Items with Index Term: organizational structure
Abadi, M (2005) Issues and challenges in communication within design teams in the construction industry: Investigation the use of virtual teams and information and communication technologies in the UK construction industry. PhD thesis, University of Manchester, UK.
Abankwa, Derek Asante (2021) What drives technology adaptation in construction firms? An investigation of the antecedents, adaptive behaviours, and outcomes. PhD thesis, University of Hong Kong, Hong Kong.
Abdirad, H and Nazari, A (2015) Barriers to effective implementation of quality management systems in public design projects in Iran. Architectural Engineering and Design Management, 11(6), pp. 457-474. ISSN 1745-2007
Abdul Ghafar, M and Ibrahim, R (2025) Quantifying AEC professionals' cross-work culture productivity: Comparison between Malaysian and UK projects during industrialized building project. Smart and Sustainable Built Environment, 14(4), pp. 921-942. ISSN 2046-6099
Abeydeera, W P P (2003) The role of social capital in collaborative governmental and non-governmental programmes on poverty reduction in Sri Lanka. PhD thesis, University of Guelph, Canada.
Abu Bakar, R (1998) The management practices and organisational culture of large Malaysian construction contractors. PhD thesis, University of Reading, UK.
Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.
Adnan, H (2004) Joint venture projects in Malaysian construction industry: Factors critical to success. PhD thesis, Nottingham Trent University, UK.
Adnan, H B (2004) Joint venture projects in Malaysian Construction Industry Factors Critical to success. PhD thesis, Nottingham Trent University, UK.
Afzal, Fatima (2019) A framework to improve sustainability performance of construction organisations. PhD thesis, University of New South Wales, Australia.
Agyekum, A K; Fugar, F D K; Agyekum, K; Akomea-Frimpong, I and Pittri, H (2023) Barriers to stakeholder engagement in sustainable procurement of public works. Engineering, Construction and Architectural Management, 30(9), pp. 3840-3857. ISSN 0969-9988
Ahlstrand, R (2022) Structures of subcontracting: Work organisation, control, and labour in the Swedish building sector. PhD thesis, Lund University, Sweden.
Aiyetan, O A (2019) Influence of the management styles and quality of management on project delivery. Journal of Construction Business and Management, 3(1), pp. 38-44. ISSN 2521-0165
Al-Biqami, N M (2001) Virtual procurement system for virtual enterprises. PhD thesis, University of Nottingham, UK.
Al-Hachami, Z (2020) Decision making in the oil and gas construction project management: structured VS discretionary. PhD thesis, University of Liverpool, UK.
Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.
Al-Zubi, M (2011) The impact of organizational culture on knowledge sharing in the construction sector in Jordan. PhD thesis, University of Salford, UK.
Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.
Anbar, D. R.; Deng, X.; Taha Alqershy, M. and Ullah, S. (2026) Unveiling interpersonal distrust as a mediator between contingent employees and knowledge hiding in international construction projects in the gulf region. International Journal of Construction Management, 26(7), pp. 1390-1405. ISSN 1562-3599
Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.
Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 0969-9988
Apostu, A and Drăghici, M (2026) A public theatre as a living lab to create resilience. Buildings & Cities, 7(1), pp. 232-253. ISSN 2632-6655
Appell, H (2020) Workers of Europe unite!? Explaining the form of European labor organization: The construction industry. PhD thesis, Freie Universitaet Berlin, Germany.
Arif, M; Egbu, C and Toma, T (2010) Knowledge retention in construction in the UAE. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.
Assaad, R and El-Adaway, I H (2020) Enhancing the knowledge of construction business failure: A social network analysis approach. Journal of Construction Engineering and Management, 146(6): 04020052, ISSN 0733-9364
Athapaththu, K I and Karunasena, G (2018) Framework for sustainable construction practices in Sri Lanka. Built Environment Project and Asset Management, 8(1), pp. 51-63. ISSN 2044-124X
Bakar, F A; Cheung, C M; Kaltungo, A Y; Mohandes, S R and Lou, E (2024) Key organisational attributes for developing a maturity model: Adopting immersive technologies in construction safety training. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Biggins, D (2018) An exploratory investigation into how project management methods are chosen and implemented by organisations in the UK. PhD thesis, University of Manchester, UK.
