Items with Index Term: owner
Abadou, Y; Ghrieb, A; Bustamante, R and Faid, H (2020) Optimization by mixture design approach: Impact of marble and ceramic recycle on properties of mortar based on air lime. Journal of Engineering, Design and Technology, 18(6), pp. 1731-1747. ISSN 1726-0531
Abbas, N M A (2007) Construction claims in Saudi Arabia: a study of sources and associations of claims. PhD thesis, University of Strathclyde, UK.
Abd El-Razek, M E; Bassioni, H A and Mobarak, A M (2008) Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11), pp. 831-841. ISSN 0733-9364
Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.
Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.
Abdallah, M A A (2014) Optimizing the selection of sustainability measures for existing buildings. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Abdallah, M A A; El-Rayes, K and Liu, L (2016) Minimizing upgrade cost to achieve LEED certification for existing buildings. Journal of Construction Engineering and Management, 142(2): 04015073, ISSN 0733-9364
Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.
Abdelrazik, H and Marzouk, M (2021) Investigating parameters affecting maintenance of heritage buildings in Egypt. International Journal of Building Pathology and Adaptation, 39(5), pp. 734-755. ISSN 23984708
Abdirad, H; Dossick, C S; Johnson, B R and Migliaccio, G (2021) Disruptive information exchange requirements in construction projects: Perception and response patterns. Building Research & Information, 49(2), pp. 161-178. ISSN 0961-3218
Abdulla, H S (2016) An investigation on the causes and remedial measures on the delays in the construction industry in the Kingdom of Bahrain. PhD thesis, Glasgow Caledonian University, UK.
Abideen, Dania Khairy (2024) A framework for integrating building information modelling with operations and maintenance for buildings. PhD thesis, University of Manchester, UK.
Aboagye-Nimo, E; Raidén, A B; King, A and Tietze, Z (2013) A safety culture shaped by common sense. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.
Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.
Abourizk, S M and Dozzi, S P (1993) Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), pp. 355-373. ISSN 0733-9364
Abraham, D (2011) Development of a true-cost concept for renewal of municipal underground pipeline systems. PhD thesis, University of Texas at Arlington, USA.
Abraham, D M and Dickinson, R J (1998) Disposal costs for environmentally regulated facilities: LCC approach. Journal of Construction Engineering and Management, 124(2), pp. 146-154. ISSN 0733-9364
Abu-Hijleh, S F and Ibbs, C W (1989) Schedule-based construction incentives. Journal of Construction Engineering and Management, 115(3), pp. 430-443. ISSN 0733-9364
Abu-Khader, W (2023) Barriers to the adoption of digitalization in the construction industry: Perspectives of owners, contractors, and contractors. Construction Economics and Building, 23(3-4), pp. 878-106. ISSN 2204-9029
Abu-Reishah, L and Hiyassat, M A (2023) The severity of design-construction interface risks in Jordanian construction industry. International Journal of Construction Management, 23(9), pp. 1540-1548. ISSN 1562-3599
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Abuhussain, M (2020) An assessment of the Saudi Residential Buildings Envelope Code under the current and future climate change scenarios: the case for Jeddah in the hot and humid climate region. PhD thesis, University of Liverpool, UK.
Abujnah, M S (2010) Towards a risk management framework for Libyan house-building projects. PhD thesis, University of Salford, UK.
Acar, E and Yasemin, G (2011) Prediction of risk perception by owners' psychological traits in small building contractors. Construction Management and Economics, 29(8), pp. 841-852. ISSN 1466433X
Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988
Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599
Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.
Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531
Adamtey, S and Onsarigo, L (2018) Analysis of pipe-bursting construction risks using probability-impact model. Journal of Engineering, Design and Technology, 16(3), pp. 461-477. ISSN 1726-0531
Adamtey, S A (2021) A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 17(1), pp. 68-84. ISSN 1557-8771
Adamtey, S A (2022) An empirical study to assist owners in selecting the right procurement method for design-build projects. International Journal of Construction Education and Research, 18(1), pp. 67-84. ISSN 1557-8771
Adan, H and Fuerst, F (2015) Modelling energy retrofit investments in the UK housing market: A microeconomic approach. Smart and Sustainable Built Environment, 4(3), pp. 251-267. ISSN 2046-6099
Addy, M N; Adinyira, E; Dadzoe, F and Opoku, D (2022) The market for green buildings in Sub-Saharan Africa: Experts' perspective on the economic benefits in Ghana. Journal of Construction in Developing Countries, 27(1), pp. 173-188. ISSN 1823-6499
Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099
Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.
Adey, B T; Lethanh, N; Hartmann, A and Viti, F (2014) Evaluation of intervention strategies for a road link in the Netherlands. Built Environment Project and Asset Management, 4(2), pp. 180-198. ISSN 2044-124X
Adi Maimun, N H (2016) Price and rent effects of energy efficiency in residential properties: evidence from the Belfast Metropolitan area. PhD thesis, Ulster University, UK.
Adia, I (2019) Strategies to secure sustainable funding for the successful conclusion of infrastructure projects. PhD thesis, Walden University, USA.
Adukpo, Emmanuel Selorm (2018) The development of governance capabilities for project owners and operators : a dynamic capabilities perspective. PhD thesis, University of Hong Kong, Hong Kong.
Adukpo, S E and Leiringer, R (2016) Client project governance capabilities: Unpacking the concept and governance mechanisms in practice. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2020) Integrated project delivery (IPD): Projecting a common good to key participants and the project. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Agha, R H M and Hussein, A N (2024) Adaptation re-use of traditional cafés in Erbil, Iraq. International Journal of Building Pathology and Adaptation, 42(1), pp. 153-174. ISSN 23984708
Aguocha, T (2023) Best practices for cost monitoring and control in construction projects: An exploratory case study. DBA thesis, National University, USA.
Agyakwa-Baah, A and Chileshe, N (2010) Construction professionals perception of risk assesssment and management practices: Does length of service in construction industry matter. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Agyekum, K; Akli-Nartey, E E K; Kukah, A S and Agyekum, A K (2023) Importance-performance analysis (IPA) of the indoor environmental quality (IEQ) of an edge-certified building in Ghana. International Journal of Building Pathology and Adaptation, 41(1), pp. 73-95. ISSN 23984708
Ahern, E (2022) A framework for improving the process of building certification to enhance energy efficiency: the case of Ireland. DProf thesis, Anglia Ruskin University, UK.
Ahluwalia, S S (2009) A framework for efficient condition assessment of the building infrastructure. PhD thesis, University of Waterloo, Canada.
Ahmad, H S; Ayoush, M D and Al-Alwan, M S (2020) Causes of delay to public infrastructure projects according to engineers representing different contract parties. Built Environment Project and Asset Management, 10(1), pp. 153-179. ISSN 2044-124X
Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387
Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.
Ahmed, S M (1993) An integrated total quality management (TQM) model for the construction process. PhD thesis, Georgia Institute of Technology, USA.
Ahmed, S M; Ahmad, R and Darshi De Saram, D (1999) Risk management trends in the Hong Kong construction industry: A comparison of contractors and owners perceptions. Engineering, Construction and Architectural Management, 6(3), pp. 225-234. ISSN 0969-9988
Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning. PhD thesis, University of Maryland, College Park, USA.
Ahuja, S; Nikolova, N and Clegg, S (2020) Professional identity and anxiety in architect-client interactions. Construction Management and Economics, 38(7), pp. 589-602. ISSN 01446193
Aigwi, I E; Egbelakin, T and Ingham, J (2018) Efficacy of adaptive reuse for the redevelopment of underutilised historical buildings: Towards the regeneration of New Zealand's provincial town centres. International Journal of Building Pathology and Adaptation, 36(4), pp. 385-407. ISSN 23984708
Aigwi, I E; Nwadike, A N; Le, A T H; Rotimi, F E; Sorrell, T; Jafarzadeh, R and Rotimi, J (2022) Prioritising optimal underutilised historical buildings for adaptive reuse: A performance-based MCDA framework validation in auckland, New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 181-204. ISSN 2046-6099
Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.
Akinradewo, O; Aigbavboa, C; Oke, A; Edwards, D and Kasongo, N (2023) Key requirements for effective implementation of building information modelling for maintenance management. International Journal of Construction Management, 23(11), pp. 1902-1910. ISSN 1562-3599
Akomah, B B and Ramani, P V (2025) Confirmatory factor analysis of the positive factors influencing the performance of Ghanaian construction projects. Construction Innovation, 25(4), pp. 1250-1286. ISSN 1471-4175
Akujuru, V A and Ruddock, L (2015) Dichotomising compulsory land acquisition and land contamination valuations. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 268-288. ISSN 1759-5916
Al Awad, O S (2015) The uptake of advanced IT with specific emphasis on BIM by SMEs in the Jordanian construction industry. PhD thesis, University of Salford, UK.
Al Hashmi, E (2016) Fire engineering in sustainable buildings: an evaluation for the application of performance-based design in Abu Dhabi. PhD thesis, University of Central Lancashire, UK.
Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.
Al-Aubaidy, N A (2015) Factors affecting underreporting of construction safety incidents on capital projects. PhD thesis, University of Texas at Austin, USA.
Al-Bayati, A J and Panzer, L (2019) Reducing damage to underground utilities: Lessons learned from damage data and excavators in North Carolina. Journal of Construction Engineering and Management, 145(12): 04019078, ISSN 0733-9364
Al-Dughaither, K A (1996) International construction financing strategies: Influential factors and decision-making. PhD thesis, Carnegie Mellon University, USA.
Al-Fadhali, N (2024) An amos-SEM approach to evaluating stakeholders' influence on construction project delivery performance. Engineering, Construction and Architectural Management, 31(2), pp. 638-661. ISSN 0969-9988
Al-Gahtani, A S Z (1991) Construction claims for public and private projects in Saudi Arabia. DSc thesis, George Washington University, USA.
Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.
Al-Hachami, Z (2020) Decision making in the oil and gas construction project management: structured VS discretionary. PhD thesis, University of Liverpool, UK.
Al-Homoud, M S and Khan, M M (2004) Assessing safety measures in residential buildings in Saudi Arabia. Building Research & Information, 32(4), pp. 300-305. ISSN 0961-3218
Al-Kaabi, N S (2006) A fuzzy-based construction safety advisor (CSA) for construction safety in the United Arab Emirates. PhD thesis, Ohio State University, USA.
Al-Khalil, M I and Al-Ghafly, M A (1999) Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5), pp. 647-655. ISSN 01446193
Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599
Al-Lahham, Yazan (2019) Risk management approaches in SMEs: A study of owner-managers in Jordan. PhD thesis, University of Liverpool, UK.
Al-Saleh, F S (1980) A case study and evaluation of a technological delivery system: Construction management in Saudi Arabia. PhD thesis, University of Washington, USA.
Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.
Al-Sinaidi, A A (2002) Computation of construction contractor capability. PhD thesis, Florida Institute of Technology, USA.
Al-Sinaidi, A R (2005) Selecting the unit price bid: An analytical method. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Al-Sinan, F M (1986) Evaluation of construction management contracts in developing countries. PhD thesis, Purdue University, USA.
Al-Sinan, M A (2004) TQM and the construction industry: Saudi Arabia: a case study. PhD thesis, City, University of London, UK.
Al-Sobiei, O S (2001) Assessment of risk allocation in construction projects. PhD thesis, Illinois Institute of Technology, USA.
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(4), pp. 423-430. ISSN 01446193
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Managing owner's risk of contractor default. Journal of Construction Engineering and Management, 131(9), pp. 973-978. ISSN 0733-9364
Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(2), pp. 117-132. ISSN 1358-9180
Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988
Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.
AlMaian, R Y; Needy, K L; Walsh, K D and Alves, T D C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(2): 04015061, ISSN 0733-9364
Alaghbari, W; Kadir, M R A and Salim, A (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), pp. 192-206. ISSN 0969-9988
Alajmani, H; Ahmed, S and El-Sayegh, S M (2024) Factors causing delays in the UAE construction industry amid the covid-19 pandemic. Journal of Financial Management of Property and Construction, 29(1), pp. 135-151. ISSN 1366-4387
Alaka, H A; Oyedele, L O; Owolabi, H A; Oyedele, A A; Akinade, O O; Bilal, M and Ajayi, S O (2017) Critical factors for insolvency prediction: Towards a theoretical model for the construction industry. International Journal of Construction Management, 17(1), pp. 25-49. ISSN 1562-3599
Alameri, R and Esmaeili, B (2023) Progressive design-build delivery method: Assessment of project performance. International Journal of Construction Education and Research, 19(1), pp. 22-41. ISSN 1557-8771
Alananga, S; Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(8), pp. 671-688. ISSN 01446193
Alani, A M; Petersen, A K; Chapman, K G and Khosrowshahi, F (2004) A proposed quantitative model for building repair and maintenance: Theory, model development and application. Journal of Construction Research, 5(2), pp. 193-210. ISSN 1609-9451
Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: Delay of international funded road projects. Engineering, Construction and Architectural Management, 30(4), pp. 1746-1767. ISSN 0969-9988
Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.
Alazzam, M. and Celoza, A. (2026) Current state of supplier qualification in capital projects: Factors, practices, and industry perspectives. Journal of Construction Engineering and Management, 152(8): 04026111, ISSN 0733-9364
Albano, L D (1992) An axiomatic approach to performance-based design. PhD thesis, Massachusetts Institute of Technology, USA.
Albattah, M A (2016) A critical analysis of the structural changes related to craft demographics influencing craft supply and demand in the United States across multiple dimensions. PhD thesis, University of Colorado at Boulder, USA.
Albert, A (2013) Strategies for construction hazard recognition. PhD thesis, University of Colorado at Boulder, USA.
Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities. PhD thesis, Brunel University, UK.
Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2021) Best practices of organizational change for adopting alternative project delivery methods in the AEC industry. Engineering, Construction and Architectural Management, 28(4), pp. 1060-1082. ISSN 0969-9988
Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Employee reactions to adoption of alternative project delivery methods within the AEC industry. International Journal of Construction Education and Research, 19(1), pp. 4-21. ISSN 1557-8771
Aldossari, K M A (2020) Organizational change management for the adoption of alternative project delivery methods within the AEC industry. PhD thesis, Arizona State University, USA.
Algahtany, M (2018) Assessment and development of contractors' mitigation practices towards risks out of contractors' control in the Saudi construction industry. PhD thesis, Arizona State University, USA.
Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.
Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.
Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Alkasisbeh, M R (2018) An integrated decision support framework for life-cycle building asset management. PhD thesis, Western Michigan University, USA.
Alkhamali, K S H (2014) Leadership style, organisational culture and disputes in public construction. PhD thesis, Heriot-Watt University, UK.
Alkhathami, M M (2004) Examination of the correlation of critical success and delay factors in construction projects in the kingdom of Saudi Arabia. PhD thesis, University of Pittsburgh, USA.
Allen, S and Hinks, J (1996) Comment: How long should housing last? Some implications of the age and probable life of housing in England. Construction Management and Economics, 14(6), pp. 531-535. ISSN 01446193
Almazroa, D A (2003) Project delivery system decision framework using the weighting factors and analytic hierarchy process methods. PhD thesis, University of Pittsburgh, USA.
Almeraikhi, A M (2010) An integrated framework for multi-project planning and control. PhD thesis, Sheffield Hallam University, UK.
Almutiri, Y R (2016) Empirical investigation into development of a curricular framework to embed building information modelling with undergraduate architectural programmes within Saudi Arabia. PhD thesis, University of Salford, UK.
Alofi, A (2017) Improving the Saudi Arabia procurement system: Perception and development of the construction industry. PhD thesis, Arizona State University, USA.
Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms. PhD thesis, Illinois Institute of Technology, USA.
Alpmen, A S (2013) Development and implementation of a proactive safety performance evaluation system for general contractors. PhD thesis, Wayne State University, USA.
Alqarni, K H (2018) A case study of information technology acceptance in the Saudi Arabian architecture, engineering and construction industry. PhD thesis, University of Reading, UK.
Alqershy, M T and Kishore, R (2023) Construction claims prediction using ann models: A case study of the Indian construction industry. International Journal of Construction Management, 23(6), pp. 1097-1108. ISSN 1562-3599
Alruqi, W M and Hallowell, M R (2019) Critical success factors for construction safety: Review and meta-analysis of safety leading indicators. Journal of Construction Engineering and Management, 145(3): 04019005, ISSN 0733-9364
Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.
Alsalman, A A (2012) Construction risks allocation: Optimal risk allocation decision support model. PhD thesis, Oregon State University, USA.
Alshahrani, S (2017) Development the a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alshahrani, S A A D (2017) Development of a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alshehri, A M (2013) Conflict in architectural projects: diagnosis and avoidance: a study based on Saudi Arabian construction industry. PhD thesis, University of Manchester, UK.
Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.
Amadi, C; Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Amponsah, C T (2010) Public-private partnerships: Critical success factors for procurements of capital projects. PhD thesis, Capella University, USA.
Amponsah, C T and Forbes, J L (2012) Public-private partnerships: Critical factors for procurement of capital projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 211-221. ISSN 17514312
An, X; Li, H; Zuo, J; Ojuri, O; Wang, Z and Ding, J (2018) Identification and prevention of unbalanced bids using the unascertained model. Journal of Construction Engineering and Management, 144(11): 05018013, ISSN 0733-9364
An, X; Ren, S; Wang, L and Huang, Y (2025) Evolutionary game analysis of collaborative application of BIM platform from the perspective of value co-creation. Engineering, Construction and Architectural Management, 32(7), pp. 4458-4474. ISSN 0969-9988
Anamege, T E (2019) Capital financing strategies of small-scale contractors in Nigeria. PhD thesis, Walden University, USA.
Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave? PhD thesis, University of Reading, UK.
Andalib, R; Hoseini, A and Gatmiri, B (2018) A stochastic model of cash flow forecasting considering delays in owners' payments. Construction Management and Economics, 36(10), pp. 545-564. ISSN 01446193
Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988
Anderson, S D; Patil, S S; Gibson Jr, G E and Sullivan, G R (2004) Owner-contractor work structures: Process approach. Journal of Construction Engineering and Management, 130(5), pp. 680-690. ISSN 0733-9364
Anderson, S d (1989) Potential for construction industry improvement. PhD thesis, University of Texas at Austin, USA.
Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), pp. 69-80. ISSN 01446193
Andrade, J B (2017) Early stage design methodology to ensure life cycle sustainability of residential buildings. PhD thesis, Universidade do Minho, Portugal.
Andreas, H; Dorée, A and Martin, L (2010) A constructivist approach for teaching research methodology in construction management. International Journal of Construction Education and Research, 6(4), pp. 253-270. ISSN 1557-8771
Andrew, A; Murning, I; Pitt, M and Tucker, M (2008) Investment in the Scottish further education estate 19992006. Journal of Financial Management of Property and Construction, 13(3), pp. 209-216. ISSN 1366-4387
Annunen, P and Haapasalo, H (2023) Industrial operation model for the construction industry. International Journal of Construction Management, 23(16), pp. 2736-2745. ISSN 1562-3599
Antino, P (2021) Interpreting the Party Wall etc Act 1996 and the implications for building below ground. PhD thesis, Anglia Ruskin University, UK.
Antonopoulou, S (1987) The building industry in Greece: its role in the post-war Greek economy. PhD thesis, University College London, UK.
Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.
Arain, F M and Pheng, L S (2005) How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3), pp. 181-196. ISSN 1745-2007
Aramvareekul, P (2003) An analysis of labor productivity in the United States construction industry. PhD thesis, State University of New York at Buffalo, USA.
Arantes, A and Ferreira, L M D F (2020) Underlying causes and mitigation measures of delays in construction projects: An empirical study. Journal of Financial Management of Property and Construction, 25(2), pp. 165-181. ISSN 1366-4387
Arditi, D; Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), pp. 171-181. ISSN 01446193
Arditi, D and Alavipour, S M R (2019) Trends in expectations about duties and responsibilities of construction managers. Journal of Construction Engineering and Management, 145(7): 04019037, ISSN 0733-9364
Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364
Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(8), pp. 721-732. ISSN 1466433X
Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364
Arditi, D and Lee, D E (2003) Assessing the corporate service quality performance of design-build contractors using quality function deployment. Construction Management and Economics, 21(2), pp. 175-185. ISSN 01446193
Arditi, D and Lee, D E (2004) Service quality performance of design/build contractors using quality function deployment. Construction Management and Economics, 22(2), pp. 123-127. ISSN 01446193
Arditi, D and Ongkasuwan, D (2009) Duties and responsibilities of construction managers: Perceptions of parties involved in construction. Journal of Construction Engineering and Management, 135(12), pp. 1370-1374. ISSN 0733-9364
Arditi, D and Patel, B K (1989) Impact analysis of owner-directed acceleration. Journal of Construction Engineering and Management, 115(1), pp. 144-157. ISSN 0733-9364
Arditi, D and Yasamis, F (1998) Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), pp. 361-373. ISSN 0733-9364
Ardron, T G and Allwood, J M (2025) Exploring time and cost optimization in energy retrofit programmes of traditionally constructed, owner-occupied UK dwellings. Building Research & Information, 53(3), pp. 397-415. ISSN 0961-3218
Arensman, D B and Ozbek, M E (2012) Building information modeling and potential legal issues. International Journal of Construction Education and Research, 8(2), pp. 146-156. ISSN 1557-8771
Argyroudis, S A; Nasiopoulos, G; Mantadakis, N and Mitoulis, S A (2021) Cost-based resilience assessment of bridges subjected to earthquakes. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 209-222. ISSN 1759-5916
Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.
Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364
Asaad, A and El-Sayegh, S M (2021) Key criteria for selecting green suppliers for construction projects in the UAE. Journal of Financial Management of Property and Construction, 26(2), pp. 201-218. ISSN 1366-4387
Asamoah, R O; Baiden, B K; Nani, G and Kissi, E (2022) Identifying intangible resources to enhance profitability strategies of small-medium scale construction firms (SMSCFs) in developing countries. International Journal of Construction Management, 22(11), pp. 2207-2214. ISSN 1562-3599
Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.
Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364
Ashuri, B; Wang, J; Shahandashti, M and Baek, M (2019) A data envelopment analysis (DEA) model for building energy benchmarking. Journal of Engineering, Design and Technology, 17(4), pp. 747-768. ISSN 1726-0531
Assaad, R and El-Adaway, I H (2020) Enhancing the knowledge of construction business failure: A social network analysis approach. Journal of Construction Engineering and Management, 146(6): 04020052, ISSN 0733-9364
Assaf, S; Hassanain, M A; Abdallah, A; Sayed, A M Z and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), pp. 597-615. ISSN 2044-124X
Atalah, A (2008) Effect of rock trenching vibrations on nearby structures. Journal of Construction Engineering and Management, 134(4), pp. 234-241. ISSN 0733-9364
Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364
Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Au, T and Hendrickson, C (1986) Profit measures for construction projects. Journal of Construction Engineering and Management, 112(2), pp. 273-286. ISSN 0733-9364
Augenbroe, G and Park, C S (2005) Quantification methods of technical building performance. Building Research & Information, 33(2), pp. 159-172. ISSN 0961-3218
Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry. PhD thesis, University of Alberta, Canada.
Awad, A M (2005) The interaction between project finance of a large-scale construction project and macroeconomic indicators and policies. PhD thesis, University of Nottingham, UK.
Awagah, Nicholas K (2024) An integrated framework for mentoring artisans in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Axon, C J; Bright, S J; Dixon, T J; Janda, K B and Kolokotroni, M (2012) Building communities: Reducing energy use in tenanted commercial property. Building Research & Information, 40(4), pp. 461-472. ISSN 0961-3218
Aydın, D and Mıhlayanlar, E (2024) Determination of the significance of project delivery attributes (PDAs) on sustainable projects in Turkey. Journal of Engineering, Design and Technology, 22(5), pp. 1682-1703. ISSN 1726-0531
Ayodeji, A A (2008) Managing building and civil engineering project claims to reduce conflict intensity and contractors' potential to dispute. PhD thesis, National University of Singapore, Singapore.
Azambuja, M M B (2009) A decision support system for rapid evaluation and selection of engineered equipment suppliers. PhD thesis, University of Texas at Austin, USA.
Azcarate-Aguerre, J F; Conci, M; Zils, M; Hopkinson, P and Klein, T (2022) Building energy retrofit-as-a-service: A total value of ownership assessment methodology to support whole life-cycle building circularity and decarbonisation. Construction Management and Economics, 40(9), pp. 676-689. ISSN 01446193
Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.
Azhar, S; Ahmad, I and Sein, M K (2010) Action research as a proactive research method for construction engineering and management. Journal of Construction Engineering and Management, 136(1), pp. 87-98. ISSN 0733-9364
Aziz, A M A (2008) Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(5), pp. 507-529. ISSN 1466433X
Azmy, N (2012) The role of team effectiveness in construction project teams and project performance. PhD thesis, Iowa State University, USA.
Babalola, A and Harinarain, N (2024) Policy barriers to sustainable construction practice in the Nigerian construction industry: An exploratory factor analysis. Journal of Engineering, Design and Technology, 22(1), pp. 214-234. ISSN 1726-0531
Badra, N; Hegazy, H; Zhang, J; Yahia, M; Fathy, M and AboulHaggag, S (2025) Application of fuzzy multi-objective model for crashing the construction of steel structure projects post-pandemic (Covid-19). International Journal of Construction Management, 25(3), pp. 363-374. ISSN 1562-3599
Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(4), pp. 249-269. ISSN 0969-9988
Bajere, P A (1996) Maintenance conditions and occupant behavior in government-provided housing in Lagos, Nigeria. DIT thesis, University of Northern Iowa, USA.
Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.
Ballesteros-Pérez, P; Skitmore, M; Pellicer, E and González-Cruz, M C (2015) Scoring rules and abnormally low bids criteria in construction tenders: A taxonomic review. Construction Management and Economics, 33(4), pp. 259-278. ISSN 01446193
Ballesteros-Pérez, P; Skitmore, M; Pellicer, E and Zhang, X (2016) Scoring rules and competitive behavior in best-value construction auctions. Journal of Construction Engineering and Management, 142(9): 04016035, ISSN 0733-9364
Balogun, T B (2014) Towards a life cycle framework for bridge management systems in the UK: Insights from a critical review of international approaches and models. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Balogun, T B (2018) Integrating bridge maintenance life cycle assessments into bridge design for improved sustainable decision making. PhD thesis, University of the West of England, Bristol, UK.
Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.
Baniassadi, F; Alvanchi, A and Mostafavi, A (2018) A simulation-based framework for concurrent safety and productivity improvement in construction projects. Engineering, Construction and Architectural Management, 25(11), pp. 1501-1515. ISSN 0969-9988
Barnes, W C (1993) Microcomputers in management of construction operations. Journal of Construction Engineering and Management, 119(2), pp. 403-412. ISSN 0733-9364
Barsoumian, T (2023) Survive and thrive: An exploration of methods implemented by small businesses in the construction industry to sustain their business beyond 5 years. EdD thesis, Pepperdine University, USA.
Bartiaux, F; Gram-Hanssen, K; Fonseca, P; Ozoliņa, L and Christensen, T H (2014) A practice-theory approach to homeowners' energy retrofits in four European areas. Building Research & Information, 42(4), pp. 525-538. ISSN 0961-3218
Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades. PhD thesis, University of California, Berkeley, USA.
Bates, A J (2008) The owner's role in project success. PhD thesis, Polytechnic University, USA.
Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.
Baweshkha, Monair Ali (2021) Integrating project management office and organisational change management processes for better implementation and adoption of e-health strategy in Saudi Arabia. PhD thesis, RMIT University, Australia.
Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X
Bayraktar, M E; Hastak, M; Gokhale, S and Safi, B (2011) Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects. Journal of Construction Engineering and Management, 137(9), pp. 645-655. ISSN 0733-9364
Beardmore, D C and Molenaar, K R (2023) Roadway design and construction in infrastructure limited contexts: A risk breakdown structure. International Journal of Construction Management, 23(10), pp. 1675-1683. ISSN 1562-3599
Becerik, B (2006) Implementation and value of online collaboration and project management systems in design and construction. DDes thesis, Harvard University, USA.
Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.
Beheiry, S M A (2005) Examining the impact of corporate commitment to sustainability. PhD thesis, University of Texas at Austin, USA.
Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364
Bell, L C and McCullouch, B G (1983) Microcomputer spreadsheet applications. Journal of Construction Engineering and Management, 109(2), pp. 214-223. ISSN 0733-9364
Bell, L C and Stukhart, G (1986) Attributes of materials management systems. Journal of Construction Engineering and Management, 112(1), pp. 14-21. ISSN 0733-9364
Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects. PhD thesis, Carnegie Mellon University, USA.
Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193
Ben-Alon, L (2020) Natural buildings: Integrating earthen building materials and methods into mainstream construction. PhD thesis, Carnegie Mellon University, USA.
Benster, N A (1970) A study and assessment of water penetration and rapid deterioration in existing dwellings-developed as a guide to future building design, production and maintenance management. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Bentil, K K (1990) A model approach for predicting commercial construction site accidents. PhD thesis, University of Florida, USA.
Berawi, M A; Kim, A A; Naomi, F; Basten, V; Miraj, P; Medal, L A and Sari, M (2023) Designing a smart integrated workspace to improve building energy efficiency: An Indonesian case study. International Journal of Construction Management, 23(3), pp. 410-422. ISSN 1562-3599
Berends, T C (2007) Contracting economics of large engineering and construction projects. PhD thesis, Delft University of Technology, Netherlands.
Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.
Besiktepe, D (2021) Multi-criteria decision-making approach for building maintenance in facility management. PhD thesis, Colorado State University, USA.
Besser, D (2006) The experience of women in construction management: A hermeneutic phenomenological study. PhD thesis, University of Minnesota, USA.
Bew, M D (2017) Engineering better social outcomes through requirements management & integrated asset data processing. PhD thesis, University of Salford, UK.
Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364
Bichard, E and Thurairajah, N (2013) Behaviour change strategies for energy efficiency in owner-occupied housing. Construction Innovation, 13(2), pp. 165-185. ISSN 1471-4175
Bichard, E and Thurairajah, N (2014) Trialling behaviour change strategies to motivate interest in property level flood protection. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 130-143. ISSN 1759-5916
Bilge, E C and Yaman, H (2021) Information management roles in real estate development lifecycle: Literature review on BIM and IPD framework. Construction Innovation, 21(4), pp. 723-742. ISSN 1471-4175
Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.
Bingham, E; Gibson, G E and Asmar, M E (2018) Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests. Journal of Construction Engineering and Management, 144(6): 04018033, ISSN 0733-9364
Bishop, E (2014) The use of Department of Health standards and guidance: effects on, and benefits to, healthcare accommodation. PhD thesis, Loughborough University, UK.
Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.
Bo, X and Chan, A P C (2012) Investigation of barriers to entry into the design-build market in the people's republic of China. Journal of Construction Engineering and Management, 138(1), pp. 120-127. ISSN 0733-9364
Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects. PhD thesis, Heriot-Watt University, UK.
Bonuke, D O (2021) Strategies to improve survival rate among small businesses in the construction industry. PhD thesis, Walden University, USA.
Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.
Bordass, B; Cohen, R; Standeven, M and Leaman, A (2001) Assessing building performance in use 2: Technical performance of the Probe buildings. Building Research & Information, 29(2), pp. 103-113. ISSN 0961-3218
Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies. PhD thesis, KTH Royal Institute of Technology, Sweden.
Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364
Borrallo-Jiménez, M; Esquivias, P M; Fernández-Agüera, J and LopezDeAsiain, M (2025) Hybrid ventilation in a nearly zero-energy building as a function of users' habits for better indoor air quality and thermal comfort in a warm climate. Building Research & Information, 53(1-2), pp. 77-94. ISSN 0961-3218
Bosch, A; Volker, L and Koutamanis, A (2015) BIM in the operations stage: Bottlenecks and implications for owners. Built Environment Project and Asset Management, 5(3), pp. 331-343. ISSN 2044-124X
Bosch-Rekveldt, M G C (2011) Managing project complexity: A study into adapting early project phases to improve project performance in large engineering projects. PhD thesis, Delft University of Technology, Netherlands.
Botha, P S and Scheepbouwer, E (2015) Christchurch rebuild, New Zealand: Alliancing with a difference. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 121-129. ISSN 17514304
Boukendour, S and Hughes, W P (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), pp. 279-289. ISSN 01446193
Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector. PhD thesis, Nottingham Trent University, UK.
Bradley, P E (2019) Methodology for the sequence analysis of building stocks. Building Research & Information, 47(2), pp. 141-155. ISSN 0961-3218
Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364
Brennan, M D (2011) Integrated project delivery: A normative model for value creation in complex military medical projects. PhD thesis, University of Illinois, USA.
Bright, S (2010) Carbon reduction and commercial leases in the UK. International Journal of Law in the Built Environment, 2(3), pp. 218-231. ISSN 1756-1450
Brissi, S G (2021) Principles for the adoption of offsite construction in design and construction companies. PhD thesis, Purdue University, USA.
Brockman, J L (2014) Interpersonal conflict in construction: Cost, cause, and consequence. Journal of Construction Engineering and Management, 140(2): 04013050, ISSN 0733-9364
Brogan, Elizabeth A (2022) Drainage design engineering risk on design-build transportation projects. PhD thesis, University of Colorado at Denver, USA.
Bromilow, F J and Tucker, S N (1983) Terotechnological optimality in construction. Construction Papers, 2(1), pp. 41-50. ISSN 0144-8587
Brown, K (2023) The role of governance in the building of arenas for popular music in France and England, 1980-2019. PhD thesis, Leeds Beckett University, UK.
Brown, N; Malmqvist, T and Wintzell, H (2016) Owner organizations' value-creation strategies through environmental certification of buildings. Building Research & Information, 44(8), pp. 863-874. ISSN 0961-3218
Bruce, R D; Gebken, R J and Strong, S D (2009) The impact of the leadership in energy and environmental design accredited professional (LEED-ap) credential on prime/general contractor employees. International Journal of Construction Education and Research, 5(3), pp. 182-196. ISSN 1557-8771
Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.
Bryde, D J (2008) Is construction different? A comparison of perceptions of project management performance and practices by business sector and project type. Construction Management and Economics, 26(3), pp. 315-327. ISSN 1466433X
Bryde, D J and Volm, J M (2009) Perceptions of owners in German construction projects: Congruence with project risk theory. Construction Management and Economics, 27(11), pp. 1059-1071. ISSN 1466433X
Bröchner, J and Grandinson, B (1992) R&d cooperation by swedish contractors. Journal of Construction Engineering and Management, 118(1), pp. 3-16. ISSN 0733-9364
Bu-Qammaz, A S A S (2015) Risk management model for international public construction joint venture projects in Kuwait. PhD thesis, Ohio State University, USA.
Bubbers, G and Christian, J (1992) Hypertext and claim analysis. Journal of Construction Engineering and Management, 118(4), pp. 716-730. ISSN 0733-9364
Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364
Buchholz, M and Lützkendorf, T (2023) European building passports: Developments, challenges and future roles. Buildings & Cities, 4(1), pp. 902-919. ISSN 2632-6655
Bullen, P and Love, P (2011) A new future for the past: A model for adaptive reuse decision-making. Built Environment Project and Asset Management, 1(1), pp. 32-44. ISSN 2044-124X
Burati, J L; Matthews, M F and Kalidindi, S N (1991) Quality management in construction industry. Journal of Construction Engineering and Management, 117(2), pp. 341-359. ISSN 0733-9364
Burgett, J M and Chini, A R (2013) Effective energy efficiency measures for existing residential homes in the Florida market. International Journal of Construction Education and Research, 9(1), pp. 61-80. ISSN 1557-8771
Burke, R D (2018) Early design decisions in building materials for higher performing buildings. PhD thesis, Arizona State University, USA.
Burrus, R T; Dumas, C F and Graham, J E (2011) Hurricane risk and coastal property owner choices. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 118-138. ISSN 1759-5916
Buser, M and Carlsson, V (2015) Renewing renovation: Looking at renovation of owners occupied houses with socio-materiality lenses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Buser, M and Carlsson, V (2017) What you see is not what you get: Single-family house renovation and energy retrofit seen through the lens of sociomateriality. Construction Management and Economics, 35(5), pp. 276-287. ISSN 01446193
Buser, M; Carlsson, V and Koch, C (2019) Interactive shaping of expertise: The play between house-owner and SME contractors negotiating renovation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.
Caldas, C H; Chou, C C and O'Connor, J (2008) Negotiation-based decision support model for utility relocations in transportation infrastructure projects. Construction Management and Economics, 26(10), pp. 1079-1090. ISSN 1466433X
Calhoun, M E (2015) Synergistic effects among leading indicators of construction safety management. PhD thesis, University of Alaska Fairbanks, USA.
Campbell, A J (2012) The politics of canal construction: the Ashby Canal, 1781-1804. PhD thesis, University of Leicester, UK.
Campion, N A (2015) Advancing life cycle assessment: Perspectives from the building and healthcare industries. PhD thesis, University of Pittsburgh, USA.
Cao, D; Li, H and Wang, G (2014) Impacts of isomorphic pressures on BIM adoption in construction projects. Journal of Construction Engineering and Management, 140(12): 04014056, ISSN 0733-9364
Cao, M T; Cheng, M Y and Wu, Y W (2015) Hybrid computational model for forecasting Taiwan construction cost index. Journal of Construction Engineering and Management, 141(4): 04014089, ISSN 0733-9364
Cariño, J M N and Garciano, L E O (2020) Proposed evacuation safety index (ESI) for school buildings. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 309-328. ISSN 1759-5916
Carlsson, V (2017) SME contractors on the stage for energy renovations? A dramaturgical perspective on SME contractors’ roles and interactions with house owners. PhD thesis, Chalmers University of Technology, Sweden.
Carlsson, V and Koch, C (2014) Shall we dance? Encounters for energy renovation of single family houses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Carmichael, D G and Balatbat, M C A (2008) The influence of extra projects on overall investment feasibility. Journal of Financial Management of Property and Construction, 13(3), pp. 161-175. ISSN 1366-4387
Carmichael, D G and Balatbat, M C A (2010) A contractor's analysis of the likelihood of payment of claims. Journal of Financial Management of Property and Construction, 15(2), pp. 102-117. ISSN 1366-4387
Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387
Carmo, Lie Uema do (2012) Construction contracts of large projects. PhD thesis, Universidade de São Paulo, Brazil.
Caruajulca, P and Khalilzadeh, M (2025) Empowerment and project performance success: The role of leadership and power distance. Journal of Engineering, Design and Technology, 23(5), pp. 1694-1711. ISSN 1726-0531
Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy. PhD thesis, University of Texas at Austin, USA.
Ceric, A (2014) Communication risk and trust in construction projects: A framework for interdisciplinary research. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Cerić, A and Ivić, I (2025) Communication challenges and blockchain in building energy efficiency retrofits: Croatia case. Engineering, Construction and Architectural Management, 32(1), pp. 1-15. ISSN 0969-9988
Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988
Cha, H S; Kim, J and Han, J Y (2009) Identifying and assessing influence factors on improving waste management performance for building construction projects. Journal of Construction Engineering and Management, 135(7), pp. 647-656. ISSN 0733-9364
Chagadama, J (2022) Small construction business owners’ strategies to reduce voluntary employee turnover. PhD thesis, Walden University, USA.
Chakravarty, S (2002) Essays on contracting in the construction industry. PhD thesis, University of Southern California, USA.
Chan, D W M; Hung, H T W; Chan, A P C and Lo, T K K (2014) Overview of the development and implementation of the mandatory building inspection scheme (MBIS) in Hong Kong. Built Environment Project and Asset Management, 4(1), pp. 71-89. ISSN 2044-124X
Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193
Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.
Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364
Chang, C Y and Qian, Y (2015) An econometric analysis of holdup problems in construction projects. Journal of Construction Engineering and Management, 141(6): 04015004, ISSN 0733-9364
Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364
Chao, L C and Liaw, S J (2019) Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008, ISSN 0733-9364
Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction. PhD thesis, George Washington University, USA.
Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2013) Development of a conceptual team integration performance index for alliance projects. Construction Management and Economics, 31(11), pp. 1128-1143. ISSN 1466433X
Chelson, D E (2010) The effects of building information modeling on construction site productivity. PhD thesis, University of Maryland, College Park, USA.
Chen, C and Messner, J I (2010) A recommended practices system for a global virtual engineering team. Architectural Engineering and Design Management, 6(3), pp. 207-221. ISSN 1745-2007
Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193
Chen, L; Yuan, B and Wang, X (2024) Simulation analysis of the constraints on the green retrofit of existing buildings and strategies for its promotion: a hybrid method based on ISM and SD. Building Research & Information, 52(5), pp. 515-532. ISSN 0961-3218
Chen, P; Qiang, M and Wang, J N (2009) Project management in the Chinese construction industry: Six-case study. Journal of Construction Engineering and Management, 135(10), pp. 1016-1026. ISSN 0733-9364
Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364
Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.
Chen, X; Feng, J; Zhao, Y and Lu, T (2025) Feasibility of a program delay claims scheme: Synergistic effect and risk-cost optimization. Journal of Construction Engineering and Management, 151(10): 04025151, ISSN 0733-9364
Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364
Chen, Y Q; Lu, H; Lu, W and Zhang, N (2010) Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA). Engineering, Construction and Architectural Management, 17(6), pp. 598-614. ISSN 0969-9988
Chen, Y Q; Zhang, Y B and Zhang, S J (2014) Impacts of different types of owner-contractor conflict on cost performance in construction projects. Journal of Construction Engineering and Management, 140(6): 4014017, ISSN 0733-9364
Cheng, M.; Chong, H. Y.; Xu, Y.; Chi, M. and Liu, G. (2026) Dynamic interplay for blockchain-smart contracts (sc) adoption among government, private owners and general contractors across stages of contract development. Engineering, Construction and Architectural Management, 33(7), pp. 5445-5468. ISSN 0969-9988
Cheng, M. Y.; Khitam, A. F. K.; Vu, Q. T. and Widjaja, D. D. (2026) Satellite-inspired time-frequency deep learning for predicting and assessing financial health in general contractors. Journal of Construction Engineering and Management, 152(8): 04026120, ISSN 0733-9364
Cheng, J C P and Venkataraman, V (2016) Analyzing relationships between project team compositions and green building certification in green building projects. Built Environment Project and Asset Management, 6(5), pp. 449-461. ISSN 2044-124X
Cheung, S-O; Lam, K-C; Wong, S-S and Wong, S-H (2001) The fee sensitive risk exposures of project authorized person in Hong Kong. Construction Economics and Building, 1(2), pp. 65-72. ISSN 2204-9029
Chileshe, N and Boadua Yirenkyi-Fianko, A (2012) An evaluation of risk factors impacting construction projects in Ghana. Journal of Engineering, Design and Technology, 10(3), pp. 306-329. ISSN 1726-0531
Chin, C S and Russell, J S (2008) Predicting the expected service level and the realistic lead time of rfi process using binary logistic regression. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.
Cho, C-S (2000) Development of the project definition rating index (PDRI) for building projects. PhD thesis, University of Texas at Austin, USA.
Cho, K and Hastak, M (2013) Time and cost-optimized decision support model for fast-track projects. Journal of Construction Engineering and Management, 139(1), pp. 90-101. ISSN 0733-9364
Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.
Cho, W M and Hadikusumo, B H W (2024) Psychological contract between contractors and owners in construction projects: The mediating role of inter-organisational teamwork. Engineering, Construction and Architectural Management, 31(10), pp. 4001-4015. ISSN 0969-9988
Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry. PhD thesis, University of Wisconsin - Madison, USA.
Choi, J O; O'Connor, J T and Kim, T W (2016) Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. Journal of Construction Engineering and Management, 142(10): 04016055, ISSN 0733-9364
Chotibhongs, R (2011) Managing the bidding process for the construction owner-detection and prevention of unbalanced bids and collusive bids. PhD thesis, Illinois Institute of Technology, USA.
Chotibhongs, R and Arditi, D (2012) Detection of collusive behavior. Journal of Construction Engineering and Management, 138(11), pp. 1251-1258. ISSN 0733-9364
Chotibhongs, R and Arditi, D (2012) Analysis of collusive bidding behaviour. Construction Management and Economics, 30(3), pp. 221-231. ISSN 1466433X
Choudhry, R M; Fang, D and Lingard, H (2009) Measuring safety climate of a construction company. Journal of Construction Engineering and Management, 135(9), pp. 890-899. ISSN 0733-9364
Choudhry, R M; Gabriel, H F; Khan, M K and Azhar, S (2017) Causes of discrepancies between design and construction in the Pakistan construction industry. Journal of Construction in Developing Countries, 22(2), pp. 1-18. ISSN 1823-6499
Chow, L K and Ng, S T (2003) Performance-based evaluation for engineering consultants: A study of assessment criteria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals. PhD thesis, Iowa State University, USA.
Christensen, P H; Robinson, S and Simons, R (2022) Institutional investor motivation, processes, and expectations for sustainable building investment. Building Research & Information, 50(3), pp. 276-290. ISSN 0961-3218
Christudason, A (2009) Property rights: Achieving a fine balance in collective sales of strata developments in Singapore. International Journal of Law in the Built Environment, 1(1), pp. 26-41. ISSN 1756-1450
Christudason, A; Kenna, P and Lujanen, M (2010) Legal challenges in ensuring regular maintenance and repairs of owner-occupied apartment blocks. International Journal of Law in the Built Environment, 2(2), pp. 178-197. ISSN 1756-1450
Chukwu, I (2018) Sustainability in the Nigerian construction industry: The feasibility of adopting green building rating system. PhD thesis, Indiana State University, USA.
Chunduri, S (2014) Development of planning and design phases of an integrative building lifecycle process model for advanced energy retrofit projects. PhD thesis, Pennsylvania State University, USA.
Clarke, N; Bradley, J G and Spillane, J P (2020) Mental health and well-being in micro-enterprises in the construction industry: An Irish perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Clarke, N P; Spillane, J P and Bradley, J G (2024) Barriers to adopting strategic planning as a management tool in small construction firms. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Cloete, Brent; Agumba, Justus; Adebowale, Oluseyi Julius and Meyer, Chris (2026) From readiness to implementation: A framework for BIM adoption in facilities management organisations. Journal of Construction Business and Management, 8(2), pp. 43-53. ISSN 2521-0165
Col Debella, D and Ries, R (2006) Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11), pp. 1131-1138. ISSN 0733-9364
Cole, R J (1999) Building environmental assessment methods: Clarifying intentions. Building Research & Information, 27(4-5), pp. 230-246. ISSN 0961-3218
Cole, R J and Valdebenito, M J (2013) The importation of building environmental certification systems: International usages of BREEAM and LEED. Building Research & Information, 41(6), pp. 662-676. ISSN 0961-3218
Collins, A and Baccarini, D (2004) Project success: A survey. Journal of Construction Research, 5(2), pp. 211-231. ISSN 1609-9451
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Conley, M A and Gregory, R A (1999) Partnering on small construction projects. Journal of Construction Engineering and Management, 125(5), pp. 320-324. ISSN 0733-9364
Contarini, A and Meijer, A (2015) LCA comparison of roofing materials for flat roofs. Smart and Sustainable Built Environment, 4(1), pp. 97-109. ISSN 2046-6099
Cook, E L (1997) Integration of total quality management with a project management approach for capital projects. PhD thesis, Texas A&M University, USA.
Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.
Coram, W R (1997) The privatisaton of the property services agency. PhD thesis, University of Manchester, UK.
Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.
Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.
Craig, R (1999) How innovative is the common law of tendering? Journal of Construction Procurement, 5(1), pp. 15-26. ISSN 1358-9180
Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193
Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.
Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364
Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.
Cruz Rios, F (2018) Beyond recycling: Design for disassembly, reuse, and circular economy in the built environment. PhD thesis, Arizona State University, USA.
Cuellar Franca, R M (2013) Sustainability assessment framework for the residential construction sector in the UK. PhD thesis, University of Manchester, UK.
Cui, L (2023) Collusion governance strategies under the construction supervision system in China. Construction Management and Economics, 41(9), pp. 724-738. ISSN 01446193
Cui, L (2025) Incentive contract design and selection for inhibiting unethical collusion in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 870-892. ISSN 0969-9988
Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988
Dai, H; Cao, G and Su, H (2006) Management and construction of the three gorges project. Journal of Construction Engineering and Management, 132(6), pp. 615-619. ISSN 0733-9364
Dang, C N and Le-Hoai, L (2016) Critical success factors for implementation process of design-build projects in Vietnam. Journal of Engineering, Design and Technology, 14(1), pp. 17-32.
Dang, C N; Le-Hoai, L; Kim, S-Y; Nguyen, C V; Lee, Y-D and Lee, S-H (2017) Identification of risk patterns in Vietnamese road and bridge construction: Contractor's perspective. Built Environment Project and Asset Management, 7(1), pp. 59-72. ISSN 2044-124X
DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.
Darlow, G; Rotimi, J O B and Wajiha Mohsin, S (2022) Automation in New Zealand's offsite construction: A status update. Built Environment Project and Asset Management, 12(1), pp. 38-52. ISSN 2044-124X
Dash, A (2021) Determinants of evs adoption: A study on green behavior of consumers. Smart and Sustainable Built Environment, 10(1), pp. 125-137. ISSN 2046-6099
Datta, S D; Akter, J; Rhyme, A N; Mamun, M A; Rana, M J and Abdullah, M S (2025) Assessing and mitigating building fire risk based on the scenario clusters in Bangladesh. International Journal of Construction Management, 25(12), pp. 1381-1394. ISSN 1562-3599
Datta, S D; Sobuz, M H R; Nafe Assafi, M; Sutan, N M; Islam, M N; Mannan, M B; Akid, A S M and Hasan, N M S (2025) Critical project management success factors analysis for the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 43(3), pp. 482-511. ISSN 2398-4708
Davis, C (2020) The influence of national culture on conflict in project management: How organizations manage conflict. PhD thesis, Northcentral University, USA.
Davis II, D C E (2023) Algorithmic design in recommender systems: Expanding DBE participation in the U.S. construction industry. DBA thesis, University of South Florida, USA.
De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach. PhD thesis, Aston University, UK.
De La Garza, J M and Mitropoulos, P (1991) Technology-transfer (t2) model for expert systems. Journal of Construction Engineering and Management, 117(4), pp. 736-755. ISSN 0733-9364
De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364
De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
De Marco, A; Rafele, C and Thaheem, M J (2016) Dynamic management of risk contingency in complex design-build projects. Journal of Construction Engineering and Management, 142(2): 04015080, ISSN 0733-9364
De Neyra, P L A and Celoza, A (2026) Identifying influential factors in end-of-life decision-making for buildings using the Delphi method. Journal of Construction Engineering and Management, 152(4): 04026015, ISSN 0733-9364
Dean, W E (1992) Earthquakes and old buildings: Seismic risk permits for California structures. PhD thesis, RAND Graduate School, USA.
Defoe, P S (2018) The consideration of trees in rights of light cases part 2. International Journal of Building Pathology and Adaptation, 36(3), pp. 318-332. ISSN 23984708
Del Caño, A and De La Cruz, M P (2002) Integrated methodology for project risk management. Journal of Construction Engineering and Management, 128(6), pp. 473-485. ISSN 0733-9364
Delatte, G (2014) The effects of three dimensional modeling on labor productivity through enhancing visualization of craft workers in the industrial construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Delatte, N J (2017) Challenges of civil engineering megaprojects in North America. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 161-166. ISSN 17514304
Demetracopoulou, V; O'Brien, W J; Khwaja, N; Feghaly, J and El Asmar, M (2024) A critical review and analysis of decision-support processes and tools for project delivery method selection. Engineering, Construction and Architectural Management, 31(1), pp. 487-505. ISSN 0969-9988
Deng, B; Lv, X; Du, Y; Li, X and Yin, Y (2025) Critical risk factors for construction supply chain in China: A fuzzy synthetic evaluation analysis. Engineering, Construction and Architectural Management, 32(1), pp. 483-506. ISSN 0969-9988
Deng, X (2008) Research on agent construction management mode and principal-agent relationship. PhD thesis, Wuhan University, China.
Deng, X; Ding, S and Tian, Q (2004) Reasons underlying a mandatory high penalty construction contract bonding system. Journal of Construction Engineering and Management, 130(1), pp. 67-74. ISSN 0733-9364
Denicol, Juliano (2019) Designing client organisations and supply chain strategies to deliver megaprojects. PhD thesis, University College London, UK.
Denny-Smith, G; Loosemore, M; Barwick, D; Sunindijo, R and Piggott, L (2019) Decolonising indigenous social impact research using community-based methods. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Denny-Smith, G; Williams, M; Loosemore, M; Riza Yosia, S and Piggott, L (2024) What social value do indigenous contractors create? Construction Management and Economics, 42(1), pp. 16-34. ISSN 01446193
Derakhshanfar, H; Ochoa, J J; Kirytopoulos, K; Mayer, W and Langston, C (2021) A cartography of delay risks in the Australian construction industry: Impact, correlations and timing. Engineering, Construction and Architectural Management, 28(7), pp. 1952-1978. ISSN 0969-9988
Devine-Wright, P; Wrapson, W; Henshaw, V and Guy, S (2014) Low carbon heating and older adults: Comfort, cosiness and glow. Building Research & Information, 42(3), pp. 288-299. ISSN 0961-3218
Dhal, M (2020) Labor stand: Face of precarious migrant construction workers in India. Journal of Construction Engineering and Management, 146(6): 04020048, ISSN 0733-9364
Dharmapalan, V; O'Brien, W J; Morrice, D and Jung, M (2021) Assessment of visibility in industrial construction projects: A viewpoint from supply chain stakeholders. Construction Innovation, 21(4), pp. 782-799. ISSN 1471-4175
Dhawan, K (2023) Supply chain management driven logistics efficiency in the New Zealand construction sector. PhD thesis, Auckland University of Technology, New Zealand.
Diab, M F; Varma, A and Panthi, K (2017) Modeling the construction risk ratings to estimate the contingency in highway projects. Journal of Construction Engineering and Management, 143(8): 04017041, ISSN 0733-9364
Dias Jr., A (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects. PhD thesis, University of Michigan, USA.
Diekmann, J; Ashley, D; Bauman, R; Carroll, J and Finlayson, F (2000) Viability of privatised transportation projects: An evaluation tool for design/build teams. Journal of Construction Procurement, 6(1), pp. 33-43. ISSN 1358-9180
Diekmann, J E and Nelson, M C (1985) Construction claims: Frequency and severity. Journal of Construction Engineering and Management, 111(1), pp. 74-81. ISSN 0733-9364
Dissanayake, D M Nayana S (2017) Fuzzy multi-attribute analysis model for engineering-procurement-construction contractor selection. PhD thesis, Queensland University of Technology, Australia.
Diyagama, D; Victar, H C; Waidyasekara, A S and Rameezdeen, R (2024) Managing external stakeholders influences in mega construction projects. International Journal of Construction Management, 24(8), pp. 809-819. ISSN 1562-3599
Do, S T; Nguyen, V T; Tran, C N N and Aung, Z M (2023) Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999-2011. ISSN 1562-3599
Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.
Donyavi, S and Flanagan, R (2011) Tracking and positioning technology and its applications for supply chain materials for small and medium enterprises (SMEs) on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Dorrah, D H (2024) Development of integrated decision support framework for payment management and negotiation in construction projects. PhD thesis, University of Toronto, Canada.
Dozzi, P; Hartman, F; Tidsbury, N and Ashrafi, R (1996) More-stable owner-contractor relationships. Journal of Construction Engineering and Management, 122(1), pp. 30-35. ISSN 0733-9364
Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499
Drexler Jr, J A and Larson, E W (2000) Partnering: Why project owner-contractor relationships change. Journal of Construction Engineering and Management, 126(4), pp. 293-297. ISSN 0733-9364
Dubey, K K (2001) A framework for analysing quality in the US homebuilding industry. PhD thesis, Swansea University, UK.
Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.
Dyson, K; Matthews, J and Love, P E D (2016) Critical success factors of adapting heritage buildings: An exploratory study. Built Environment Project and Asset Management, 6(1), pp. 44-57. ISSN 2044-124X
Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364
Ebbert, T (2010) Re-face: Refurbishment strategies for the technical improvement of office façades. PhD thesis, Delft University of Technology, Netherlands.
Ebekozien, A; Aigbavboa, C O; Samsurijan, M S; Adjekophori, B and Nwaole, A N C (2024) Leakages in affordable housing delivery: Threat to achieving Sustainable Development Goal 11. Engineering, Construction and Architectural Management, 31(6), pp. 2353-2368. ISSN 0969-9988
Ebekozien, A; Aigbavboa, C O; Samsurijan, M S; Muhammad, A K and Akinradewo, O (2024) Developing a framework for housing financing: A case study of nigeria's sustainable low-cost housing via soft system methodology. Engineering, Construction and Architectural Management, 32(13), pp. 27-48. ISSN 0969-9988
Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771
Ebrahimigharehbaghi, S (2022) Understanding the decision-making process in homeowner energy retrofits: From behavioural and transaction cost perspectives. PhD thesis, Delft University of Technology, Netherlands.
Ebrahimigharehbaghi, S; Qian, Q K; de Vries, G and Visscher, H J (2022) Identification of the behavioural factors in the decision-making processes of the energy efficiency renovations: Dutch homeowners. Building Research & Information, 50(4), pp. 369-393. ISSN 0961-3218
Ed Koehn, E; Kothari, R K and Pan, C S (1995) Safety in developing countries: Professional and bureaucratic problems. Journal of Construction Engineering and Management, 121(3), pp. 261-265. ISSN 0733-9364
Edmondson, V C (1996) After entry, then what? An examination of the strategy and performance of minority-owned ventures in the United States construction industry. PhD thesis, University of Georgia, USA.
Edwards, D J and Holt, G D (2008) Protecting capital investment in plant and equipment: Case study observations of post-theft recovery. Journal of Financial Management of Property and Construction, 13(2), pp. 96-110. ISSN 1366-4387
Efebeli, T V (2021) Strategies for reducing project cost overruns in the oil and gas construction industry. PhD thesis, Walden University, USA.
