Items with Index Term: option

Number of items: 888.

Abas, N H; Blismas, N and Lingard, H (2021) Development of risk assessment tool using damaging energy and argumentation theory for evaluating construction occupational safety and health risks. Engineering, Construction and Architectural Management, 28(10), pp. 2967-2993. ISSN 0969-9988

Abbasi, M H (2024) Phasing out fossil fuel heating in UK homes: A multi-dimensional framework for sustainability assessment of alternatives and their lifecycle implications. PhD thesis, Liverpool John Moores University, UK.

AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.

Abduh, M and Skibniewski, M J (2004) Electronic networking technologies in construction. Journal of Construction Research, 5(1), pp. 17-42. ISSN 1609-9451

Abdul Karim, Mahmoud (2022) Postwar infrastructure reconstruction in Syria: How public-private partnership impacts economic growth. ArtD thesis, University of Florence, Italy.

Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193

Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.

Abo Kanon, H (2017) The motivations, possibilities and constrains of flexible housing practices in the UK and Turkey. PhD thesis, Heriot-Watt University, UK.

Aboushiwa, M A A (2000) Promoter briefing on the procurement and selection of contract strategy offering the best value for money. PhD thesis, University of Manchester, UK.

Abruzzini, A and Abrishami, S (2022) Integration of BIM and advanced digital technologies to the end of life decision-making process: A paradigm of future opportunities. Journal of Engineering, Design and Technology, 20(2), pp. 388-413. ISSN 1726-0531

Abu Aisheh, Y (2011) Climate change and the built environment: an evaluation of sustainable refurbishment options for higher education buildings in the UK. PhD thesis, University of Birmingham, UK.

Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364

Adedayo, O; Michieletto, M; Bamidele, E and Ntigulirwa, M (2020) Application of hybrid green fences for security in public building designs in Nigeria: Lessons from Kigali, Rwanda and Abuja, Nigeria. Journal of Construction in Developing Countries, 25(1), pp. 147-162. ISSN 1823-6499

Adighibe, C; Skitmore, M and Wong, J (2010) The management of transport construction projects: A survey of public sector organisations in Queensland Australia. International Journal of Construction Management, 10(1), pp. 17-33. ISSN 1562-3599

Adu Gyamfi, B and Shaw, R (2022) The impact of COVID-19 pandemic on public engagement approaches to disaster preparedness for foreign residents: Case of Tokyo metropolitan area, Japan. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 269-285. ISSN 1759-5916

Agbesi, K; Kissi, E and Adjei-Kumi, T (2020) Implementation of sustainable procurement practices in public sector construction organisation in Ghana. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2005) Project managers' performance measures: A fresh perspective. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ahmad, A M (2014) The use of refurbishment, flexibility, standardisation and BIM to support the design of a change-ready healthcare facility. PhD thesis, Loughborough University, UK.

Ahmadian, F F A; Akbarnezhad, A; Rashidi, T H and Waller, S T (2016) Accounting for transport times in planning off-site shipment of construction materials. Journal of Construction Engineering and Management, 142(1): 04015050, ISSN 0733-9364

Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.

Akande, O K (2015) Factors influencing operational energy performance and refurbishment of UK listed church buildings: towards a strategic management framework. PhD thesis, Anglia Ruskin University, UK.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) The financial structure of private finance initiative projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Akinwunmi, A; Gameson, R; Hammond, F and Olomolaiye, P (2007) Mortgage insurance and housing finance in emerging economies. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Aksoy Tırmıkçı, C and Yavuz, C (2019) Environmental life cycle analysis of a fixed PV energy system and a two-axis sun tracking PV energy system in a low-energy house in Turkey. Smart and Sustainable Built Environment, 8(5), pp. 391-399. ISSN 2046-6099

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.

Al Yami, H M A (2017) Decision making analysis for an integrated risk management framework of maritime container port infrastructure and transportation systems. PhD thesis, Liverpool John Moores University, UK.

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction. PhD thesis, University of Alberta, Canada.

Al-Mutairi, Y (2015) Development of implementation strategies for offsite construction techniques in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Saggaf, A; Hegazy, T; Nasir, H and Taha, M (2022) Computerized DSS for evaluating design performance of residential buildings using additive weighting approach. Architectural Engineering and Design Management, 18(5), pp. 631-651. ISSN 1745-2007

Al-Sobiei, O S; Arditi, D and Polat, G (2005) Managing owner's risk of contractor default. Journal of Construction Engineering and Management, 131(9), pp. 973-978. ISSN 0733-9364

Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531

Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(2), pp. 117-132. ISSN 1358-9180

Alabi, A G F; Ajiboye, T K and Olusegun, H D (2010) Investigating the cutting forces in heat treated medium carbon steel when turning on a lathe machine. Journal of Engineering, Design and Technology, 8(1), pp. 80-93. ISSN 1726-0531

Alani, A M; Petersen, A K; Chapman, K G and Khosrowshahi, F (2004) A proposed quantitative model for building repair and maintenance: Theory, model development and application. Journal of Construction Research, 5(2), pp. 193-210. ISSN 1609-9451

Alaqad, M; Gidado, K; Piroozfar, P; Alkhadim, M and Dorgham, A (2020) Efficacy of value management system in building projects: A UK perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.

Alarćon, L F and Ashley, D B (1996) Modeling project performance for decision making. Journal of Construction Engineering and Management, 122(3), pp. 265-273. ISSN 0733-9364

Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.

Alazemi, T (2011) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.

Alazemi, Talal Lafi (2012) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.

Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007

Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.

Alhusban, M (2018) Conceptual procurement framework for building information modelling uptake to enhance buildings' sustainability performance in the Jordanian public sector. PhD thesis, University of Portsmouth, UK.

Ali, A H; Kineber, A F; Elyamany, A; Ibrahim, A H and Daoud, A O (2025) Application of Ginni's mean analysis for identifying the stationary driver enhancing modular construction adoption in the building industry. International Journal of Construction Management, 25(3), pp. 322-333. ISSN 1562-3599

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almarri, K and Boussabaine, H (2021) Re-evaluating the risk costing agenda in PPP projects. Built Environment Project and Asset Management, 11(1), pp. 22-37. ISSN 2044-124X

Alnaser, N W (2010) Utilisation of solar and wind energy in buildings in the Kingdom of Bahrain: a step towards sustainable building construction. PhD thesis, University of Reading, UK.

Alruwaythi, O (2017) Influence of engineering information format, demographics, and spatial cognition on craft worker performance. PhD thesis, University of Colorado at Boulder, USA.

Alruwaythi, O and Goodrum, P (2019) A difference in perspective: Impact of different formats of engineering information and spatial cognition on craft-worker eye-gaze patterns. Journal of Construction Engineering and Management, 145(11): 04019065, ISSN 0733-9364

Alruwaythi, O F (2017) Influence of engineering information format, demografics and spatial cognition on craft worker performance. PhD thesis, University of Colorado at Boulder, USA.

Alzubaidi, H J (1993) Maintenance modelling of a major hospital complex. PhD thesis, University of Salford, UK.

Amadi, A I (2026) Construction economics at early stage: Order of cost estimating, life cycle costing and development appraisal of a proposed office complex. International Journal of Building Pathology and Adaptation, 44(1), pp. 70-90. ISSN 2398-4708

Amadi, A and Higham, A P (2020) A cost trajectory to environmentally adaptive building construction in wet humid settings. International Journal of Building Pathology and Adaptation, 38(1), pp. 68-88. ISSN 23984708

Amaka-Otchere, A B K (2016) Energy access and rural development in Ghana: Prospects for decentralised energy and appropriate technology options. African Journal of Built Environment Research, 1(1), pp. 29-58. ISSN 2414-0236

Amankona, D (2021) Socio-ecological impacts and adaptations arising from Chinese-led infrastructure developments in Africa: A case study of the BUI hydropower dam in Ghana. PhD thesis, Open University, UK.