Boerkoel, S; Gledson, B; Littlemore, M and Ponton, H (2022) Challenges of organisational learning in a Netherlands project-based organisation. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Bonanomi, M M; Hall, D M; Staub-French, S; Tucker, A and Talamo, C M L (2020) The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms. Engineering, Construction and Architectural Management, 27(4), pp. 872-892. ISSN 0969-9988
Bonanomi, Marcella Maria Melania Teodora (2018) Digital transformation of multidisciplinary design firms: A systematic analysis-based approach to change management. PhD thesis, Politecnico di Milano, Italy.
Bouraoui, D and Lizarralde, G (2013) Centralized decision making, users' participation and satisfaction in post-disaster reconstruction: The case of Tunisia. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 145-167. ISSN 1759-5916
Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.
Cai, S; Ma, Z; Skibniewski, M J and Guo, J (2020) Construction automation and robotics: From one-offs to follow-ups based on practices of Chinese construction companies. Journal of Construction Engineering and Management, 146(10): 05020013, ISSN 0733-9364
Calzadilla, E; Awinda, K and Parkin, A (2012) An examination of the risk management process in Venezuelan construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Castillo, T; Herrera, R F and Alarcón, L F (2023) The quality of small social networks and their performance in architecture design offices. Journal of Construction Engineering and Management, 149(2): 04022162, ISSN 0733-9364
Chan, D W M; Olawumi, T O and Ho, A M L (2019) Critical success factors for building information modelling (BIM) implementation in Hong Kong. Engineering, Construction and Architectural Management, 26(9), pp. 1838-1854. ISSN 0969-9988
Chan, K (2023) Fast track: State capacity and railway bureaucracies in China and India. PhD thesis, Princeton University, USA.
Chen, P (2005) An interpretive comparison of Chinese and western conceptions of project management work. PhD thesis, Cranfield University, UK.
Chen, Y; Cai, X; Li, J; Lin, P; Song, H; Liu, G; Cao, D and Ma, X (2023) The values and barriers of BIM implementation combination evaluation based on stakeholder theory: A study in China. Engineering, Construction and Architectural Management, 30(7), pp. 2814-2836. ISSN 0969-9988
Chen, Zhanliang (2024) Narrative carpentry: A study on conservation organisations for traditional Chinese timber structures. DDes thesis, Harvard University, USA.
Cheng, F and Yin, Y (2024) Organizational antecedents and multiple paths of knowledge-sharing behavior of construction project members: Evidence from Chinese construction enterprises. Engineering, Construction and Architectural Management, 31(3), pp. 957-975. ISSN 0969-9988
Cheng, M Y; Su, C W and You, H Y (2003) Optimal project organizational structure for construction management. Journal of Construction Engineering and Management, 129(1), pp. 70-79. ISSN 0733-9364
Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.
Christina, S; Dainty, A; Daniels, K and Waterson, P (2014) How organisational behaviour and attitudes can impact building energy use in the UK retail environment: A theoretical framework. Architectural Engineering and Design Management, 10(1-2), pp. 164-179. ISSN 1745-2007
Cruz-Roveda, S (2022) A qualitative open-ended interview study using a comparative multiple case study approach of bus rapid transit (BRT) construction projects within the United States. DPA thesis, California Baptist University, USA.
Davies, G (2012) The impact of organisational culture, learning and knowledge development on performance. DBA thesis, Kingston University, UK.
Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364
Denicol, Juliano (2019) Designing client organisations and supply chain strategies to deliver megaprojects. PhD thesis, University College London, UK.
Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.
Dosumu, O (2018) Assessment of the likelihood of risk occurrence on tendering and procurement of construction projects. Journal of Construction Business and Management, 2(1), pp. 20-32. ISSN 2521-0165
Dou, Y; Li, T; Li, L; Zhang, Y and Li, Z (2023) Tracking the research on ten emerging digital technologies in the AECO industry. Journal of Construction Engineering and Management, 149(3): 03123003, ISSN 0733-9364
Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771
Egbu, C; Hari, S and Kumar, B (2003) Knowledge management practices in small and medium enterprises in the construction industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Egbu, C O (2000) Knowledge management in construction SMEs: Coping with the issues of structure, culture, commitment and motivation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ekemode, B G; Adegoke, O J and Aderibigbe, A (2017) Factors influencing land title registration practice in Osun state, Nigeria. International Journal of Law in the Built Environment, 9(3), pp. 240-255. ISSN 1756-1450
Ekström, D; Rempling, R and Plos, M (2019) Integrated project team performance in early design stages: performance indicators influencing effectiveness in bridge design. Architectural Engineering and Design Management, 15(4), pp. 249-266. ISSN 1745-2007
Emsoff, J E (1994) An object-oriented environment for the visual integration of project scheduling data. PhD thesis, Texas A&M University, USA.