Egbelakin, T; Wilkinson, S; Potangaroa, R and Ingham, J (2011) Enhancing seismic risk mitigation decisions: A motivational approach. Construction Management and Economics, 29(10), pp. 1003-1016. ISSN 01446193
Egbelakin, T K; Wilkinson, S; Potangaroa, R and Ingham, J (2011) Challenges to successful seismic retrofit implementation: A socio-behavioural perspective. Building Research & Information, 39(3), pp. 286-300. ISSN 0961-3218
Eissa, R; Eid, M S and Elbeltagi, E (2021) Current applications of game theory in construction engineering and management research: A social network analysis approach. Journal of Construction Engineering and Management, 147(7): 0002085, ISSN 0733-9364
Eissa, R and El-Adaway, I H (2024) Accelerating the circular economy transition: A construction value chain-structured portfolio of strategies and implementation insights. Journal of Construction Engineering and Management, 150(8): 04024077, ISSN 0733-9364
Eissa, R; Nabi, M A and El-Adaway, I H (2024) Risk–reward share allocation under different integrated project delivery relational structures: A monte-carlo simulation and cooperative game theoretic solutions approach. Journal of Construction Engineering and Management, 150(4): 04024013, ISSN 0733-9364
El Asmar, M; Hanna, A S and Chang, C K (2009) Monte Carlo simulation approach to support alliance team selection. Journal of Construction Engineering and Management, 135(10), pp. 1087-1095. ISSN 0733-9364
El Ghazali, Y (2013) Implications of RFID in a supply chain: Process, knowledge management and performance. PhD thesis, Ecole Polytechnique, Montreal, Canada.
El Wardani, M A; Messner, J I and Horman, M J (2006) Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), pp. 230-238. ISSN 0733-9364
El-Diraby, T E-S (1997) System for evaluating bridge construction plans. PhD thesis, University of Texas at Austin, USA.
El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988
El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988
El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387
El-Razek, M E A; Bassioni, H and El-Salam, W A (2007) Investigation into the causes of claims in Egyptian building construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X
El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.
Elazouni, A M (2006) Classifying construction contractors using unsupervised-learning neural networks. Journal of Construction Engineering and Management, 132(12), pp. 1242-1253. ISSN 0733-9364
Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities. PhD thesis, University of Alberta, Canada.
Elbarkouky, M M G and Fayek, A R (2011) Fuzzy similarity consensus model for early alignment of construction project teams on the extent of their roles and responsibilities. Journal of Construction Engineering and Management, 137(6), pp. 432-440. ISSN 0733-9364
Elbarkouky, M M G and Robinson Fayek, A (2011) Fuzzy preference relations consensus approach to reduce conflicts on shared responsibilities in the owner managing contractor delivery system. Journal of Construction Engineering and Management, 137(8), pp. 609-618. ISSN 0733-9364
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Elhakeem, A A M (2006) An asset management framework for educational buildings with life-cycle cost analysis. PhD thesis, University of Waterloo, Canada.
Elhegazy, H; Ebid, A; Mahdi, I; Haggag, S and Abdul-Rashied, I (2021) Implementing QFD in decision making for selecting the optimal structural system for buildings. Construction Innovation, 21(2), pp. 345-360. ISSN 1471-4175
Elnady, Ahmed Abdelrady Okasha Mohamed (2023) An integrated framework for balancing contractor's workload versus capacity using system dynamics. PhD thesis, University of Alberta, Canada.
Elvin, G A (1998) A process model for integrated design and construction. PhD thesis, University of California, Berkeley, USA.
Elyamany, A; Basha, I and Zayed, T (2007) Performance evaluating model for construction companies: Egyptian case study. Journal of Construction Engineering and Management, 133(8), pp. 574-581. ISSN 0733-9364
Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance. PhD thesis, North Dakota State University, USA.
English, J (2007) The development of women in the South African construction workforce in terms of employment, training and skills acquisition. PhD thesis, Glasgow Caledonian University, UK.
Enshassi, A; Al-Najjar, J and Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), pp. 126-151. ISSN 1366-4387
Enshassi, A; Ayyash, A and Choudhry, R M (2016) BIM for construction safety improvement in Gaza Strip: Awareness, applications and barriers. International Journal of Construction Management, 16(3), pp. 249-265. ISSN 1562-3599
Enshassi, A; Choudhry, R M; Mayer, P E and Shoman, Y (2008) Safety performance of subcontractors in the palestinian construction industry. Journal of Construction in Developing Countries, 13(1), pp. 51-62. ISSN 1823-6499
Enshassi, A; Mohamed, S and El-Ghandour, S (2009) Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(1), pp. 61-72. ISSN 0969-9988
Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387
Enshassi, A A; Arain, F and El-Rayyes, Y (2014) Post-evaluation system in construction projects in Gaza Strip-Palestine. Journal of Construction in Developing Countries, 19(2), pp. 51-73. ISSN 1823-6499
Enshassi, M S A; Walbridge, S; West, J S and Haas, C T (2020) Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory. Journal of Construction Engineering and Management, 146(2): 04019096, ISSN 0733-9364
Erbil, Y; Akincitürk, N and Acar, E (2013) Inter-organizational context of the innovation process and the role of architectural designers as system integrators: Case evidence from Turkey. Architectural Engineering and Design Management, 9(2), pp. 77-94. ISSN 1745-2007
Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.
Everett, J G and Saito, H (1996) Construction automation: Demands and satisfiers in the United States and Japan. Journal of Construction Engineering and Management, 122(2), pp. 147-151. ISSN 0733-9364
Ewart, K and Silcock, G (1987) An analysis of the cost of compliance with the fire services order, Northern Ireland, 1985. Construction Management and Economics, 5(1), pp. 3-12. ISSN 01446193
Eyiah, A K (2001) An integrated approach to financing small contractors in developing countries: A conceptual model. Construction Management and Economics, 19(5), pp. 511-518. ISSN 01446193
Eyiah, A K (2004) Financing small and medium scale construction firms in Ghana: A framework for improvement. PhD thesis, University of Manchester, UK.
Fahmy, Sami W (2005) Comparative analysis of expected and actual performance of public design-build projects. PhD thesis, University of Calgary, Canada.
Fan, S L (2014) Intellectual property rights in building information modeling application in Taiwan. Journal of Construction Engineering and Management, 140(3): 4013058, ISSN 0733-9364
Fang, C Y (2015) Mapping innovation in the construction sector: A study of national firms in Malaysia. PhD thesis, University of Malaya, Malaysia.
Fang, D; Fong, P S W and Li, M (2004) Risk assessment model of tendering for Chinese building projects. Journal of Construction Engineering and Management, 130(6), pp. 862-868. ISSN 0733-9364
Fang, D; Li, M; Fong, P S W and Shen, L (2004) Risks in Chinese construction market: contractors' perspective. Journal of Construction Engineering and Management, 130(6), pp. 853-861. ISSN 0733-9364
Fang, D; Wang, Y; Lim, H W; Ma, L; Gu, B and Huang, Y (2023) Construction of a Bayesian network based on leadership-culture-behavior model to improve owner safety management behavior. Journal of Construction Engineering and Management, 149(3): 04022177, ISSN 0733-9364
Farahani, A (2019) A systematic approach to strategic maintenance and renovation planning in multifamily buildings. PhD thesis, Chalmers University of Technology, Sweden.
Farahani, A; Wallbaum, H and Dalenbäck, J O (2019) Optimized maintenance and renovation scheduling in multifamily buildings: a systematic approach based on condition state and life cycle cost of building components. Construction Management and Economics, 37(3), pp. 139-155. ISSN 01446193
Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.
Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364
Farid, F (1990) Pricing construction contracts under Tax Reform Act of 1986. Journal of Construction Engineering and Management, 116(2), pp. 300-315. ISSN 0733-9364
Farid, F and Boyer, L T (1985) Fair and reasonable markup (FARM) pricing model. Journal of Construction Engineering and Management, 111(4), pp. 374-390. ISSN 0733-9364
Faridi, A S and El-Sayegh, S M (2006) Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), pp. 1167-1176. ISSN 1466433X
Farnsworth, C B; Warr, R O; Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC project delivery on managing process risk in transportation construction. Journal of Construction Engineering and Management, 142(3): 04015091, ISSN 0733-9364
Farrell, M L (1999) The evolution of value theory and the practice of real estate valuation. Journal of Financial Management of Property and Construction, 4(2), pp. 5-32. ISSN 1366-4387
Farshchian, M M and Heravi, G (2018) Probabilistic assessment of cost, time, and revenue in a portfolio of projects using stochastic agent-based simulation. Journal of Construction Engineering and Management, 144(5): 4018028, ISSN 0733-9364
Farshchian, M M; Heravi, G and Abourizk, S (2017) Optimizing the owner's scenarios for budget allocation in a portfolio of projects using agent-based simulation. Journal of Construction Engineering and Management, 143(7): 04017022, ISSN 0733-9364
Fasna, M F F and Gunatilake, S (2020) Roles and functions of stakeholders in implementing energy retrofits in the hotel sector. International Journal of Building Pathology and Adaptation, 38(5), pp. 737-751. ISSN 23984708
Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988
Fawcett, T (2014) Exploring the time dimension of low carbon retrofit: Owner-occupied housing. Building Research & Information, 42(4), pp. 477-488. ISSN 0961-3218
Fawcett, T and Killip, G (2014) Anatomy of low carbon retrofits: Evidence from owner-occupied superhomes. Building Research & Information, 42(4), pp. 434-445. ISSN 0961-3218
Fay-Spina, D (2017) Exploring business planning strategies of women-owned small businesses in the construction trades. PhD thesis, Walden University, USA.
Fayek, Aminah (1996) A competitive estimating and tendering strategy model for use in the civil engineering construction industry. PhD thesis, University of Melbourne, Australia.
Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 0969-9988
Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364
Felix, R (1988) The use of domestic building products by the owner-builder. PhD thesis, University of Leeds, UK.
Fenais, A (2020) Developing an augmented reality solution for mapping underground infrastructure. PhD thesis, Arizona State University, USA.
Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.
Fergusson, K J (1993) Impact of integration on industrial facility quality. PhD thesis, Stanford University, USA.
Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007
Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007
Fields, S (2022) Strategies for competitive advantage in small construction businesses. PhD thesis, Walden University, USA.
Fieldson, R (2017) The afterlife clause; towards a strategy for improved adaptation in retail property. International Journal of Building Pathology and Adaptation, 35(4), pp. 364-379.
Filippova, O; Xiao, Y; Rehm, M and Ingham, J (2018) Economic effects of regulating the seismic strengthening of older buildings. Building Research & Information, 46(7), pp. 711-724. ISSN 0961-3218
Finch, E (1992) Environmental assessment of construction projects. Construction Management and Economics, 10(1), pp. 5-18. ISSN 01446193
Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364
Finke, M R (1999) Window analyses of compensable delays. Journal of Construction Engineering and Management, 125(2), pp. 96-100. ISSN 0733-9364
Firat Dogu, A; Damci, A; Arditi, D and Demirkesen, S (2024) An advanced decision-support system for ranking unbalanced bids. Construction Management and Economics, 42(7), pp. 610-623. ISSN 01446193
Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364
Fisher, R B (2004) Partnering public sector construction contracts: A conflict avoidance process. PhD thesis, Virginia Commonwealth University, USA.
Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.
Fitch, G J; Odeh, I and William Ibbs, C (2015) Economic sustainability of dbo water based on wastewater projects in the U.S.: Three case studies. Journal of Construction Engineering and Management, 141(5): 05015001, ISSN 0733-9364
Fletcher, K (2018) A systemic model for a building performance and condition evaluation for primary schools. PhD thesis, University of Salford, UK.
Florez, L; Castro, D and Irizarry, J (2013) Measuring sustainability perceptions of construction materials. Construction Innovation, 13(2), pp. 217-234. ISSN 1471-4175
Foliente, G and Seo, S (2012) Modelling building stock energy use and carbon emission scenarios. Smart and Sustainable Built Environment, 1(2), pp. 118-138. ISSN 2046-6099
Forbes, D; Smith, S D and Horner, M (2007) A case-based reasoning approach for selecting risk management techniques. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.
Foster, R D (1982) Does pictorial documentation improve construction cost control? PhD thesis, Texas A&M University, USA.
Foulds, C; Royston, S; Aggeli, A; Crowther, A and Robison, R (2026) Sharing energy renovations know-how through citizen–professional knowledge networks. Buildings & Cities, 7(1), pp. 341-359. ISSN 2632-6655
Foulds, C (2013) Practices and technological change: the unintended consequences of low energy dwelling design. PhD thesis, University of East Anglia, UK.
Franco, L A (2005) Problem structuring methods for collaboration: A conceptual development, with an application to a construction partnership in the UK. PhD thesis, London School of Economics and Political Science, UK.
Francom, T C (2015) Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects. PhD thesis, Arizona State University, USA.
Francom, T C and El Asmar, M (2015) Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate analyses. Journal of Construction Engineering and Management, 141(9): 4015028, ISSN 0733-9364
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364
Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364
Franz, B and Roberts, B A M (2022) Thematic analysis of successful and unsuccessful project delivery teams in the building construction industry. Journal of Construction Engineering and Management, 148(3): 05022001, ISSN 0733-9364
Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.
Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(3), pp. 160-173. ISSN 01446193
Frimpong, Y and Oluwoye, J (2003) Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), pp. 175-187. ISSN 1609-9451
Fu, M; Liu, R and Hon, C K H (2021) Walkability evaluation of building circulation based on user preference. Engineering, Construction and Architectural Management, 28(10), pp. 2904-2924. ISSN 0969-9988
Gabe, J (2016) Successful greenhouse gas mitigation in existing Australian office buildings. Building Research & Information, 44(2), pp. 160-174. ISSN 0961-3218
Gade, A N; Larsen, T S and Selman, A D (2021) Leaving no one behind: A glimpse into the state of adoption of the Sustainable Development Goals in the Danish construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Gade, A N and Opoku, A (2020) Challenges for implementing the Sustainable Development Goals in the Danish construction industry: Building owners' perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(6), pp. 1683-1712. ISSN 0969-9988
Gajpal, Y; Islam, M A and Elazouni, A (2026) Towards competitive contractors' bids: Optimizing selections of subcontractors and payment lags using branch and bound algorithm. Construction Management and Economics, 44(4), pp. 260-278. ISSN 0144-6193
Galanis, P (2014) Probabilistic methods to identify seismically hazardous older-type concrete frame buildings. PhD thesis, University of California, Berkeley, USA.
Galotti, V (2025) An exploration of design-build risk and project profitability in the architecture, engineering and construction sector. PhD thesis, University of Colorado at Boulder, USA.
Galvin, R (2014) Why German homeowners are reluctant to retrofit. Building Research & Information, 42(4), pp. 398-408. ISSN 0961-3218
Gambatese, J A and Hallowell, M (2011) Enabling and measuring innovation in the construction industry. Construction Management and Economics, 29(6), pp. 553-567. ISSN 1466433X
Gambatese, J A; Michael Toole, T and Abowitz, D A (2017) Owner perceptions of barriers to prevention through design diffusion. Journal of Construction Engineering and Management, 143(7): 04017016, ISSN 0733-9364
Gamez, E A (2009) Risk assessment for international development projects: Owner's perspective. PhD thesis, Northeastern University, USA.
Gamil, Y and Abdul Rahman, I (2020) Assessment of critical factors contributing to construction failure in Yemen. International Journal of Construction Management, 20(5), pp. 429-436. ISSN 1562-3599
Gan, X; Jia, J; Le, Y; Liu, T and Xue, Y (2025) Mitigating the aftermath of relationship conflict between the owners and contractors: A contract enforcement approach. Engineering, Construction and Architectural Management, 32(8), pp. 4949-4968. ISSN 0969-9988
Gann, D M and Barlow, J (1996) Flexibility in building use: The technical feasibility of converting redundant offices into flats. Construction Management and Economics, 14(1), pp. 55-66. ISSN 01446193
Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process. PhD thesis, Iowa State University, USA.
Gao, Z; Walters, R C; Jaselskis, E J and Wipf, T J (2006) Approaches to improving the quality of construction drawings from owner's perspective. Journal of Construction Engineering and Management, 132(11), pp. 1187-1192. ISSN 0733-9364
Garciacortes, A (2017) Knowledge transfer and application in integrated project delivery teams. PhD thesis, Michigan State University, USA.
Garmston, H; Pan, W and de Wilde, P (2012) Decision-making in façade selection for multi-storey buildings. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Garvey, F P (1981) A study of the utilization of construction management in the design process of educational facilities. EdD thesis, Ball State University, USA.
Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructive investment decisions. Construction Management and Economics, 22(4), pp. 373-383. ISSN 01446193
Gautam, K P (2009) Life-cycle cost analysis of home-ownership. PhD thesis, University of Hawai'i at Manoa, USA.
George, M and Sekpe, V (2010) Inspection of insulated concrete form walls using ground penetrating radar. International Journal of Construction Education and Research, 6(4), pp. 303-317. ISSN 1557-8771
Georgiou, J; Smith, J and Love, P (2003) Building registration: Training and housing quality. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Ghafoori, M (2023) Developing building maintenance and upgrade system (BMUS) to minimize operational cost of existing buildings within available budgets. PhD thesis, University of Colorado at Denver, USA.
Gholizadeh, P and Esmaeili, B (2020) Cost of occupational incidents for electrical contractors: Comparison using robust-factorial analysis of variance. Journal of Construction Engineering and Management, 146(7): 0001861, ISSN 0733-9364
Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.
Ghosh, S and Lee, S K (2023) Using social network analysis to explore communication among members of an integrated project delivery team. International Journal of Construction Education and Research, 19(2), pp. 132-149. ISSN 1557-8771
Gibbons, T N (2013) Management agreements in multi-unit housing developments: A case study in regulation and remedies. International Journal of Law in the Built Environment, 5(3), pp. 207-221. ISSN 17561469
Gibney, A (1998) Studies in eighteenth-century building history. PhD thesis, Trinity College Dublin, Ireland.
Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.
Gibson, G E and Bell, L C (1990) Electronic data interchange in construction. Journal of Construction Engineering and Management, 116(4), pp. 727-737. ISSN 0733-9364
Gibson, G E; El Asmar, M; Yussef, A and Ramsey, D (2024) A novel approach for measuring the accuracy of front end engineering design. Engineering, Construction and Architectural Management, 31(7), pp. 2669-2696. ISSN 0969-9988
Gibson, G E; Kaczmarowski, J H and Lore, H E (1995) Preproject-planning process for capital facilities. Journal of Construction Engineering and Management, 121(3), pp. 312-318. ISSN 0733-9364
Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218
Gibson Jr, G E; McGinnis, C I; Flanigan, W S and Wood, J E (1996) Constructability in public sector. Journal of Construction Engineering and Management, 122(3), pp. 274-280. ISSN 0733-9364
Giel, B K (2013) Framework for evaluating the BIM competencies of building owners. PhD thesis, University of Florida, USA.
Gilham, A (2023) The relationship between customers’ satisfaction and trust in the global supply chain and profitability. DBA thesis, Walden University, USA.
Gillich, A (2025) Market transformations: Gas conversion as a blueprint for net zero retrofit. Buildings & Cities, 6(1), pp. 359-377. ISSN 2632-6655
Gillis III, W L (2013) Development of an integrative commissioning methodology for new-building construction. PhD thesis, Missouri University of Science and Technology, USA.
Glagola, C R (1993) A model of current quality performance measurements for industrial construction. PhD thesis, Clemson University, USA.
Glavan, J R and Tucker, R L (1991) Forecasting design-related problems-case study. Journal of Construction Engineering and Management, 117(1), pp. 47-65. ISSN 0733-9364
Glavinich, T E (1990) Development of a model microcomputer-based project management system. DrEng thesis, University of Kansas, USA.
Gleeson, M P and Thomson, C (2012) Investigating a suitable learning environment to advance sustainable practices among micro construction enterprises. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Goedert, J D and Meadati, P (2008) Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management, 134(7), pp. 509-516. ISSN 0733-9364
Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(2), pp. 159-173. ISSN 2044-124X
Gohardani, N (2014) An approach towards sustainable building. PhD thesis, KTH Royal Institute of Technology, Sweden.
Goodrum, P M; Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), pp. 415-423. ISSN 01446193
Gordon, C M (1994) Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), pp. 196-210. ISSN 0733-9364
Gough, K (1992) From bamboo to bricks: Self-help housing and the building materials industry in urban Colombia. PhD thesis, University of London, University College London, UK.
Goulias, D (1992) Quality assurance and specifications. PhD thesis, University of Texas at Austin, USA.
Graebert, R F (2015) The implementation of building energy management in commercial real estate and impacts on building energy performance. PhD thesis, Stanford University, USA.
Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Graham, G (2016) Factors influencing and risk associated with the use of drones by specialty construction companies in the United States of America. PhD thesis, Indiana State University, USA.
Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects. PhD thesis, University of Colorado at Boulder, USA.
Gransberg, D D; Karaca, I and Senadheera, S (2004) Calculating roller requirements for chip seal projects. Journal of Construction Engineering and Management, 130(3), pp. 378-384. ISSN 0733-9364
Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.
Grasso, B; Rasdorf, W and Bridgers, M (2008) Nature and extent of domestic construction program outsourcing. Journal of Construction Engineering and Management, 134(12), pp. 1002-1010. ISSN 0733-9364
Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364
Grau, D; Cruz Rios, F and Sherman, R (2021) Project validation: A set-based and concurrent design approach to inform owner's authorization decision on complex projects. Journal of Construction Engineering and Management, 147(10): 04021132, ISSN 0733-9364
Greenberg, D G (1978) Fixing things: A phenomenological study of ten persons. PhD thesis, Union Institute and University, USA.
Griffis, F H and Butler, M (1988) Case for cost-plus contracting. Journal of Construction Engineering and Management, 114(1), pp. 83-94. ISSN 0733-9364
Griffis, F H and Christodoulou, S (2000) Construction risk analysis tool for determining liquidated damages insurance premiums: Case study. Journal of Construction Engineering and Management, 126(6), pp. 407-413. ISSN 0733-9364
Griffith, A F (1997) Team alignment during pre-project planning of capital facilities. PhD thesis, University of Texas at Austin, USA.
Griner Jr., C H (2019) Small construction business owners' strategies for employee retention. DBA thesis, Walden University, USA.
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Grobler, L J and Singh, V (1999) Research information: The green buildings for Africa programme. Building Research & Information, 27(3), pp. 183-193. ISSN 0961-3218
Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Grosse, H (2018) Conflicts and alternative solutions: How hostilities obstruct alternative solutions. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Gschösser, F (2011) Environmental assessment of road constructions: Life cycle assessment of Swiss road pavements and an accompanying analysis of construction and maintenance costs. DSc thesis, ETH Zürich, Switzerland.
Guerra-Santin, O and Silvester, S (2017) Development of Dutch occupancy and heating profiles for building simulation. Building Research & Information, 45(4), pp. 396-413. ISSN 0961-3218
Gugel, J G and Russell, J S (1994) Model for constructability approach selection. Journal of Construction Engineering and Management, 120(3), pp. 509-521. ISSN 0733-9364
Guilbert, A (2024) Energy sufficiency and recognition justice: A study of household consumption. Buildings & Cities, 5(1), pp. 489-505. ISSN 2632-6655
Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits. PhD thesis, Pennsylvania State University, USA.
Gultekin-Bicer, P; Anumba, C J and Leicht, R M (2018) Advanced energy retrofit projects: Cross-case analysis of integrated system design. International Journal of Construction Management, 18(6), pp. 453-466. ISSN 1562-3599
Gumusburun Ayalp, G (2022) Leadership styles and entrepreneurship orientations in Turkish construction industry. International Journal of Construction Management, 22(4), pp. 690-700. ISSN 1562-3599
Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.
Gunduz, M and Al-Ajji, I (2022) Employment of CHAID and crt decision tree algorithms to develop bid/no-bid decision-making models for contractors. Engineering, Construction and Architectural Management, 29(9), pp. 3712-3736. ISSN 0969-9988
Guo, G (2016) Information exchange using digital collaboration technology: five cases of the social networks in approvals. PhD thesis, University of Reading, UK.
Guo, K (2006) Risk of pavement warranties to contractors. PhD thesis, University of Florida, USA.
Guo, S; Wang, J and Wu, H (2021) Profit distribution of IPD projects using fuzzy alliance. Engineering, Construction and Architectural Management, 28(8), pp. 2069-2089. ISSN 0969-9988
Guo, S; Wang, J and Xiong, H (2023) The influence of effort level on profit distribution strategies in ipd projects. Engineering, Construction and Architectural Management, 30(9), pp. 4099-4119. ISSN 0969-9988
Gupta, R; Barnfield, L and Hipwood, T (2014) Impacts of community-led energy retrofitting of owner-occupied dwellings. Building Research & Information, 42(4), pp. 446-461. ISSN 0961-3218
Gupta, R and Chandiwala, S (2010) Understanding occupants: Feedback techniques for large-scale low-carbon domestic refurbishments. Building Research & Information, 38(5), pp. 530-548. ISSN 0961-3218
Gussias, A (2002) Service life management of concrete harbour structures. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Guven, G and Ergen, E (2013) Factors affecting the selection of data storage approach in radio frequency identification applications. Construction Innovation, 13(1), pp. 117-138. ISSN 1471-4175
Guyer, R C and Laman, J A (2012) Short-line railroad management system for bridge prioritization. Built Environment Project and Asset Management, 2(1), pp. 25-40. ISSN 2044-124X
Guzman de la Cruz, A L (1998) Cost-performance criteria for seismic retrofitting. PhD thesis, University of Puerto Rico, Mayaguez, Puerto Roco.
Günhan, S and Arditi, D (2007) Budgeting owner's construction contingency. Journal of Construction Engineering and Management, 133(7), pp. 492-497. ISSN 0733-9364
Habib, M and Spang, K (2014) Alternative project delivery systems for transport infrastructure in Germany. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.
Hadavi, A (1991) Improvement in construction productivity through goal setting in a unionized environment. PhD thesis, Northwestern University, USA.
Haddad, B (2007) Risk management in the contractual language in the construction industry: The effect of exculpatory clauses on contractor bid price. PhD thesis, Indiana State University, USA.
Haddadin, K H (2003) Cultural and institutional barriers to the take-up of construction management in Jordan. PhD thesis, University of Westminster, UK.
Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.
Haghighi, Z (2022) Architectural photovoltaic application. PhD thesis, Delft University of Technology, Netherlands.
Haines, V and Mitchell, V (2014) A persona-based approach to domestic energy retrofit. Building Research & Information, 42(4), pp. 462-476. ISSN 0961-3218
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Halaweh, M M (2012) System management of construction projects based on industrial engineering prespective with impact on net profit. PhD thesis, State University of New York at Binghamton, USA.
Hall, D M (2017) The early stages of integrated project delivery: Institutionalization and impact on adoption of systemic innovations. PhD thesis, Stanford University, USA.
Halligan, D W; Hester, W T and Thomas, H R (1987) Managing unforeseen site conditions. Journal of Construction Engineering and Management, 113(2), pp. 273-287. ISSN 0733-9364
Haltenhoff, C E (1987) Construction management performance under dual services agreements. Journal of Construction Engineering and Management, 113(4), pp. 640-647. ISSN 0733-9364
Hamalainen, A K; Vaismaa, K and Kolisoja, P J (2025) Exploring information needed in maintenance backlog-related decision-making in the Finnish road network. Built Environment Project and Asset Management, 15(2), pp. 271-287. ISSN 2044-124X
Hamdi, I M (1996) Multimedia applications in construction project management: An owner's perspective. PhD thesis, University of Kentucky, USA.
Hamilton, I G; Shipworth, D; Summerfield, A J; Steadman, P; Oreszczyn, T and Lowe, R (2014) Uptake of energy efficiency interventions in English dwellings. Building Research & Information, 42(3), pp. 255-275. ISSN 0961-3218
Hamilton, M R (1994) The relationship between pre-project planning effort and success for capital construction projects. PhD thesis, University of Texas at Austin, USA.
Han, K; Degol, J and Golparvar-Fard, M (2018) Geometry- and appearance-based reasoning of construction progress monitoring. Journal of Construction Engineering and Management, 144(2): 04017110, ISSN 0733-9364
Han, Y; Li, Y; Taylor, J E and Zhong, J (2018) Characteristics and evolution of innovative collaboration networks in architecture, engineering, and construction: Study of national prize-winning projects in China. Journal of Construction Engineering and Management, 144(6): 04018038, ISSN 0733-9364
Han, Y; Shen, J; Zhu, X; An, B and Bao, X (2024) Interaction mechanisms of interface management risks in complex systems of high-speed rail construction projects: An association rule mining-based modeling framework. Engineering, Construction and Architectural Management, 31(5), pp. 2101-2127. ISSN 0969-9988
Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.
Hanioglu, M N and Arditi, D (2013) Teaming/timing sequences in hotel development projects. Construction Management and Economics, 31(4), pp. 369-385. ISSN 1466433X
Hanna, A S (2016) Benchmark performance metrics for integrated project delivery. Journal of Construction Engineering and Management, 142(9): 04016040, ISSN 0733-9364
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364
Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364
Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364
Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364
Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193
Hansen, D E (2021) Including commissioning during design phase benefits new construction: A qualitative case study. PhD thesis, Northcentral University, USA.
Hari, S; Egbu, C and Kumar, B (2005) A knowledge capture awareness tool: An empirical study on small and medium enterprises in the construction industry. Engineering, Construction and Architectural Management, 12(6), pp. 533-567. ISSN 0969-9988
Harmon, K M J (2003) Effectiveness of dispute review boards. Journal of Construction Engineering and Management, 129(6), pp. 674-679. ISSN 0733-9364
Harper, C M; Molenaar, K R and Cannon, J P (2016) Measuring constructs of relational contracting in construction projects: The owner's perspective. Journal of Construction Engineering and Management, 142(10): 04016053, ISSN 0733-9364
Harrison, B W (1982) Socially responsive professional behavior of architectural firms: A social psychological perspective. PhD thesis, University of Michigan, USA.
