Refinancing and restructuring projects utilising project finance in developing countries. PhD thesis, University of Manchester, UK.
Ganiyu, S (2021) Developing a Bim-Knowledge (Bim-K) framework for improved decision-making in building construction projects. PhD thesis, London South Bank University, UK.
Gholami, E (2017) Exploiting BIM in energy efficient domestic retrofit: evaluation of benefits and barriers. PhD thesis, University of Liverpool, UK.
Gholami Rostam, Mehdi (2024) Energy efficiency assessment in building designs integrating climate resilience and long-term environmental sustainability. PhD thesis, University of New South Wales, Australia.
Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218
Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.
Glavinich, T E (1990) Development of a model microcomputer-based project management system. DrEng thesis, University of Kansas, USA.
Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Godoy-Shimizu, D; Hong, S M; Korolija, I; Schwartz, Y; Mavrogianni, A and Mumovic, D (2022) Pathways to improving the school stock of England towards net zero. Buildings & Cities, 3(1), pp. 939-963. ISSN 2632-6655
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175
Gonzalez, Alvaro Eduardo (2016) Organisational design & mirroring in construction. MPhil thesis, University of Sydney, Australia.
Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364
Gravina da Rocha, C; Korb, S and Sacks, R (2022) Work structuring and product design for customized repetitive projects. Construction Management and Economics, 40(7-8), pp. 526-547. ISSN 01446193
Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(2), pp. 133-144. ISSN 01446193
Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X
Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.
Grimsrud, D; Bridges, B and Schulte, R (2006) Continuous measurements of air quality parameters in schools. Building Research & Information, 34(5), pp. 447-458. ISSN 0961-3218
Gupta, R and Gregg, M (2013) Preventing the overheating of English suburban homes in a warming climate. Building Research & Information, 41(3), pp. 281-300. ISSN 0961-3218
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Gwimile, T A (2026) Holistic maintenance management for higher learning institution buildings in Tanzania. International Journal of Building Pathology and Adaptation, 44(1), pp. 223-240. ISSN 2398-4708
Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.
Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.
Haddad, B (2007) Risk management in the contractual language in the construction industry: The effect of exculpatory clauses on contractor bid price. PhD thesis, Indiana State University, USA.
Hamilton, M R (1994) The relationship between pre-project planning effort and success for capital construction projects. PhD thesis, University of Texas at Austin, USA.
Hammond, S; Bowen, P and Cattell, K (2016) The roadside work-seeker phenomenon in the South African informal construction sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Hampshire, P (2015) The development of an approach and decision support tool to inform sustainable roof selection. EngD thesis, University of Bath, UK.
Han, C-H (1990) Artificial intelligence methodology for simulation modeling. PhD thesis, Georgia Institute of Technology, USA.
Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.
Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.
Hassanein, A A G and Afify, H M F (2007) Risk management practices of contractors: A case study of power station projects in Egypt. Journal of Financial Management of Property and Construction, 12(3), pp. 164-179. ISSN 1366-4387
Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.
Hauenstein, A D (1966) Construction: A taxonomy and syllabus of production practices with implications for industrial arts. PhD thesis, Ohio State University, USA.
Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), pp. 171-182. ISSN 01446193
Holt, L (1983) A case study of the construction of a terephthalic acid plant for Imperial Chemicals Limited at the Davies Works, Wilton, Cleveland, UK. Construction Management and Economics, 1(1), pp. 57-74. ISSN 01446193
Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193
Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988
Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.
Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193
Hu, L and Wu, H (2016) Exploratory study on risk management of state-owned construction enterprises in China. Engineering, Construction and Architectural Management, 23(5), pp. 674-691. ISSN 0969-9988
Hua, Y and Liu, A M M (2017) An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry. Architectural Engineering and Design Management, 13(6), pp. 423-438. ISSN 1745-2007
Hulme, T W and Burchell, A J (1992) Bored tunneling for Singapore metro. Journal of Construction Engineering and Management, 118(2), pp. 363-384. ISSN 0733-9364
Hung, C-C (1999) A study of factors affecting the implementation of ISO 9000 in Taiwan's construction industry. DIT thesis, University of Northern Iowa, USA.
Huni, Tendai (2025) Social power configurations influencing relationship strength and supplier performance in the construction industry. PhD thesis, Vaal University of Technology, South Africa.