Enshassi, A and Al Swaity, E (2015) Key stressors leading to construction professionals' stress in the Gaza Strip, Palestine. Journal of Construction in Developing Countries, 20(2), pp. 53-79. ISSN 1823-6499
Erdogan, B; Anumba, C; Bouchlaghem, D and Nielsen, Y (2005) Change management in construction: The current context. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Farmer, C M (2018) Constructing program management offices for major defense acquisition programs: Factors to consider. DEng thesis, George Washington University, USA.
Fath-Kolmes, E. M. and Long, T. B. (2026) Dynamic capabilities for sustainability and performance maturity levels: Evidence from the construction industry. Construction Management and Economics, 44(6), pp. 430-452. ISSN 0144-6193
Fillingham, V L (2018) Assessing information management as a tool for the ongoing maintenance of built assets. EngD thesis, University of Reading, UK.
Frödell, M (2014) Organisation of purchasing and buyer-supplier relationships in large construction companies. PhD thesis, Chalmers University of Technology, Sweden.
Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.
García de Soto, B; Agustí-Juan, I; Joss, S and Hunhevicz, J (2022) Implications of construction 4.0 to the workforce and organizational structures. International Journal of Construction Management, 22(2), pp. 205-217. ISSN 1562-3599
Gluch, P (2005) Building green: perspectives on environmental mangagement in construction. PhD thesis, Chalmers University of Technology, Sweden.
Gluch, P and Räisänen, C (2009) Aligning the practices of the permanent with those of the temporary. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Gluch, P and Räisänen, C (2009) Interactional perspective on environmental communication in construction projects. Building Research & Information, 37(2), pp. 164-175. ISSN 0961-3218
Gluch, P and Räisänen, C (2012) What tensions obstruct an alignment between project and environmental management practices? Engineering, Construction and Architectural Management, 19(2), pp. 127-140. ISSN 0969-9988
Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499
Greed, C H (1990) The position of women in surveying. PhD thesis, Open University, UK.
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Haddadin, K H (2003) Cultural and institutional barriers to the take-up of construction management in Jordan. PhD thesis, University of Westminster, UK.
Hari, S; Egbu, C O and Kumar, B (2004) Knowledge capture in small and medium enterprises in the construction industry: Challenges and opportunities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Hartmann, A and Girmscheid, G (2004) The innovation potential of integrated services and its utilisation through co-operation. Engineering, Construction and Architectural Management, 11(5), pp. 335-341. ISSN 0969-9988
Hartwell, J (2018) Construction organisation structure and innovation adoption. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Healy, J; Ryan, W; Stewart, S and Stewart, R (2002) Training needs analysis in an SME in the Irish construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Holloway, S S (2009) When does the network organizational form fail? Examining the impact of project characteristics on organizational structure and performance. PhD thesis, University of Oregon, USA.
Hughes, W P (1989) Organizational analysis of building projects. PhD thesis, Liverpool Polytechnic, UK.
Hughes, W P (2001) Evaluating plans of work. Engineering, Construction and Architectural Management, 8(4), pp. 272-283. ISSN 0969-9988
Hughes, W P (2003) A comparison of two editions of the RIBA plan of work. Engineering, Construction and Architectural Management, 10(5), pp. 302-311. ISSN 0969-9988
Ilter, A T (2011) Evaluation of contracting firms' innovation approaches. PhD thesis, Istanbul Technical University, Turkey.
Irfan, M; Malik, M S A and Kaka Khel, S S U H (2020) Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries. Engineering, Construction and Architectural Management, 27(10), pp. 3135-3153. ISSN 0969-9988
Iromuanya, C (2013) A qualitative study on construction project success factors in dynamic project environments: A Delphi approach. PhD thesis, Capella University, USA.
Jewell, C A (2011) A typology of construction professional service firms: A consulting engineering perspective. PhD thesis, University of Reading, UK.