Harthi, B A A (2015) Risk management in fast-track projects: a study of UAE construction projects. PhD thesis, University of Wolverhampton, UK.
Hartman, F and Snelgrove, P (1996) Risk allocation in lump-sum contracts: concept of latent dispute. Journal of Construction Engineering and Management, 122(3), pp. 291-296. ISSN 0733-9364
Hartman, F; Snelgrove, P and Ashrafi, R (1997) Effective wording to improve risk allocation in lump sum contracts. Journal of Construction Engineering and Management, 123(4), pp. 379-387. ISSN 0733-9364
Hartman, F T (1993) Construction dispute reduction through an improved contracting process in the Canadian context. PhD thesis, Loughborough University, UK.
Hartog, L; Weijs-Perrée, M and Appel-Meulenbroek, R (2018) The influence of personality on user satisfaction: Multi-tenant offices. Building Research & Information, 46(4), pp. 402-416. ISSN 0961-3218
Hasanzadeh, S and Esmaeili, B (2022) Influence of best value procurement on design-build projects: A grounded theory study. International Journal of Construction Education and Research, 18(3), pp. 270-292. ISSN 1557-8771
Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.
Hassan, M E (2013) Assessing the impact of lean/integrated project delivery system on final project success. PhD thesis, George Mason University, USA.
Hassanain, M A; Adewale, B; Al-Hammad, A-M and Sanni-Anibire, M O (2018) Factors affecting building services' coordination during the design development and review stages. Built Environment Project and Asset Management, 8(1), pp. 64-77. ISSN 2044-124X
Hassanain, M A; Alamoudi, A; Al-Hammad, A M and Abdallah, A (2020) Barriers to the implementation of poe practices in the Saudi Arabian building industry. Architectural Engineering and Design Management, 16(2), pp. 150-165. ISSN 1745-2007
Hassanein, A A G and Afify, H M F (2006) Contractors' risk identification behaviour: A case study. Journal of Construction Procurement, 12(1),
Hassanein, A A G and Afify, H M F (2007) Risk management practices of contractors: A case study of power station projects in Egypt. Journal of Financial Management of Property and Construction, 12(3), pp. 164-179. ISSN 1366-4387
Hassanein, M A A G (1990) Mechanisms for transfer of price risk of construction materials. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hassanien, A (2003) Analysing hotel repositioning through property renovation in the hospitality industry. PhD thesis, University of Strathclyde, UK.
Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2007) Project manager's decision aid for a radical project cycle reduction. Journal of Construction Engineering and Management, 133(6), pp. 437-446. ISSN 0733-9364
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364
Hatush, Z; Saleh, S and Shiki, A (2005) Effect of critical delay factors on cost: Overrun during the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.
He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193
He, Q; Wang, T; Chan, A P C and Xu, J (2021) Developing a list of key performance indictors for benchmarking the success of construction megaprojects. Journal of Construction Engineering and Management, 147(2): 04020164, ISSN 0733-9364
He, W; Shi, Y and Kong, D (2019) Construction of a 5D duration and cost optimisation model based on genetic algorithm and BIM. Journal of Engineering, Design and Technology, 17(5), pp. 929-942. ISSN 1726-0531
Hefferan, Michael (2006) An examination of the interface between commercial property assets and contemporary knowledge-intensive firms: Demands, responses and priorities. PhD thesis, Queensland University of Technology, Australia.
Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364
Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364
Hein, M F; Dougherty, M and Hobbs, T (2013) Cleaning methods for pervious concrete pavements. International Journal of Construction Education and Research, 9(2), pp. 102-116. ISSN 1557-8771
Henderson, J R (2013) Enhancing buildability through improving design-construction feedback loops within complex projects. PhD thesis, Loughborough University, UK.
Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X
Herbsman, Z and Ellis, R (1992) Multiparameter bidding system: innovation in contract administration. Journal of Construction Engineering and Management, 118(1), pp. 142-150. ISSN 0733-9364
Hester, W T; Kuprenas, J A and Thomas, H R (1987) Arbitration: A look at its form and performance. Journal of Construction Engineering and Management, 113(3), pp. 353-367. ISSN 0733-9364
Heydari, M; Heravi, G; Raeisinafchi, R and Karimi, H (2024) A dynamic model to assess the role of site supervision systems in the safety performance of construction projects. Journal of Construction Engineering and Management, 150(3): 04024001, ISSN 0733-9364
Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Hillestad, D (2022) Building owners and managers organizational maturity self-assessment for a facility condition assessment program. PhD thesis, Arizona State University, USA.
Hinze, J and Antal, T (1991) Construction contract provisions for preservation of artifacts. Journal of Construction Engineering and Management, 117(1), pp. 106-117. ISSN 0733-9364
Hinze, J and Raboud, P (1988) Safety on large building construction projects. Journal of Construction Engineering and Management, 114(2), pp. 286-293. ISSN 0733-9364
Hinze, J and Tracey, A (1994) The contractor-subcontractor relationship: The subcontractor's view. Journal of Construction Engineering and Management, 120(2), pp. 274-287. ISSN 0733-9364
Hinze, J W (1976) The effect of middle management on safety in construction. PhD thesis, Stanford University, USA.
Hipwood, T (2018) Understanding teleological influences on owner-occupier home improvements: Implications for encouraging low carbon retrofit. PhD thesis, Cardiff University, UK.
Hipwood, T (2022) Adapting owner-occupied dwellings in the UK: Lessons for the future. Buildings & Cities, 3(1), pp. 297-315. ISSN 2632-6655
Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599
Hjelseth, E (2010) Exchange of relevant information in BIM objects defined by the role-and life-cycle information model. Architectural Engineering and Design Management, 6(4), pp. 279-287. ISSN 1745-2007
Ho, D C W; Chau, K W and Yau, Y (2008) Evaluating unauthorized appendages in private apartment buildings. Building Research & Information, 36(6), pp. 568-579. ISSN 0961-3218
Ho, S P (2005) Bid compensation decision model for projects with costly bid preparation. Journal of Construction Engineering and Management, 131(2), pp. 151-159. ISSN 0733-9364
Ho, S P and Liu, L Y (2004) Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), pp. 94-104. ISSN 0733-9364
Hobson Jr., D E (1996) Developing a decision model that replicates industry experts using minimal information. PhD thesis, University of Kansas, USA.
Holm, M G (2000) Service management in housing refurbishment: A theoretical approach. Construction Management and Economics, 18(5), pp. 525-533. ISSN 01446193
Holmes, S H and Reinhart, C F (2013) Assessing future climate change and energy price scenarios: Institutional building investment. Building Research & Information, 41(2), pp. 209-222. ISSN 0961-3218
Holt, G D and Edwards, D J (2005) Domestic builder selection in the uk housing repair and maintenance sector: a critique. Journal of Construction Research, 6(1), pp. 123-137. ISSN 1609-9451
Homayouni, H (2015) Aligning contractual, technological, and organizational elements to achieve higher performance buildings: A qualitative comparative analysis approach. PhD thesis, University of Washington, USA.
Home, R (2017) Deregulating planning control over britain's housing stock. International Journal of Law in the Built Environment, 9(3), pp. 193-206. ISSN 1756-1450
Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708
Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364
Horvath, A (1997) Estimation of environmental implications of construction materials and designs using life cycle assessment techniques. PhD thesis, Carnegie Mellon University, USA.
Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708
Hosseinian, S M; Andalib, M and Carmichael, D G (2022) Appropriate types of payments in construction contracts based on agency theory parameters. Journal of Construction Engineering and Management, 148(1): 04021187, ISSN 0733-9364
Hosseinian, S M and Carmichael, D G (2013) Optimal incentive contract with risk-neutral contractor. Journal of Construction Engineering and Management, 139(8), pp. 899-909. ISSN 0733-9364
Hosseinian, S M and Jaberi, A (2025) Optimizing the distribution of outcomes across multiple levels of subcontracting in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 1278-1302. ISSN 0969-9988
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Householder, J L and Rutland, H E (1990) Who owns float? Journal of Construction Engineering and Management, 116(1), pp. 130-133. ISSN 0733-9364
Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.
Hsu, D (2014) Improving energy benchmarking with self-reported data. Building Research & Information, 42(5), pp. 641-656. ISSN 0961-3218
Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings. PhD thesis, University of Maryland, College Park, USA.
Hu, X and Chong, H Y (2022) Integrated frameworks of construction procurement systems for off-site manufacturing projects: Social network analysis. International Journal of Construction Management, 22(11), pp. 2089-2097. ISSN 1562-3599
Hu, Y; Liu, M; Le, Y and Skitmore, M (2022) External consultant involvement for organizational capability building in complex construction projects: A perspective from interorganizational learning process. Journal of Construction Engineering and Management, 148(1): 04021181, ISSN 0733-9364
Hu, Y; Song, J and Zhao, T (2024) Evolutionary game analysis of the intelligent upgrading of smart solar photovoltaic projects. Engineering, Construction and Architectural Management, 31(5), pp. 1835-1856. ISSN 0969-9988
Hua, Y and Liu, A M M (2017) An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry. Architectural Engineering and Design Management, 13(6), pp. 423-438. ISSN 1745-2007
Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.
Huang, W H; Tserng, H P; Jaselskis, E J and Lee, S Y (2014) Dynamic threshold cash flow-based structural model for contractor financial prequalification. Journal of Construction Engineering and Management, 140(10): 04014047, ISSN 0733-9364
Huang, X (2003) The owner's role in construction safety. PhD thesis, University of Florida, USA.
Huang, X (2012) Estimating the cost of engineering services using parametrics and the bathtub failure model. PhD thesis, University of Bath, UK.
Huang, X and Hinze, J (2006) Owner's role in construction safety. Journal of Construction Engineering and Management, 132(2), pp. 164-173. ISSN 0733-9364
Huang, X and Hinze, J (2006) Owner's role in construction safety: Guidance model. Journal of Construction Engineering and Management, 132(2), pp. 174-181. ISSN 0733-9364
Hui, E C M (2006) Intra-urban residential mobility and property markets: Theory and evidence. Journal of Financial Management of Property and Construction, 11(2), pp. 117-130. ISSN 1366-4387
Hulme, T W and Burchell, A J (1992) Bored tunneling for Singapore metro. Journal of Construction Engineering and Management, 118(2), pp. 363-384. ISSN 0733-9364
Huovinen, P (2020) Advancement of the design of AEC-related business management concepts along the common good dimension. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Husain, T (2023) Foreign investment and infrastructure financing: railways during the first age of globalisation. PhD thesis, University College London, UK.
Hutchings, D M (2002) An investigation of management practices used in small-volume home building companies of the United States. PhD thesis, Texas A&M University, USA.
Hutchings, D M and Eggett, D L (2006) Management practices as predictors of success for small-volume home builders in the United States. International Journal of Construction Education and Research, 2(3), pp. 217-230. ISSN 1557-8771
Hutchings, M and Christofferson, J (2005) Factors leading to construction company success: Perceptions of small-volume residential contractors. International Journal of Construction Education and Research, 1(2), pp. 102-111. ISSN 1557-8771
Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.
Hwang, B G and Lim, E S J (2013) Critical success factors for key project players and objectives: Case study of Singapore. Journal of Construction Engineering and Management, 139(2), pp. 204-215. ISSN 0733-9364
Hwang, B G; Zhao, X and Yang, K W (2019) Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies. Journal of Construction Engineering and Management, 145(2): 04018125, ISSN 0733-9364
Hwang, Hyemi (2011) Rational irrationality: The making of property decisions in firms as a part of resource allocation processes - a Korean example. PhD thesis, University of New South Wales, Australia.
Hwang, S; Park, M; Lee, H S; Lee, S and Kim, H (2013) Dynamic feasibility analysis of the housing supply strategies in a recession: Korean housing market. Journal of Construction Engineering and Management, 139(2), pp. 148-160. ISSN 0733-9364
Hyari, K H (2016) Handling unbalanced bidding in construction projects: Prevention rather than detection. Journal of Construction Engineering and Management, 142(2): 04015060, ISSN 0733-9364
Hyari, K H and Alamayreh, T (2023) Unbalanced bidding in construction projects: A contractors' perspective. International Journal of Construction Management, 23(12), pp. 2058-2066. ISSN 1562-3599
Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364
Hyari, K H; Tarawneh, Z S and Katkhuda, H N (2016) Detection model for unbalanced pricing in construction projects: A risk-based approach. Journal of Construction Engineering and Management, 142(12): 04016078, ISSN 0733-9364
Hyari, K H and Thneibat, M (2025) Detecting skewed pricing in tenders for public-sector projects. Construction Innovation, 25(4), pp. 1153-1170. ISSN 1471-4175
Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.
Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364
Högberg, L (2014) Building sustainability: Studies on incentives in construction and management of real estate. PhD thesis, KTH Royal Institute of Technology, Sweden.
Ibbs, C W (1991) Innovative contract incentive features for construction. Construction Management and Economics, 9(2), pp. 157-169. ISSN 01446193
Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364
Ibbs, C W and Ashley, D B (1987) Impact of various construction contract clauses. Journal of Construction Engineering and Management, 113(3), pp. 501-521. ISSN 0733-9364
Ibbs, C W; Bates, L C and Echeverry, D (1987) Owner-furnished equipment (OFE) contract practices. Journal of Construction Engineering and Management, 113(2), pp. 249-263. ISSN 0733-9364
Ibrahim, K I; Costello, S B and Wilkinson, S (2015) Validation of a model for assessing alliance team integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness. PhD thesis, University of Wisconsin - Madison, USA.
Igo, T and Skitmore, M (2006) Diagnosing the organizational culture of an Australian engineering consultancy using the competing values framework. Construction Innovation, 6(2), pp. 121-139. ISSN 1471-4175
Ikerd II, W F (2021) Level of acceptance (LOA) for scan-to-BIM creation. PhD thesis, University of Denver, USA.
Ikuabe, M O and Oke, A E (2019) Contractors’ opportunism: construction professionals’ awareness of influencing factors. Journal of Engineering, Design and Technology, 17(1), pp. 102-114. ISSN 1726-0531
Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364
Inayat, A; Melhem, H and Esmaeily, A (2015) Critical success factors in an agency construction management environment. Journal of Construction Engineering and Management, 141(1): 06014010, ISSN 0733-9364
Ingirige, B; Haigh, R; Malalgoda, C and Palliyaguru, R (2008) Exploring good practice knowledge transfer related to post-tsunami housing (re-)construction in Sri Lanka. Journal of Construction in Developing Countries, 13(2), pp. 21-42. ISSN 1823-6499
Ioannou, P. G. and Liu, L. Y. (1993) Advanced construction technology system: Acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364
Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364
Ioannou, P G (2019) Friedman's bidding model: Errors and corrections. Journal of Construction Engineering and Management, 145(10): 04019058, ISSN 0733-9364
Ioannou, P G and Awwad, R E (2010) Below-average bidding method. Journal of Construction Engineering and Management, 136(9), pp. 936-946. ISSN 0733-9364
Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364
Ioannou, P G and Liu, L Y (1993) Advanced construction technology system: acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364
Irizarry, J and Gheisari, M (2013) Situation awareness (SA), a qualitative user-centered information needs assessment approach. International Journal of Construction Management, 13(3), pp. 35-53. ISSN 1562-3599
Irumba, R (2015) Modelling of construction safety performance and housing markets in Kampala, Uganda. PhD thesis, KTH Royal Institute of Technology, Sweden.
Irving, P A (2016) Explicating excessive financial resource allocation by building control in achieving regulatory conformity in domestic extensions. PhD thesis, University of Salford, UK.
Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.
Iseley, D T (1991) Trenchless excavation construction methods: Classification and evaluation. Journal of Construction Engineering and Management, 117(3), pp. 521-536. ISSN 0733-9364
Isiofia, L A; Nna, E; Uzuegbunam, F O and Ibem, E O (2024) The association of physical development density, prevalence and types of microbes in colonized façade finishes in enugu metropolis, Nigeria. International Journal of Building Pathology and Adaptation, 42(6), pp. 1147-1168. ISSN 2398-4708
Iyer, K C and Jha, K N (2006) Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. ISSN 0733-9364
Jaafar, M; Nuruddin, A R and Abu Bakar, S P S (2014) Business success and psychological traits of housing developers. Construction Economics and Building, 14(2), pp. 57-72. ISSN 2204-9029
Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(2), pp. 75-88. ISSN 1557-8771
Jackson, J T (1990) Technical specifications' effect on construction. Journal of Construction Engineering and Management, 116(3), pp. 463-467. ISSN 0733-9364
Jacques de Sousa, L; Poças Martins, J and Sanhudo, L (2024) Predicting construction project compliance with machine learning model: case study using Portuguese procurement data. Engineering, Construction and Architectural Management, 31(13), pp. 285-302. ISSN 0969-9988
Jadidoleslami, S; Saghatforoush, E; Heravi, A and Preece, C (2022) A practical framework to facilitate constructability implementation using the integrated project delivery approach: A case study. International Journal of Construction Management, 22(7), pp. 1225-1239. ISSN 1562-3599
Jafari, A (2013) A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(7), pp. 746-760. ISSN 1466433X
Jahanger, Q K (2025) Digitalization of construction-phase information management by project owners: Qualitative analysis of potential benefits and probable factors. Engineering, Construction and Architectural Management, 32(11), pp. 7561-7586. ISSN 0969-9988
Jalali, Farhang (2020) Quantifying pavement preservation performance using probabilistic deterioration modeling. PhD thesis, Auburn University, USA.
Jambol, D D; Molwus, J J and Daniel, M M (2013) Re-thinking the approaches to mass housing delivery in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Jang, Y; Jeong, I B; Cho, Y K and Ahn, Y (2019) Predicting business failure of construction contractors using long short-term memory recurrent neural network. Journal of Construction Engineering and Management, 145(11): 04019067, ISSN 0733-9364
Jaradat, S; Whyte, J and Luck, R (2013) Professionalism in digitally mediated project work. Building Research & Information, 41(1), pp. 51-59. ISSN 0961-3218
Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364
Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.
Jaselskis, E J; Anderson, S D and Russell, J S (1996) Strategies for achieving excellence in construction safety performance. Journal of Construction Engineering and Management, 122(1), pp. 61-70. ISSN 0733-9364
Jaselskis, E J and El-Misalami, T (2003) Implementing radio frequency identification in the construction process. Journal of Construction Engineering and Management, 129(6), pp. 680-688. ISSN 0733-9364
Jaselskis, E J and Russell, J S (1992) Risk analysis approach to selection of contractor evaluation method. Journal of Construction Engineering and Management, 118(4), pp. 814-821. ISSN 0733-9364
Jayarathne, T D; De Silva, N and Samarakoon, W K U R M K P K (2024) Adopting smart retrofits: A decision-making model and benchmarking criteria. Built Environment Project and Asset Management, 14(3), pp. 366-383. ISSN 2044-124X
Jayawardana, J; Sandanayake, M; Jayasinghe, S; Kulatunga, A and Zhang, G (2025) Key barriers and mitigation strategies towards sustainable prefabricated construction: A case of developing economies. Engineering, Construction and Architectural Management, 32(7), pp. 4796-4833. ISSN 0969-9988
Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.
Jayesh, M P (2020) Inter-state migration for employment in India: a study on construction workers in Kerala. PhD thesis, Indian Institute of Technology Delhi, India.
Jenkins, K (2023) The COVID-19 implications on the United States failing infrastructure and its affect on future generations. PhD thesis, Capitol Technology University, USA.
Jergeas, G F and Hartman, F T (1994) Contractors' construction-claims avoidance. Journal of Construction Engineering and Management, 120(3), pp. 553-560. ISSN 0733-9364
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9): 04025134, ISSN 0733-9364
Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.
Jha, K N and Chockalingam, C T (2011) Prediction of schedule performance of Indian construction projects using an artificial neural network. Construction Management and Economics, 29(9), pp. 901-911. ISSN 1466433X
Jha, K N and Iyer, C K (2006) What attributes should a project coordinator possess? Construction Management and Economics, 24(9), pp. 977-988. ISSN 1466433X
Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X
Ji, S H; Park, M and Lee, H S (2010) Data preprocessing-based parametric cost model for building projects: Case studies of Korean construction projects. Journal of Construction Engineering and Management, 136(8), pp. 844-853. ISSN 0733-9364
Jia, M and Zhao, L (2025) Evolutionary analysis of information-based construction management promotion using a government-enterprise evolutionary game model. Engineering, Construction and Architectural Management, 32(1), pp. 349-373. ISSN 0969-9988
Jiang, H (2006) Chinese multinational construction firms in international and domestic markets: A re-examination of the eclectic paradigm. PhD thesis, National University of Singapore, Singapore.
Jiang, W and Zhao, X (2021) Trust and the intent to cooperate in energy performance contracting for public buildings in China. Engineering, Construction and Architectural Management, 28(1), pp. 372-396. ISSN 0969-9988
Jibril, R S (2024) Women on board, institutional ownership and emissions disclosure practices as tools for attaining sustainable development goals in Nigeria. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 728-754. ISSN 1759-5916
Jobling, P E and Smith, N J (2018) Experience of the role of contracts in megaproject execution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 18-24. ISSN 17514304
Johannes, K; Voordijk, H and Aranda-Mena, G (2023) The role of purchasing in raising the maturity of smart maintenance management. Built Environment Project and Asset Management, 13(2), pp. 324-340. ISSN 2044-124X
Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.
Johansen, A (2021) Influence of risk assessment on perceptions of contract negotiation and fraud prevention. DBA thesis, Capella University, USA.
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.
Johnsson, H and Sardén, Y (2008) Industrialised timber housing: From trial to production. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Jones, T; Shan, Y and Goodrum, P M (2010) An investigation of corporate approaches to sustainability in the US engineering and construction industry. Construction Management and Economics, 28(9), pp. 971-983. ISSN 1466433X
Jonsson, A Z and Muyingo, H (2019) Building inspection in multi-dwelling housing and the perception of building quality. Construction Economics and Building, 19(2), pp. 144-159. ISSN 2204-9029
Jorge, A (2013) The subsidiarity rule: The unjust enrichment doctrine in construction law. International Journal of Law in the Built Environment, 5(3), pp. 253-270. ISSN 17561469
Joseph, S; Ralwala, A; Wachira-Towey, I and Mutisya, E (2023) Sustainable construction transition (SCT) policy regime in Kenya. Journal of Construction Business and Management, 6(1), pp. 1-16. ISSN 2521-0165
Joubert, F J (2015) Risk simulation in a portfolio of port and rail capital projects. PhD thesis, University of Pretoria, South Africa.
Joukar, A and Nahmens, I (2016) Volatility forecast of construction cost index using general autoregressive conditional heteroskedastic method. Journal of Construction Engineering and Management, 142(1): 04015051, ISSN 0733-9364
Jowkar, M; Temeljotov-Salaj, A; Lindkvist, C M and Støre-Valen, M (2022) Sustainable building renovation in residential buildings: Barriers and potential motivations in Norwegian culture. Construction Management and Economics, 40(3), pp. 161-172. ISSN 01446193
Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.
Ju, Q; Dai, Y; Liu, H and Shen, Z (2026) Interface management of complex capital projects from the perspective of interface clusters: Using complex networks and spectral clustering methods. Journal of Construction Engineering and Management, 152(2): 04025257, ISSN 0733-9364
Julayhe, N and Rahman, M M (2021) Dwellers' perception on challenges and motivators of greening existing buildings in Brunei darussalam. Built Environment Project and Asset Management, 11(5), pp. 870-887. ISSN 2044-124X
Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.
Kabbani, I A (1993) Decision support life cycle analysis system in building design. PhD thesis, University of Colorado at Boulder, USA.
Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Kado, D and Bala, K (2015) Pareto analysis on the quality sections/factors prevalence of Nigerian design firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Kagan, H A; Leary, D J and Pratter, G E K (1986) Design engineers' responsibilities during construction. Journal of Construction Engineering and Management, 112(3), pp. 394-402. ISSN 0733-9364
Kalach, M; Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(4), pp. 969-993. ISSN 0969-9988
Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.
Kallman, J W (1998) Loss control project decision models for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.
Kamal, E M and Flanagan, R (2014) Key characteristics of rural construction SMEs. Journal of Construction in Developing Countries, 19(2), pp. 1-13. ISSN 1823-6499
Kamal, E M; Lou, E C W; Yusof, N and Osmadi, A (2022) Absorptive capacity of Malaysian SME construction organisations. Architectural Engineering and Design Management, 18(3), pp. 313-324. ISSN 1745-2007
Kamani-Fard, A; Ahmad, M H and Ossen, D R (2012) The sense of place in the new homes of post-Bam earthquake reconstruction. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 220-236. ISSN 1759-5916
Kang, Y; O'Brien, W J; Thomas, S and Chapman, R E (2008) Impact of information technologies on performance: Cross study comparison. Journal of Construction Engineering and Management, 134(11), pp. 852-863. ISSN 0733-9364
Kangari, R (1995) Risk management perceptions and trends of U.S. Construction. Journal of Construction Engineering and Management, 121(4), pp. 422-429. ISSN 0733-9364
Kaplanoglu, S B (2007) Impact of pre-project peer review on project success. PhD thesis, Illinois Institute of Technology, USA.
Kapoor, P (2022) Exploratory study of the SMES of manufacturers of construction products in Uttar Pradesh. PhD thesis, Amity University, Noida, India.
Karakhan, A A; Rajendran, S; Gambatese, J and Nnaji, C (2018) Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach. Journal of Construction Engineering and Management, 144(7): 04018054, ISSN 0733-9364
Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.
Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988
Karim, A and Adeli, H (1999) CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management, 125(5), pp. 368-376. ISSN 0733-9364
Karunasena, G and Rameezdeen, R (2010) Post-disaster housing reconstruction: Comparative study of donor vs owner-driven approaches. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 173-191. ISSN 1759-5916
Karvekar, S P (2008) Private sector participation in roads development: Planning and management issues. PhD thesis, Maharaja Sayajirao University of Baroda, India.
Kasapolu, E (2011) Leadership behaviors in project design offices. Journal of Construction Engineering and Management, 137(5), pp. 356-363. ISSN 0733-9364
Kashiwagi, D T and Byfield, R (2002) Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement. Journal of Construction Engineering and Management, 128(6), pp. 496-502. ISSN 0733-9364
Kashiwagi, D T and Byfield, R (2002) Minimizing political influence in performance contracting case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(2), pp. 101-116. ISSN 1358-9180
Kashiwagi, D T; Halmrast, C T and Tisthammer, T (1996) Intelligent procurement of construction systems. Journal of Construction Procurement, 2(1), pp. 56-65. ISSN 1358-9180
Kashiwagi, D T and Massner, S (2005) Solving the construction craftperson skill shortage problem through construction undergraduate and graduate education. International Journal of Construction Education and Research, 1(2), pp. 89-101. ISSN 1557-8771
Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364
Kasprzak, C and Dubler, C (2012) Aligning BIM with FM: Streamlining the process for future projects. Construction Economics and Building, 12(4), pp. 68-77. ISSN 2204-9029
Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364
Katsanis, C J (1998) An empirical examination of the relationships between strategy, structure and performance in building industry organizations. PhD thesis, Universite de Montreal, Canada.
Kazmierczak, A and Bichard, E (2010) Investigating homeowners' interest in property-level flood protection. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 157-172. ISSN 1759-5916
Kelley, M N (1991) Ft. Drum estimating and bidding from contractor's point of view. Journal of Construction Engineering and Management, 117(3), pp. 565-571. ISSN 0733-9364
Kelly, D and Ilozor, B (2022) Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA. International Journal of Construction Management, 22(14), pp. 2808-2816. ISSN 1562-3599
Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.
Keskin, B (2021) A building information modeling (BIM)-centric digital ecosystem for smart airport life cycle management. PhD thesis, Syracuse University, USA.
Khalafallah, A; Kartam, N and Razeq, R A (2019) Bilevel standards-compliant platform for evaluating building contractor safety. Journal of Construction Engineering and Management, 145(10): 4019054, ISSN 0733-9364
Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364
Khalef, R; Ali, G G; El-adaway, I H and Gad, G M (2022) Managing construction projects impacted by the COVID-19 pandemic: A contractual perspective. Construction Management and Economics, 40(4), pp. 313-330. ISSN 01446193
Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.
Khan, I H and Munawer, T (2024) A systematic review of economic sustainability of vertical greenery systems in buildings. Construction Economics and Building, 24(1-2), pp. 119-143. ISSN 2204-9029
Khan, I H and Munawer, T (2024) A systematic review of economic sustainability of vertical greenery systems for buildings. Construction Economics and Building, 24(1-2), pp. 119-143. ISSN 2204-9029
Khan, S B; Proverbs, D G and Xiao, H (2022) The motivation of operatives in small construction firms towards health and safety: a conceptual framework. Engineering, Construction and Architectural Management, 29(1), pp. 245-261. ISSN 0969-9988
Khanh, H. D.; Tiep, N. V. and Nguyen, K. V. (2026) EFA models for evaluating stakeholder perceptions of falls-from-height risks in building projects: A case study from Vietnam. Journal of Engineering, Design and Technology, 24(6), pp. 1483-1509. ISSN 1726-0531
Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.