Ihuah, P W (2015) Conceptual framework for the sustainable management of social (public) housing estates in the Niger Delta region of Nigeria. PhD thesis, University of Salford, UK.
Ilyas, M; Shaojun, C; Li, Y; Ahmad, S and Hamza, A (2024) Cause analysis of delay in development induced displacement and resettlement (didr) project. A case study of diamer basha dam project in Pakistan. International Journal of Construction Management, 24(5), pp. 551-560. ISSN 1562-3599
Inan Gunaydin, T (2022) Wind flow on and around u-shaped buildings. Journal of Engineering, Design and Technology, 20(3), pp. 841-859. ISSN 1726-0531
Ismail, S (2013) Factors attracting the use of public private partnership in Malaysia. Journal of Construction in Developing Countries, 18(1), pp. 95-108. ISSN 1823-6499
Ismail, S and Haris, F A (2014) Constraints in implementing public private partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4(3), pp. 238-250. ISSN 2044-124X
Ismaila, S O; Akanbi, O G and Ngassa, C N (2014) Models for estimating the anthropometric dimensions using standing height for furniture design. Journal of Engineering, Design and Technology, 12(3), pp. 336-347.
Jalilzadehazhari, E; Johansson, P; Johansson, J and Mahapatra, K (2019) Developing a decision-making framework for resolving conflicts when selecting windows and blinds. Architectural Engineering and Design Management, 15(5), pp. 357-381. ISSN 1745-2007
Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.
Jenner, M S (1997) Designing high performance teams for projects: a study of 49 project teams in the UK construction industry. PhD thesis, Open University, UK.
Jiang, L; Zhong, H; Chen, J; Cheng, J; Chen, S; Gong, Z; Lun, Z; Zhang, J and Su, Z (2023) Study on the construction workforce management based on lean construction in the context of COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3310-3329. ISSN 0969-9988
John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Johnston, J O D (1975) Development of a computerised library system in the construction industry. PhD thesis, Aston University, UK.
Jones, I and Graham, M (2009) The integration of sprinkler systems into school fire safety packages within South and West Wales. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Jones, P; Lannon, S and Patterson, J (2013) Retrofitting existing housing: How far, how much? Building Research & Information, 41(5), pp. 532-550. ISSN 0961-3218
Joseph Oladiran, O and Rogers Simeon, D (2023) Consciousness and prospects of autoclaved aerated concrete (aac) blocks for wall construction: Comparative study Nigeria and South Africa. Journal of Construction Business and Management, 6(2), pp. 1-10. ISSN 2521-0165
Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364
Junjia, Y; Ales@Alias, A H; Haron, N A and Abu Bakar, N (2025) Developing a method for evaluating the value of hoisting risk response strategies: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 32(9), pp. 6115-6136. ISSN 0969-9988
Kaggiah, G M B (2022) Strategies for improving the sustainability of SMEs in the construction industry in Malawi. PhD thesis, University of Bolton, UK.
Kavishe, N and Chileshe, N (2020) Driving forces for adopting public-private partnerships in Tanzanian housing projects. International Journal of Construction Management, 20(8), pp. 912-927. ISSN 1562-3599
Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988
Kavishe, N W (2018) Improving the delivery of PPP housing projects in developing countries. PhD thesis, University of Birmingham, UK.
Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531
Khamaksorn, A; Tah, J H M and Kurul, E (2022) Social networks and knowledge transfer in international construction joint venture projects: A case study in Thailand. Journal of Construction in Developing Countries, 27(1), pp. 111-137. ISSN 1823-6499
Khan, K I A (2016) Management of information complexity using system dynamics for small and medium-sized enterprises (SMEs) on construction projects. PhD thesis, University of Reading, UK.
Kim, J J and William Ibbs, C (1995) Work-package-process model for piping construction. Journal of Construction Engineering and Management, 121(4), pp. 381-387. ISSN 0733-9364
Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.
