Items with Index Term: overheads
Al-Nakeeb, A A R (2000) An assessment of the effectiveness of quality assurance systems in the construction industry. PhD thesis, University of South Wales, UK.
Auradkar, P K; Raykar, A; Agarwal, I; Sitaram, D and Manavalan R (2022) Accuracy assessment and performance analysis of raster to vector conversions on lulc data: India. Journal of Engineering, Design and Technology, 20(6), pp. 1787-1809. ISSN 1726-0531
Brocklesby, M (1999) The environmental impact of frame materials: an assessment of the embodied impacts for building frames in the UK construction industry. PhD thesis, University of Sheffield, UK.
Champion, R (2011) A consideration of recovery of prolongation costs in a construction context. International Journal of Law in the Built Environment, 3(3), pp. 237-251. ISSN 1756-1450
Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193
Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.
Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X
Chao, L C and Kuo, C P (2018) Neural-network-centered approach to determining lower limit of combined rate of overheads and markup. Journal of Construction Engineering and Management, 144(2): 04017117, ISSN 0733-9364
Chao, L C and Liaw, S J (2019) Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008, ISSN 0733-9364
Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193
Chua, D K H; Wang, Y and Tan, W T (2003) Impacts of obstacles in East Asian cross-border construction. Journal of Construction Engineering and Management, 129(2), pp. 131-141. ISSN 0733-9364
Davis, R and Watson, P (1999) The utilization of formulae in overhead and profit claims. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Disney, O and Fahlstedt, O (2021) Site overheads: The lost dimension of improved productivity? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Eksteen, B and Rosenberg, D (2002) The management of overhead costs in construction companies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Ioannidou, D; Zerbi, S; García de Soto, B and Habert, G (2018) Where does the money go? Economic flow analysis of construction projects. Building Research & Information, 46(4), pp. 348-366. ISSN 0961-3218
Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.
Klopper, C H (1986) An investigation into and evaluation of the cost reimbursable basis for building contracts. DSc thesis, University of Pretoria, South Africa.
Lloyd, C A (2020) Modular manufacture and construction of small nuclear power generation systems. PhD thesis, University of Cambridge, UK.
Matto, M C (2023) Identifying the latent shortcomings of force account projects in Tanzania: The case of construction projects in the education sector. Engineering, Construction and Architectural Management, 30(2), pp. 787-804. ISSN 0969-9988
Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.
Serugga, J; Kagioglou, M; Edwards, D; Talebi, S and Johns, N (2024) Key influences to cost modelling and analysis in off-site construction: Research trends and gap analysis. Architectural Engineering and Design Management, 20(6), pp. 1335-1356. ISSN 1745-2007
Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.
Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988
Sutrisna, M; Potts, K and Proverbs, D (2004) Quotation mechanism for pre-pricing variations in civil engineering projects: A quest for best practice. Journal of Financial Management of Property and Construction, 9(1), pp. 13-26. ISSN 1366-4387
Tah, J H M; Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(1), pp. 31-36. ISSN 01446193
Tilley, M (2016) What elements are required to achieve sustainable business change using health and safety as a lens? DProf thesis, Middlesex University, UK.
Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029
Up a level