Khatibi, A.; Sedigh Rezvani, M.; Alavi, P. and Rahmati, S. (2026) A holistic fire risk-to-resilience framework for the historic bazaars (case study: The Zanjan bazaar, Iran). International Journal of Disaster Resilience in the Built Environment, 17(4), pp. 505-526. ISSN 1759-5908
Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708
Kheni, N A; Dainty, A R J and Gibb, A (2008) Health and safety management in developing countries: A study of construction SMEs in Ghana. Construction Management and Economics, 26(11), pp. 1159-1169. ISSN 1466433X
Kheni, N A; Dainty, A R J and Gibb, A G F (2007) Influence of political and socio-cultural environments on health and safety management within SMEs: A Ghana case study. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kheni, N A; Gibb, A G F and Dainty, A R J (2010) Health and safety management within small- and medium-sized enterprises (SMEs) in developing countries: Study of contextual influences. Journal of Construction Engineering and Management, 136(10), pp. 1104-1115. ISSN 0733-9364
Khoa, V. D.; Chinda, T. and Nguyen, N. H. (2026) Knowledge management process to enhance construction competitiveness in the long term: System dynamics modelling approach. International Journal of Construction Management, 26(9), pp. 1960-1977. ISSN 1562-3599
Kiani, H (1998) A model for measuring effectiveness of building construction organisations: Owner's perspective. PhD thesis, University of Waterloo, USA.
Kim, Y W and Rhee, B D (2026) An incentive scheme in GMP contracts using a game theory approach. Journal of Construction Engineering and Management, 152(4): 04026016, ISSN 0733-9364
Kim, H S (1998) Evaluation of quality during early design: A prerequisite to defining value for money for the client. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Kim, H-s (1998) Value for money in building design: Modelling the cost-quality relationships. PhD thesis, University of Reading, UK.
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Kim, J H and Fisher, N (2001) Knowledge management for small occasional construction industry clients: A theoretical framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kim, J L; Greene, M and Kim, S (2014) Cost comparative analysis of a new green building code for residential project development. Journal of Construction Engineering and Management, 140(5): 05014002, ISSN 0733-9364
Kim, S B (2002) Assessment of CII knowledge implementation at the organizational level. PhD thesis, University of Texas at Austin, USA.
Kim, S J (2009) Identification of construction project problems and their impacts on project success. PhD thesis, University of Florida, USA.
Kim, S Y; Nguyen, M V and Luu, V T (2020) A performance evaluation framework for construction and demolition waste management: Stakeholder perspectives. Engineering, Construction and Architectural Management, 27(10), pp. 3189-3213. ISSN 0969-9988
Kinawy, S N (2017) Customizing information delivery for citizens in transportation infrastructure projects: Towards active community participation in decision-making. PhD thesis, University of Toronto, Canada.
Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.
Klitgaard, K A (1987) The organization of work in residential construction. PhD thesis, University of New Hampshire, USA.
Klotz, L (2008) Process transparency for sustainable building delivery. PhD thesis, Pennsylvania State University, USA.
Koch, C and Urup, L (2017) Project performance: An emerging constellation of multiple institutions. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Komolafe, M O; Oyewole, M O and Kolawole, J T (2016) Extent of incorporation of green features in office properties in Lagos, Nigeria. Smart and Sustainable Built Environment, 5(3), pp. 232-260. ISSN 2046-6099
Konchar, M D (1997) A comparison of United States project delivery systems. PhD thesis, Pennsylvania State University, USA.
Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints. PhD thesis, University of Wisconsin - Madison, USA.
Korpela J, M R (2013) BIM in facility management and maintenance: The case of Kaisa Library of Helsinki University. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Koskelo, T M (2005) A method for strategic technical life cycle management of real estates. DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Koskisto, O (1997) Reliability-based optimization of plant precast concrete building systems. PhD thesis, Johns Hopkins University, USA.
Kostuk, K J (2003) Quantifying the uncertainty associated with long-term maintenance contracts. PhD thesis, University of Saskatchewan, Canada.
Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193
Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(2), pp. 126-132. ISSN 0969-9988
Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.
Kraiem, Z M and Diekmann, J E (1987) Concurrent delays in construction projects. Journal of Construction Engineering and Management, 113(4), pp. 591-602. ISSN 0733-9364
Krima, N (2009) Assessing the effectiveness of Libyan supervisors in dealing with construction delays. PhD thesis, University of Salford, UK.
Krima, N; Aouad, G; Hatush, Z and Baldry, D (2005) An assessment model: The efficiency of consultants when dealing with delays in construction projects in Libya. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Krizek, R J; Wei, L and Ahmad, H (1996) Lessons learned from multiphase reconstruction project. Journal of Construction Engineering and Management, 122(1), pp. 44-54. ISSN 0733-9364
Krystallis, I (2016) A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery. PhD thesis, Loughborough University, UK.
Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.
Kulaksiz, T (2019) Analysis of factors influencing return on investment (ROI) for building information modeling (BIM) implementation. PhD thesis, Wayne State University, USA.
Kulevich, A E (2025) Effective strategies for mitigating bidding corruption for U.S. Infrastructure contracts. DBA thesis, Walden University, USA.
Kumar, D and Zhang, C (2025) Carbon emission reduction in construction industry: Qualitative insights on procurement, policies and artificial intelligence. Built Environment Project and Asset Management, 15(3), pp. 399-414. ISSN 2044-124X
Kumar Dhar, T; Sk. Maruf Hossain, M and Rubayet Rahaman, K (2013) How does flexible design promote resource efficiency for housing? A study of Khulna, Bangladesh. Smart and Sustainable Built Environment, 2(2), pp. 140-157. ISSN 2046-6099
Kurkela, M; Maksimainen, M; Julin, A; Virtanen, J P; Männistö, I; Vaaja, M T and Hyyppä, H (2022) Applying photogrammetry to reconstruct 3D luminance point clouds of indoor environments. Architectural Engineering and Design Management, 18(1), pp. 56-72. ISSN 1745-2007
Kuusk, K and Kalamees, T (2016) Retrofit cost-effectiveness: Estonian apartment buildings. Building Research & Information, 44(8), pp. 920-934. ISSN 0961-3218
Kwon, T W; Lee, K T; Kim, J H and Kim, J J (2023) Proposal of hierarchical organization structure for negotiation consensus in multinational joint-client megaprojects: Case of us force relocation program in Korea. Journal of Construction Engineering and Management, 149(2): 05022019, ISSN 0733-9364
Lad, V H; Patel, D A; Chauhan, K A and Patel, K A (2024) Prioritisation of bridge for improving its resilience using multi-criteria decision-making techniques. Engineering, Construction and Architectural Management, 31(7), pp. 2952-2976. ISSN 0969-9988
Ladzani, M W (2009) Evaluation of small and medium-sized enterprises' performance in the built environment. DPhil thesis, University of Johannesburg, South Africa.
Lahdenperä, P (2026) Design-build with a development phase: The underlying theory. Journal of Construction Engineering and Management, 152(4): 04026025, ISSN 0733-9364
Lahdenperä, P (2001) An analysis of the statistics on project procurement methods in Finland, 1989-1998. Journal of Construction Procurement, 7(1), pp. 27-41. ISSN 1358-9180
Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X
Lahdenperä, P (2012) How to proportion capability and fee percentage for team comparison in competitive early involvement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Lahdenperä, P (2024) Design–build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4-5), pp. 18-42. ISSN 2204-9029
Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), pp. 61-78. ISSN 1366-4387
Lai, A W Y and Lai, W M (2013) Users' satisfaction survey on building maintenance in public housing. Engineering, Construction and Architectural Management, 20(4), pp. 420-440. ISSN 0969-9988
Lai, A W Y and Pang, P S M (2010) Measuring performance for building maintenance providers. Journal of Construction Engineering and Management, 136(8), pp. 864-876. ISSN 0733-9364
Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(4), pp. 415-427. ISSN 1466433X
Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.
Lal, Anshu Singh (2024) Best practices of information technology project managers leading agile projects. EdD thesis, Pepperdine University, USA.
Lapinski, A R; Horman, M J and Riley, D R (2006) Lean processes for sustainable project delivery. Journal of Construction Engineering and Management, 132(10), pp. 1083-1091. ISSN 0733-9364
Larkin, K; Odeyinka, H and Eadie, R (2012) An exploration of theoretical concepts and methods for assessing risk impacts on the variability between contract sum and final account in design and build projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Larsson, N K (1999) Development of a building performance rating and labelling system in Canada. Building Research & Information, 27(4-5), pp. 332-341. ISSN 0961-3218
Laufer, A (1992) A micro view of the project planning process. Construction Management and Economics, 10(1), pp. 31-43. ISSN 01446193
Laufer, A and Moore, B E (1983) Attitudes toward productivity pay programs. Journal of Construction Engineering and Management, 109(1), pp. 89-101. ISSN 0733-9364
Lavikka, R H; Kyrö, R; Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1946-1961. ISSN 0969-9988
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364
Le, Nguyen Tran Khoi (2019) Identification of risk factors, success practices, and feasibility of the best value approach application to improve construction performance in Vietnam and other developing countries. PhD thesis, Arizona State University, USA.
Leather, P and Rolfe, S J (1997) Fit for the task: The future of the small scale domestic repair and maintenance industry in the UK. Construction Management and Economics, 15(2), pp. 201-212. ISSN 01446193
Ledbetter, W B (1994) Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. ISSN 0733-9364
Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364
Lee, D E and Arditi, D (2006) Total quality performance of design/build firms using quality function deployment. Journal of Construction Engineering and Management, 132(1), pp. 49-57. ISSN 0733-9364
Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364
Lee, H W; Choi, K and Gambatese, J A (2014) Real options valuation of phased investments in commercial energy retrofits under building performance risks. Journal of Construction Engineering and Management, 140(6): 5014004, ISSN 0733-9364
Lee, J I; Lee, H S and Park, M (2018) Contractor liquidity evaluation model for successful public housing projects. Journal of Construction Engineering and Management, 144(12): 04018109, ISSN 0733-9364
Lee, J K (2011) Building environment rule and analysis (BERA) language and its application for evaluating building circulation and spatial program. PhD thesis, Georgia Institute of Technology, USA.
Lee, K J (2013) A formal and ontological approach to embed commissioning test protocol into building information model. PhD thesis, Carnegie Mellon University, USA.
Lee, M E (1984) Alienation and control among "semi-autonomous work groups" in the non-unionized residential sector of the construction industry. PhD thesis, American University, USA.
Lee, S (2007) Understanding and quantifying the impact of changes on construction labor productivity: Integration of productivity factors and quantification methods. PhD thesis, University of California, Berkeley, USA.
Lee, Y S; Kim, J J and Lee, T S (2016) Topological competiveness based on social relationships in the Korean construction-management industry. Journal of Construction Engineering and Management, 142(11): 05016014, ISSN 0733-9364
Lehtiranta, L and Junnonen, J M (2014) Stretching risk management standards: Multi-organizational perspectives. Built Environment Project and Asset Management, 4(2), pp. 128-145. ISSN 2044-124X
Lehtiranta, L; Kärnä, S; Junnonen, J M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(6), pp. 463-475. ISSN 1466433X
Lehtonen, J L and Kiiras, J M (2010) Cost modelling in underpinning projects. Construction Management and Economics, 28(9), pp. 985-995. ISSN 1466433X
Leicht, R and Harty, C (2017) Influence of multiparty IPD contracts on construction innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Leshinsky, R (2012) Use of planning agreements to support sustainability and environmental preservation: A case study from Victoria, Australia. International Journal of Law in the Built Environment, 4(2), pp. 157-172. ISSN 1756-1450
Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.
Levander, E and Sardén, Y (2009) Maintenance and operating costs in off-site timber framed housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Lewis, A (2013) A framework for improving building operations decisions for energy efficiency. PhD thesis, University of Reading, UK.
Lewis, A and Elmualim, A (2011) Development of a decision support system for proactive energy and maintenance management decisions. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Leyland, M R (2016) Patronage and the architectural profession: the country house in nineteenth-century Northamptonshire. PhD thesis, University of Leicester, UK.
Lhee, S C; Issa, R R A and Flood, I (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. Journal of Construction Engineering and Management, 138(1), pp. 22-30. ISSN 0733-9364
Li, H.; Wang, S.; Liu, J. and Guan, X. (2026) How the relationship quality of owner-contractor affects technological innovation performance in megaprojects: The mediating role of resource orchestration. Engineering, Construction and Architectural Management, 33(7), pp. 5155-5179. ISSN 0969-9988
Li, J.; Sun, J.; Cao, J. and Mao, L. (2026) Evolutionary dynamics of multiagent on-chain adoption strategies in blockchain-enabled smart construction. Journal of Construction Engineering and Management, 152(8): 04026113, ISSN 0733-9364
Li, Q; Zhang, Q; Shen, Y and Zhang, X (2025) Uncovering the dynamic decision-making behaviours of multiple stakeholders in the community public infrastructure. Journal of Engineering, Design and Technology, 23(5), pp. 1501-1518. ISSN 1726-0531
Li, H; Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(2), pp. 151-164. ISSN 1466433X
Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364
Li, H; Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), pp. 444-458. ISSN 0969-9988
Li, H; Liang, M; Han, H and Zhang, W (2025) Building mechanism of the initial trust motivation of owners toward contractors. Journal of Engineering, Design and Technology, 23(1), pp. 51-68. ISSN 1726-0531
Li, H; Su, L; L.V, L and Xia, Q (2021) Detecting unbalanced bidding to achieve economic sustainability using fuzzy logic approach. Construction Innovation, 21(2), pp. 164-181. ISSN 1471-4175
Li, H; Su, L; Zuo, J; An, X; Dong, G; Wang, L and Zhang, C (2023) The framework of data-driven and multi-criteria decision-making for detecting unbalanced bidding. Engineering, Construction and Architectural Management, 30(2), pp. 598-622. ISSN 0969-9988
Li, J; Jiang, W and Zuo, J (2020) The effects of trust network among project participants on project performance based on SNA approach: A case study in China. International Journal of Construction Management, 20(8), pp. 837-847. ISSN 1562-3599
Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364
Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364
Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.
Li, X; Zhang, Z; Jim, C Y; Lai, J and Chen, X (2023) Owner-based benefit evaluation of bim applications in China's engineering projects. Engineering, Construction and Architectural Management, 30(9), pp. 4387-4414. ISSN 0969-9988
Li, Y; He, N; Li, H; Liu, Z and Qi, J (2021) Influencing factors on inter-organizational trust asymmetry behavior in construction projects: Evidence from China. Engineering, Construction and Architectural Management, 28(1), pp. 308-331. ISSN 0969-9988
Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364
Lima, Luanda Regina Reis (2022) A systematic approach for developing sustainability guidelines for stakeholders in public project management. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Lin, S C (2015) An analysis for construction engineering networks. Journal of Construction Engineering and Management, 141(5): 04014096, ISSN 0733-9364
Lin, Y H; Niu, D; Guo, Y and Zeng, N (2024) The effects of project uncertainty on guanxi governance and contractual governance. Engineering, Construction and Architectural Management, 31(12), pp. 4726-4753. ISSN 0969-9988
Lindhard, S and Larsen, J K (2016) Identifying the key process factors affecting project performance. Engineering, Construction and Architectural Management, 23(5), pp. 657-673. ISSN 0969-9988
Lines, B (2014) Action research approach to implementation of APDMS within owner organizations strategic management and overcoming resistance to change in the AEC industry. PhD thesis, Arizona State University, USA.
Lines, B C; Kakarapalli, R and Nguyen, P H D (2022) Does best value procurement cost more than low-bid? A total project cost perspective. International Journal of Construction Education and Research, 18(1), pp. 85-100. ISSN 1557-8771
Lines, B C; Perrenoud, A; Sullivan, K T and Smithwick, J (2015) Implementing new project delivery strategies: Development of a web-based multimedia tool to support owner project team training. International Journal of Construction Education and Research, 11(2), pp. 140-160. ISSN 1557-8771
Lines, B C and Ravi Kumar, G G (2018) Developing more competitive proposals: Relationship between contractor qualifications-based proposal content and owner evaluation scores. Journal of Construction Engineering and Management, 144(5): 04018030, ISSN 0733-9364
Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771
Lines, B C; Sullivan, K T and Wiezel, A (2016) Support for organizational change: Change-readiness outcomes among AEC project teams. Journal of Construction Engineering and Management, 142(2): 04015062, ISSN 0733-9364
Ling, F Y Y; Hartmann, A; Kumaraswamy, M and Dulaimi, M (2007) Influences on innovation benefits during implementation: Client's perspective. Journal of Construction Engineering and Management, 133(4), pp. 306-315. ISSN 0733-9364
Ling, F Y Y; Ibbs, C W and Hoo, W Y (2006) Determinants of international architectural, engineering, and construction firms' project success in China. Journal of Construction Engineering and Management, 132(2), pp. 206-214. ISSN 0733-9364
Ling, F Y Y; Low, S P; Wang, S and Egbelakin, T (2008) Models for predicting project performance in China using project management practices adopted by foreign AEC firms. Journal of Construction Engineering and Management, 134(12), pp. 983-990. ISSN 0733-9364
Ling, F Y Y and Tran, H B T (2012) Ingredients to engender trust in construction project teams in Vietnam. Construction Innovation, 12(1), pp. 43-61. ISSN 1471-4175
Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X
Lingard, H; Turner, M and Charlesworth, S (2015) Growing pains: Work-life impacts in small-to-medium sized construction firms. Engineering, Construction and Architectural Management, 22(3), pp. 312-326. ISSN 0969-9988
Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364
Lippard, C D (2006) Building inequality: A case study of white, black, and latino contractors in the Atlanta construction industry. PhD thesis, Georgia State University, USA.
Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction. PhD thesis, Stanford University, USA.
Liu, J; Jin, T; Pan, Y and Li, Y (2026) Data sharing mechanism among intelligent transportation infrastructure stakeholders: Based on the data value chain perspective. Journal of Construction Engineering and Management, 152(2): 04025240, ISSN 0733-9364
Liu, H (2017) The impact of owner practices and procedures on construction project safety performance. PhD thesis, University of Kentucky, USA.
Liu, H; Jazayeri, E and Dadi, G B (2017) Establishing the influence of owner practices on construction safety in an operational excellence model. Journal of Construction Engineering and Management, 143(6): 04017005, ISSN 0733-9364
Liu, H; Kwigizile, V and Huang, W C (2021) Holistic framework for highway construction cost index development based on inconsistent pay items. Journal of Construction Engineering and Management, 147(7): 04021052, ISSN 0733-9364
Liu, H; Yu, Y; Sun, Y and Yan, X (2021) A system dynamic approach for simulation of a knowledge transfer model of heterogeneous senders in mega project innovation. Engineering, Construction and Architectural Management, 28(3), pp. 681-705. ISSN 0969-9988
Liu, J and Ma, G (2021) Study on incentive and supervision mechanisms of technological innovation in megaprojects based on the principal-agent theory. Engineering, Construction and Architectural Management, 28(6), pp. 1593-1614. ISSN 0969-9988
Liu, K and El-Gohary, N (2022) Bridge deterioration knowledge ontology for supporting bridge document analytics. Journal of Construction Engineering and Management, 148(6): 04022030, ISSN 0733-9364
Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.
Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.
Liu, M; Zhu, Y; Wei, J; Le, Y and Zhang, X (2022) Impact of institutional pressures on external program manager involvement: Evidence from large projects in China. Journal of Construction Engineering and Management, 148(9): 04022079, ISSN 0733-9364
Liu, R; Du, J; Issa, R R A and Giel, B (2017) BIM cloud score: Building information model and modeling performance benchmarking. Journal of Construction Engineering and Management, 143(4): 04016109, ISSN 0733-9364
Liu, Y (2021) From best practices to next practices: project-based learning in the development of large infrastructure. PhD thesis, Delft University of Technology, Netherlands.
Liu, Y; Amini-Abyaneh, A; Hertogh, M; Houwing, E J and Bakker, H (2021) Collaborate to learn and learn to collaborate: A case of exploitative learning in the inter-organizational project. Engineering, Construction and Architectural Management, 28(3), pp. 809-830. ISSN 0969-9988
Liu, Y; Messner, J I and Leicht, R M (2018) A process model for usability and maintainability design reviews. Architectural Engineering and Design Management, 14(6), pp. 457-469. ISSN 1745-2007
Liu, Y; Zhao, J; Dimitrov, V; Irish, A; Jones, C; Kirk, S; Thomas, J and Welter, D (2010) An entertaining robot prototype for pets. Journal of Engineering, Design and Technology, 8(2), pp. 189-205. ISSN 1726-0531
Llale J, C-M O (2023) Potential benefits of close proximity of taxi ranks to retail developments. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Lo, T Y J (2021) Innovation management in the construction industry: Innovation performance indicators for AECOO organizations. PhD thesis, Stanford University, USA.
Lo, W; Lin, C L and Yan, M R (2007) Contractor's opportunistic bidding behavior and equilibrium price level in the construction market. Journal of Construction Engineering and Management, 133(6), pp. 409-416. ISSN 0733-9364
Long, P W (2021) A conceptual framework for sharing knowledge and information between facility management/operations and building design teams. PhD thesis, University of Salford, UK.
Lopez Del Puerto, C; Strong, K and Miller, M (2013) Analysis of owners safety management approaches in design-build projects. International Journal of Construction Education and Research, 9(4), pp. 307-316. ISSN 1557-8771
Loraine, R K (1994) Project specific partnering. Engineering, Construction and Architectural Management, 1(1), pp. 5-16. ISSN 0969-9988
Lou, Y (2022) Interconnections among energy consumption, carbon emissions, and economic impacts for sustainable buildings. PhD thesis, University of Colorado at Boulder, USA.
Love, P E D; Zhou, J; Matthews, J; Sing, C-P and Carey, B (2015) A systems information model for managing electrical, control, and instrumentation assets. Built Environment Project and Asset Management, 5(3), pp. 278-289. ISSN 2044-124X
Lu, Na (2007) Investigation of designers' and general contractors' perceptions of offsite construction techniques in the United States construction industry. PhD thesis, Clemson University, USA.
Lu, S L and Sexton, M (2010) Career journeys and turning points of senior female managers in small construction firms. Construction Management and Economics, 28(2), pp. 125-139. ISSN 1466433X
Lu, W; Guo, W and Zhu, Q (2020) Effect of justice on contractor's relational behavior: Moderating role of owner's asset specificity. Journal of Construction Engineering and Management, 146(4): 04020020, ISSN 0733-9364
Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988
Lu, W; Zhang, L and Li, Z (2015) Influence of negotiation risk attitude and power on behaviors and outcomes when negotiating construction claims. Journal of Construction Engineering and Management, 141(2): 04014069, ISSN 0733-9364
Lu, Y; Pang, D and Li, Y (2016) Evolutionary collaboration network and organizational competitiveness in megaprojects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the P.R. Of China. PhD thesis, University of Manchester, UK.
Luo, Y and Chen, Y (2023) Understanding the relationship between asset specificity and governance choices in construction projects: Moderating role of uncertainty. Journal of Construction Engineering and Management, 149(3): 04022178, ISSN 0733-9364
Lv, L; Wang, Z; Li, H; Zhang, C and Qiao, R (2022) Tournament incentive mechanisms design for long-distance water diversion projects incorporating preference heterogeneity. Journal of Construction Engineering and Management, 148(6): 04022036, ISSN 0733-9364
Ma, G; Wu, Z; Wu, M and Shang, S (2022) A hybrid method for matching analysis of construction project characteristics with operation and maintenance requirements. Engineering, Construction and Architectural Management, 29(8), pp. 3114-3136. ISSN 0969-9988
Ma, L and Fu, H (2022) A governance framework for the sustainable delivery of megaprojects: The interaction of megaproject citizenship behavior and contracts. Journal of Construction Engineering and Management, 148(4), ISSN 0733-9364
Ma, Q; Cheung, S O and Li, S (2025) Managing risks in IPD-ish projects: Experience from Hong Kong. Engineering, Construction and Architectural Management, 32(3), pp. 1816-1836. ISSN 0969-9988
Maali, O M (2022) Management practices to improve adoption and employee well-being during organizational changes in the AEC industry. PhD thesis, University of Kansas, USA.
Maby, C and Gwilliam, J (2022) Integrating energy efficiency into private home repair, maintenance and improvement practice in England and Wales. Building Research & Information, 50(4), pp. 424-437. ISSN 0961-3218
Macsporran, C and Tucker, S N (1996) Target budget levels for building operating costs. Construction Management and Economics, 14(2), pp. 103-119. ISSN 01446193
Maemura, Y; Kim, E and Ozawa, K (2018) Root causes of recurring contractual conflicts in international construction projects: Five case studies from Vietnam. Journal of Construction Engineering and Management, 144(8): 05018008, ISSN 0733-9364
Magxaka, M; Gajjar, D and Lucas, J (2023) Project close-out process for HVAC mechanical contractors: Current practices. Journal of Construction Engineering and Management, 149(1): 05022016, ISSN 0733-9364
Mahamid, I (2013) Common risks affecting time overrun in road construction projects in Palestine: Contractors' perspective. Construction Economics and Building, 13(2), pp. 45-53. ISSN 2204-9029
Mahamid, I (2013) Contractors' perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management, 20(4), pp. 446-460. ISSN 0969-9988
Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387
Mahdavi, A (2016) A system-of-systems approach to ex-ante analysis of profit potential of a project portfolio. PhD thesis, Purdue University, USA.
Mahdi, H S and Carmichael, D G (2014) Optimal sharing arrangement for multiple project outcomes. Journal of Financial Management of Property and Construction, 19(3), pp. 264-280. ISSN 1366-4387
Mahdi, H S and Carmichael, D G (2014) An optimal target cost contract with a risk neutral owner. Engineering, Construction and Architectural Management, 21(5), pp. 586-604. ISSN 0969-9988
Mahdi Hosseinian, S; Farahpour, E and Carmichael, D G (2020) Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7): 04020067, ISSN 0733-9364
Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.
Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.
Majdalani, Z; Ajam, M and Mezher, T (2006) Sustainability in the construction industry: A Lebanese case study. Construction Innovation, 6(1), pp. 33-46. ISSN 1471-4175
Majumdar, T (2024) Pmc: A classification of production metrics found useful by AEC professionals. PhD thesis, Stanford University, USA.
Mak, S W K; Choy, L H T and ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(2), pp. 92-105. ISSN 1471-4175
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Maloney, W F (1988) Substance abuse in construction. Journal of Construction Engineering and Management, 114(4), pp. 614-630. ISSN 0733-9364
Mambwe, M; Mwanaumo, E M; Phiri, F and Chabota, K (2020) The construction subcontracting policy framework for developing local contractors capacities in Zambia. Journal of Construction Business and Management, 4(1), pp. 60-70. ISSN 2521-0165
Manavazhi, M R and Xunshi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(4), pp. 379-391. ISSN 01446193
Manewa, R M A S (2012) Economic considerations for adaptability in buildings. PhD thesis, Loughborough University, UK.
Mannarino, J A (2001) Evaluation of the construction management delivery system and establishing a model for selection: A qualitative approach. PhD thesis, State University of New York at Buffalo, USA.
Manoliadis, O G; Pantouvakis, J P and Christodoulou, S (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(4), pp. 373-384. ISSN 1466433X
Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Case study-based challenges of quality concrete finishing for architecturally complex structures. Journal of Construction Engineering and Management, 133(3), pp. 208-216. ISSN 0733-9364
Mantha, B R K and García de Soto, B (2021) Assessment of the cybersecurity vulnerability of construction networks. Engineering, Construction and Architectural Management, 28(10), pp. 3078-3105. ISSN 0969-9988
Mao, X; Deng, B; Zhao, X and Lv, X (2026) Supervision mechanism of integrated construction consultancy services in China: Tripartite game analysis. Engineering, Construction and Architectural Management, 33(1), pp. 641-665. ISSN 0969-9988
Marciano, E J (2003) Sustainable development and the cement and concrete industries. PhD thesis, Universite de Sherbrooke, Canada.
Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Marsh, K and Fayek, A R (2010) SuretyAssist: Fuzzy expert system to assist surety underwriters in evaluating construction contractors for bonding. Journal of Construction Engineering and Management, 136(11), pp. 1219-1226. ISSN 0733-9364
Marshall, H E (1985) A graphical approach to discounted payback. Construction Management and Economics, 3(2), pp. 105-120. ISSN 01446193
Marteinsson, B (2003) Durability and the factor method of ISO 15686-1. Building Research & Information, 31(6), pp. 416-426. ISSN 0961-3218
Martek, I; Edwards, D J; Seaton, S and Jones, D (2022) An appraisal of Australia's approach to promoting urban sustainability. Built Environment Project and Asset Management, 12(2), pp. 262-276. ISSN 2044-124X
Martin, H; Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), pp. 170-188. ISSN 1745-2007
Marton, J and Richter, A (2004) In search of safety on construction sites -implications of culture, organizational structures and structural change on safety. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(2), pp. 111-124. ISSN 1471-4175
Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499
Mathar, H; Assaf, S; Hassanain, M A; Abdallah, A and Sayed, A M Z (2020) Critical success factors for large building construction projects: Perception of consultants and contractors. Built Environment Project and Asset Management, 10(3), pp. 349-367. ISSN 2044-124X
Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.