Ameh, H and Lamond, J (2025) Public preference of flood-resilient housing technologies in Nigeria: A case study of Kogi State. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 87-103. ISSN 1759-5908

Amin, R A (2016) Condition-based maintenance: innovation in building maintenance management. PhD thesis, University College London, UK.

Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.

Andersen, M; Kleindienst, S; Yi, L; Lee, J; Bodart, M and Cutler, B (2008) An intuitive daylighting performance analysis and optimization approach. Building Research & Information, 36(6), pp. 593-607. ISSN 0961-3218

Andrade, J B (2017) Early stage design methodology to ensure life cycle sustainability of residential buildings. PhD thesis, Universidade do Minho, Portugal.

Angel, S; Lamson-Hall, P and Blanco, Z G (2021) Anatomy of density: Measurable factors that constitute urban density. Buildings & Cities, 2(1), pp. 264-282. ISSN 2632-6655

Ansell, M (2009) A study of a collaborative framework arrangement for highways renewals schemes. EngD thesis, Loughborough University, UK.

Ansell, M; Evans, R; Holmes, M; Price, A and Pasquire, C (2009) An application of the construction management framework in highways major maintenance. Engineering, Construction and Architectural Management, 16(2), pp. 162-174. ISSN 0969-9988

Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Antoniou, F and Aretoulis, G (2019) A multi-criteria decision-making support system for choice of method of compensation for highway construction contractors in Greece. International Journal of Construction Management, 19(6), pp. 492-508. ISSN 1562-3599

Anumba, C J; Abdullah, A and Ruikar, K (2008) An integrated system for demolition techniques selection. Architectural Engineering and Design Management, 4(2), pp. 130-148. ISSN 1745-2007

Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.

Arewa, A O; Olubodun, F and Peter Swai, L (2024) Exploring nuanced approach to criminalization of late payers in the construction sector. International Journal of Construction Management, 24(10), pp. 1136-1144. ISSN 1562-3599

Arijeloye, B T (2025) Impact of project risk allocation on PPP housing project delivery in Nigeria: Partial least square structural equation modeling approach. Journal of Engineering, Design and Technology, 23(3), pp. 812-829. ISSN 1726-0531

Arijeloye, B T; Aje, I O and Oke, A E (2024) Evaluating the key risk factors in PPP-procured mass housing projects in Nigeria: A Delphi study of industry experts. Journal of Engineering, Design and Technology, 22(1), pp. 60-76. ISSN 1726-0531

Arman, M H R (2014) Using option theory to manage risks in highway winter operations. PhD thesis, Purdue University, USA.

Ashcroft, D; Egbelakin, T; Jing, J and Rasheed, E O (2019) Cost comparison of seismic damage resisting systems for modules in multi-storey buildings. Journal of Engineering, Design and Technology, 17(2), pp. 330-346. ISSN 1726-0531

Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364

Ashuri, B; Lu, J and Kashani, H (2011) A real options framework to evaluate investments in toll road projects delivered under the two-phase development strategy. Built Environment Project and Asset Management, 1(1), pp. 14-31. ISSN 2044-124X

Aslan, Zaki M (2008) The design of protective structures for the conservation and presentation of archaeological sites. PhD thesis, University College London, UK.

Atapattu, A M D S; Hadiwattage, C; Perera, B A K S and Rajaratnam, D (2024) Employing criteria scoring matrix in appraising the economic return of transcending to a circular built environment. Smart and Sustainable Built Environment, 13(2), pp. 267-290. ISSN 2046-6099

Atherinis, D; Bakowski, B; Velcek, M and Moon, S (2018) Developing and laboratory testing a smart system for automated falsework inspection in construction. Journal of Construction Engineering and Management, 144(3): 04017119, ISSN 0733-9364

Atkin, B (1993) Stereotypes and themes in building designs: Insights for model builders. Construction Management and Economics, 11(2), pp. 119-130. ISSN 01446193

Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.

Atkinson, J G B (2008) Market influences on low carbon energy designs in buildings. EngD thesis, University of Surrey, UK.

Attarzadeh, M; Chua, D K H; Beer, M and Abbott, E L S (2017) Options-based negotiation management of PPP-BOT infrastructure projects. Construction Management and Economics, 35(11-12), pp. 676-692. ISSN 0144-6193

Atukpa, D J (2021) Managerial support strategies to minimize job insecurity among Nigerian private firms. PhD thesis, Walden University, USA.

Augenbroe, G; Castro, D and Ramkrishnan, K (2009) Decision model for energy performance improvements in existing buildings. Journal of Engineering, Design and Technology, 7(1), pp. 21-36. ISSN 1726-0531

Awil, A U; Rashid, A and Aziz, A (2002) International markets: Malaysian construction contractors and the stage theory. Construction Economics and Building, 2(1), pp. 94-106. ISSN 2204-9029

Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria. PhD thesis, Heriot-Watt University, UK.

Awodele, O A; Aghimien, D O; Akinkunmi, O G and Aigbavboa, C O (2019) Labour-only procurement: A veritable surviving strategy for contractors in a challenging economy. Journal of Engineering, Design and Technology, 17(2), pp. 347-361. ISSN 1726-0531

Aye, L; Bamford, N; Charters, B and Robinson, J (1999) Environmentally sustainable development: A life cycle costing approach for a commercial office building in Melbourne, Australia. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Aye, L; Bamford, N; Charters, B and Robinson, J (2000) Environmentally sustainable development: A life-cycle costing approach for a commercial office building in Melbourne, Australia. Construction Management and Economics, 18(8), pp. 927-934. ISSN 01446193

Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.

Ayodele, T O and Olaleye, A (2021) Flexibility decision pathways in the management of uncertainty in property development: Experience from an emerging market. Journal of Financial Management of Property and Construction, 26(3), pp. 408-432. ISSN 1366-4387

Baborska-Narozny, M; Szulgowska-Zgrzywa, M; Mokrzecka, M; Chmielewska, A; Fidorow-Kaprawy, N; Stefanowicz, E; Piechurski, K and Laska, M (2020) Climate justice: Air quality and transitions from solid fuel heating. Buildings & Cities, 1(1), pp. 120-140. ISSN 2632-6655

Baborska-Narozny, M; Bandurski, K and Grudzinska, M (2025) Understanding shading through home-use experience, measurement and modelling. Buildings & Cities, 6(1), pp. 466-489. ISSN 2632-6655

Badasyan, N (2018) Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(2), pp. 215-230. ISSN 2044-124X

Badu, E; Edwards, D J and Owusu-Manu, D (2012) Trade credit and supply chain delivery in the Ghanaian construction industry: Analysis of vendor interactions with small to medium enterprises. Journal of Engineering, Design and Technology, 10(3), pp. 360-379. ISSN 1726-0531

Bae, Y J (2016) Integrated design tool of building system optimization for building life cycle cost. PhD thesis, Purdue University, USA.

Bagheri-Lotfabad, K.; Faghihi, S. V. and Hosseini Nourzad, S. H. (2026) Optimizing resilience in hospital networks: Site selection criteria for enhancing health-care infrastructure. International Journal of Disaster Resilience in the Built Environment, 17(3), pp. 342-374. ISSN 1759-5908

Bahadir, M (2025) Predicting construction project durations in Europe using regression analysis methodology. DEngr thesis, George Washington University, USA.

Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.

Baker, D and Nateque Mahmood, M (2012) Developing tools to support complex infrastructure decision-making. Smart and Sustainable Built Environment, 1(1), pp. 59-72. ISSN 2046-6099

Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Balogun, T B (2014) Towards a life cycle framework for bridge management systems in the UK: Insights from a critical review of international approaches and models. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Balouktsi, M (2020) Carbon metrics for cities: Production and consumption implications for policies. Buildings & Cities, 1(1), pp. 233-259. ISSN 2632-6655

Bamford, N; Charters, W; Lacey, R; Mills, A; Radovic, D; Robinson, J; Williams, P and Yencken, D (1998) Environment and sustainability in commercial office buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Barrows, M; Clevenger, C M; Abdallah, M and Wu, W (2020) Value of certifications when seeking construction employment. International Journal of Construction Education and Research, 16(1), pp. 61-79. ISSN 1557-8771

Bastian-Pinto, C. L.; Brandão, L. E.; Stanganello, A.; Pellegrino, R. and Marques, N. L. (2026) Assessing the role of term extension clauses in mitigating disruptive events in infrastructure concessions. Construction Management and Economics, 44(6), pp. 412-429. ISSN 0144-6193

Beitelmal, W H (2016) Towards an infrastructure asset management organizational model for developing countries. PhD thesis, University of Colorado at Boulder, USA.

Bello, N U; Jolaoso, A B and Olanrele, O O (2018) Comparative analysis of investment attributes of hotel and commercial property in South-Western Nigeria. African Journal of Built Environment Research, 2(1), pp. 1-20. ISSN 2414-0236

Belusko, M; Timothy, M and Leary, O (2010) Cost analyses of measures to improve residential energy ratings to 6 stars: Playford North development, South Australia. Construction Economics and Building, 10(1-2), pp. 36-47. ISSN 2204-9029

Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193

Bender, M J (1996) A framework for collaborative planning and investigations of decision support tools for hydro development. PhD thesis, University of Manitoba, Canada.

Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193

Bennett, W G and Karunarathna, H (2020) Coastal flood alleviation through management interventions under changing climate conditions. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 187-203. ISSN 1759-5916

Bernold, L E (1990) Testing bar-code technology in construction environment. Journal of Construction Engineering and Management, 116(4), pp. 643-655. ISSN 0733-9364

Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.

Bew, M D (2017) Engineering better social outcomes through requirements management & integrated asset data processing. PhD thesis, University of Salford, UK.

Biltoria, A K and Roy, U K (2024) Affordable housing using industrialized construction: a market-based standardization of housing units in India. Architectural Engineering and Design Management, 20(5), pp. 1203-1221. ISSN 1745-2007

Birchall, S J (2011) An appraisal of the performance of a 'green' office building. PhD thesis, University of Leeds, UK.

Birkeland, J L (2015) Prospects for nature in proposals for urban growth. Smart and Sustainable Built Environment, 4(3), pp. 310-314. ISSN 2046-6099

Bishop, D (1994) The professionals' view of the Health and Safety Commission's draft Construction (Design and Management) Regulations. Construction Management and Economics, 12(4), pp. 365-372. ISSN 01446193

Bitarafan, M; Hosseini, S B; Abazarlou, S and Mahmoudzadeh, A (2015) Selecting the optimal composition of architectural forms from the perspective of civil defense using AHP and IHWP methods. Architectural Engineering and Design Management, 11(2), pp. 137-148. ISSN 1745-2007

Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364

Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193

Blismas, N; Wakefield, R and Hauser, B (2010) Concrete prefabricated housing via advances in systems technologies: Development of a technology roadmap. Engineering, Construction and Architectural Management, 17(1), pp. 99-110. ISSN 0969-9988

Blyth, K; Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(4), pp. 193-210. ISSN 1471-4175

Boakye Danquah, C; Acheampong, A and Adjei-Kumi, T (2022) Level of awareness of formwork design in the Ghanaian construction industry; enabling future technology application. Journal of Engineering, Design and Technology, 20(4), pp. 1015-1039. ISSN 1726-0531

Borges, Maria Luiza Abath Escorel (2025) Decision-making optimization method for construction site layout planning based on slp and BIM. PhD thesis, Universidade Estadual de Campinas, Brazil.

Boukendour, S (2007) Preventing post-contractual opportunism by an option to switch from one contract to another. Construction Management and Economics, 25(7), pp. 723-727. ISSN 1466433X

Boukendour, S and Bah, R (2001) The guaranteed maximum price contract as call option. Construction Management and Economics, 19(6), pp. 563-567. ISSN 01446193

Boukendour, S and Hughes, W P (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), pp. 279-289. ISSN 01446193

Bourikas, L; Costanza, E; Gauthier, S; James, P A B; Kittley-Davies, J; Ornaghi, C; Rogers, A; Saadatian, E and Huang, Y (2018) Camera-based window-opening estimation in a naturally ventilated office. Building Research & Information, 46(2), pp. 148-16. ISSN 0961-3218

Bowden, S L (2005) Application of mobile IT in construction. EngD thesis, Loughborough University, UK.

Božiček, D; Almezeraani, Y and Košir, M (2024) Making sense of LCA results when evaluating multiple building designs: Comparison of interpretation concepts. Building Research & Information, 52(1-2), pp. 129-147. ISSN 0961-3218

Brandao, L E T and Saraiva, E (2008) The option value of government guarantees in infrastructure projects. Construction Management and Economics, 26(11), pp. 1171-1180. ISSN 1466433X

Braz, João Carlos Rocha (2014) Technical and economic evaluation of structural systems to eight floors residential buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Broer, S (2012) Solutions to climate change in UK housing developments: a lifestyle approach. EngD thesis, University College London, UK.

Broome, J C and Perry, J G (1995) Experiences of the use of the New Engineering Contract. Engineering, Construction and Architectural Management, 2(4), pp. 271-285. ISSN 0969-9988

Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.

Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364

Bukhari, Fakhri A (2011) A hierarchical evolutionary algorithmic design (head) system for generating and evolving building design models. PhD thesis, Queensland University of Technology, Australia.

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Burtonshaw-Gunn, S A (2001) Strategic supply chain management: Critical success factors for partnering relationships within the UK construction industry. PhD thesis, Manchester Metropolitan University, UK.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level. PhD thesis, KTH Royal Institute of Technology, Sweden.

Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), pp. 203-216. ISSN 01446193

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.

Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988

Cameron, I and Hare, B (2008) Planning tools for integrating health and safety in construction. Construction Management and Economics, 26(9), pp. 899-909. ISSN 1466433X

Campos, C R (2023) Simplified Matlab calculation tool for LCA optimization of domestic buildings. PhD thesis, University of Strathclyde, UK.

Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(6): 04024046, ISSN 0733-9364

Capitanio, M (2018) More green space in Japanese shopping streets: Assessing the manifold potential of green roofs in Shimokitazawa, Tokyo. Smart and Sustainable Built Environment, 7(2), pp. 212-222. ISSN 2046-6099

Carey, G (2017) An evaluation of how VfM can be achieved from a government's perspective in relation to school building projects in Ireland. PhD thesis, University of Salford, UK.

Carlsson, V and Koch, C (2014) Shall we dance? Encounters for energy renovation of single family houses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387

Carmichael, D G; Nguyen, T A and Shen, X (2019) Single treatment of PPP road project options. Journal of Construction Engineering and Management, 145(2): 04018122, ISSN 0733-9364

Cates, G R (2004) Improving project management with simulation and completion distribution functions. PhD thesis, University of Central Florida, USA.