Johnson, K D and Tatum, C B (1993) Technology in marine construction firms. Journal of Construction Engineering and Management, 119(1), pp. 148-162. ISSN 0733-9364
Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988
Ju C, R S (2013) Institutional determinants of construction safety management strategies of contractors in Hong Kong. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
K'Akumu, O A (2010) The enabling environment for artisanal dimension stone in Nairobi, Kenya. PhD thesis, University of Westminster, UK.
Katsanis, C J (1998) An empirical examination of the relationships between strategy, structure and performance in building industry organizations. PhD thesis, Universite de Montreal, Canada.
King, C J (2012) Project management skills of the future. PhD thesis, Arizona State University, USA.
Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: Projects between tyranny and perforation. Building Research & Information, 33(6), pp. 536-546. ISSN 0961-3218
Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.
Koolwijk, J S J (2022) Rules, power and trust: Interplay between inter-organizational structures and interpersonal relationships in project-based organizations in the construction industry. PhD thesis, Delft University of Technology, Netherlands.
Kreider, R G (2013) An ontology of the uses of building information modeling. PhD thesis, Pennsylvania State University, USA.
Krystallis, I (2016) A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery. PhD thesis, Loughborough University, UK.
Ku, K and Taiebat, M (2011) BIM experiences and expectations: The constructors' perspective. International Journal of Construction Education and Research, 7(3), pp. 175-197. ISSN 1557-8771
Kuitert, L; Volker, L and Hermans, M (2016) Safeguarding public values by project-based construction clients: Leads for future research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(2), pp. 38-51. ISSN 1358-9180
Laepple, E S (2005) Exploring project collaboration systems in the building industry. PhD thesis, Texas A&M University, USA.
Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.
Laryea, S and Lubbock, A (2014) Tender pricing environment of subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(1): 04013029, ISSN 0733-9364
Lau, C H (2019) The global trading activities of consulting engineering firms: managing risk and geographical choice. PhD thesis, University of Oxford, UK.
Le, M A T and Brønn, C (2007) Linking experience and learning: Application to multi-project building environments. Engineering, Construction and Architectural Management, 14(2), pp. 150-163. ISSN 0969-9988
Leung, W Y (2000) A conceptual framework and research method for analysing the performance of construction firms in Hong Kong. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Li, I H Y (2012) The relationship of cultural incongruence and information processing in facilities management in the public health care sector. PhD thesis, University of Hong Kong, Hong Kong.
Li, T; Li, Z and Cai, J (2024) Antecedents and consequence of intra-organizational diffusion of prefabricated construction technology: A contingency theory perspective. Engineering, Construction and Architectural Management, 31(7), pp. 2932-2951. ISSN 0969-9988
Li, Y I H; Fellows, R F and Liu, A M M (2008) Directional interaction of organizational culture and structure through information processing theory. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Lijauco, F; Gajendran, T; Brewer, G and Rasoolimanesh, S M (2020) Impacts of culture on innovation propensity in small to medium enterprises in construction. Journal of Construction Engineering and Management, 146(3): 04019116, ISSN 0733-9364
Lim, T H B (2009) Organizational flexibility management in construction. PhD thesis, National University of Singapore, Singapore.
Liu, T and Wilkinson, S (2013) Can the pilot public-private partnerships project be applied in future urban rail development? A case study of Beijing Metro Line 4 project. Built Environment Project and Asset Management, 3(2), pp. 250-263. ISSN 2044-124X
Liu, T and Wilkinson, S (2014) Using public-private partnerships for the building and management of school assets and services. Engineering, Construction and Architectural Management, 21(2), pp. 206-223. ISSN 0969-9988
Liu, Z (2012) Know-how signalling and transfer systems to support integrated supply chains. PhD thesis, University of Manchester, UK.
Loforte Ribeiro, F (2009) Enhancing knowledge management in construction firms. Construction Innovation, 9(3), pp. 268-284. ISSN 1471-4175
London, K; Kenley, R and Agapiou, A (1998) Theoretical supply chain network modelling in the building industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Loosemore, M; Keast, R and Barraket, J (2023) How are social procurement actors shaping a new field of professional practice in the Australian construction industry? Engineering, Construction and Architectural Management, 30(9), pp. 4192-4209. ISSN 0969-9988
Loosemore, M; Nguyen, B T and Denis, N (2000) An investigation into the merits of encouraging conflict in the construction industry. Construction Management and Economics, 18(4), pp. 447-456. ISSN 01446193
Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988
Lu, W; Xu, J and Söderlund, J (2020) Exploring the effects of building information modeling on projects: Longitudinal social network analysis. Journal of Construction Engineering and Management, 146(5): 04020037, ISSN 0733-9364
Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico. PhD thesis, University of Leeds, UK.