Koukkari, H (2010) Transformation of a research centre toward an innovation partner in the construction sector. Engineering, Construction and Architectural Management, 17(1), pp. 89-98. ISSN 0969-9988
Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364
Kumaraswamy, M M; Miller, C J; Rahman, M M; Pickernell, D G; Ng, S T and Wong, I P Y (2006) Developing web-based tools for teaching, training, learning and development: The role of academic institutions. Architectural Engineering and Design Management, 2(1-2), pp. 123-135. ISSN 1745-2007
Kumaraswamy, M M and Morris, D A (2002) Build-operate-transfer-type procurement in Asian megaprojects. Journal of Construction Engineering and Management, 128(2), pp. 93-102. ISSN 0733-9364
Kuusk, K and Kalamees, T (2016) Retrofit cost-effectiveness: Estonian apartment buildings. Building Research & Information, 44(8), pp. 920-934. ISSN 0961-3218
Kwaghsende, F K (2020) Assessment of social networks in informal solid waste recycling activities and sustainable solid waste management, North Central Nigeria. African Journal of Built Environment Research, 4(1), pp. 21-35. ISSN 2414-0236
Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(4), pp. 415-427. ISSN 1466433X
Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.
Lambert, E L (2015) Complex factors related to capital construction project success: A case study. PhD thesis, Capella University, USA.
Lammie, J L and Shah, D P (1984) Construction management: MARTA in retrospect. Journal of Construction Engineering and Management, 110(4), pp. 459-475. ISSN 0733-9364
Lansley, P; McCreadie, C; Tinker, A; Flanagan, S and Goodacre, K (2004) Adapting the homes of older people: A case study of costs and savings. Building Research & Information, 32(6), pp. 468-483. ISSN 0961-3218
Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.
Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364
Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 0969-9988
Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liang Wong, I; Eames, P and Perera, S (2012) Energy simulations of a transparent-insulated office façade retrofit in London, UK. Smart and Sustainable Built Environment, 1(3), pp. 253-276. ISSN 2046-6099
Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.
Lin, Y-S (1996) Optimal design and probabilistic evaluation of fire egress systems. PhD thesis, Duke University, USA.
Liu, L (2017) A systematic approach for major renovation of residential buildings. PhD thesis, Linköping University, Sweden.
Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364
Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599
London, K (2010) Multi-market industrial organizational economic models for the internationalization process by small and medium enterprise construction design service firms. Architectural Engineering and Design Management, 6(2), pp. 132-152. ISSN 1745-2007
Loosemore, M (2015) Barriers to social enterprise in the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Loosemore, M and Denny-Smith, G (2016) Barriers to indigenous enterprise in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364
Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico. PhD thesis, University of Leeds, UK.
Mahdi, H S and Afshar, E (2024) Performance of electronic devices for bridging existing information gaps at construction sites: The case of a developing country. International Journal of Construction Management, 24(14), pp. 1510-1520. ISSN 1562-3599
Makarfi Ibrahim, Y; Kaka, A; Aouad, G and Kagioglou, M (2009) Framework for a generic work breakdown structure for building projects. Construction Innovation, 9(4), pp. 388-405. ISSN 1471-4175
Mallawaarachchi, H; De Silva, L and Rameezdeen, R (2016) Indoor environmental quality and occupants' productivity: Suggestions to enhance national green certification criteria. Built Environment Project and Asset Management, 6(5), pp. 462-477. ISSN 2044-124X
Mansor, M; Zakariya, K and Harun, N Z (2019) Challenges on use of recreational parks in Kuala Lumpur. Journal of Construction in Developing Countries, 24(1), pp. 141-162. ISSN 1823-6499
Mantle, E J (2007) An evaluation of 3d building modelling and visualisation packages for enhancing public participation within the planning process. PhD thesis, University of Glamorgan, UK.
Mantzouratos, N; Gardiklis, D; Dedoussis, V and Kerhoulas, P (2004) Concise exterior lighting simulation methodology. Building Research & Information, 32(1), pp. 42-47. ISSN 0961-3218
Manu, E (2014) Supply chain management practices in construction and inter-organisational trust dynamics. PhD thesis, University of Wolverhampton, UK.
Manu, E; Ankrah, N; Chinyio, E A and Proverbs, D (2016) Functional consequences of trust in the construction supply chain: A multi-dimensional view. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Marefat, A; Toosi, H and Mahmoudi Hasankhanlo, R (2019) A BIM approach for construction safety: Applications, barriers and solutions. Engineering, Construction and Architectural Management, 26(9), pp. 1855-1877. ISSN 0969-9988
Mashali, A; Elbeltagi, E; Motawa, I and Elshikh, M (2023) Stakeholder management challenges in mega construction projects: Critical success factors. Journal of Engineering, Design and Technology, 21(2), pp. 358-375. ISSN 1726-0531
Masitenyane, L A (2020) Dimensions and outcomes of buyer-seller relationship intentions for concrete products in the construction environment. DTech thesis, Vaal University of Technology, South Africa.
Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.
Matipa, W M; Kelliher, D and Keane, M (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice. Journal of Financial Management of Property and Construction, 14(1), pp. 79-89. ISSN 1366-4387
Maull, W M (1998) An investigation into the development of engineering students' conceptual understanding of mathematics. PhD thesis, University of Plymouth, UK.
McAleenan, C (2016) Operation analysis and control: a paradigm shift in construction safety management. PhD thesis, University of South Wales, UK.
McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.
Menoka, B (2014) Stakeholder engagement and sustainability-related project performance in construction. PhD thesis, Liverpool John Moores University, UK.
Mewomo, M C; Aigbavboa, C and Lesalane, P (2018) An examination of the key drivers of amendments to the standard forms of contract in the South African construction industry. Journal of Construction in Developing Countries, 23(1), pp. 115-124. ISSN 1823-6499
Miller, C J M; Packham, G A; Pickernell, D G and McGovern, M (2004) Building for the future: The potential importance of the construction industry in welsh economic development policy. Construction Management and Economics, 22(5), pp. 533-540. ISSN 01446193
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Mirzaei, M (2018) Cost-effectiveness of outsourcing public architectural/engineering projects in government agencies. PhD thesis, New York University Tandon School of Engineering, USA.
Mitropoulos, P and Sanchez, R (2016) Criteria and considerations for project work structuring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 124-130. ISSN 17514304
Mohamad, Saifulnizam Suhaimi (2014) Value management in design planning: A systems-based framework for multi-disciplinary team involvement. PhD thesis, Queensland University of Technology, Australia.
Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599
Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X
Monteiro, Mario Augusto Parente (2015) Intention to recycle solid waste in civil construction companies. PhD thesis, Universidade de Fortaleza, Brazil.
Morgan, D C (1986) Site layout and construction planning. PhD thesis, University of Nottingham, UK.
Morley, J (2026) Energy sufficiency, space temperature and public policy. Buildings & Cities, 7(1), pp. 110-125. ISSN 2632-6655
Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364
Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.
Motlagh, K C (1992) Algorithms for computerised surface modelling and highway alignment design. PhD thesis, University of Strathclyde, UK.
Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364
Mrad, F; Asem Abdul-Malak, M; Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(4), pp. 325-335. ISSN 0969-9988
Munns, A K and Al-Haimus, K M (2000) Estimating using cost significant global cost models. Construction Management and Economics, 18(5), pp. 575-585. ISSN 01446193
Murguia, D; Rathnayake, A; Jansen Van Vuuren, T and Middleton, C (2024) Measuring construction productivity across projects: Multilevel three-dimensional framework. Journal of Construction Engineering and Management, 150(11): 04024151, ISSN 0733-9364
Namini, Seyed Saeed Banihashemi (2017) Active BIM with artifical intelligence for energy optimisation in buildings. PhD thesis, University of Technology Sydney, Australia.
Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.
Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(4), pp. 273-294. ISSN 01446193
Nghitanwa, E M (2016) Development of practical guidelines to promote occupational health and safety for workers in the construction industry in Windhoek, Namibia. DLittPhil thesis, University of South Africa, South Africa.
Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.
Nyawera, J X and Theodore Conrad, H (2021) Critical drivers towards generative process health and safety culture. Journal of Engineering, Design and Technology, 19(2), pp. 385-411. ISSN 1726-0531
O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175
Odongo, N H and Motari, W O (2022) Consumers' perceptiveness towards store brands within supermarkets. International Journal of Construction Management, 22(13), pp. 2459-2468. ISSN 1562-3599
Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.