Celis-D'Amico, F; Echeverria-Valiente, E; Garcia-Alvarado, R; Escorcia-Oyola, O and da Casa-Martín, F (2025) CASA+: Highly energy-efficient housing system for the central-south of Chile. Construction Innovation, 25(2), pp. 306-327. ISSN 1471-4175

Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(6), pp. 2463-2480. ISSN 0969-9988

Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2009) Drivers for adopting public private partnerships-empirical comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), pp. 1115-1124. ISSN 0733-9364

Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2010) Critical success factors for PPPs in infrastructure developments: Chinese perspective. Journal of Construction Engineering and Management, 136(5), pp. 484-494. ISSN 0733-9364

Chan, K H (2012) Critical factors in minimizing lighting energy. Architectural Engineering and Design Management, 8(1), pp. 21-29. ISSN 1745-2007

Chao, L C and Skibniewski, M J (1998) Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4), pp. 297-304. ISSN 0733-9364

Chao-Amonphat, S; Nitivattananon, V and Srinonil, S (2024) Adaptation measures on hydrological risks and climate change impacts in urbanized sub-region, Thailand: A case study in Lower Chao Phraya River basin. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 59-79. ISSN 1759-5916

Chapman, C and Ward, S (2008) Developing and implementing a balanced incentive and risk sharing contract. Construction Management and Economics, 26(6), pp. 659-669. ISSN 1466433X

Charef, R (2019) A BIM-based framework to integrate a sustainable end-of-life into the asset lifecycle: towards the circular economy. PhD thesis, Coventry University, UK.

Chau, A D; Hoang, H T and Nguyen, L D (2025) Web-based decision support system for automated pavement design and life-cycle cost analysis. Journal of Construction Engineering and Management, 151(8): 05025004, ISSN 0733-9364

Chau, K W; Lai, L W C; Liang, J; Ng, F F and Wong, K T (2021) The negative impact of public sector-led redevelopment projects on the prices of old and new housing units in high density urban areas. International Journal of Construction Management, 21(11), pp. 1156-1164. ISSN 1562-3599

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X

Checherita, C D (2009) A macroeconomic analysis of investment under public-private partnerships and its policy implications—the case of developing countries. PhD thesis, George Mason University, USA.

Chen, W and Lai, J (2025) Performance assessment of residential building renovation: A scientometric analysis and qualitative review of literature. Smart and Sustainable Built Environment, 14(3), pp. 625-648. ISSN 2046-6099

Cheng, T; Soo, G; Kumaraswamy, M and Jin, W (2010) Security of payment for Hong Kong construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 17-28. ISSN 17514312

Cheung, S O and Chow, P T (2011) Withdrawal in construction project dispute negotiation. Journal of Construction Engineering and Management, 137(12), pp. 1071-1079. ISSN 0733-9364

Cheung, S O; Yiu, K T W and Suen, H (2004) Construction negotiation online. Journal of Construction Engineering and Management, 130(6), pp. 844-852. ISSN 0733-9364

Chi, Sae (2018) Developing a methodology for evaluating privately operated toll road projects using stochastic cost-benefit analysis. PhD thesis, Queensland University of Technology, Australia.

Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.

Chin, C S and Russell, J S (2008) Predicting the expected service level and the realistic lead time of rfi process using binary logistic regression. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Choudhari, S and Tindwani, A (2017) Logistics optimisation in road construction project. Construction Innovation, 17(2), pp. 158-179. ISSN 1471-4175

Choudhary, K; Sangwa, N R and Sangwan, K S (2025) Comparative life cycle assessment of flooring options for sustainable buildings. Construction Innovation, 25(4), pp. 1108-1126. ISSN 1471-4175

Chowdhooree, I; Aziz, T; Rashid, M J and Hossain, M (2024) Climate change adaptation through nature-based solution: Examining the case of Thakurani Khal of Mongla Port Municipality, Bagerhat Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 474-493. ISSN 1759-5916

Christie, L; Donn, M and Walton, D (2011) The'apparent disconnect' towards the adoption of energy-e/cient technologies. Building Research & Information, 39(5), pp. 450-458. ISSN 0961-3218

Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system. PhD thesis, University of Newcastle upon Tyne, UK.

Cieraad, F D; Schraven, D F J and de Bruijne, M L C (2018) Investments under pressure: A real options approach to prepare for emergency asylum shelter in a multi actor setting. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Clapp, D; Shuler, S; Nobe, M D; Demiranda, M and Nobe, M E C (2007) Capital equipment acquisition in heavy construction. International Journal of Construction Education and Research, 3(3), pp. 159-178. ISSN 1557-8771

Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy. PhD thesis, University of Florida, USA.

Coelho Maran, A C (2010) Multicriteria decision support system to delineate water resources planning and management regions. PhD thesis, Colorado State University, USA.

Cole, R J and Mitchell, L (1999) Customizing and using GBTool: Two case-study projects. Building Research & Information, 27(4-5), pp. 257-275. ISSN 0961-3218

Contarini, A and Meijer, A (2015) LCA comparison of roofing materials for flat roofs. Smart and Sustainable Built Environment, 4(1), pp. 97-109. ISSN 2046-6099

Craig, R (1999) How innovative is the common law of tendering? Journal of Construction Procurement, 5(1), pp. 15-26. ISSN 1358-9180

Craighill, A L (2002) Lifecycle assessment and evaluation of construction and demolition waste management. PhD thesis, University of East Anglia, UK.

Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.

Crippa, J; Boeing, L C; Caparelli, A P A; da Costa, M R M M; Scheer, S; Araujo, A M F and Bem, D (2018) A BIM–LCA integration technique to embodied carbon estimation applied on wall systems in Brazil. Built Environment Project and Asset Management, 8(5), pp. 491-503. ISSN 2044-124X

Crosthwaite, D (2001) The internationalisation of construction professional services: Consulting engineers overseas. PhD thesis, University of Reading, UK.

DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.

Dave, N; Guduru, R; Misra, A K and Sharma, A K (2022) Experimental evaluation of bond behavior in controlled, binary and quaternary concretes developed using scms. Journal of Engineering, Design and Technology, 20(6), pp. 1430-1448. ISSN 1726-0531

Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.

Davies, R J (2003) Formulating competitive strategy in the UK housebuilding industry: Executive summary. EngD thesis, University of Warwick, UK.

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193

Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193

De Araujo, V (2023) Timber construction as a multiple valuable sustainable alternative: Main characteristics, challenge remarks and affirmative actions. International Journal of Construction Management, 23(8), pp. 1334-1343. ISSN 1562-3599

De La Garza, J M and Mitropoulos, P (1992) Flavors and mixins of expert systems technology transfer model for AEC industry. Journal of Construction Engineering and Management, 118(3), pp. 435-453. ISSN 0733-9364

De Neyra, P L A and Celoza, A (2026) Identifying influential factors in end-of-life decision-making for buildings using the Delphi method. Journal of Construction Engineering and Management, 152(4): 04026015, ISSN 0733-9364

De Wilde, P J C J (2004) Computational support for the selection of energy saving building components. PhD thesis, Delft University of Technology, Netherlands.

Dean, W E (1992) Earthquakes and old buildings: Seismic risk permits for California structures. PhD thesis, RAND Graduate School, USA.