Lundrigan, C (2016) Megaprojects: A design and strategy perspective. PhD thesis, University of Manchester, UK.
Luo, J (2001) Assessing management and performance of sinoforeign construction joint ventures. Construction Management and Economics, 19(1), pp. 109-117. ISSN 01446193
Luu, T V; Kim, S Y; Cao, H L and Park, Y M (2008) Performance measurement of construction firms in developing countries. Construction Management and Economics, 26(4), pp. 373-386. ISSN 1466433X
Ly, Reachsak (2025) Leveraging artificial intelligence and distributed ledger technologies toward smart and autonomous buildings. PhD thesis, Virginia Tech, USA.
Macdonald, R N (2013) A strategy for materials price risk mitigation. PhD thesis, University of Alabama, USA.
Mahmud, Bello Zailani (2025) Equity-driven workforce development initiatives through long-term strategic partnerships for the construction and maintenance of green stormwater infrastructure. DEng thesis, Morgan State University (Maryland), USA.
Mansfield, N R (1990) The internationalisation of the British construction consulting sector and technology transfer in developing countries. PhD thesis, University of Strathclyde, UK.
Markovic, P B (2015) Factors that influence project team members to use BIM and IDDs in the construction industry. DM thesis, University of Phoenix, USA.
Martin, H; Lewis, T M and Fifi, J (2014) Centralized versus decentralized construction project structure: easing communication difficulties. International Journal of Construction Management, 14(3), pp. 156-170. ISSN 1562-3599
Marton, J and Richter, A (2004) In search of safety on construction sites -implications of culture, organizational structures and structural change on safety. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
McArthur, J (2023) Enrolment, technical mediation, and the obligatory passage point: a socio-technical examination of the Canada Green Building Council. PhD thesis, University of Edinburgh, UK.
McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(2), pp. 83-103. ISSN 1557-8771
Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.
Morrey N, D A and Thomson D, P C (2013) Problematisation of the shift from products to services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Moyo, T and Chigara, B (2023) Factors affecting the competence of quantity surveying professionals in Zimbabwe. Journal of Construction in Developing Countries, 28(2), pp. 1-17. ISSN 1823-6499
Murguia, D; Demian, P and Soetanto, R (2021) Systemic BIM adoption: A multilevel perspective. Journal of Construction Engineering and Management, 147(4): 04021014, ISSN 0733-9364
Murray, M (2003) Building perceptions with metaphors: A study of the communication and decision making behaviour of construction professionals within projects. PhD thesis, University of Strathclyde, UK.
Murray, M D and Langford, D A (1998) Construction procurement systems: A linkage with project organizational models. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Mutti, C d N and Hughes, W P (2001) Contemporary organizational theory in the management of construction projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Naismith, N (2007) An emprical evaluation of strategic human resource management within construction sites. PhD thesis, Loughborough University, UK.
Nguyen, M. V. and Do, X. S. (2026) Investigating key sources of work stress at Vietnamese architectural design firms. Journal of Engineering, Design and Technology, 24(6), pp. 1412-1434. ISSN 1726-0531
Niu, S and Pan, W (2016) Perspectives and practices of collaborative energy design technologies for closing the building energy performance gap. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Nwaogu, J M; Chan, A P C; Sunindijo, R Y; Darko, A; Yang, J Y and Salihu, D (2023) Prevalence and risk factors for poor mental health and suicidal ideation in the Nigerian construction industry. Journal of Construction Engineering and Management, 149(3): 05022021, ISSN 0733-9364
Odewole, A O (2020) Development of a collaborative innovation management framework to assist in the utilisation of agricultural waste as building materials in Nigeria. PhD thesis, University of Salford, UK.
Oliveira, Otávio José de (2005) Management model for small building design firms. PhD thesis, Universidade de São Paulo, Brazil.
Oshoniyi, A O (2014) Ethnicity and hiring: Phenomenological study of employees' perception in housing construction industry, Lagos state, Nigeria. DM thesis, University of Phoenix, USA.