Ohueri, C C; Enegbuma, W I and Habil, H (2020) MyCREST embedded framework for enhancing the adoption of green office building development in Sarawak. Built Environment Project and Asset Management, 10(2), pp. 215-230. ISSN 2044-124X
Ohueri, C C; Enegbuma, W I; Wong, N H; Kuok, K K and Kenley, R (2018) Labour productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(3), pp. 293-304. ISSN 2044-124X
Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988
Oke, A E; Ibironke, O T and Bayegun, O A (2017) Appraisal of reward packages in construction firms: A case of quantity surveying firms in Nigeria. Journal of Engineering, Design and Technology, 15(6), pp. 722-737.
Okoroh, M I (1992) Knowledge based decision support system for the selection and appointment of sub-contractors for building refurbishment contracts. PhD thesis, Loughborough University, UK.
Olubajo, O O and Daniel, E I (2024) Understanding a worker recruitment as a practice of informality in construction work packages. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Omar, M R; Ayob, A; Zakaria, M H; Rahim, N S A; Mokhtar, H; Rani, H A and Rahman, F A (2023) Perspective of construction building professionals on low-carbon materials in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 139-162. ISSN 1823-6499
Omer, M M; Moyo, T; Al-Otaibi, A; Alawag, A M; Rizal Alias, A and Rahman, R A (2025) Critical factors affecting workplace well-being at construction sites across countries with different income levels. Construction Innovation, 25(1), pp. 104-130. ISSN 1471-4175
Omer, M M; Moyo, T; Alias, A R and Rahman, R A (2025) Development of workplace well-being indexes at construction sites. Journal of Engineering, Design and Technology, 23(4), pp. 1111-1136. ISSN 1726-0531
Ong, Eric Mei Siang (2008) Trust, commitment, satisfaction and learning in construction project teams. PhD thesis, University of New South Wales, Australia.
Onyenokporo, N C and Ochedi, E T (2019) Low-cost retrofit packages for residential buildings in hot-humid Lagos, Nigeria. International Journal of Building Pathology and Adaptation, 37(3), pp. 250-272. ISSN 23984708
Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708
Opawole, A; Kajimo-Shakantu, K; Alao, O O and Ogbaje, C P (2019) Risk factors associated with procuring university hostel facilities through build-operate-transfer model. Journal of Engineering, Design and Technology, 17(1), pp. 136-154. ISSN 1726-0531
Oraee, M.; Hosseini, M. R. and Edwards, D. J. (2026) Quantitative insights into collaboration in BIM-enabled projects: A PLS-SEM approach. Engineering, Construction and Architectural Management, 33(3), pp. 2538-2563. ISSN 0969-9988
Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.
Oshodi, O S; Awuzie, B O; Akotia, J; Ademiloye, A S and Ngowi, A (2020) A bibliometric analysis of recycled concrete research (1978–2019). Built Environment Project and Asset Management, 10(5), pp. 725-736. ISSN 2044-124X
Osman, B and Zhu, H (2020) A virtual educational model on a CNC milling machine including and excluding two methods of fuzzy controllers. Journal of Engineering, Design and Technology, 18(5), pp. 1153-1163. ISSN 1726-0531
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.
Pandimani, M R; Ponnada, M R and Geddada, Y (2024) Finite-element modeling of partially prestressed concrete beams with unbonded tendon under monotonic loadings. Journal of Engineering, Design and Technology, 22(1), pp. 235-256. ISSN 1726-0531
Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges. PhD thesis, Purdue University, USA.
Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175
Pardalis, G; Mahapatra, K and Mainali, B (2020) Swedish construction MSEs: Simply renovators or renovation service innovators? Building Research & Information, 48(1), pp. 67-83. ISSN 0961-3218
Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study. PhD thesis, University of Dundee, UK.
Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387
Price, A D F and Shawa, H H (1997) Risk and risk management in project related finance. Journal of Construction Procurement, 3(3), pp. 27-46. ISSN 1358-9180
Priven, V and Sacks, R (2015) Effects of the last planner system on social networks among construction trade crews. Journal of Construction Engineering and Management, 141(6): 04015006, ISSN 0733-9364
Qadir, N; Brooks, T and Quigg, E (2023) Potential for construction statutory adjudication in Pakistan: taking lessons from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 91-102. ISSN 17514304
Raed, H (1999) Empowerment via progressive participation: Jordanian experience of the low income housing production. PhD thesis, University College London, UK.
Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.