Delgado, L; Shealy, T; Garvin, M and Pearce, A (2018) Framing energy efficiency with payback period: Empirical study to increase energy consideration during facility procurement processes. Journal of Construction Engineering and Management, 144(5): 04018027, ISSN 0733-9364

Delghust, M; Roelens, W; Tanghe, T; De Weerdt, Y and Janssens, A (2015) Regulatory energy calculations versus real energy use in high-performance houses. Building Research & Information, 43(6), pp. 675-690. ISSN 0961-3218

Diehlmann, F; Hiemsch, P S; Wiens, M; Lüttenberg, M and Schultmann, F (2022) Including decision-makers preferences in the cost-deprivation trade-off during disaster interventions. Journal of Engineering, Design and Technology, 20(2), pp. 543-565. ISSN 1726-0531

Diker, F and Erkan, İ (2022) Fuzzy logic method in the design of elementary school classrooms. Architectural Engineering and Design Management, 18(5), pp. 739-758. ISSN 1745-2007

Dikmen, I; Birgonul, M T and Arikan, A E (2006) Application of an integrated risk management system (IRMS) to an international construction project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dilger, W H; Tadros, G S and Giannelia, P (1992) Method proposed for construction of multispan cable-stayed bridges. Journal of Construction Engineering and Management, 118(2), pp. 273-282. ISSN 0733-9364

Ding, G and Forsythe, P (2016) A comparative study of floor construction on sloping sites: An analysis of cumulative energy demand and greenhouse gas emissions. Construction Economics and Building, 16(1), pp. 33-49. ISSN 2204-9029

Ding, G K C (2005) Developing a multicriteria approach for the measurement of sustainable performance. Building Research & Information, 33(1), pp. 3-16. ISSN 0961-3218

Ding, Grace K C (2004) The development of a multi-criteria approach for the measurement of sustainable performance for built projects and facilities. PhD thesis, University of Technology Sydney, Australia.

Doan, P and Menyah, K (2013) Impact of irreversibility and uncertainty on the timing of infrastructure projects. Journal of Construction Engineering and Management, 139(3), pp. 331-338. ISSN 0733-9364

Dolla, T; Devkar, G and Boeing, L (2021) Procurement governance and information asymmetry in waste management of India. Built Environment Project and Asset Management, 11(1), pp. 38-51. ISSN 2044-124X

Doloi, H (2008) Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives. Construction Management and Economics, 26(11), pp. 1181-1196. ISSN 1466433X

Dominguez, D (2008) Handling future uncertainty: Strategic planning for the infrastructure sector. DSc thesis, ETH Zürich, Switzerland.

Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.

Donn, M; Selkowitz, S and Bordass, B (2012) The building performance sketch. Building Research & Information, 40(2), pp. 186-208. ISSN 0961-3218

Donohoe, S and Coggins, J K (2016) Framework agreements in a post-recession economy. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dowd, V G (1996) The effect of economic cycles on the development and use of alternative procurement systems in the UK construction industry during the period 1965-1995. Journal of Construction Procurement, 2(1), pp. 11-29. ISSN 1358-9180

Downey, M (2014) Selection and adoption of low and zero carbon technologies in social housing: a socio-technical network approach. PhD thesis, University of Reading, UK.

Dowsett, R; Green, M; Sexton, M and Harty, C (2019) Projecting at the project level: MMC supply chain integration roadmap for small housebuilders. Construction Innovation, 19(2), pp. 193-211. ISSN 1471-4175

Du, H; Han, Q; Sun, J and Wang, C C (2023) Adoptions of prefabrication in residential sector in China: Agent-based policy option exploration. Engineering, Construction and Architectural Management, 30(4), pp. 1697-1725. ISSN 0969-9988

Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364

DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.

Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175

Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.

Dunn, P J; Oyegoke, A S; Ajayi, S; Palliyaguru, R and Devkar, G (2023) Challenges and benefits of led retrofit projects: A case of salix financed secondary school in the UK. Journal of Engineering, Design and Technology, 21(6), pp. 1883-1900. ISSN 1726-0531

Dunston, P S; Savage, B M and Mannering, F L (2000) Weekend closure for construction of asphalt overlay on urban highway. Journal of Construction Engineering and Management, 126(4), pp. 313-315. ISSN 0733-9364

Edum-Fotwe, F T (1995) A framework for improving the strategic management of construction contractors. PhD thesis, Loughborough University, UK.

Edum-Fotwe, F T; Thorpe, A and McCaffer, R (2000) Assessing potential of on-line transaction for information as a resource in the construction process. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Edum-Fotwe, F T; Thorpe, A; McCaffer, R and Price, A D F (1997) Developing construction management research: A balance of perspectives. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Ekanayake, L L (2006) Interface conflicts and regulatory decision making process on power projects in Sri Lanka. PhD thesis, National University of Singapore, Singapore.

Ekström, M A and Björnsson, H C (2005) Valuing flexibility in architecture, engineering, and construction information technology investments. Journal of Construction Engineering and Management, 131(4), pp. 431-438. ISSN 0733-9364

El-Adaway, I H and Kandil, A A (2009) Contractors' claims insurance: A risk retention approach. Journal of Construction Engineering and Management, 135(9), pp. 819-825. ISSN 0733-9364

El-Mashaleh, M S; Hyari, K H; Bdour, A N and Rababeh, S M (2016) A multi-attribute decision-making model for construction enterprise resource planning system selection. International Journal of Construction Education and Research, 12(1), pp. 66-79. ISSN 1557-8771

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Elbeltagi, E; Hosny, O A; Elhakeem, A; Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(7), pp. 659-670. ISSN 1466433X

Elliman, T and Orange, G (2003) Developing distributed design capabilities in the construction supply chain. Construction Innovation, 3(1), pp. 15-26. ISSN 1471-4175

Elmahroug, M H; Tutesigensi, A and Brookes, N J (2014) Integrating external stakeholder identification and project initiation in civil engineering infrastructure projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Embry, E (2023) Building change: A multi-level analysis of resilience through sustainability, health, and entrepreneurship in the built environment. PhD thesis, University of Colorado at Boulder, USA.

Emekci, Ş (2018) A life cycle costing based decision support tool for cost-optimal energy efficient design and/or refurbishments. PhD thesis, Middle East Technical University, Turkey.

Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.

English, J and Bowen, P (2012) Overcoming potential risks to females employed in the South African construction industry. International Journal of Construction Management, 12(1), pp. 37-49. ISSN 1562-3599

Ertuğrul, H M and Pirgaip, B (2021) The nexus between construction investment and economic development: Evidence from mena countries. Construction Management and Economics, 39(11), pp. 932-947. ISSN 01446193

Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X

Esmaeeli, A N and Heravi, G (2019) Real options approach versus conventional approaches to valuing highway projects under uncertainty. Journal of Construction Engineering and Management, 145(11): 04019068, ISSN 0733-9364

Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X

Etzion, Y (1980) A theoretical basis for a model of the selection, design and integration of sub-systems in the building process to minimize cost. PhD thesis, Texas A&M University, USA.

Evans, S.; Steadman, P.; Neto-Bradley, A.; Humphrey, D.; Liddiard, R.; Shamsi, H.; Palmer, J. and Simons, G. (2026) Nine 'myths' about the building stock of Great Britain. Buildings & Cities, 7(1), pp. 704-721. ISSN 2632-6655

Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364

Fahmy, Sami W (2005) Comparative analysis of expected and actual performance of public design-build projects. PhD thesis, University of Calgary, Canada.