Mbachu, J; Egbelakin, T; Rasheed, E O and Shahzad, W M (2017) Influence of key role players on productivity outcomes in the residential building lifecycle. Journal of Engineering, Design and Technology, 15(4), pp. 528-551.
McCaa, B M (2021) Leadership style needed within small construction companies to optimize a safety climate. PhD thesis, Adler University, USA.
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
McIntyre, C (1996) A decision support system for the residential land development site selection process. PhD thesis, Pennsylvania State University, USA.
McKeever, T M (2018) How do the perceptions of wages, benefits, and working conditions differ among unionized mechanical construction workers in right-to-work and non-right-to-work states. PhD thesis, Indiana University of Pennsylvania, USA.
McKillop, R; Hare, B and Lawani, K (2022) Evaluating the health and safety practices of construction small and medium-sized enterprise leaders. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
McKim, R A (1990) Risk management for the construction owner. PhD thesis, University of Waterloo, Canada.
McLoud, M (1988) Craftsmen and entrepreneurs: Builders in late nineteenth-century Washington, D.C. PhD thesis, George Washington University, USA.
McMillan, L (2023) Artificial intelligence–enabled self-healing infrastructure systems. PhD thesis, University College London, UK.
McNicholas, T M (1994) Potential barriers to the adoption of new technology in the United States construction industry. DBA thesis, Golden Gate University, USA.
Mechlenborg, M and Gram-Hanssen, K (2022) Masculine roles and practices in homes with photovoltaic systems. Buildings & Cities, 3(1), pp. 638-652. ISSN 2632-6655
Meeampol, S and Ogunlan, S O (2006) Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. ISSN 1366-4387
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Meier, J R and Russell, J S (2000) Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450. ISSN 0733-9364
Meikle, J L and Connaughton, J N (1994) How long should housing last? Some implications of the age and probable life of housing in England. Construction Management and Economics, 12(4), pp. 315-321. ISSN 01446193
Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.
Melson, S and Kronstam, T (1999) An approach to infrastructure client projects. Engineering, Construction and Architectural Management, 6(1), pp. 71-77. ISSN 0969-9988
Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364
Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364
Meng, J; Yan, J and Xue, B (2018) Exploring relationships between national culture and infrastructure sustainability using QCA. Journal of Construction Engineering and Management, 144(9): 04018082, ISSN 0733-9364
Meng, X (2002) Guarantees for contractor's performance and owner's payment in China. Journal of Construction Engineering and Management, 128(3), pp. 232-237. ISSN 0733-9364
Merchant, A and Bajaj, D (2002) An analysis of the use of the "design-build" project delivery system by interior design firms, and its effectiveness in delivering fit-out projects. Journal of Construction Procurement, 8(1), pp. 17-34. ISSN 1358-9180
Mezher, T M and Tawil, W (1998) Causes of delay in the construction industry in Lebanon. Engineering, Construction and Architectural Management, 5(3), pp. 252-260. ISSN 0969-9988
Miao, J.; Shen, G. Q.; Fan, H. and Wang, G. (2026) Governing cross-regional collaborative innovation in construction: Evolutionary game insights from complex adaptive systems. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988
Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.
Milion, Raphael Negri (2019) Method for managing defects in residential buildings. PhD thesis, Universidade Federal de São Carlos, Brazil.
Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs. PhD thesis, Oklahoma State University, USA.
Minchin, R E; Hammons, M I and Ahn, J (2008) A construction quality index for highway construction. Construction Management and Economics, 26(12), pp. 1313-1324. ISSN 1466433X
Minchin, R E and Thomas, H R (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, 129(1), pp. 1-7. ISSN 0733-9364
Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364
Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364
Mincks, W R (2016) Career success for construction project managers: A qualitative study of construction project managers coping with stress to complete successful projects. PhD thesis, University of Idaho, USA.
Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988
Mirzaei, Z (2015) An investigation of methodologies to determine the most sustainable bridge work programs. DSc thesis, ETH Zürich, Switzerland.
Mis, N B; Joseph, R; Proverbs, D and Lamond, J (2015) Grass-root preparedness against potential flood risk among residential and commercial property holders. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 44-56. ISSN 1759-5916
Mishra, S (2009) Transportation infrastructure investment decision making under uncertainty and risk. PhD thesis, Wayne State University, USA.
Mistry, D and Davis, P R (2009) A client's perspective of critical success factors in project alliances. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Mitropoulos, P and Sanchez, R (2016) Criteria and considerations for project work structuring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 124-130. ISSN 17514304
Mlecnik, E (2013) Improving passive house certification: Recommendations based on end-user experiences. Architectural Engineering and Design Management, 9(4), pp. 250-264. ISSN 1745-2007
Mochtar, K (2000) Market-based pricing in construction. PhD thesis, Illinois Institute of Technology, USA.
Mochtar, K and Arditi, D (2001) Pricing strategy in the US construction industry. Construction Management and Economics, 19(4), pp. 405-415. ISSN 01446193
Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation, 19(2), pp. 256-279. ISSN 1471-4175
Mohamed, M (2022) A risk-based model for construction inspection in highways. PhD thesis, University of Kansas, USA.
Mohamed Sultan, A A B (2019) Decision tools for recycling with a focus on fibre reinforced composites. PhD thesis, University of Manchester, UK.
Mohamedein, S. M. and Nassar, A. H. (2026) Calculating cost contingency for residential construction projects in Egypt using a machine learning algorithm. International Journal of Construction Management, 26(9), pp. 1761-1776. ISSN 1562-3599
Molenaar, K; Washington, S and Diekmann, J (2000) Structural equation model of construction contract dispute potential. Journal of Construction Engineering and Management, 126(4), pp. 268-276. ISSN 0733-9364
Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.
Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364
Montague, A M (2017) Investigating women entrepreneurs in construction and their sense of belonging in a male dominated industry: A multiple-case study. DBA thesis, Northcentral University, USA.
Moore, R W (1981) California contractors licensing schools: A study of occupational licensure and training. PhD thesis, University of California, Los Angeles, USA.
Moreira, Lorena Claudia de Souza (2018) The building owner's manual assisted by augmented reality. PhD thesis, Universidade Estadual de Campinas, Brazil.
Morgan, J (2009) Housing and security in England and Wales: Casualisation revisited. International Journal of Law in the Built Environment, 1(1), pp. 42-58. ISSN 1756-1450
Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988
Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029
Mostafavi, A and Karamouz, M (2010) Selecting appropriate project delivery system: Fuzzy approach with risk analysis. Journal of Construction Engineering and Management, 136(8), pp. 923-930. ISSN 0733-9364
Motiar Rahman, M and Kumaraswamy, M M (2002) Risk management trends in the construction industry: Moving towards joint risk management. Engineering, Construction and Architectural Management, 9(2), pp. 131-151. ISSN 0969-9988
Moua, B and Russell, J S (2001) Comparison of two maintainability programs. Journal of Construction Engineering and Management, 127(3), pp. 239-244. ISSN 0733-9364
Moura, H and Teixeira, J C (2007) Types of construction claims: A Portuguese survey. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Mousavi, E; Gajjar, D; Sharma, V and Patel, S (2023) Use of network analysis to study regional footprint for construction coating applicators. International Journal of Construction Management, 23(6), pp. 1021-1029. ISSN 1562-3599
Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.
Mselle, J and Sanga, S A (2018) Constraints facing incremental housing construction in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 23(1), pp. 1-20. ISSN 1823-6499
Muianga, Elisa Atália Daniel (2018) Evolutionary model for IPD implementation in construction projects with little diffusion of collaborative practices. PhD thesis, Universidade Estadual de Campinas, Brazil.
Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.
Mukopfa, C (2021) Strategies to sustain small construction businesses beyond the first 5 years of operation. DBA thesis, Walden University, USA.
Mulholland, S M; Boffy-Ramirez, E and Clevenger, C M (2026) Incentives and effort elicitation in construction contracting: Modeling strategic behavior under DBB and CMR/GMP contracts. Construction Management and Economics, 44(2), pp. 143-158. ISSN 0144-6193
Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.
Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.
Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2020) BIM-based operational information requirements for asset owners. Architectural Engineering and Design Management, 16(2), pp. 100-114. ISSN 1745-2007
Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2021) BIM business value for asset owners: Key issues and challenges. International Journal of Building Pathology and Adaptation, 39(1), pp. 135-151. ISSN 23984708
Munir, M; Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(6), pp. 1171-1191. ISSN 0969-9988
Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.
Murphy, R (2011) Strategic planning in Irish quantity surveying practices. PhD thesis, Heriot-Watt University, UK.
Murray, Alex (2018) Returns on public capital investment: Procurement, whole life cost and value in English schools and hospitals, from 1997-2012. PhD thesis, University College London, UK.
Murray, B and Smyth, H (2009) Barriers to franchise initiation for general contractors in US remodeling industry: A non-franchisor perspective. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Murray, B and Smyth, H (2011) Franchising in the US remodelling market: Growth opportunities and barriers faced by general contractors. Construction Management and Economics, 29(6), pp. 623-634. ISSN 1466433X
Murtagh, N R A H R (2015) Harnessing the motivations of architectural designers to engage with sustainable construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Murtaza, M B; Fisher, D J and Skibniewski, M J (1993) Knowledge-based approach to modular construction decision support. Journal of Construction Engineering and Management, 119(1), pp. 115-130. ISSN 0733-9364
Musabayana, J (2012) Small enterprise growth: The critical role of the owner-manager a case study of the construction sector in Gauteng, South Africa. DBL thesis, University of South Africa, South Africa.
Musallami, A A and Assaf, S (1996) Public owners' satisfaction with consultancy practices in Saudi Arabia. Building Research & Information, 24(3), pp. 148-151. ISSN 0961-3218
Mushtaha, E; Shamsuzzaman, M; Abdouli, S A; Hamdan, S and Soares, T G (2020) Application of the analytic hierarchy process to developing sustainability criteria and assessing heritage and modern buildings in the UAE. Architectural Engineering and Design Management, 16(5), pp. 329-355. ISSN 1745-2007
Musonda, I (2012) Construction health and safety (H&S) performance improvement: a client-centred model. PhD thesis, University of Johannesburg, South Africa.
Na, R (2013) Property rights analysis of building material pricing. PhD thesis, University of Hong Kong, Hong Kong.
Nabi, M A; El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(5): 04024024, ISSN 0733-9364
Naji, K K; Gunduz, M and Maki, O (2023) Development of a campus facility management operational framework using a modified Delphi method. Journal of Construction Engineering and Management, 149(7): 04023052, ISSN 0733-9364
Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats. PhD thesis, Purdue University, USA.
Nam, C H (1990) The process of product innovation in the building and heavy sectors of the U.S. construction industry. PhD thesis, Stanford University, USA.
Nam, C H; Gasiorowski, J G and Tatum, C B (1991) Microlevel study of integration in high-strength concrete innovation. Journal of Construction Engineering and Management, 117(2), pp. 294-309. ISSN 0733-9364
Nam, C H and Tatum, C B (1989) Toward understanding of product innovation process in construction. Journal of Construction Engineering and Management, 115(4), pp. 517-534. ISSN 0733-9364
Nam, C H and Tatum, C B (1992) Noncontractual methods of integration on construction projects. Journal of Construction Engineering and Management, 118(2), pp. 385-398. ISSN 0733-9364
Nam, C H and Tatum, C B (1992) Strategies for technology push: Lessons from construction innovations. Journal of Construction Engineering and Management, 118(3), pp. 507-524. ISSN 0733-9364
Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364
Ndekugri, I (2016) Late disputes and the NEC3 Engineering and Construction Contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 65-76. ISSN 17514304
Ndekugri, I; Braimah, N and Gameson, R (2008) Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9), pp. 692-700. ISSN 0733-9364
Ndekugri, I; Daeche, H and Zhou, D (2013) The project insurance option in infrastructure procurement. Engineering, Construction and Architectural Management, 20(3), pp. 267-289. ISSN 0969-9988
Ndlela, W H Z (2022) Dynamic challenges facing SME consulting firms in the built environment sector in Kwazulu-Natal province: The entrepreneurial approach. DBA thesis, University of Liverpool, UK.
Neeraj, S; Mannakkara, S and Wilkinson, S (2020) Build back better concepts for resilient recovery: A case study of India's 2018 flood recovery. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 280-294. ISSN 1759-5916
Netto, A M (2001) Third party rights for latent defects in buildings. PhD thesis, King's College London, UK.
Neufville, R D and Smith, J T (1994) Improving contractors' bids using preference reversal phenomenon. Journal of Construction Engineering and Management, 120(4), pp. 706-719. ISSN 0733-9364
Neuman, Y; Alves, T D C L; Walsh, K D and Needy, K L (2015) Quantitative analysis of supplier quality surveillance practices in EPC projects. Journal of Construction Engineering and Management, 141(11): 04015039, ISSN 0733-9364
Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.
Nezami, M R; de Bruijne, M L C; Hertogh, M J C M and Bakker, H L M (2024) Assessment criteria for inter-organizational collaboration in interconnected infrastructure projects. Engineering, Construction and Architectural Management, 31(9), pp. 3456-3478. ISSN 0969-9988
Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.
Nguyen, H D; Nguyen, L D; Chih, Y Y and Le-Hoai, L (2017) Influence of participants' characteristics on sustainable building practices in emerging economies: Empirical case study. Journal of Construction Engineering and Management, 143(8): 05017014, ISSN 0733-9364
Nguyen, Hai N (2010) The impact of leadership behaviours and organisational culture on knowledge management practices in small and medium enterprises. PhD thesis, Griffith University, Australia.
Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364
Nguyen, P H D; Lines, B C and Tran, D Q (2018) Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. Journal of Construction Engineering and Management, 144(10): 04018093, ISSN 0733-9364
Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X
Nguyen, T A; Le, N M U; Nguyen, S H and Ngo, N V (2024) Determining the Frequency of Component with Building Information Modelling-Level of Development in Facility Management: A Case Study in Vietnam. Journal of Construction in Developing Countries, 29(2), pp. 157-180. ISSN 1823-6499
Nguyen, T H; Shehab, T and Gao, Z (2008) Selecting an architecture-engineering team by using fuzzy set theory. Engineering, Construction and Architectural Management, 15(3), pp. 282-298. ISSN 0969-9988
Nguyen, T P and Chileshe, N (2015) Revisiting the construction project failure factors in Vietnam. Built Environment Project and Asset Management, 5(4), pp. 398-416. ISSN 2044-124X
Nguyen T P, C N (2013) Revisiting the critical factors causing failure of construction projects in Vietnam. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Nicol, L A (2011) The role of institutional regimes in motivating change for sustainable housing. Building Research & Information, 39(5), pp. 459-472. ISSN 0961-3218
Nielsen, Y and Özbay, F O (2000) Information flow models for large scale public projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Nikellis, A (2019) Risk-informed decision making for civil infrastructure subjected to single and multiple hazards. PhD thesis, State University of New York at Buffalo, USA.
Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.
Niknam, M (2015) A semantics-based approach to construction cost estimating. PhD thesis, Marquette University, USA.
Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2001) Constructability implementation: A survey in the Malaysian construction industry. Construction Management and Economics, 19(8), pp. 819-829. ISSN 01446193
Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2004) Constructability concepts in Kuala Selangor cable-stayed bridge in Malaysia. Journal of Construction Engineering and Management, 130(3), pp. 315-321. ISSN 0733-9364
Nishida, Y; Hua, Y and Okamoto, N (2016) Alternative building emission-reduction measure: Outcomes from the Tokyo cap-and-trade program. Building Research & Information, 44(5-6), pp. 644-659. ISSN 0961-3218
Nouri, H; Safehian, M and Mir Mohammad Hosseini, S M (2023) Life cycle assessment of earthen materials for low-cost housing a comparison between rammed earth and fired clay bricks. International Journal of Building Pathology and Adaptation, 41(2), pp. 364-377. ISSN 23984708
O'Connor, J T; Choi, J O and Winkler, M (2016) Critical success factors for commissioning and start-up of capital projects. Journal of Construction Engineering and Management, 142(11): 04016060, ISSN 0733-9364
O'Connor, J T; O'Brien, W J and Choi, J O (2014) Critical success factors and enablers for optimum and maximum industrial modularization. Journal of Construction Engineering and Management, 140(6): 4014012, ISSN 0733-9364
O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364
Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387
Oduyemi, O; Okoroh, M and Dean, A (2015) Developing an artificial neural network model for life cycle costing in buildings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ofori-Boadu, A N; Shofoluwe, M A and Pyle, R (2017) Development of a housing eligibility assessment scoring method for low-income urgent repair programs. International Journal of Building Pathology and Adaptation, 35(3), pp. 194-217.
Ogbu, C P (2017) Building quality condition and maintenance cost: The case of public low income housing in Abia State, Nigeria. Journal of Construction Business and Management, 1(2), pp. 24-34. ISSN 2521-0165
Ogbu, C P and Olatunde, N (2019) Relationship between organisational effectiveness and project performance of SME contractors: A developing country perspective. Journal of Construction Business and Management, 3(2), pp. 1-16. ISSN 2521-0165
Oglesby, C H (1990) Dilemmas facing construction education and research in 1990s. Journal of Construction Engineering and Management, 116(1), pp. 4-17. ISSN 0733-9364
Ogwueleka, A C and Maritz, M J (2016) Modeling for incentive payoffs in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(3), pp. 543-562.
Oh, E H; Naderpajouh, N; Hastak, M and Gokhale, S (2016) Integration of the construction knowledge and expertise in front-end planning. Journal of Construction Engineering and Management, 142(2): 04015067, ISSN 0733-9364
Ohrn, G (2009) The influence of job-order-contracting as a construction project delivery method on owner satisfaction. PhD thesis, Indiana State University, USA.
Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387
Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988
Oladapo, A A (2007) A quantitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and Technology, 5(1), pp. 35-48. ISSN 1726-0531
Oladunjoye, O A; Proverbs, D G; Collins, B and Xiao, H (2020) A cost-benefit analysis model for the retrofit of sustainable urban drainage systems towards improved flood risk mitigation. International Journal of Building Pathology and Adaptation, 38(3), pp. 423-439. ISSN 23984708
Olander, S (2006) External stakeholder analysis in construction project management. PhD thesis, Lund University, Sweden.
Olanipekun, A O; Xia, B; Hon, C and Hu, Y (2017) Project owners' motivation for delivering green building projects. Journal of Construction Engineering and Management, 143(9): 04017068, ISSN 0733-9364
Olanipekun, Ayokunle Olubunmi (2017) Motivating project owners to increase their commitment towards improving the delivery performance of green building projects. PhD thesis, Queensland University of Technology, Australia.
Olatunji, O A and Akanmu, A (2015) BIM-FM and consequential loss: How consequential can design models be? Built Environment Project and Asset Management, 5(3), pp. 304-317. ISSN 2044-124X
Oliva, C A; Granja, A D and Picchi, F A (2024) Target value design: Guidelines for implementation in the real estate market in Brazil. Architectural Engineering and Design Management, 20(6), pp. 1323-1334. ISSN 1745-2007
Oliveira, Otávio José de (2005) Management model for small building design firms. PhD thesis, Universidade de São Paulo, Brazil.
Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.
Oputa, N B (2017) Project managers' strategies for megaproject success. PhD thesis, Walden University, USA.
Orczyk, J J (1989) Parametric construction scheduling. PhD thesis, Purdue University, USA.
Ormeño Zender, Y and García de Soto, B (2021) Use of scrum in the rehabilitation of a commercial building in Peru. Construction Innovation, 21(2), pp. 145-163. ISSN 1471-4175
Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.
Osuizugbo, I C; Okolie, K C and Oshodi, O S (2024) Factors supporting the implementation of buildability assessment as a tool for buildability improvement. Journal of Engineering, Design and Technology, 22(3), pp. 879-900. ISSN 1726-0531
Osuizugbo, I C; Okolie, K C and Oyeyipo, O O (2023) Factors influencing buildability assessment implementation in the Nigerian construction industry. Construction Innovation, 23(5), pp. 917-938. ISSN 1471-4175
Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.
Oti, A H; Tah, J H M and Abanda, F H (2018) Integration of lessons learned knowledge in building information modeling. Journal of Construction Engineering and Management, 144(9): 04018081, ISSN 0733-9364
Ouma, L A; Castronovo, F; Rupinder, K and Leicht, R (2026) Assessment instrument for lean journeys in integrated project delivery: Lean learning health assessment (llha). Engineering, Construction and Architectural Management, 33(15), pp. 47-71. ISSN 0969-9988
Oviedo-Haito, R J; Jiménez, J; Cardoso, F F and Pellicer, E (2014) Survival factors for subcontractors in economic downturns. Journal of Construction Engineering and Management, 140(3): 4013056, ISSN 0733-9364
Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.
Oyedele, L O (2010) Sustaining architects' and engineers' motivation in design firms: An investigation of critical success factors. Engineering, Construction and Architectural Management, 17(2), pp. 180-196. ISSN 0969-9988
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988
Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Oyetunji, A A (2001) Methodology for selecting project delivery and contract strategies for capital projects. PhD thesis, Texas A&M University, USA.
Oyewobi, L; Adedayo, O F; Olorunyomi, S O and Jimoh, R A (2023) Influence of social media adoption on the performance of construction small and medium-sized enterprises (SMEs) in Abuja: Nigeria. Engineering, Construction and Architectural Management, 30(9), pp. 4229-4252. ISSN 0969-9988
Oyewobi, L O; Olorunyomi, O S; Jimoh, R A and Rotimi, J O B (2020) Impact of social media usage on performance of construction businesses (CBS) in Abuja, Nigeria. Journal of Financial Management of Property and Construction, 26(2), pp. 257-278. ISSN 1366-4387
Oyewobi, L O; Windapo, A and Rotimi, J O B (2016) Relationship between decision-making style, competitive strategies and organisational performance among construction organisations. Journal of Engineering, Design and Technology, 14(4), pp. 713-738.
Ozols, R and Fortune, C (2012) Towards the identification of factors affecting the development of small sized construction contacting organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
O’Connor, J T and Davis, V S (1988) Constructability improvement during field operations. Journal of Construction Engineering and Management, 114(4), pp. 548-564. ISSN 0733-9364
Palmer, K (2012) Local authority liability in New Zealand for defective homes. International Journal of Law in the Built Environment, 4(3), pp. 203-216. ISSN 17561469
Pan, J; Vorvoreanu, M and Zhou, Z (2014) Social media adoption in disaster restoration industry. Construction Innovation, 14(3), pp. 346-369. ISSN 1471-4175
Pan, P; Wang, Y; Yang, Y and Zhang, S (2025) Conceptualization and measurement of owner BIM capabilities: From a project owner organization perspective. Engineering, Construction and Architectural Management, 32(6), pp. 3963-3997. ISSN 0969-9988
Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.
Parvaneh, F and El-Sayegh, S M (2016) Project selection using the combined approach of AHP and LP. Journal of Financial Management of Property and Construction, 21(1), pp. 39-53. ISSN 1366-4387
Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.
Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X
Patacas, J (2019) A framework and common data environment for the development and management of asset information models. PhD thesis, Teesside University, UK.
Paterson, Ian (1981) Contractors' risk and insurance in the Australian building industry. PhD thesis, University of New South Wales, Australia.
Pathak, C (2021) Electric vehicle infrastructure decision support system. PhD thesis, University of Washington, USA.
Patil, S S (2000) Optimal owner contractor relationships based on capital project competencies. PhD thesis, Texas A&M University, USA.
Patlakas, P; Musso, M and Larkham, P (2022) A digital curation model for post-occupancy evaluation data. Architectural Engineering and Design Management, 18(2), pp. 128-148. ISSN 1745-2007
Paullin, R J (1977) Construction management: Implications for intermediate school district boards of education and administrators in Michigan. PhD thesis, Michigan State University, USA.
Paulson, B C and Fondahl, J W (1983) Craft jurisdiction impact on construction. Journal of Construction Engineering and Management, 109(4), pp. 369-386. ISSN 0733-9364
Pavard, A.; de Paula, N. and Poirier, E. (2026) Organizational competencies for BIM adoption: A cross-field analysis in the built asset industry. Construction Innovation, 26(4), pp. 1118-1140. ISSN 1471-4175
Pavlovas, V (2006) Energy savings in existing Swedish apartment buildings: Some aspects on demand controlled ventilation and individual metering. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Pekkonen, M; Turunen, M and Haverinen-Shaughnessy, U (2018) Housing quality perceptions in Finland: The elderly population. Building Research & Information, 46(4), pp. 417-429. ISSN 0961-3218
Peltokorpi, A; Olivieri, H; Granja, A D and Seppänen, O (2018) Categorizing modularization strategies to achieve various objectives of building investments. Construction Management and Economics, 36(1), pp. 32-48. ISSN 01446193
Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.
Perkins, R A (2009) Sources of changes in design: build contracts for a governmental owner. Journal of Construction Engineering and Management, 135(7), pp. 588-593. ISSN 0733-9364
Perkinson, G M; Sanvido, V E and Grobler, F (1994) A facility programming information framework. Engineering, Construction and Architectural Management, 1(1), pp. 69-84. ISSN 0969-9988
Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.
Pesantes-Tavares, E R (2011) Construction worker health: A web-based approach to selecting alternatives to hazardous procedures. PhD thesis, University of Florida, USA.
Pesek, A E (2017) Impact of construction document deficiencies on heavy/civil low-bid infrastructure projects and the introduction of a contractor document review assessment. PhD thesis, Arizona State University, USA.
Petersen, D and Kadefors, A (2016) Social procurement and employment requirements in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Pham, V H S and Phan, K A (2023) Elaboration of willingness to pay and compensation demanded for costly bid preparation. International Journal of Construction Management, 23(7), pp. 1131-1137. ISSN 1562-3599
Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.
Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.
Pinder, J and Wilkinson, S J (2000) The obsolescence of office property: A new research agenda. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.
Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364
Piña, A E; Lu, S L and Phua, F T T (2021) Women owner-managers of small construction firms: A complementary perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Piña, A E; Lu, S L and Phua, F T T (2022) Exploring the lived experience of women owner-managers of small construction firms: A social identity approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Plat, H T (1996) Property values and implications of refurbishment costs. Journal of Financial Management of Property and Construction, 1(2), pp. 57-64. ISSN 1366-4387
Ploeger, H and Groetelaers, D (2014) Managing multi-owned, mixed-use developments in the Netherlands: The opinion of professional managing agents. International Journal of Law in the Built Environment, 6(3), pp. 271-285. ISSN 1756-1450
Plugge, P W (2007) An evidence-based comparison of construction project delivery. PhD thesis, Colorado State University, USA.
Pocock, J B; Kuennen, S T; Gambatese, J and Rauschkolb, J (2006) Constructability state of practice report. Journal of Construction Engineering and Management, 132(4), pp. 373-383. ISSN 0733-9364
Polat, G and Donmez, U (2010) ANP-based marketing activity selection model for construction companies. Construction Innovation, 10(1), pp. 89-111. ISSN 1471-4175
Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation. PhD thesis, Queensland University of Technology, Australia.
Pontikis, K L (1998) Apartment building process: The design and construction of the korinthos apartment building in Cyprus. PhD thesis, University of California, Berkeley, USA.
Prasad, K V; Vasugi, V; Venkatesan, R and Bhat, N S (2019) Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), pp. 216-238. ISSN 1557-8771
Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387
Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.
Primdahl, M B; Forman, M; Frandsen, A F; Pihl, D and Nielsen, A K B (2022) Does the enactment of information and communications technology agreements in a digital construction organisation impact the mental work environment? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Prince, M W (1992) Implications of perception and strategy for engineers in construction management. Construction Management and Economics, 10(2), pp. 93-105. ISSN 01446193
Pryke, S D; Zagkli, G and Kougia, I (2011) Resource provision ego-networks in small Greek construction firms. Building Research & Information, 39(6), pp. 616-636. ISSN 0961-3218
Pärn, E A and Edwards, D (2017) Vision and advocacy of optoelectronic technology developments in the AECO sector. Built Environment Project and Asset Management, 7(3), pp. 330-348. ISSN 2044-124X
Qian, Q and Zhang, L (2018) Impact of regulatory focus on choice of project-governance modes: Role of tolerance of opportunistic behavior. Journal of Construction Engineering and Management, 144(8): 04018070, ISSN 0733-9364
Quigley, D; Perara, S and Heaney, G (2007) Identifying the optimum balance across capital, life-cycle and environmental costs in new build construction projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Rachid, Z; Toufik, B and Mohammed, B (2019) Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), pp. 371-381. ISSN 1562-3599
Radtke, M W and Russell, J S (1993) Project-level model process for implementing constructability. Journal of Construction Engineering and Management, 119(4), pp. 813-831. ISSN 0733-9364
Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.
Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(4), pp. 365-375. ISSN 01446193
Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Rajendran, S (2007) Sustainable construction safety and health rating system. PhD thesis, Oregon State University, USA.