Rantsatsi, N P (2021) Improving construction health and safety agent collaboration and health and safety performance in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Renault, B Y; Agumba, J N and Ansary, N (2020) Establishing core factors of risk management influencing performance outcome of small and medium firm's construction projects in Gauteng. Journal of Construction in Developing Countries, 25(2), pp. 93-127. ISSN 1823-6499
Renukappa, S; Suresh, S; Abdalla, W; Shetty, N; Yabbati, N and Hiremath, R (2024) Evaluation of smart village strategies and challenges. Smart and Sustainable Built Environment, 13(6), pp. 1386-1407. ISSN 2046-6099
Riaz, Z; Edwards, D J; Mackenzie, J and Thorpe, T (2006) Emerging information, communication and technology systems applied to construction vehicle safety. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Robinson, A; Austin, S and Gibb, A (2011) Efficiencies in design and manufacturing for construction using shipping containers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Rocha, C G D; Anzanello, M J and Gerchman, M (2018) Method to assess the match between clients' input and decoupling points in customized building projects. Journal of Construction Engineering and Management, 144(5): 04018018, ISSN 0733-9364
Russell, A D and Ranasinghe, M (1992) Analytical approach for economic risk quantification of large engineering projects. Construction Management and Economics, 10(4), pp. 277-301. ISSN 01446193
Sacks, R; Treckmann, M and Rozenfeld, O (2009) Visualization of work flow to support lean construction. Journal of Construction Engineering and Management, 135(12), pp. 1307-1315. ISSN 0733-9364
Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.
Safa, M; Shahi, A; Haas, C T and Hipel, K W (2017) Construction contract management using value packaging systems. International Journal of Construction Management, 17(1), pp. 50-64. ISSN 1562-3599
Salameh, M; Touqan, B and Suliman, A (2024) Enhancing student satisfaction and academic performance through school courtyard design: A quantitative analysis. Architectural Engineering and Design Management, 20(4), pp. 911-927. ISSN 1745-2007
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Salem, M A (1985) Motivation of national and expatriate construction workers in Jordan. PhD thesis, University of Michigan, USA.
Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364
Salman, S H (1991) Planning and control in the small business: Case studies from construction industry. PhD thesis, Swansea University, UK.
Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.
Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 0969-9988
Saurin, T A; Formoso, C T and Guimaraes, L B M (2004) Safety and production: An integrated planning and control model. Construction Management and Economics, 22(2), pp. 159-169. ISSN 01446193
Sawhney, A (1994) Simulation-based planning for construction. PhD thesis, University of Alberta, Canada.
Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(2), pp. 153-177. ISSN 01446193
Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.
Shaheen, A A; Fayek, A R and Abourizk, S M (2007) Fuzzy numbers in cost range estimating. Journal of Construction Engineering and Management, 133(4), pp. 325-334. ISSN 0733-9364
Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988
Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(7), pp. 2810-2835. ISSN 0969-9988
Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.
Shar, B K (2002) Application of it to improve the design process in the construction sector of Pakistan: A case of the specification management process. PhD thesis, University of Newcastle upon Tyne, UK.
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364
Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988
Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364
Sidwell, A C (1983) An evaluation of management contracting. Construction Management and Economics, 1(1), pp. 47-55. ISSN 01446193
Silvestri, A; Paraciani, N and Villani, T (2021) Performance evaluation of textile materials for lightweight envelopes in minor sports facilities and their impact on indoor comfort. Architectural Engineering and Design Management, 17(3-4), pp. 347-359. ISSN 1745-2007
Simpeh, F.; Appau, M. W. and Attakora-Amaniampong, E. (2026) Technological compliance and usefulness of heating and cooling systems in on-campus student housing in Ghana. Smart and Sustainable Built Environment, 15(3), pp. 1068-1084. ISSN 2046-6099
Simukonda, W and Kamwela, N (2021) The management of theft and vandalism on construction jobsites in the southern region of Malawi. Journal of Construction Business and Management, 5(1), pp. 47-59. ISSN 2521-0165
Simukonda, W T (2024) Modelling offsite construction to control hazards and direct cost of accidents. PhD thesis, Nelson Mandela University, South Africa.
Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771
Skitmore, M and Smyth, H (2007) Pricing construction work: A marketing viewpoint. Construction Management and Economics, 25(6), pp. 619-630. ISSN 1466433X
Slicher, A W R (1997) A strategic decision support system for a consulting engineering firm using a hybrid neural network-expert system approach. PhD thesis, University of Leeds, UK.
Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda. PhD thesis, University of London, UK.
Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.
Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Stojanovic, V; Falconer, R; Blackwood, D; Paterson, G; Fleming, M and Bell, S (2014) Interactive visualisation of heat loss and gain for early-stage energy appraisal of the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Stundon, D; Spillane, J; Lim, J P B; Tansey, P and Tracey, M (2015) Building information modelling energy performance assessment on domestic dwellings: A comparative study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Styhre, A and Gluch, P (2010) Managing knowledge in platforms: Boundary objects and stocks and flows of knowledge. Construction Management and Economics, 28(6), pp. 589-599. ISSN 1466433X
Sugiyantoro (2021) Homebuyers' strategies for progressive residential infrastructure improvement in Bandung, Indonesia. PhD thesis, University College London, UK.
Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.
Sunikka-Blank, M; Galvin, R and Behar, C (2018) Harnessing social class, taste and gender for more effective policies. Building Research & Information, 46(1), pp. 114-126. ISSN 0961-3218
Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Sunusi, B; Hashim, A H; Samah, A A and Ahmad, N (2021) The moderating effect of privacy in the relationships between residential livability and residents' life satisfaction. Journal of Construction in Developing Countries, 26(1), pp. 45-62. ISSN 1823-6499
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Sverlinger, P-O M (2000) Managing knowledge in professional service organizations: Technical consultants serving the construction industry. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tangkitsiri, W (2016) Modelling user satisfaction with transportation public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Tanko, B L; Abdullah, F; Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(3), pp. 305-319. ISSN 2044-124X
Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 0969-9988
Tasselli, Nicola (2023) BIM digital integration for existing buildings: Processes and tools to foster technological innovation of added-value building systems applied to the 20th century built asset in emilia-romagna. PhD thesis, Università degli Studi di Ferrara, Italy.
Tatari, O; Castro-Lacouture, D and Skibniewski, M J (2007) Current state of construction enterprise information systems: Survey research. Construction Innovation, 7(4), pp. 310-319. ISSN 1471-4175
Tembo, M; Kahanji, C and Mwanaumo, E M (2024) Cultivating procurement strategies to manage the tender price level for public infrastructure: : A case study of IRCP (World Bank) projects in Zambia. Journal of Construction Business and Management, 7(1), pp. 16-33. ISSN 2521-0165
Thangaraj, R K and Chan, T K (2012) The effects of the global financial crisis on the Australian building construction supply chain. Construction Economics and Building, 12(3), pp. 16-30. ISSN 2204-9029
Thomson, C S (2006) A study of the innovation process within the construction project environment. PhD thesis, University of Dundee, UK.
Thomson, D S (2000) The development of packaged, reusable building services components: A pilot study in the UK National Health Service. PhD thesis, Heriot-Watt University, UK.
Tiong, R L K (1995) Impact of financial package versus technical solution in a BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 304-311. ISSN 0733-9364
Tiong, R L K and Alum, J (1997) Final negotiation in competitive BOT tender. Journal of Construction Engineering and Management, 123(1), pp. 6-10. ISSN 0733-9364
Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988
Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531
Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364
Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218
Torres, A (2023) Using large peer-teaching groups to learn construction management software packages. International Journal of Construction Education and Research, 19(4), pp. 426-442. ISSN 1557-8771
Touran, A (1981) Construction operations data acquisition and processing via time-lapse photography interfaced to a minicomputer. PhD thesis, Stanford University, USA.
Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193
Turner, R K (2006) Sustainability auditing and assessment challenges. Building Research & Information, 34(3), pp. 197-200. ISSN 0961-3218
Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Tzoumis, K A (1992) The role of public involvement in managing political conflict: A comparative case study of public involvement activities in siting low-level radioactive waste disposal facilities. PhD thesis, Texas A&M University, USA.
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
Varghese, K (1992) Automated route planning for large vehicles on industrial construction sites. PhD thesis, University of Texas at Austin, USA.
Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364
Vernikos, V K (2016) Realising offsite construction in the civil engineering and infrastructure sector. PhD thesis, Loughborough University, UK.
Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.