O’Neill, T; Hartigan, K and Spillane, J P (2024) Factors inhibiting higher education institutions from addressing industry driven change in Irish construction management programs. International Journal of Construction Education and Research, 20(1), pp. 65-82. ISSN 15578771
Panagiotakopoulos, P D (2005) A systems and cybernetics approach to corporate sustainability in construction. PhD thesis, Heriot-Watt University, UK.
Panjaitan, N; Hasnida, A S and Ali, A Y (2022) Mesoergonomics, the missing part of the macroergonomics and microergonomics approach. Journal of Engineering, Design and Technology, 20(3), pp. 649-670. ISSN 1726-0531
Patel, M and Robinson, H (2010) Impact of governance on project delivery of complex NHS PFI/PPP schemes. Journal of Financial Management of Property and Construction, 15(3), pp. 216-234. ISSN 1366-4387
Penn, A (2006) What can architectural research bring to organization theory? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.
Perry, J G (1985) The development of contract strategies for construction projects. PhD thesis, University of Manchester, UK.
Perry, M J (1997) Distributed cognition and computer supported collaborative design: The organisation of work in construction engineering. PhD thesis, Brunel University, UK.
Pichura, A C (2004) The phenomenon of innovation and its influence on changing project delivery models in construction in Japan. PhD thesis, University of Tokyo, Japan.
Pienaar, E J A (1988) A study to identify and evaluate the level of strategic management in the construction industry. DBA thesis, University of Pretoria, South Africa.
Pirzadeh, P; Zhang, R P and Lingard, H (2016) Safety climate as a multi-level and dynamic concept: Exploring the variance at different levels over time. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Puddicombe, M S (1998) Interorganizational project strategy: contracts, contacts, and performance in the building industry. PhD thesis, Boston University, USA.
Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms. PhD thesis, University of Dundee, UK.
Raidén, A B; Dainty, A R J and Neale, R H (2003) A strategic employee resourcing framework (serf) for construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Raidén, A B; Dainty, A R J and Neale, R H (2004) Exemplary human resource development (hrd) within a large construction contractor. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Razmdoost, K and Mills, G (2016) Towards a service-led relationship in project-based firms. Construction Management and Economics, 34(4-5), pp. 317-334. ISSN 01446193
Rodger, D; Callaghan, N and Thomson, C S (2020) The loosening control of social housing: Creating a holistic retrofit system for an ageing population through the lens of governmentality. Construction Management and Economics, 38(12), pp. 1101-1121. ISSN 01446193
Rowlinson, S (2001) Matrix organizational structure, culture and commitment: A Hong Kong public sector case study of change. Construction Management and Economics, 19(7), pp. 669-673. ISSN 01446193
Rwelamila, P D and Phungula, M G (2009) Managing the complexity of public private partnerships initiatives: How mature are South African public institutions? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Rwelamila, P M D (2007) Project management competence in public sector infrastructure organisations. Construction Management and Economics, 25(1), pp. 55-66. ISSN 1466433X
Rwelamila P D, H C M S (2013) Capacity building in emerging economies through international construction ventures: Case study of the nmpp project. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Sear, E A; Hartland, T G; Abdel-Wahab, M S and Miller, C G (2008) Implementing customer relationship management at constructionskills. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Sepasgozar, Samad (2015) Technology adoption in construction. PhD thesis, University of New South Wales, Australia.
Shah, M; Tang, L and Hughes, W P (2012) Exploring process, productivity and structure in design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Shirazi, B; Langford, D A and Rowlinson, S M (1996) Organizational structures in the construction industry. Construction Management and Economics, 14(3), pp. 199-212. ISSN 01446193
Shohet, I M; Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(2), pp. 219-228. ISSN 01446193
Sillars, D N (1998) Pre-operational attributes as predictors of organizational success within a joint venture: Modeling joint venture formation in the architecture/engineering/construction industry. PhD thesis, Georgia Institute of Technology, USA.