Rajendran, S; Gambatese, J A and Behm, M G (2009) Impact of green building design and construction on worker safety and health. Journal of Construction Engineering and Management, 135(10), pp. 1058-1066. ISSN 0733-9364
Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Rana, V.; Singh, V.; Singh, A. R.; Rao, M. S. and Kashyap, K. (2026) Promoting real estate sensitivity among AEC students: A board game-based approach to applied learning. Architectural Engineering and Design Management, 22(1), pp. 149-167. ISSN 1745-2007
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Enforcement of liquidated damages. Journal of Construction Engineering and Management, 121(4), pp. 459-463. ISSN 0733-9364
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Have I reached substantial completion? Journal of Construction Engineering and Management, 121(1), pp. 121-129. ISSN 0733-9364
Rankin, K; Suji, M; Pandey, B; Baniya, J; Hirslund, D V; Limbu, B; Rawal, N and Shneiderman, S (2026) Negotiating expertise in nepal's post-earthquake disaster reconstruction. Buildings & Cities, 7(1), pp. 1-19. ISSN 2632-6655
Raouf, A M I and Al-Ghamdi, S G (2019) Building information modelling and green buildings: Challenges and opportunities. Architectural Engineering and Design Management, 15(1), pp. 1-28. ISSN 1745-2007
Rasdorf, W; Grasso, B and Bridgers, M (2010) Public versus private perceptions on hiring an external program manager. Journal of Construction Engineering and Management, 136(2), pp. 219-226. ISSN 0733-9364
Rashed, Y; Omrani, S; Nilsson, D and Drogemuller, R (2024) Sustainability promotion through information provision: the perspective of Australian apartment owners and renters. Building Research & Information, 52(8), pp. 923-940. ISSN 0961-3218
Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X
Razak, D S A; Mills, G and Roberts, A (2018) How do infrastructure owners build capabilities to reduce operational failure? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Razia, B; Larkham, P and Thurairajah, N (2019) Risk assessment and risk engagement in the construction industry within conflict zones. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364
Ren, Z; Anumba, C J and Ugwu, O (2000) Towards a multi-agent system for construction claims negotiation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.
Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364
Ribeiro, F L (1998) Delivering large scale building projects: a case study. Journal of Construction Procurement, 4(2), pp. 77-88. ISSN 1358-9180
Ribeiro, F L (1998) Project delivery methods for large scale building projects: A case study. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Rich, F A (2020) Managing the wear of heavy construction equipment steel track undercarriage by soil sand content. PhD thesis, Indiana State University, USA.
Rich, K (2011) Design and construction process of two LEED certified university buildings: A collective case study. PhD thesis, University of Missouri - Columbia, USA.
Riel, Paul E (2015) Campus planners' preferences for residence hall project delivery methods. EdD thesis, University of North Florida, USA.
Riemer, J W (1975) On building buildings: The social organization of a transitional work setting. PhD thesis, University of New Hampshire, USA.
Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364
Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.
Robertson, C M (2018) Migrant worker perceptions of life, work, health and safety in Kuwait: A construction industry perspective. PhD thesis, Auckland University of Technology, New Zealand.
Rockow, Z R (2020) Qualitative & quantitative analyses of existing buildings’ adaptability. PhD thesis, Clemson University, USA.
Rockow, Z R and Ross, B E (2020) An areal openness model (AOM) for quantifying the "openness" of floor plans. International Journal of Building Pathology and Adaptation, 39(3), pp. 470-489. ISSN 23984708
Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175
Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan. PhD thesis, University of Michigan, USA.
Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.
Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364
Rojas Molina, E M (1997) Developing a web-centric process to support inspection. PhD thesis, University of Colorado at Boulder, USA.
Rosas Sanchez, L (2008) Application of game modeling to good tunneling practice. PhD thesis, University of Colorado at Boulder, USA.
Rosenfeld, Y (2014) Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1): 04013039, ISSN 0733-9364
Rotimi, F E; Tookey, J; Craig, N and Rotimi, J O B (2011) Opportunities for defect reporting in new residential buildings: A case for New Zealand. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.
Roussac, A C and Bright, S (2012) Improving environmental performance through innovative commercial leasing: An Australian case study. International Journal of Law in the Built Environment, 4(1), pp. 6-22. ISSN 1756-1450
Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364
Roza, C (2006) Environmental assessment: The Eden project. PhD thesis, University College London, UK.
Ruegg, R T and Fuller, S K (1985) The economics of fire protection: Fast-response residential sprinklers. Construction Management and Economics, 3(1), pp. 43-57. ISSN 01446193
Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364
Rukwaro, R W and Kieti, R M (2019) Spatial design parameters for residential extensions: The case of Buru Buru estate in Nairobi, Kenya. Architectural Engineering and Design Management, 15(1), pp. 29-47. ISSN 1745-2007
Ruokamo, E; Tikkanen, T; Lukkarinen, J and Karhinen, S (2026) Energy retrofits in shared ownership: Exploring motivations in Finnish housing companies. Building Research & Information, 54(3), pp. 289-305. ISSN 0961-3218
Ruokolainen, A and Plat, H T (1998) A system for allocating of private home owners' annual budget to housing. Journal of Financial Management of Property and Construction, 3(3), pp. 37-48. ISSN 1366-4387
Russell, J S and Gugel, J G (1993) Comparison of two corporate constructability programs. Journal of Construction Engineering and Management, 119(4), pp. 769-784. ISSN 0733-9364
Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364
Russell, J S; Hancher, D E and Skibniewski, M J (1992) Contractor prequalification data for construction owners. Construction Management and Economics, 10(2), pp. 117-135. ISSN 01446193
Russell, J S and Jaselskis, E J (1992) Predicting construction contractor failure prior to contract award. Journal of Construction Engineering and Management, 118(4), pp. 791-811. ISSN 0733-9364
Russell, J S and Jaselskis, E J (1992) Quantitative study of contractor evaluation programs and their impact. Journal of Construction Engineering and Management, 118(3), pp. 612-624. ISSN 0733-9364
Russell, J S; Jaselskis, E J and Lawrence, S P (1997) Continuous assessment of project performance. Journal of Construction Engineering and Management, 123(1), pp. 64-71. ISSN 0733-9364
Russell, J S; Skibniewski, M J and Cozier, D R (1990) Qualifier-2: Knowledge-based system for contractor prequalification. Journal of Construction Engineering and Management, 116(1), pp. 157-171. ISSN 0733-9364
Rybkowski, Z K; Arroyo, P and Parrish, K (2022) Assessment of current target value design practices: Consistencies and inconsistencies of application. Construction Management and Economics, 40(7-8), pp. 598-617. ISSN 01446193
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218
Sadri, S L (1993) An integrated information system for building construction projects. PhD thesis, Georgia Institute of Technology, USA.
Sadrinooshabadi, S; Taheri, A; Yitmen, I and Jongeling, R (2021) Requirement management in a life cycle perspective based on ISO 19650-1 and coclass as the new classification system in Sweden. Engineering, Construction and Architectural Management, 28(9), pp. 2736-2753. ISSN 0969-9988
Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.
Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X
Safari, M (2019) A regenerative approach to development and construction of building energy retrofit projects. PhD thesis, Pennsylvania State University, USA.
Sagoo, G S (2016) Attitudes and perceptions of construction business owners on the effect of immigration within the West London construction business community. PhD thesis, Swiss Management Center, Switzerland.
Salary, S and Reyes, M (2025) Identifying the impact of preconstruction elements on project budget. Journal of Construction Engineering and Management, 151(6): 04025058, ISSN 0733-9364
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Salih, F; Eissa, R and El-Adaway, I H (2024) Data-driven analysis of progressive design build in water and wastewater infrastructure projects. Journal of Construction Engineering and Management, 150(1): 04023149, ISSN 0733-9364
Salleh, Rohaniyati (2009) Critical success factors of project management for Brunei construction projects: Improving project performance. PhD thesis, Queensland University of Technology, Australia.
Salman, S H (1991) Planning and control in the small business: Case studies from construction industry. PhD thesis, Swansea University, UK.
Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499
San Cristóbal, J R (2012) Contractor selection using multicriteria decision-making methods. Journal of Construction Engineering and Management, 138(6), pp. 751-758. ISSN 0733-9364
Sanders, C H and Phillipson, M C (2003) UK adaptation strategy and technical measures: The impacts of climate change on buildings. Building Research & Information, 31(3-4), pp. 210-221. ISSN 0961-3218
Sanga, S A and Lucian, C (2016) Cost shares and factor-cost ratios in owner-built incremental housing in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 21(1), pp. 113-130. ISSN 1823-6499
Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.
Santoso, D S and Bourpanus, N (2019) Moving to e-bidding: Examining the changes in the bidding process and the bid mark-up decisions of Thai contractors. Journal of Financial Management of Property and Construction, 24(1), pp. 2-18. ISSN 1366-4387
Sanvido, V; Grobler, F; Parfitt, K; Guvenis, M and Coyle, M (1992) Critical success factors for construction projects. Journal of Construction Engineering and Management, 118(1), pp. 94-111. ISSN 0733-9364
Satterfield, J H (2020) Strategies for improving the performance of multigenerational cohorts in the construction industry. PhD thesis, Walden University, USA.
Saunders, L W (2013) Measuring safety attitude differences in the construction supply chain. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Savicky, J (2023) Exploration of solicitation optimization within the built environment. PhD thesis, Arizona State University, USA.
Sawalhi, N and Enshassi, A (2005) Application of project time management tools and techniques to the construction industry in the Gaza Strip. Construction Economics and Building, 5(1), pp. 1-8. ISSN 2204-9029
Sayed, A M Z; Assaf, S; Aldosary, A S; Hassanain, M A and Abdallah, A (2020) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(1), pp. 16-27. ISSN 2044-124X
Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988
Schexnayder, C and Ohrn, L G (1997) Highway specifications: quality versus pay. Journal of Construction Engineering and Management, 123(4), pp. 437-443. ISSN 0733-9364
Schexnayder, C J; Weber, S L and David, S A (2004) Transportation agency use of owner-controlled insurance programs. Journal of Construction Engineering and Management, 130(4), pp. 517-524. ISSN 0733-9364
Schlick, H (1983) Temporary heating in construction contracts. Journal of Construction Engineering and Management, 109(4), pp. 447-459. ISSN 0733-9364
Schlick, H (1986) Construction of semi-prefabricated masonry facade. Journal of Construction Engineering and Management, 112(1), pp. 62-68. ISSN 0733-9364
Schnabel, J J and Martin, R E (1983) Parking garage supported on structural fill. Journal of Construction Engineering and Management, 109(3), pp. 286-296. ISSN 0733-9364
Seek, Ngee Huat (1981) Modification of the existing housing stock: A study of housing adjustments through home improvement. PhD thesis, Australian National University, Australia.
Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.
Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364
Selman, A D; Guðjónsdóttir, S and Gade, A N (2021) Is the Danish construction sector ready for sustainable and circular construction sites? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Selman, A D; Heiselberg, H L and Gade, A N (2021) Attitudes towards using wood in the Danish building sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(1), pp. 61-77. ISSN 0969-9988
Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364
Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),
Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.
Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364
Serpell, A F (2004) Towards a knowledge-based assessment of conceptual cost estimates. Building Research & Information, 32(2), pp. 157-164. ISSN 0961-3218
Sexton, M and Barrett, P (2003) Appropriate innovation in small construction firms. Construction Management and Economics, 21(6), pp. 623-633. ISSN 01446193
Sexton, M; Barrett, P S; Miozzo, M; Wharton, A and Leho, E (2001) Innovation in small construction firms: Is it just a frame of mind? In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Seyis, S; Ergen, E and Pizzi, E (2016) Identification of waste types and their root causes in green-building project delivery process. Journal of Construction Engineering and Management, 142(2): 04015059, ISSN 0733-9364
Shabani Ardakani, S and Nik-Bakht, M (2021) Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1): 1974, ISSN 0733-9364
Shabha, G; Barber, F and Laycock, P (2023) A qualitative assessment of the impact of smart homes and environmentally beneficial technologies on the UK 2050 net-zero carbon emission target. Smart and Sustainable Built Environment, 12(2), pp. 341-360. ISSN 2046-6099
Shafique, F (2020) Transformational leadership for sustainability in architecture engineering and construction project teams. PhD thesis, Michigan State University, USA.
Shaikh, S; Brown, A and Enegbuma, W I (2023) The role of disaster knowledge management in improving housing reconstruction outcomes: With particular reference to postearthquake reconstruction in Pakistan. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 314-331. ISSN 1759-5916
Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. PhD thesis, Georgia Institute of Technology, USA.
Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.
Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771
Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771
Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364
Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.
Shang, L and Abdel Aziz, A M (2020) Stackelberg game theory-based optimization model for design of payment mechanism in performance-based PPPs. Journal of Construction Engineering and Management, 146(4): 04020029, ISSN 0733-9364
Sharma, V; Caldas, C H and Mulva, S P (2020) Identification and prioritization of factors affecting the overall project cost of healthcare facilities. Journal of Construction Engineering and Management, 146(2): 04019106, ISSN 0733-9364
Sharma, V; Caldas, C H and Mulva, S P (2021) Development of metrics and an external benchmarking program for healthcare facilities. International Journal of Construction Management, 21(6), pp. 615-630. ISSN 1562-3599
Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599
She, Ling-Ye (2014) Understanding the conditions of trust between governance and management within project alliancing. PhD thesis, University of Melbourne, Australia.
Shearman, J; Hughes, W P; Gilchrist, R and Elwazani, S (2005) Strategies for reducing construction problems on archaeological sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Shebob, A (2012) Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya. PhD thesis, Teesside University, UK.
Shehadeh, A; Alshboul, O and Hamedat, O (2022) Risk assessment model for optimal gain-pain share ratio in target cost contract for construction projects. Journal of Construction Engineering and Management, 148(2): 04021197, ISSN 0733-9364
Shell, J F (2006) Decision-making strategies used by California school districts' chief business officials in the selection of construction management services as a project delivery system for construction projects over five million dollars. EdD thesis, University of La Verne, USA.
Sherratt, F; Dowsett, R and Sherratt, S (2020) Construction 4.0 and its potential impact on people working in the construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 145-152. ISSN 17514304
Shi, Q; Yao, L; Bi, C and Zhu, J (2025) Dynamic incentive mechanisms in mega project-risk management considering the participation of the insurance company. Engineering, Construction and Architectural Management, 32(9), pp. 5792-5813. ISSN 0969-9988
Shiers, D; Lavers, A and Keeping, M (2007) Indicators of the impact of environmental factors on UK construction law: Developments in the new millennium. Construction Management and Economics, 25(7), pp. 821-829. ISSN 1466433X
Shiha, A and El-Adaway, I H (2026) From ports to projects: Estimating the impact of supply chain volatility and trade policy changes on construction material prices. Journal of Construction Engineering and Management, 152(6): 04026064, ISSN 0733-9364
Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364
Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364
Shim, E (2008) The decision-making modeling for concurrent planning of construction projects. PhD thesis, Texas A&M University, USA.
Shin, K-C (2000) Identification of critical dispute characteristics (CDCs) during construction project operations. PhD thesis, Georgia Institute of Technology, USA.
Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988
Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218
Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: Executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(7), pp. 2665-2688. ISSN 0969-9988
Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988
Shrivas, A and Singla, H K (2022) Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 22(8), pp. 1455-1463. ISSN 1562-3599
Shuck, D W (1983) Design phase cost estimating. PhD thesis, Purdue University, USA.
Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175
Siehler, B A (1999) European construction companies as global players towards the new millennium. PhD thesis, University of South Wales, UK.
Siew, R Y J (2015) Alternative framework for assessing sustainable building funds: Green building fund. Building Research & Information, 43(2), pp. 160-169. ISSN 0961-3218
Sillars, D N and Kangari, R (1997) Japanese construction alliances. Journal of Construction Engineering and Management, 123(2), pp. 146-152. ISSN 0733-9364
Simmonds, D M (2015) Information technology and sustainability: An empirical study of the value of the building automation system. PhD thesis, University of South Florida, USA.
Simmons, K M and Sutter, D (2007) Tornado shelters and the housing market. Construction Management and Economics, 25(11), pp. 1119-1126. ISSN 01446193
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Sinesilassie, E G; Tripathi, K K; Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: Engineer's perspective. Engineering, Construction and Architectural Management, 26(10), pp. 2410-2431. ISSN 0969-9988
Sing, M C P; Luk, S Y Y; Chan, K H C; Liu, H J and Humphrey, R (2024) Scan-to-BIM technique in building maintenance projects: Practicing quantity take-off. International Journal of Building Pathology and Adaptation, 42(6), pp. 1250-1262. ISSN 2398-4708
Singer, H and Özşahin, Ş (2022) Prioritization of laminate flooring selection criteria from experts' perspectives: A spherical fuzzy AHP-based model. Architectural Engineering and Design Management, 18(6), pp. 911-926. ISSN 1745-2007
Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Slaughter, E S (2001) Design strategies to increase building flexibility. Building Research & Information, 29(3), pp. 208-217. ISSN 0961-3218
Smith, B W (2008) Temporary construction lighting of buildings: An evaluation of four techniques, both qualitative and quantitative. International Journal of Construction Education and Research, 4(2), pp. 132-149. ISSN 1557-8771
Smith, G R and Roth, R D (1991) Safety programs and the construction manager. Journal of Construction Engineering and Management, 117(2), pp. 360-371. ISSN 0733-9364
Smith, J P; Miller, K; Christofferson, J and Hutchings, M (2011) Best practices for dealing with price volatility in utah's residential construction market. International Journal of Construction Education and Research, 7(3), pp. 210-225. ISSN 1557-8771
Smolders, A L (2019) Trust unravelled: In inter-organisational relationships in a regulated tender environment. PhD thesis, Delft University of Technology, Netherlands.
Sodangi, M and Salman, A (2023) AHP-DEMATEL modelling of consultant related delay factors affecting sustainable housing construction in Saudi Arabia. International Journal of Construction Management, 23(16), pp. 2859-2868. ISSN 1562-3599
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Somiah, M K (2018) An integrated competitive advantage model for indigenous construction firms in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Somiah, M K; Aigbavboa, C and Thwala, W D (2021) Rethinking the attributes for competitive advantage of indigenous construction firms in developing countries: A Ghana study. International Journal of Construction Education and Research, 17(3), pp. 242-257. ISSN 1557-8771
Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.
Songer, A D (1992) Toward an improved understanding of public sector design-build planning. PhD thesis, University of California, Berkeley, USA.
Songer, A D and Ibbs, W C (1995) Managing requests for proposal development in public sector design-build. Journal of Construction Procurement, 1(1), pp. 64-80. ISSN 1358-9180
Songer, A D and Molenaar, K R (1997) Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123(1), pp. 34-40. ISSN 0733-9364
Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180
Songer, A D and Walker, B (2004) General contractor emotional intelligence in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Soon, J L (2021) CSR logics of owner-managers in SMEs: the case of Malaysia. PhD thesis, Kingston University, UK.
Sourav, M M I; Russedul Islam, M; Mohibur Rahman, S and Istiak Jahan, M (2025) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: Scenario of Bangladesh. Engineering, Construction and Architectural Management, 32(6), pp. 3883-3913. ISSN 0969-9988
Sparkling, A E (2018) Collaborative project delivery practices, goal alignment, and performance in architecture, engineering, and construction project teams. PhD thesis, Michigan State University, USA.
Spataru, C and Gauthier, S (2014) How to monitor people 'smartly' to help reducing energy consumption in buildings? Architectural Engineering and Design Management, 10(1-2), pp. 60-78. ISSN 1745-2007
Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives. PhD thesis, Pennsylvania State University, USA.
Staab, G E (1989) Construction of port and facilities on horn of Africa: lessons learned. Journal of Construction Engineering and Management, 115(1), pp. 53-69. ISSN 0733-9364
Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.
Steele, K (2003) A methodology to facilitate the environmental comparison of bridge management strategies. PhD thesis, University of Surrey, UK.
Stehn, L; Engström, S; Uusitalo, P and Lavikka, R (2021) Understanding industrialised house building as a company’s dynamic capabilities. Construction Innovation, 21(1), pp. 5-21. ISSN 1471-4175
Steiger, T L (1988) Working construction: Organization and control of the labor process. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.
Stenbeck, T (2008) Quantifying effects of incentives in a rail maintenance performance-based contract. Journal of Construction Engineering and Management, 134(4), pp. 265-272. ISSN 0733-9364
Stephens, P (1974) Builders' and plumbers' merchanting: an attribute study of organization, functions and performance. PhD thesis, University of Manchester, UK.
Stewart, W S and Tatum, C B (1988) Segmental placement of Renton outfall: Construction innovation. Journal of Construction Engineering and Management, 114(3), pp. 390-407. ISSN 0733-9364
Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(3), pp. 251-267. ISSN 01446193
Stone, M L; Johnson, P W and Leopard, T A (2011) Using design-based change orders as a lessons learned metric in university dormitory construction. International Journal of Construction Education and Research, 7(3), pp. 226-240. ISSN 1557-8771
Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.
Strachan, M E (2013) Energy-led, non-domestic building refurbishment: decision support for a whole-building approach to improvement of operational performance. PhD thesis, Heriot-Watt University, UK.
Stukhart, G (1984) Contractual incentives. Journal of Construction Engineering and Management, 110(1), pp. 34-42. ISSN 0733-9364
Stukhart, G (1987) Construction management responsibilities during design. Journal of Construction Engineering and Management, 113(1), pp. 90-98. ISSN 0733-9364
Stukhart, G and Cook, E L (1990) Bar-code standardization in industrial construction. Journal of Construction Engineering and Management, 116(3), pp. 416-431. ISSN 0733-9364
Sturts, C S (2001) Value-bidding: An integrative approach utilizing conjoint analysis and classical bidding theory. PhD thesis, Columbia University, USA.
Su, Y; Lucko, G and Thompson, R C (2018) Application of voting theory to the float ownership problem. Journal of Construction Engineering and Management, 144(1): 04017094, ISSN 0733-9364
Subedi, J; Ghimire, R M; Neupane, R P and Amatya, S (2016) Cost difference of buildings in Kathmandu constructed with and without earthquake safer features. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 444-459. ISSN 1759-5916
Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364
Sufianto, Heru (2013) A fire safety improvement framework for residential buildings: A socio-ecological behaviour modification approach. PhD thesis, University of New South Wales, Australia.
Suk, Sung Joon (2012) Analysis of project management attributes for the successful delivery of capital facility projects. PhD thesis, University of Texas at Austin, USA.
Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Sun, C; Wang, M; Man, Q and Wan, D (2023) Research on the BIM application mechanism of engineering-procurement-construction projects based on a tripartite evolutionary game. Journal of Construction Engineering and Management, 149(3): 04022182, ISSN 0733-9364
Sun, H; Wang, Y and Meng, J (2019) A trading and pricing method of expansion options for BOT freeway projects in China. Engineering, Construction and Architectural Management, 26(7), pp. 1406-1423. ISSN 0969-9988
Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity. PhD thesis, University of California, Berkeley, USA.
Sun, X (2016) Energy-efficient retrofits for existing buildings: a multi-dimensional, comparative study of buildings in Hong Kong, Shanghai and Singapore, with focus on operation and maintenance. PhD thesis, University of Hong Kong, Hong Kong.
Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.
Sundling, R (2019) A development process for extending buildings vertically – based on a case study of four extended buildings. Construction Innovation, 19(3), pp. 367-385. ISSN 1471-4175
Suprapto, M (2016) Collaborative contracting in projects. PhD thesis, Delft University of Technology, Netherlands.
Suriyanon, N; Sutheerawatthana, P; Kaewmoracharoen, M and Klansai, V (2023) The utility and value of contract terms: A case study on interior contractors. Construction Economics and Building, 23(1-2), pp. 77-94. ISSN 2204-9029
Swarup, L; Korkmaz, S and Riley, D (2011) Project delivery metrics for sustainable, high-performance buildings. Journal of Construction Engineering and Management, 137(12), pp. 1043-1051. ISSN 0733-9364
Synovec, T M (2020) A strategy to reduce total cost of ownership of the U.S. Air Force's airfield pavements. PhD thesis, Mississippi State University, USA.
Szentes, H and Eriksson, P E (2016) Paradoxical organizational tensions between control and flexibility when managing large infrastructure projects. Journal of Construction Engineering and Management, 142(4): 05015017, ISSN 0733-9364
Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364
Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors. PhD thesis, University of Wisconsin - Madison, USA.
Taheri Tafti, M and Tomlinson, R (2016) Long-term socio-spatial transformation of earthquake-affected neighbourhoods in Bhuj: Who stayed, who left and who moved in? International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 230-258. ISSN 1759-5916
Tahir, H A (2015) A project control framework for the Libyan construction industry. PhD thesis, Sheffield Hallam University, UK.
Tajaddini, A; Paydar, A; Abbasianjahromi, H and Azami, Z (2023) Analysis of the damage indexes of construction projects using a hybrid fuzzy method. International Journal of Construction Management, 23(10), pp. 1694-1703. ISSN 1562-3599
Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis. DEng thesis, George Washington University, USA.
Tallant, D J (1993) Privatization in a developing economy: Lessons from the Turkish cement industry. PhD thesis, Cornell University, USA.
Tamer, Z; Yoon, Y and Hastak, M (2012) Protocol for profitability analysis using internal entities in organizational structure of construction companies. Journal of Construction Engineering and Management, 138(12), pp. 1394-1402. ISSN 0733-9364
Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.
Tangwe, S and Simon, M (2019) Quantification of the viability of residential air source heat pump water heaters as potential replacement for geysers in South Africa. Journal of Engineering, Design and Technology, 17(2), pp. 456-470. ISSN 1726-0531
Tatum, C B (1986) Potential mechanisms for construction innovation. Journal of Construction Engineering and Management, 112(2), pp. 178-191. ISSN 0733-9364
Tatum, C B (1987) Improving constructibility during conceptual planning. Journal of Construction Engineering and Management, 113(2), pp. 191-207. ISSN 0733-9364
Tatum, C B (1987) Process or innovation in construction firm. Journal of Construction Engineering and Management, 113(4), pp. 648-663. ISSN 0733-9364
Tatum, C B (1989) Organizing to increase innovation in construction firms. Journal of Construction Engineering and Management, 115(4), pp. 602-617. ISSN 0733-9364
Tatum, C B; Bauer, M F and Meade, A W (1989) Process of innovation for up/down construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(2), pp. 179-195. ISSN 0733-9364
Taylor, T R B; Uddin, M; Goodrum, P M; McCoy, A and Shan, Y (2012) Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1360-1369. ISSN 0733-9364
Tchumtcha Wembe, P (2023) Managing stakeholders in engineering procurement construction management projects in Africa by Chinese project managers. International Journal of Construction Management, 23(2), pp. 329-337. ISSN 1562-3599
Tehami, M and Seddiki, M (2023) Investigation toward the adoption of building information modelling in Algeria from architects' perspective. Journal of Construction in Developing Countries, 28(2), pp. 329-352. ISSN 1823-6499
Teng, Y; Li, X; Wu, P and Wang, X (2019) Using cooperative game theory to determine profit distribution in IPD projects. International Journal of Construction Management, 19(1), pp. 32-45. ISSN 1562-3599
Teo, E A L and Harikrishna, N (2006) A quantitative model for efficient maintenance of plastered and painted façades. Construction Management and Economics, 24(12), pp. 1283-1293. ISSN 1466433X
Thabet, W and Lucas, J (2017) Asset data handover for a large educational institution: Case-study approach. Journal of Construction Engineering and Management, 143(11): 05017017, ISSN 0733-9364
Thomas, H R (2002) 2000 Peurifoy lecture: Construction practices in developing countries. Journal of Construction Engineering and Management, 128(1), pp. 1-7. ISSN 0733-9364
Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364
Thomas, H R; Smith, G R and Wright, D E (1990) Resolving disputes over contract notice requirements. Journal of Construction Engineering and Management, 116(4), pp. 738-755. ISSN 0733-9364
Thomas, H R; Smith, G R and Wright, D E (1991) Legal aspects of oral change orders. Journal of Construction Engineering and Management, 117(1), pp. 148-162. ISSN 0733-9364
Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364
Thompson, B P (2009) Investigation of system dynamics applied to building simulation for anti-terrorism resource allocation. PhD thesis, University of Wisconsin - Madison, USA.
Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Thomsen, A and Van Der Flier, K (2011) Understanding obsolescence: A conceptual model for buildings. Building Research & Information, 39(4), pp. 352-362. ISSN 0961-3218
Thorpe, D; Ryan, N and Charles, M B (2009) Innovation and small residential builders: An Australian study. Construction Innovation, 9(2), pp. 184-200. ISSN 1471-4175
Tian, Z; He, Q and Wang, T (2025) How to mobilize owner-dynamic capabilities in megaprojects? A tripartite evolutionary game approach. Engineering, Construction and Architectural Management, 32(3), pp. 1478-1498. ISSN 0969-9988
Tiellemans, N; Kemperman, A; Maussen, S and Arentze, T (2022) The influence of group decision-making on residents' preferences for sustainable energy measures of dwellings. Building Research & Information, 50(4), pp. 410-423. ISSN 0961-3218
Tinker, A and Burt, R (2004) "Greening" the construction curriculum. International Journal of Construction Education and Research, 1(1), pp. 26-33. ISSN 1557-8771
Tiong, R L K (1992) Strategies in risk management of on-demand guarantees. Journal of Construction Engineering and Management, 118(2), pp. 229-243. ISSN 0733-9364
Tokede, O; Boggavarapu, M K and Wamuziri, S (2023) Assessment of building retrofit scenarios using embodied energy and life cycle impact assessment. Built Environment Project and Asset Management, 13(5), pp. 666-681. ISSN 2044-124X
Touran, A (2010) Probabilistic approach for budgeting in portfolio of projects. Journal of Construction Engineering and Management, 136(3), pp. 361-366. ISSN 0733-9364
Touran, A; Atgun, M and Bhurisith, I (2004) Analysis of the United States department of transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), pp. 719-725. ISSN 0733-9364
Tozer, L; Macrae, H and Smit, E (2023) Achieving deep-energy retrofits for households in energy poverty. Buildings & Cities, 4(1), pp. 258-273. ISSN 2632-6655
Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364
Tran, D Q; Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(6), pp. 1319-1336. ISSN 0969-9988
Tran, H and Carmichael, D G (2012) The likelihood of subcontractor payment: Downstream progression via the owner and contractor. Journal of Financial Management of Property and Construction, 17(2), pp. 135-152. ISSN 1366-4387
Tran, H and Carmichael, D G (2013) A contractor's classification of owner payment practices. Engineering, Construction and Architectural Management, 20(1), pp. 29-45. ISSN 0969-9988
Tran, Hanh Van (2013) Contractor internal profiling of owners. PhD thesis, University of New South Wales, Australia.