Vinodh, S; Sundararaj, G; Devadasan, S R; Kuttalingam, D; Jayaprakasam, J and Rajanayagam, D (2009) Agility through the interfacing of CAD and cam. Journal of Engineering, Design and Technology, 7(2), pp. 143-170. ISSN 1726-0531
Wang, Y-R (2002) Applying the PDRI in project risk management. PhD thesis, University of Texas at Austin, USA.
Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175
Warszawski, A (1996) Strategic planning in construction companies. Journal of Construction Engineering and Management, 122(2), pp. 133-140. ISSN 0733-9364
Watts, G (2019) Measuring and managing the social value created by a diverse construction business. PhD thesis, Loughborough University, UK.
Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.
Wimalasena, N N and Gunatilake, S (2018) The readiness of construction contractors and consultants to adopt e-tendering: The case of Sri Lanka. Construction Innovation, 18(3), pp. 350-370. ISSN 1471-4175
Winarno, S; Griffith, A and Stephenson, P (2010) Reducing earthquake risk to non-engineered buildings in Indonesia. Construction Innovation, 10(4), pp. 421-434. ISSN 1471-4175
Wirba, E N (1996) An object-oriented knowledge-based systems approach to construction project control. PhD thesis, London South Bank University, UK.
Witteveen, W and Dorée, A (2011) Quick and effective: An innovative procurement scheme for six Dutch highway projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Wong, F (1997) Implementation of safety policy and safety system for construction companies in Hong Kong: Senior management's perspective. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.
Wood, H L and Ashton, P (2010) Modelling project complexity. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Yi, J S (2003) CAMP (CAse Matching Prediction): A dynamic forecasting model for periodic expenditures of residential building projects. PhD thesis, University of Wisconsin - Madison, USA.
Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.
Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.
Yoon, S; Weidner, T and Hastak, M (2021) Erratum: Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution (journal of construction engineering and management DOI: 10.1061/(ASCE)CO.1943-7862.0001956). Journal of Construction Engineering and Management, 147(7): 08221001, ISSN 0733-9364
Yoon, S; Weidner, T and Hastak, M (2021) Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution. Journal of Construction Engineering and Management, 147(3): 04020185, ISSN 0733-9364
Yorston, N and Chileshe, N (2014) Lessons learned from building the education revolution (BER) program by the South Australia construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Yousefzadeh, S; Spillane, J P; Lamont, L; McFadden, J and Lim, J P B (2015) Building information modelling (BIM) software interoperability: A review of the construction sector. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.
Zarei, F and Nik-Bakht, M (2024) Extending CityGML with public input: social ADE. Built Environment Project and Asset Management, 14(4), pp. 547-561. ISSN 2044-124X
Zerjav, V; Hartmann, T and Javemick-Will, A (2012) Internal governance of design and engineering: The case of the multinational firm. Journal of Construction Engineering and Management, 138(1), pp. 135-143. ISSN 0733-9364
Zhang, X (2005) Criteria for selecting the private-sector partner in public-private partnerships. Journal of Construction Engineering and Management, 131(6), pp. 631-644. ISSN 0733-9364
Zhang, X (2005) Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 3-14. ISSN 0733-9364
Zhang, Xuan (2025) Coordination and optimization of prefabricated building supply chain for sustainability development. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Zheng, J; Gu, Y; Li, P; Luo, L and Wu, G (2025) Research evolution and thematic breakthroughs in project leadership: A bibliometric analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1970-2002. ISSN 0969-9988
Zolkafli, U K; Zakaria, N; Mohammad Mazlan, A and Ali, A S (2019) Maintenance work for heritage buildings in Malaysia: Owners' perspectives. International Journal of Building Pathology and Adaptation, 37(1), pp. 186-195. ISSN 23984708
da Rocha, C G and Kemmer, S (2018) Integrating product and process design in construction. Construction Management and Economics, 36(9), pp. 535-543. ISSN 01446193
de Feijter, F J (2023) Trust in circular design: Active stakeholder participation in Chinese and Dutch housing retrofit projects. Building Research & Information, 51(1), pp. 105-118. ISSN 0961-3218
ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175
Ürge-Vorsatz, D; Koeppel, S and Mirasgedis, S (2007) Appraisal of policy instruments for reducing buildings' CO2 emissions. Building Research & Information, 35(4), pp. 458-477. ISSN 0961-3218
Up a level