Sillars, D N and Kangari, R (2004) Predicting organizational success within a project-based joint venture alliance. Journal of Construction Engineering and Management, 130(4), pp. 500-508. ISSN 0733-9364
Sozen, Z (1985) Size, technology and aspects of structure in contractor firms in Turkey. Construction Management and Economics, 3(3), pp. 233-247. ISSN 01446193
Steiger, T L (1988) Working construction: Organization and control of the labor process. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Sun, J; Wang, C C; Yang, Z; Yu, T; Li, J and Xiong, X (2022) Impact of organizational decentralization degree on job satisfaction and job performance: A hierarchical linear model analysis for construction projects. Engineering, Construction and Architectural Management, 29(4), pp. 1642-1660. ISSN 0969-9988
Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Sverlinger, P-O M (2000) Managing knowledge in professional service organizations: Technical consultants serving the construction industry. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Tai, S; Wang, Y and Anumba, C J (2009) A survey on communications in large-scale construction projects in China. Engineering, Construction and Architectural Management, 16(2), pp. 136-149. ISSN 0969-9988
Tall, B; Matarneh, S; Sweis, G; Sweis, R and AlBalkhy, W (2023) Factors affecting the success of development projects of the non-governmental organizations (NGOs) in Jordan. International Journal of Construction Management, 23(10), pp. 1756-1767. ISSN 1562-3599
Tamer, Z; Yoon, Y and Hastak, M (2012) Protocol for profitability analysis using internal entities in organizational structure of construction companies. Journal of Construction Engineering and Management, 138(12), pp. 1394-1402. ISSN 0733-9364
Tarhuni, S M (2013) An investigation into the management of knowledge in a historic building conservation organisation in Tripoli, Libya. PhD thesis, University of Newcastle upon Tyne, UK.
Tatum, C B (1989) Organizing to increase innovation in construction firms. Journal of Construction Engineering and Management, 115(4), pp. 602-617. ISSN 0733-9364
Teebken, J (2024) Disrupt and unlock? The role of actors in urban adaptation path-breaking. Buildings & Cities, 5(1), pp. 162-181. ISSN 2632-6655
Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.
Tennant, S and Fernie, S (2011) An alternative form of supply chain governance: Construction clans. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Teo, Ai Lin Evelyn (1997) Strategic market positioning in the construction industry: Models for evaluating mobility and diversification. PhD thesis, University of New South Wales, Australia.
Tu, B; Zuo, J; Chang, R D; Webber, R J; Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: A China case study. Engineering, Construction and Architectural Management, 30(4), pp. 1321-1343. ISSN 0969-9988
Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences. PhD thesis, University of Hong Kong, Hong Kong.
Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.
Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.
Veshosky, D A (1992) An investigation of factors that influence decisions by engineering firms concerning adoption of CAD/CAE systems. PhD thesis, Lehigh University, USA.
Vinodh, S; Sundararaj, G; Devadasan, S R and Rajanayagam, D (2008) Quantification of agility: An experimentation in an Indian electronics switches manufacturing company. Journal of Engineering, Design and Technology, 6(1), pp. 48-64. ISSN 1726-0531
Wade, F and Visscher, H (2021) Retrofit at scale: Accelerating capabilities for domestic building stocks. Buildings & Cities, 2(1), pp. 800-811. ISSN 2632-6655
Walker, A (1980) A model for the design of project management structures for building clients. PhD thesis, Liverpool Polytechnic, UK.
Walker, A and Hughes, W P (1984) Private industrial project management: A systems-based case study. Construction Management and Economics, 2(2), pp. 93-110. ISSN 01446193
Walker, A and Hughes, W P (1986) A conventionally-managed project: A systems- based case study. Construction Management and Economics, 4(1), pp. 57-74. ISSN 01446193
Walker, A and Hughes, W P (1987) A project managed by a multi-disciplinary practice: A systems-based case study. Construction Management and Economics, 5(2), pp. 123-140. ISSN 01446193
Wanberg, J (2014) The role and use of communities of practice to facilitate knowledge sharing in project based organizations. PhD thesis, University of Colorado at Boulder, USA.
Wanberg, J; Javernick-Will, A and Taylor, J E (2017) Mechanisms to initiate knowledge-sharing connections in communities of practice. Journal of Construction Engineering and Management, 143(11): 04017085, ISSN 0733-9364
Wang, C; Li, B; Li, B and Baldwin, A (2017) Case study of "project controlling" on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(6), pp. 862-874. ISSN 0969-9988
Wang, D; Huang, R; Li, K and Shrestha, A (2025) Organizational structure and dynamic capabilities on business model innovation in project-driven enterprises: Evidence from the construction industry. Engineering, Construction and Architectural Management, 32(1), pp. 578-600. ISSN 0969-9988
Wang, Y; Ma, L and Fu, H (2024) Effect of social identity on megaproject managers' conflict management styles. Journal of Construction Engineering and Management, 150(10): 04024139, ISSN 0733-9364
Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.