Triana-Granados, K V; Bernard, I R; Merlin, A; Lucko, G and Ballesteros-Pérez, P (2024) Graphical delay tracking for linear and repetitive schedules. Journal of Construction Engineering and Management, 150(8): 04024090, ISSN 0733-9364
Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: An example analysis for Indonesia. Construction Management and Economics, 22(8), pp. 861-876. ISSN 01446193
Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.
Tripathi, K K (2018) Critical success factors for construction organizations in India. PhD thesis, Indian Institute of Technology Delhi, India.
Tryggestad, K; Hugosson, M and Søberg, P (2018) Managing risk and uncertainty in sustainable construction innovation: The role of the partnering contract. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Tsai, S L; Ochiai, C; Deng, C Z and Tseng, M H (2022) A sustainable post-disaster housing development framework for an indigenous hao-cha community in Taiwan: Considering culture and livelihood in housing extensions. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 583-600. ISSN 1759-5916
Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X
Tsenkova, S (1998) Private housebuilding and housing markets in transitional economies: The case of Bulgaria. PhD thesis, University of Toronto, Canada.
Tserng, H P; Liao, H H; Tsai, L K and Chen, P C (2011) Predicting construction contractor default with option-based credit models-models' performance and comparison with financial ratio models. Journal of Construction Engineering and Management, 137(6), pp. 412-420. ISSN 0733-9364
Tu, B; Zuo, J; Chang, R D; Webber, R J; Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: A China case study. Engineering, Construction and Architectural Management, 30(4), pp. 1321-1343. ISSN 0969-9988
Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364
Tuomela, A (2005) Network service organisation: interaction in workplace networks. PhD thesis, Helsinki University of Technology, Finland.
Turner, J R (2004) Farsighted project contract management: Incomplete in its entirety. Construction Management and Economics, 22(1), pp. 75-83. ISSN 01446193
Tymvios, N and Gambatese, J A (2016) Direction for generating interest for design for construction worker safety: a Delphi study. Journal of Construction Engineering and Management, 142(8): 4016024, ISSN 0733-9364
Tymvios, N and Gambatese, J A (2016) Perceptions about design for construction worker safety: Viewpoints from contractors, designers, and university facility owners. Journal of Construction Engineering and Management, 142(2): 04015078, ISSN 0733-9364
Uher, T and Brand, M (2007) A comparative analysis of the operation of 'compulsory rapid adjudication' in New South Wales and New Zealand. Construction Management and Economics, 25(7), pp. 765-775. ISSN 1466433X
Umeokafor, N (2017) An appraisal of the barriers to client involvement in health and safety in Nigeria's construction industry. Journal of Engineering, Design and Technology, 15(4), pp. 471-487.
Umeokafor, N (2018) An investigation into public and private clients' attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(6), pp. 798-815. ISSN 0969-9988
Uusitalo, P; Lappalainen, E; Seppänen, O; Pikas, E; Peltokorpi, A; Menzhinskii, N and Piitulainen, M (2021) To trust or not to trust: Is trust a prerequisite for solving design quality problems? Construction Management and Economics, 39(4), pp. 279-297. ISSN 01446193
Uzuegbunam, F O; Isiofia, L A and Ibem, E O (2024) Assessment of susceptibility of buildings with different façade finishes to microbial decay in the hot-humid tropical environment of enugu, southeast Nigeria. International Journal of Building Pathology and Adaptation, 42(6), pp. 1106-1125. ISSN 2398-4708
V Nithyapriyadharshini (2017) A study on the workplace issues faced by women labours in the construction industry in Chennai city. PhD thesis, Mother Teresa Womens University, India.
Vahanvati, M and Beza, B (2017) An owner-driven reconstruction in Bihar. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 306-319. ISSN 1759-5916
Vahanvati, M and Rafliana, I (2019) Reliability of build back better at enhancing resilience of communities. International Journal of Disaster Resilience in the Built Environment, 10(4), pp. 208-221. ISSN 1759-5916
Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.
Vaux, J S and Kirk, W M (2018) Relationship conflict in construction management: Performance and productivity problem. Journal of Construction Engineering and Management, 144(6): 1478, ISSN 0733-9364
Vaux, James S (2014) Relationship conflict in construction management and how it affects performance and profit. PhD thesis, Washington State University, USA.
Vecino, G A (2016) The feasibility of using web-based technology for the management of dredging projects. PhD thesis, University of Maryland, College Park, USA.
Venkataraman, V (2017) Investigating the impact of project management factors on green building project delivery using link analysis and system dynamics techniques. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Venkateswaran, C B and Murugasan, R (2017) Time delay and cost overrun of road over bridge construction projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 79-96. ISSN 1823-6499
Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.
Vinci, F (2022) Project-based networks in the delivery of infrastructure projects and programmes. PhD thesis, University College London, UK.
Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.
Vlatas, D A (1986) Owner and contractor review to reduce claims. Journal of Construction Engineering and Management, 112(1), pp. 104-111. ISSN 0733-9364
Volker, L; Scharpff, J C D; de Weerdt, M M and Herder, P M (2012) Designing a dynamic network-based approach for asset management activities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Vorster, M C and Sears, G A (1987) Model for retiring, replacing, or reassigning construction equipment. Journal of Construction Engineering and Management, 113(1), pp. 125-137. ISSN 0733-9364
Vu, H A; Cu, V H; Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(6), pp. 1018-1039. ISSN 0969-9988
Waara, F and Bröchner, J (2006) Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, 132(8), pp. 797-804. ISSN 0733-9364
Wah, T K (2018) Legal analysis of construction defect claims within common law jurisdictions for Malaysia. PhD thesis, University of Malaya, Malaysia.
Wakchaure, S S and Jha, K N (2012) Determination of bridge health index using analytical hierarchy process. Construction Management and Economics, 30(2), pp. 133-149. ISSN 1466433X
Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988
Walker, D and Lloyd-Walker, B (2011) Knowledge, skills and attributes of project alliances managers in Australasia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Walker, G; Brown, S and Neven, L (2016) Thermal comfort in care homes: Vulnerability, responsibility and 'thermal care'. Building Research & Information, 44(2), pp. 135-146. ISSN 0961-3218
Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364
Wang, L.; Hwang, J.; Han, K. and Gupta, A. (2026) Generative AI-assisted compliance checking for construction requirements. Journal of Construction Engineering and Management, 152(8): 04026117, ISSN 0733-9364
Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771
Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y and Ashuri, B (2023) Data-driven assessment on the corporate credit scoring mechanism for Chinese construction supervision companies. Construction Management and Economics, 41(11-12), pp. 961-975. ISSN 01446193
Wang, J; Wang, X; Shou, W and Xu, B (2014) Integrating BIM and augmented reality for interactive architectural visualisation. Construction Innovation, 14(4), pp. 453-476. ISSN 1471-4175
Wang, R; Lu, W and Wei, Y (2021) Owners' use of contract-based power in construction project transactions: Restrictions from process specificity and uncertainty. Construction Management and Economics, 39(2), pp. 117-132. ISSN 01446193
Wang, S; Tang, W and Li, Y (2013) Relationship between owners' capabilities and project performance on development of hydropower projects in China. Journal of Construction Engineering and Management, 139(9), pp. 1168-1178. ISSN 0733-9364
Wang, W C (2002) Sim-utility: Model for project ceiling price determination. Journal of Construction Engineering and Management, 128(1), pp. 76-84. ISSN 0733-9364
Wang, W C (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), pp. 455-460. ISSN 0733-9364
Wang, X; Yin, Y and Xu, Z (2022) The influence of trust networks on public–private partnership project performance. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 65-74. ISSN 17514304
Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.
Wang, Y (2017) Zero incident safety management for continued safety improvement. PhD thesis, Polytechnic Institute of New York University, USA.
Wang, Y; Goodrum, P M; Haas, C; Glover, R and Vazari, S (2010) Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data. Construction Management and Economics, 28(12), pp. 1269-1285. ISSN 1466433X
Wanigarathna, N; Henjewele, C; Jones, K G; Pascale, F and Morga, M (2022) Modelling earthquake damage repair costs: Improving accuracy for preparedness decision making. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Wao, J O (2014) Value engineering methodology to improve building sustainability outcomes. PhD thesis, University of Florida, USA.
Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.
Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.
Warszawski, A (1996) Strategic planning in construction companies. Journal of Construction Engineering and Management, 122(2), pp. 133-140. ISSN 0733-9364
Warszawski, A (2003) Parametric analysis of the financing cost in a building project. Construction Management and Economics, 21(5), pp. 447-459. ISSN 01446193
Warszawski, A and Sacks, R (2004) Practical multifactor approach to evaluating risk of investment in engineering projects. Journal of Construction Engineering and Management, 130(3), pp. 357-367. ISSN 0733-9364
Waters, B L; Dixit, M K and Pariafsai, F (2023) Architects' ranking of professional design services. Architectural Engineering and Design Management, 19(6), pp. 620-641. ISSN 1745-2007
Weerasinghe, A S; Ramachandra, T and Rotimi, J O B (2022) Towards sustainable commercial buildings: An analysis of operation and maintenance (O&M) costs in Sri Lanka. Smart and Sustainable Built Environment, 11(3), pp. 454-468. ISSN 2046-6099
Weerasinghe, U G D (2012) Development of a framework to assess sustainability of building projects. PhD thesis, University of Calgary, Canada.
Wehle, A J (2014) Taxonometric model for using leading safety indicators in the construction industry. PhD thesis, University of Florida, USA.
Weidman, J; Dickerson, D E and Koebel, C T (2015) Intervention to improve purchasing decision-maker perceptions of ventilated tools. Journal of Construction Engineering and Management, 141(6): 04015007, ISSN 0733-9364
Weidman, J E; Miller, K R; Christofferson, J P and Newitt, J S (2011) Best practices for dealing with price volatility in commercial construction. International Journal of Construction Education and Research, 7(4), pp. 276-293. ISSN 1557-8771
Weijs-Perrée, M; van de Koevering, J; Appel-Meulenbroek, R and Arentze, T (2019) Analysing user preferences for co-working space characteristics. Building Research & Information, 47(5), pp. 534-548. ISSN 0961-3218
Weinsziehr, T; Grossmann, K; Gröger, M and Bruckner, T (2017) Building retrofit in shrinking and ageing cities: A case-based investigation. Building Research & Information, 45(3), pp. 278-292. ISSN 0961-3218
Wells, J (2001) Construction and capital formation in less developed economies: Unravelling the informal sector in an African city. Construction Management and Economics, 19(3), pp. 267-274. ISSN 01446193
Westling, H (1991) Technology procurement for innovation in Swedish construction. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Whelton, M G (2004) The development of purpose in the project definition phase of construction projects: Implications for project management. PhD thesis, University of California, Berkeley, USA.
White, J A (1964) Determination of income and financial reporting for long-term construction-type contracts. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
White, N J (2006) Destruction of the contract through material changes. International Journal of Construction Education and Research, 2(1), pp. 43-51. ISSN 1557-8771
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Williams Jr., G H (2003) An evaluation of public construction contracting methods for the public building sector in Oregon using data envelopment analysis. PhD thesis, Portland State University, USA.
Williamson, A; Williams, C and Gameson, R (2010) The consideration of maintenance issues during the design process in the UK public sector. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Willis, C J and Rankin, J H (2011) Measuring the performance of guyana's construction industry using a set of project performance benchmarking metrics. Journal of Construction in Developing Countries, 16(1), pp. 19-40. ISSN 1823-6499
Wilson, H A (1989) Organizational behaviour and safety management in the construction industry. Construction Management and Economics, 7(4), pp. 303-319. ISSN 01446193
Wirahadikusumah, R; Abduh, M; Messah, Y and Aulia, M (2021) Introducing sustainability principles into the procurement of construction works–case of Indonesian developers. International Journal of Construction Management, 21(9), pp. 932-944. ISSN 1562-3599
Won, S (2002) A model for work function characteristics-based prioritization of technologies for capital projects. PhD thesis, University of Texas at Austin, USA.
Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.
Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387
Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Woo, J (2021) A new blockchain framework for existing building energy performance measurement, reporting, and verification (MRV): A pathway for the building sector to participate in the carbon credit market. PhD thesis, University of Florida, USA.
Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.
Wu, S; Li, M and Zhang, B (2025) How compound psychological empowerment shapes project managers' citizenship behavior: A common agency framework. Construction Management and Economics, 43(12), pp. 1080-1100. ISSN 0144-6193
Wu, C H; Hsieh, T Y; Cheng, W L and Lu, S T (2004) Grey relation analysis of causes for change orders in highway construction. Construction Management and Economics, 22(5), pp. 509-520. ISSN 01446193
Wu, G; Hu, Z; Zheng, J; Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(1), pp. 101-124. ISSN 0969-9988
Wu, H; Qian, Q K; Straub, A and Visscher, H J (2022) Factors influencing transaction costs of prefabricated housing projects in China: Developers' perspective. Engineering, Construction and Architectural Management, 29(1), pp. 476-501. ISSN 0969-9988
Wu, H; Zhang, P; Li, H; Zhong, B; Guo, S; Fung, I W H and Lee, Y Y (2024) Blockchain impact on construction quality management and its adoption analysis: A game theory-based method. Journal of Construction Engineering and Management, 150(6): 04024039, ISSN 0733-9364
Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.
Wu, X and Xu, F (2021) Detection model for unbalanced bidding in railway construction projects: Considering the risk of quantity variation. Journal of Construction Engineering and Management, 147(7): 04021055, ISSN 0733-9364
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387
Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Xia, B; Chan, A; Molenaar, K and Skitmore, M (2012) Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach. Journal of Construction Engineering and Management, 138(9), pp. 1017-1022. ISSN 0733-9364
Xia, B; Molenaar, K; Chan, A; Skitmore, M and Zuo, J (2013) Determining optimal proportion of design in design-build request for proposals. Journal of Construction Engineering and Management, 139(6), pp. 620-627. ISSN 0733-9364
Xia, B; Skitmore, M; Wu, P and Chen, Q (2014) How public owners communicate the sustainability requirements of green design-build projects. Journal of Construction Engineering and Management, 140(8): 04014036, ISSN 0733-9364
Xiao, H.; Proverbs, D. G.; Joseph, R. and Adedeji, T. (2026) Property flood resilience (PFR): Exploring the experiences of commercial property owners. International Journal of Building Pathology and Adaptation, 44(4), pp. 935-949. ISSN 2398-4708
Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Xu, W and Wang, T K (2020) Dynamic safety prewarning mechanism of human-machine-environment using computer vision. Engineering, Construction and Architectural Management, 27(8), pp. 1813-1833. ISSN 0969-9988
Yakub, H (1992) Buildings at risk registers: Their influence in reducing risk of dilapidation. PhD thesis, Oxford Brookes University, UK.
Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.
Yan, L.; Wen, S. and Li, Q. (2026) How the two-tier cross-domain control influence contractor's design behavior: A configurational analysis. Engineering, Construction and Architectural Management, 33(3), pp. 2243-2267. ISSN 0969-9988
Yan, L; Chen, Y and Cao, T (2024) Integrated construction consulting project performance improvement in China using network structure and team boundary-spanning behavior: A configurational analysis. Engineering, Construction and Architectural Management, 31(11), pp. 4462-4481. ISSN 0969-9988
Yang, C (2023) Reliability-based methodology for design and evaluation of concrete bridge decks. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Yang, L; Lv, X and Zhao, X (2024) Coping with abnormal organizational behaviors in complex project based on network attack theory. Engineering, Construction and Architectural Management, 31(9), pp. 3773-3800. ISSN 0969-9988
Yang, Y; Zhang, S; Oti-Sarpong, K and Chow, V (2024) A conceptual framework of building information modelling capabilities: An infrastructure owner perspective. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Yao, M; Wang, F; Chen, Z and Ye, H (2020) Optimal incentive contract with asymmetric cost information. Journal of Construction Engineering and Management, 146(6): 04020054, ISSN 0733-9364
Yap, J B H; Rou Chong, J; Skitmore, M and Lee, W P (2020) Rework causation that undermines safety performance during production in construction. Journal of Construction Engineering and Management, 146(9): 04020106, ISSN 0733-9364
Yapicioglu, B (2015) Management for resilience: the case of the North Cyprus construction industry. PhD thesis, University of Manchester, UK.
Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects. PhD thesis, Illinois Institute of Technology, USA.
Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193
Yasamis-Speroni, F; Lee, D E and Arditi, D (2012) Evaluating the quality performance of pavement contractors. Journal of Construction Engineering and Management, 138(10), pp. 1114-1124. ISSN 0733-9364
Yean, F and Ling, Y (2006) Design-build: How to increase its usage and its impact on architects and contractors in Singapore. Construction Economics and Building, 6(1), pp. 12-24. ISSN 2204-9029
Yean Yng Ling, F (2005) Models for predicting quality of building projects. Engineering, Construction and Architectural Management, 12(1), pp. 6-20. ISSN 0969-9988
Yembi Renault, B; Agumba, J N and Ansary, N (2021) Regression analysis of the influence of demographic characteristics using risk management practices within South African small and medium construction enterprises. Journal of Engineering, Design and Technology, 19(6), pp. 1505-1529. ISSN 1726-0531
Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X
Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yik, F W H and Lee, W L (2004) Partnership in building energy performance contracting. Building Research & Information, 32(3), pp. 235-243. ISSN 0961-3218
Yin, H; Wang, D; Yin, Y; Liu, H and Deng, B (2022) Response of contractor behavior to hierarchical governance: Effects on the performance of mega-projects. Engineering, Construction and Architectural Management, 29(4), pp. 1661-1677. ISSN 0969-9988
Yin, Y-J (2010) Risk analysis of light-frame wood construction due to multiple hazards. PhD thesis, Michigan Technological University, USA.
Ying, F; Tookey, J and Roberti, J (2014) Addressing effective construction logistics through the lens of vehicle movements. Engineering, Construction and Architectural Management, 21(3), pp. 261-275. ISSN 0969-9988
Ying, F J; O'Sullivan, M and Adan, I (2021) Simulation of vehicle movements for planning construction logistics centres. Construction Innovation, 21(4), pp. 608-624. ISSN 1471-4175
Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.
Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.
Yoo, Y J (2014) The development of green building performance assessment tool (GBPAT). PhD thesis, University of Wisconsin - Madison, USA.
Younes, B (2013) A framework for invoice management in construction. PhD thesis, University of Alberta, Canada.
Younes, B; Bouferguène, A; Al-Hussein, M and Yu, H (2015) Overdue invoice management: Markov chain approach. Journal of Construction Engineering and Management, 141(1): 04014062, ISSN 0733-9364
Youssef, M; Mohamed, M S E and Balah, A A S (2024) Fuzzy model for Libyan construction projects delivery system selection. International Journal of Construction Management, 24(6), pp. 643-650. ISSN 1562-3599
Yu, A T W; Mok, K S H and Wong, I (2023) Minimisation and management strategies for refurbishment and renovation waste in Hong Kong. Engineering, Construction and Architectural Management, 30(2), pp. 869-888. ISSN 0969-9988
Yu, Y (2022) Use inspired research in using virtual reality for safe operation of exemplar critical infrastructure systems. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Yücel, B and Çomu, S (2025) Evaluating factors affecting construction technology start-up investments and investor behavior. Journal of Construction Engineering and Management, 151(11): 04025177, ISSN 0733-9364
Zagia, F.; Kajewski, S.; Omrani, S. and Motamedisedeh, O. (2026) Prioritizing the key causes of construction project delay in different countries: A cross-sectional analysis of different project types. International Journal of Construction Management, 26(9), pp. 1879-1904. ISSN 1562-3599
Zalejska Jonsson, A and Hungria Gunnelin, R (2019) Defects in newly constructed residential buildings: Owners' perspective. International Journal of Building Pathology and Adaptation, 37(2), pp. 163-185. ISSN 23984708
Zaneldin, E K (2020) Investigating the types, causes and severity of claims in construction projects in the UAE. International Journal of Construction Management, 20(5), pp. 385-401. ISSN 1562-3599
Zarghami, S A (2024) Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration. Engineering, Construction and Architectural Management, 31(6), pp. 2478-2495. ISSN 0969-9988
Zhang, P.; Sing, M. C. P. and Guo, S. (2026) What drives the adoption of quality management behavior? Evidence from owners in China's construction industry. Journal of Engineering, Design and Technology, 24(3), pp. 692-712. ISSN 1726-0531
Zhang, S; Zhong, B; Wu, H; Tang, B and Sepasgozar, S M E (2026) Impact of industry 4.0 digital technologies on optimal construction strategies: Owner preference perspective on construction service perception and unreliability costs. Journal of Construction Engineering and Management, 152(1): 04025222, ISSN 0733-9364
Zhang, C (2013) Automated progress control using laser scanning technology. PhD thesis, Illinois Institute of Technology, USA.
Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(5), pp. 529-543. ISSN 1466433X
Zhang, H; Xing, F and Liu, J (2011) Rehabilitation decision-making for buildings in the Wenchuan area. Construction Management and Economics, 29(6), pp. 569-578. ISSN 1466433X
Zhang, K and Cui, Q (2020) Does P3 favour large companies? From equity financing to social equity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Zhang, L (2019) To insist or to concede? Chinese contractors' behavioural strategies when handling disputed construction claims. PhD thesis, University of Manchester, UK.
Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304
Zhang, L; Pan, C and Zou, X (2013) Criticality comparison between the repetitive scheduling method and the network model. Journal of Construction Engineering and Management, 139(10): 06013004, ISSN 0733-9364
Zhang, P (2018) Mapping buried utilities in difficult environments. PhD thesis, University of Nottingham, UK.
Zhang, S (2019) Developing commercial capabilities for infrastructure delivery: A dynamic capabilities view. PhD thesis, University of Hong Kong, Hong Kong.
Zhang, S and Leiringer, R (2016) Owner project capabilities in infrastructure projects: Unpacking commercial capabilities. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Zhang, S; Leiringer, R and Winch, G (2024) Procuring infrastructure public-private partnerships: Capability development and learning from an owner perspective. Construction Management and Economics, 42(1), pp. 35-53. ISSN 01446193
Zhang, S; Liu, X; Gao, Y and Ma, P (2019) Effect of level of owner-provided design on contractor's design quality in DB/EPC projects. Journal of Construction Engineering and Management, 145(1): 04018121, ISSN 0733-9364
Zhang, S; Zhang, S; Gao, Y and Ding, X (2016) Contractual governance: Effects of risk allocation on contractors' cooperative behavior in construction projects. Journal of Construction Engineering and Management, 142(6): 04016005, ISSN 0733-9364
Zhang, X; Liu, M; Le, Y; Wei, J; Zhu, Y and Li, Y (2023) Deconstructing organizational capabilities of megaproject owners: Dimensions and levels. Journal of Construction Engineering and Management, 149(7): 04023055, ISSN 0733-9364
Zhang, Y; Wang, Y and Yao, H (2022) How does the embeddedness of relational behaviours in contractual relations influence inter-organisational trust in construction projects? Engineering, Construction and Architectural Management, 29(1), pp. 222-244. ISSN 0969-9988
Zhao, D; Duva, M; Mollaoglu, S; Frank, K; Garcia, A and Tait, J (2021) Integrative collaboration in fragmented project organizations: Network perspective. Journal of Construction Engineering and Management, 147(10): 04021115, ISSN 0733-9364
Zhao, J; Lam, K P; Biswas, T and Wang, H (2015) An online platform to automate LEED energy performance evaluation and submission process. Construction Innovation, 15(3), pp. 313-332. ISSN 1471-4175
Zheng, X; Qin, Y; Xue, H; Hu, X and Skitmore, M (2026) How formal control fosters relational behavior for innovation performance in infrastructure megaprojects. Journal of Construction Engineering and Management, 152(3): 04025269, ISSN 0733-9364
Zheng, J (2013) Ownership structure and company performance : the case of listed real estate companies in mainland China. PhD thesis, University of Hong Kong, Hong Kong.
Zheng, X; Chen, J; Xia, B; Skitmore, M and Zeng, S (2023) Understanding the megaproject social responsibility network among stakeholders: A reciprocal-exchange perspective. Journal of Construction Engineering and Management, 149(11): 04023105, ISSN 0733-9364
Zheng, X; Hu, X; Wu, C and Bai, J (2025) Does owners' leadership matter to relational behavior in mega construction projects? A role orientation perspective. Engineering, Construction and Architectural Management, 32(6), pp. 3608-3629. ISSN 0969-9988
Zheng, X; Hu, X; Wu, C; Li, Y and Yang, D (2025) Revisiting the relationships between governance mechanisms and project performance: Meta-analysis of main and moderating effects. Journal of Construction Engineering and Management, 151(11): 04025164, ISSN 0733-9364
Zhong, B; Zhong, W; Wu, H; Guan, Q; Tang, B and M.e Sepasgozar, S (2025) Strategic impacts of blockchain adoption on contractor decisions in competitive construction markets: A game-theoretic approach. Journal of Construction Engineering and Management, 151(12): 04025203, ISSN 0733-9364
Zhou, H; Gao, B; Tang, S; Li, B and Wang, S (2025) Intelligent detection on construction project contract missing clauses based on deep learning and NLP. Engineering, Construction and Architectural Management, 32(3), pp. 1546-1580. ISSN 0969-9988
Zhou, X (2011) Managing commodity risks in highway contracts: Quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts. PhD thesis, Texas A&M University, USA.
Zhou, X; Wang, Y; Zhang, Y and Liu, F (2024) Macro investigation on China's engineering insurance industry: Based on industrial organization theories. Engineering, Construction and Architectural Management, 31(7), pp. 2977-2994. ISSN 0969-9988
Zhu, J; Hertogh, M; Zhang, J; Shi, Q and Sheng, Z (2020) Incentive mechanisms in mega project-risk management considering owner and insurance company as principals. Journal of Construction Engineering and Management, 146(10): 04020120, ISSN 0733-9364
Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364
Zimmerman, A and Martin, M (2001) Post-occupancy evaluation: Benefits and barriers. Building Research & Information, 29(2), pp. 168-174. ISSN 0961-3218
Zolkafli, U K; Zakaria, N; Mohammad Mazlan, A and Ali, A S (2019) Maintenance work for heritage buildings in Malaysia: Owners' perspectives. International Journal of Building Pathology and Adaptation, 37(1), pp. 186-195. ISSN 23984708
Zubair, M U; Zhang, X and Hassan, M U (2024) Aligning expectations and perceptions of elevator maintenance stakeholders: An application of expectation confirmation theory. Building Research & Information, 52(4), pp. 418-430. ISSN 0961-3218
Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364
al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175
de La Garza, J M; Hancher, D E and Decker, L (1998) Analysis of safety indicators in construction. Journal of Construction Engineering and Management, 124(4), pp. 312-314. ISSN 0733-9364
de Neufville, R and King, D (1991) Risk and need-for-work premiums in contractor bidding. Journal of Construction Engineering and Management, 117(4), pp. 659-673. ISSN 0733-9364
de la Garza, J M and Melin, J W (1986) Prepayment ability to offset inflation. Journal of Construction Engineering and Management, 112(4), pp. 514-529. ISSN 0733-9364
de la Garza, J M; Vorster, M C and Parvin, C M (1991) Total float traded as commodity. Journal of Construction Engineering and Management, 117(4), pp. 716-727. ISSN 0733-9364
du Toit, J and Wagner, C (2020) The effect of housing type on householders' self-reported participation in recycling. Smart and Sustainable Built Environment, 9(4), pp. 395-412. ISSN 2046-6099
jadidoleslami, S; Saghatforoush, E and Zare Ravasan, A (2021) Constructability obstacles: An exploratory factor analysis approach. International Journal of Construction Management, 21(3), pp. 312-325. ISSN 1562-3599
olde Scholtenhuis, Léon Luc (2015) Enhancing mindful coordination in fragmented utility construction practices: By developing, implementing and evaluating virtual design and construction models. PhD thesis, University of Twente, Netherlands.
ter Huurne, R; Olde Scholtenhuis, L and Dorée, A (2022) Engaged ontology development to bridge fragmented digital realities. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
van Heel, L; van Oel, C J; Chan, P and Burdorf, A (2025) Engaging heterogeneity in stakeholders and stakeholder relationships in a hospital planning and design project. Construction Management and Economics, 43(12), pp. 999-1021. ISSN 0144-6193
Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364
Şentürk, H A; Yazici, G and Kaplanoǧlu, S B (2004) Case study: Izmit domestic and industrial water supply build-operate- transfer project. Journal of Construction Engineering and Management, 130(3), pp. 449-454. ISSN 0733-9364
Up a level