Famakin, I O; Aje, I O and Ogunsemi, D R (2012) Assessment of success factors for joint venture construction projects in Nigeria. Journal of Financial Management of Property and Construction, 17(2), pp. 153-165. ISSN 1366-4387

Fang, Y and Ng, S T (2011) Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(3), pp. 259-281. ISSN 1471-4175

Farmer, C M (2018) Constructing program management offices for major defense acquisition programs: Factors to consider. DEng thesis, George Washington University, USA.

Farnsworth, C B; Warr, R O; Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC project delivery on managing process risk in transportation construction. Journal of Construction Engineering and Management, 142(3): 04015091, ISSN 0733-9364

Farrell, M L (1999) The evolution of value theory and the practice of real estate valuation. Journal of Financial Management of Property and Construction, 4(2), pp. 5-32. ISSN 1366-4387

Farrow, C B and Reyes, M D (2022) Land-grant university strategic plans: Are university-level service-learning goals aligned with construction programs’ goals? International Journal of Construction Education and Research, 18(4), pp. 333-351. ISSN 1557-8771

Fawcett, W; Hughes, M; Krieg, H; Albrecht, S and Vennström, A (2012) Flexible strategies for long-term sustainability under uncertainty. Building Research & Information, 40(5), pp. 545-557. ISSN 0961-3218

Feiruzi, A (2024) The turnover dynamics of residential buildings. PhD thesis, Lancaster University, UK.

Ferreira, J (2024) Analysis of urban parameters via geoprocessing as a basis for city's master plans: The case of Ribeirão das Neves city, MG Brazil. International Journal of Building Pathology and Adaptation, 42(2), pp. 257-277. ISSN 23984708

Fiener, Y (2011) An intelligent system for vulnerability and remediation assessment of flooded residential buildings. PhD thesis, Loughborough University, UK.

Firouzi, A and Vahdatmanesh, M (2019) Applicability of financial derivatives for hedging material price risk in highway construction. Journal of Construction Engineering and Management, 145(5): 04019023, ISSN 0733-9364

Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.

Flores Salas, A (2016) Evaluation of the use of lightweight concrete panels for post disaster house reconstruction using Building Information Modelling. PhD thesis, University of Manchester, UK.

Foliente, G and Seo, S (2012) Modelling building stock energy use and carbon emission scenarios. Smart and Sustainable Built Environment, 1(2), pp. 118-138. ISSN 2046-6099

Forbes, C (2018) Rebuilding Nepal: Traditional and modern approaches, building or diminishing resilience? International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 218-229. ISSN 1759-5916

Ford, D N and Bhargav, S (2006) Project management quality and the value of flexible strategies. Engineering, Construction and Architectural Management, 13(3), pp. 275-289. ISSN 0969-9988

Fore, S and Mbohwa, C (2015) Greening manufacturing practices in a continuous process industry: Case study of a cement manufacturing company. Journal of Engineering, Design and Technology, 13(1), pp. 94-122.

Fore, S and Mbohwa, C T (2010) Cleaner production for environmental conscious manufacturing in the foundry industry. Journal of Engineering, Design and Technology, 8(3), pp. 314-333. ISSN 1726-0531

Forsythe, P (2018) Extending and operationalizing construction productivity measurement on building projects. Construction Management and Economics, 36(12), pp. 683-699. ISSN 01446193

Fouchal, F; Ellis, K; Hassan, T and Firth, S (2013) ICT-enabled energy efficiency: a lens onto practices of other sectors. Smart and Sustainable Built Environment, 2(2), pp. 158-178. ISSN 2046-6099

Fox, S (2003) A matrix to indicate the utility of technologies. Construction Management and Economics, 21(2), pp. 187-196. ISSN 01446193

Fox, S; Marsh, L and Cockerham, G (2002) How building design imperatives constrain construction productivity and quality. Engineering, Construction and Architectural Management, 9(5-6), pp. 378-387. ISSN 0969-9988

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector. PhD thesis, KTH Royal Institute of Technology, Sweden.

Francis, V and Lingard, H (2002) The case for family-friendly work practices in the Australian construction industry. Construction Economics and Building, 2(1), pp. 28-36. ISSN 2204-9029

Francis, V and Prosser, A (2014) Exploring vocational guidance and gender in construction. International Journal of Construction Education and Research, 10(1), pp. 39-57. ISSN 1557-8771

Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(3), pp. 160-173. ISSN 01446193

Freer, D R (2000) Vital considerations for the design and construction of new student housing communities. EdD thesis, University of California, Los Angeles, USA.

Gaafar, H K (1997) Risk allocations in standard forms of engineering and construction contract. PhD thesis, University of Birmingham, UK.

Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364

Gann, D M and Barlow, J (1996) Flexibility in building use: The technical feasibility of converting redundant offices into flats. Construction Management and Economics, 14(1), pp. 55-66. ISSN 01446193

Gannon, E J (1998) A life-cycle cost model for use in the optimization of concrete bridge deck repair and rehabilitation. PhD thesis, Pennsylvania State University, USA.

Gao, R and Liu, J (2019) Selection of government supervision mode of PPP projects during the operation stage. Construction Management and Economics, 37(10), pp. 584-603. ISSN 01446193

Gao, Y; Gan, Y; Chen, Y and Chen, Y (2025) Application of large language models to intelligently analyze long construction contract texts. Construction Management and Economics, 43(3), pp. 226-242. ISSN 0144-6193

Garcera, F C (2008) The rationale behind a small school district's decision to hire a facilities manager. EdD thesis, University of Pacific, USA.

Garcia, C; Huebschman, R; Abraham, D M and Bullock, D M (2006) Using GPS to measure the impact of construction activities on rural interstates. Journal of Construction Engineering and Management, 132(5), pp. 508-515. ISSN 0733-9364

Garcia, R (2018) California energy policy alternatives for commercial buildings to create energy resiliency, reduce carbon emissions, and lessen dependency on electrical utilities for the future California economy. EdD thesis, Brandman University, USA.

Garthwaite, P M and Eckert, C M (2012) Glitches, snags and crises: A study of change in two hospital adaptation projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructive investment decisions. Construction Management and Economics, 22(4), pp. 373-383. ISSN 01446193

Georgiou, A; Haritos, G; Fowler, M and Imani, Y (2016) Advanced phase powertrain design attribute and technology value mapping. Journal of Engineering, Design and Technology, 14(1), pp. 115-133.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Ghodki, M K (2024) A new solar powered robotic arm guided master–slave electric motors of biomass conveyor. Journal of Engineering, Design and Technology, 22(3), pp. 739-762. ISSN 1726-0531

Ghorbani Naeini, H; Norouziasas, A; Piraei, F; Kazemi, M; Kazemi, M and Hamdy, M (2024) Impact of building envelope parameters on occupants’ thermal comfort and energy use in courtyard houses. Architectural Engineering and Design Management, 20(6), pp. 1725-1751. ISSN 1745-2007

Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988

Giahchy, S; Hosseini, S A; Akhbari, M; Safa, E and Akbarpour, A (2023) A novel mathematical multi-criteria decision-making model for optimizing life cycle energy and cost in construction projects planning. Architectural Engineering and Design Management, 19(2), pp. 200-213. ISSN 1745-2007

Giesekam, J J (2016) The contribution to UK climate mitigation targets from reducing embodied carbon in the construction sector. PhD thesis, University of Leeds, UK.

Gillette, J R (1986) The law and economics of the feasibility criterion as used in section 6(b)(5) of the occupational safety and health act and in the occupational noise standard (OSHA, occupational standards). PhD thesis, Texas A&M University, USA.