Wijayarathne, N.; Gunawan, I. and Schultmann, F. (2026) An integrated framework of dynamic capabilities, digital transformation, and organizational resilience: A multimethod qualitative study in the construction sector. Journal of Construction Engineering and Management, 152(9): 04026151, ISSN 0733-9364
Wood, G; Davis, P and Olatunji, O A (2011) Modelling the costs of corporate implementation of building information modelling. Journal of Financial Management of Property and Construction, 16(3), pp. 211-231. ISSN 1366-4387
Wu, D.; Wang, T.; Chan, P. and Gruis, V. (2026) Integration of circular economy principles into Dutch social housing procurement: Technological, organizational and environmental practices, challenges and development potentials. Smart and Sustainable Built Environment, pp. 1-21. ISSN 2046-6099
Wu W, I R (2013) Impacts of BIM on talent acquisition in the construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Xu, J (2021) A human-organization-technology fit model to harness the power of building information modeling in construction project organizations. PhD thesis, University of Hong Kong, Hong Kong.
Xue, H; Sun, T; Ling, F Y Y and Wang, L (2023) Redesigning the virtual organisational structure for the management of prefabricated buildings. International Journal of Construction Management, 23(6), pp. 1069-1085. ISSN 1562-3599
Xue, H; Sun, T and Zheng, J (2022) Organizational elements and collaborative organizational citizenship behavior in off-site construction projects: Configurational approach. Journal of Construction Engineering and Management, 148(10): 04022108, ISSN 0733-9364
Yan, L; Chen, Y and Cao, T (2024) Integrated construction consulting project performance improvement in China using network structure and team boundary-spanning behavior: A configurational analysis. Engineering, Construction and Architectural Management, 31(11), pp. 4462-4481. ISSN 0969-9988
Yang, T and Fellows, R (1998) Organizational effectiveness on building projects in the UK and China: An investigation of the impacts of project managers, project organizational structures and managerial activities. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Yuan, Z; Fang, Y; Hong, J; Zhang, Q; Zhang, Z and Ni, G (2022) Coupling relationship between capabilities and benefits of lean construction for precast buildings from a multivariable moderation perspective. Journal of Construction Engineering and Management, 148(5): 04022011, ISSN 0733-9364
Yuventi, J; Levitt, R and Robertson, H (2013) Organizational barriers to productivity and innovation in large-scale, U.S.-based photovoltaic system construction projects. Journal of Construction Engineering and Management, 139(10): 06013003, ISSN 0733-9364
Zhang, M; Xue, X; Luo, T; Li, M and Tang, X (2024) The supportability evaluation of cross-regional major infrastructure projects based on the combination weighting of the game theory-cloud model. Engineering, Construction and Architectural Management, 31(9), pp. 3679-3705. ISSN 0969-9988
Zhao, D; Duva, M; Mollaoglu, S; Frank, K; Garcia, A and Tait, J (2021) Integrative collaboration in fragmented project organizations: Network perspective. Journal of Construction Engineering and Management, 147(10): 04021115, ISSN 0733-9364
Zhou, J; Wang, G and Diao, Z (2026) Enabling digital transformation of traditional enterprises through industrial internet platforms: A study from an ecosystem perspective. Engineering, Construction and Architectural Management, 33(1), pp. 413-434. ISSN 0969-9988
Zhou, Q (2002) From CAD to IAD: An internet application of steel construction consulting for architects. PhD thesis, Illinois Institute of Technology, USA.
Zin, I N M and Egbu, C (2011) The significance of knowledge sharing approaches in Malaysian construction organisations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
de Marco, A; Mangano, G and Zou, X Y (2012) Factors influencing the equity share of build-operate-transfer projects. Built Environment Project and Asset Management, 2(1), pp. 70-85. ISSN 2044-124X
de Paula, N; Arditi, D and Melhado, S (2017) Managing sustainability efforts in building design, construction, consulting, and facility management firms. Engineering, Construction and Architectural Management, 24(6), pp. 1040-1050. ISSN 0969-9988
Özdoganm, I D and Talat Birgönül, M (2000) A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects. Construction Management and Economics, 18(3), pp. 343-353. ISSN 01446193
Up a level