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Goel, A (2025) Construction management students' perception of BIM adoption and its implications in a non-mandated country. International Journal of Construction Management, 25(3), pp. 278-288. ISSN 1562-3599

Goh, B H and Sun, Y (2016) The development of life-cycle costing for buildings. Building Research & Information, 44(3), pp. 319-333. ISSN 0961-3218

Goncikowski, M (2024) Research by design: determining the form of the initial architectural concept of a skyscraper building in warsaw. Architectural Engineering and Design Management, 20(1), pp. 1-31. ISSN 1745-2007

González, J; Da Costa, B B F; Tam, V W Y and Haddad, A (2024) Effects of latitude and building orientation in indoor-illuminance levels towards energy efficiency. International Journal of Construction Management, 24(7), pp. 784-798. ISSN 1562-3599

Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), pp. 121-144. ISSN 01446193

Greeff, T N (2018) Justification for the recognition of a new nominate contract based on project defect management. LLD thesis, University of Pretoria, South Africa.

Green, E; Lannon, S; Patterson, J; Variale, F and Iorwerth, H (2020) Decarbonising the welsh housing stock: From practice to policy. Buildings & Cities, 1(1), pp. 277-292. ISSN 2632-6655

Griffis, F H and Christodoulou, S (2000) Construction risk analysis tool for determining liquidated damages insurance premiums: Case study. Journal of Construction Engineering and Management, 126(6), pp. 407-413. ISSN 0733-9364

Griffiths, P W; Norton, B; Eames, P C and Lo, S N G (1996) Detailed simulation of heat transfer across planar evacuated glazing. Building Research & Information, 24(3), pp. 141-147. ISSN 0961-3218

Grosse, H (2022) Exploring sustainability and identities from an investor's perspective: An autoethnography. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Gruneberg, S (2013) Strategy framework for post-construction contractor services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits. PhD thesis, Pennsylvania State University, USA.

Guo, K; Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: A public-private partnership perspective. Construction Management and Economics, 39(2), pp. 156-172. ISSN 01446193

Guo, Y; Su, Y; Chen, C and Martek, I (2024) Inclusion of "managing flexibility" valuations in the pricing of PPP projects: A multi-objective decision-making method. Engineering, Construction and Architectural Management, 31(11), pp. 4562-4584. ISSN 0969-9988

Haeusler, M H; Hespanhol, L and Hoggenmueller, M (2018) Participationplus: Documenting a design process of a media architecture installation in the second digital turn era. Smart and Sustainable Built Environment, 7(1), pp. 133-149. ISSN 2046-6099

Haghighi, Z (2022) Architectural photovoltaic application. PhD thesis, Delft University of Technology, Netherlands.

Hailemariam, E K; Hailemariam, L M; Amede, E A and Nuramo, D A (2023) Identification of barriers, benefits and opportunities of using bamboo materials for structural purposes. Engineering, Construction and Architectural Management, 30(7), pp. 2716-2738. ISSN 0969-9988

Hairstans, R (2007) Optimisation of timber platform frame construction. PhD thesis, Edinburgh Napier University, UK.

Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.

Haj Seiyed Taghia, S A; Darvishvand, H R and Ebrahimi, M (2020) Economic analyses for low-strength concrete wrapped with CFRP to improve the mechanical properties and seismic parameters. Journal of Construction Engineering and Management, 146(3): 04019117, ISSN 0733-9364

Hamida, H and Alshibani, A (2021) A multi-criteria decision-making model for selecting curtain wall systems in office buildings. Journal of Engineering, Design and Technology, 19(4), pp. 904-931. ISSN 1726-0531

Hamidavi, T; Abrishami, S; Ponterosso, P; Begg, D and Nanos, N (2020) OSD: A framework for the early stage parametric optimisation of the structural design in BIM-based platform. Construction Innovation, 20(2), pp. 149-169. ISSN 1471-4175

Hamilton, I G; Summerfield, A J; Steadman, J P; Stone, A and Davies, M (2010) Exploring energy integration between new and existing developments. Building Research & Information, 38(6), pp. 593-609. ISSN 0961-3218

Hamilton-MacLaren, F (2013) Alternative, more sustainable, wall construction techniques than brick and block, for new housing in England and Wales. PhD thesis, Loughborough University, UK.

Hampshire, P (2015) The development of an approach and decision support tool to inform sustainable roof selection. EngD thesis, University of Bath, UK.

Hampson, K and Tatum, C B (1997) Technology strategy and competitive performance in bridge construction. Journal of Construction Engineering and Management, 123(2), pp. 153-161. ISSN 0733-9364

Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387

Han, S H; Diekmann, J E and Ock, J H (2005) Contractor's risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), pp. 283-292. ISSN 0733-9364

Han, Sang Hyeok (2014) BIM-based motion planning of mobile crane operation in modular-based heavy construction sites. PhD thesis, University of Alberta, Canada.

Hanioglu, M N and Arditi, D (2013) Teaming/timing sequences in hotel development projects. Construction Management and Economics, 31(4), pp. 369-385. ISSN 1466433X

Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364

Hansen, G K and Olsson, N O E (2011) Layered project-layered process: Lean thinking and flexible solutions. Architectural Engineering and Design Management, 7(2), pp. 70-84. ISSN 1745-2007

Harode, A; Thabet, W and Leite, F (2024) Formulation of feature and label space using modified Delphi in support of developing a machine-learning algorithm to automate clash resolution. Journal of Construction Engineering and Management, 150(3): 04023173, ISSN 0733-9364

Haroglu, H (2010) Investigating the structural frame decision making process. EngD thesis, Loughborough University, UK.

Harris, R; Romer, J; Kelly, O and Johnson, S (2003) Design and construction of the downland gridshell. Building Research & Information, 31(6), pp. 427-454. ISSN 0961-3218

Harris, R A; Bowlby, W and Cohn, L F (1987) Method for analyzing construction haul noise impacts. Journal of Construction Engineering and Management, 113(1), pp. 6-16. ISSN 0733-9364

Hassan, O A B and Johansson, C (2018) Glued laminated timber and steel beams: A comparative study of structural design, economic and environmental consequences. Journal of Engineering, Design and Technology, 16(3), pp. 398-417. ISSN 1726-0531

Hassanein, M A A G (1990) Mechanisms for transfer of price risk of construction materials. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.

Hautamäki, R; Kulmala, L; Ariluoma, M and Järvi, L (2025) How urban green infrastructure contributes to carbon neutrality. Buildings & Cities, 6(1), pp. 272-280. ISSN 2632-6655

Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364

Heljedal M, P F (2013) Sustainable intermodal transportation of prefabricated construction materials. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Hemström, K; Gustavsson, L and Mahapatra, K (2017) The sociotechnical regime and Swedish contractor perceptions of structural frames. Construction Management and Economics, 35(4), pp. 184-195. ISSN 01446193

Henao, Y; Grubert, E; Korey, M; Bank, L C and Gentry, R (2024) Life cycle assessment and life cycle cost analysis of repurposing decommissioned wind turbine blades as high-voltage transmission poles. Journal of Construction Engineering and Management, 150(5): 05024004, ISSN 0733-9364

Hendrickson, Thomas Peter (2013) Carbon and water resource management for water distribution systems. PhD thesis, University of California, USA.

Hernandez, P and Kenny, P (2010) Integrating occupant preference and life cycle energy evaluation: A simplified method. Building Research & Information, 38(6), pp. 625-637. ISSN 0961-3218

Hezel, Claudia Regina (2014) Impact assessment of the requirements of the contractor in integrated management systems for industrial assembly companies in the oil industry. PhD thesis, Universidade Estadual de Campinas, Brazil.

Hinze, J; Hallowell, M and Baud, K (2013) Construction-safety best practices and relationships to safety performance. Journal of Construction Engineering and Management, 139(10): 04013006, ISSN 0733-9364

Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. Construction Management and Economics, 20(2), pp. 143-156. ISSN 01446193

Ho, S P and Liu, L Y (2003) How to evaluate and invest in emerging A/E/C technologies under uncertainty. Journal of Construction Engineering and Management, 129(1), pp. 16-24. ISSN 0733-9364

Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hoare, D and Broome, J (2001) Bills of quantities versus activity schedules for civil engineering projects. Journal of Construction Procurement, 7(1), pp. 11-26. ISSN 1358-9180

Hofmann, Giane Alfenas Antunes (2019) Parameters for the prevention of pathologies in steel-structured buildings. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Holden, S L (2021) Land, materials, and construction site: Decommodification through alternative construction. PhD thesis, University of Manchester, UK.

Holmes, S H and Reinhart, C F (2013) Assessing future climate change and energy price scenarios: Institutional building investment. Building Research & Information, 41(2), pp. 209-222. ISSN 0961-3218

Holtström, J; Kenlind, S S and Nord, T (2024) Project-based business models in the construction industry: key success factors for sustainable timber extension projects. Construction Management and Economics, 42(7), pp. 656-669. ISSN 01446193

Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.

Hopkin, C and Lay, S (2024) Conceptual arguments on the use of unlatched reverse swing "flappy" door smoke control systems in residential buildings. International Journal of Building Pathology and Adaptation, 42(4), pp. 618-636. ISSN 23984708

Horne, M; Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(2), pp. 96-108. ISSN 0961-3218

Hosseini Sabzevari, S A; Mottaki, Z; Hassani, A; Zandiyeh, S and Aslani, F (2023) Temporary housing site selection in soffeh mountain, district 5 of Isfahan, Iran. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 611-627. ISSN 1759-5916

Hu, E; Zou, L and Langston, C (2004) A new interlink decision making index for making multi-criteria decision. Construction Economics and Building, 4(2), pp. 33-42. ISSN 2204-9029

Hu, M; Bergsdal, H; Van Der Voet, E; Huppes, G and Muller, D B (2010) Dynamics of urban and rural housing stocks in China. Building Research & Information, 38(3), pp. 301-317. ISSN 0961-3218

Hu, X; Xia, B; Buys, L; Skitmore, M; Kennedy, R and Drogemuller, R (2015) Stakeholder analysis of a retirement village development in Australia: Insights from an interdisciplinary workshop. International Journal of Construction Management, 15(4), pp. 299-309. ISSN 1562-3599

Huang, Y L and Chou, S P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(4), pp. 379-389. ISSN 01446193

Huang, Y L and Lin, T C (2023) Compound deferrable options for the valuation of multi-stage infrastructure investment projects. Construction Management and Economics, 41(8), pp. 670-686. ISSN 01446193

Huang, Y L and Lin, W (2010) Does debt structure matter? Estimating contractor default barrier by the down-and-out call option approach. Construction Management and Economics, 28(9), pp. 947-958. ISSN 1466433X

Huang, Y L and Pi, C C (2009) Valuation of multi-stage BOT projects involving dedicated asset investments: A sequential compound option approach. Construction Management and Economics, 27(7), pp. 653-666. ISSN 1466433X

Huang, Y L and Pi, C C (2014) Real-option valuation of build-operate-transfer infrastructure projects under performance bonding. Journal of Construction Engineering and Management, 140(5): 04013068, ISSN 0733-9364

Hui, E C M and Fung, H H K (2009) Real estate development as real options. Construction Management and Economics, 27(3), pp. 221-227. ISSN 1466433X

Hui, E C M and Ivan, I M H (2008) A risk-based option pricing strategy for property valuation: An empirical study in Hong Kong. Journal of Financial Management of Property and Construction, 13(1), pp. 48-59. ISSN 1366-4387

Hui, E C M and Lam, M C M (2004) Holistic perspective of population mobility: A review. Journal of Financial Management of Property and Construction, 9(1), pp. 53-62. ISSN 1366-4387

Ibrahim, K I; Costello, S B; Wilkinson, S and Walker, D (2016) Project alliancing: The case of road infrastructure projects in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499

Ikedi, C U; Okoroh, M I; Dean, A and Omer, S A (2010) Impact assessment for building integrated photovoltaic (BIPV). In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ikediashi, D and Aigbavboa, C (2019) Outsourcing as a strategy for facilities management provision in Nigerian universities. International Journal of Construction Management, 19(4), pp. 281-290. ISSN 1562-3599

Imu, N J; Ezeamama, A and Matemilola, S (2022) Assessment of energy and emissions saving impact of solar PV modules: A case study of Bangladesh. International Journal of Building Pathology and Adaptation, 40(4), pp. 608-621. ISSN 23984708

Infante-Perea, M; Román-Onsalo, M and Navarro-Astor, E (2025) Occupational alternatives in Spanish building engineering: A gender perspective. Journal of Engineering, Design and Technology, 23(6), pp. 2005-2022. ISSN 1726-0531

Ireland, P N (2005) Supply chain management in construction: an analysis of the appropriateness of proactive supply chain management thinking for the construction industry. PhD thesis, University of Birmingham, UK.

Irizarry, J; Gheisari, M; Zolfagharian, S and Meadati, P (2013) Human computer interaction modes for construction education applications: Experimenting with small format interactive displays. International Journal of Construction Education and Research, 9(2), pp. 83-101. ISSN 1557-8771

Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.

Ishtiaque, T A and Klakegg, O J (2025) Effects of early contractor involvement in small construction projects: Lessons from Norway. Built Environment Project and Asset Management, 15(4), pp. 879-893. ISSN 2044-124X

Itard, L and Klunder, G (2007) Comparing environmental impacts of renovated housing stock with new construction. Building Research & Information, 35(3), pp. 252-267. ISSN 0961-3218

Ittmann, J T (2020) Liability of the structural engineer: Establishing, quantifying, and managing risks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Jafar Ramaji, I (2016) An integrated building information modeling (BIM) framework for multi-story modular buildings. PhD thesis, Pennsylvania State University, USA.

James, P D (2012) The specification of construction strategies for low and zero carbon homes: decision-making tools and the evaluation of whole life energy, carbon, cost and performance. PhD thesis, University of Manchester, UK.

Jang, W; Yu, G; Jung, W; Kim, D and Han, S H (2018) Financial conflict resolution for public-private partnership projects using a three-phase game framework. Journal of Construction Engineering and Management, 144(3): 05017022, ISSN 0733-9364

Jarkas, A M and Haupt, T C (2015) Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), pp. 165-194.

Jellema, P; Annemans, M and Heylighen, A (2020) The roles of cancer care facilities in users' well-being. Building Research & Information, 48(3), pp. 254-268. ISSN 0961-3218

Ji, Y; Lee, A and Swan, W (2019) Retrofit modelling of existing dwellings in the UK: The Salford energy house case study. International Journal of Building Pathology and Adaptation, 37(3), pp. 344-360. ISSN 23984708

Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.

Jiménez-Moreno, P (2020) Mass customisation for zero energy housing: the potential of Japanese manufacturing practices in the context of sustainable housebuilding in the United Kingdom. PhD thesis, University of Edinburgh, UK.

Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Johnston, M; Guaralda, M and Sawang, S (2014) Sustainable innovation for Queensland's housing design: A case study. Construction Economics and Building, 14(4), pp. 11-31. ISSN 2204-9029

Jones, P; Lannon, S and Patterson, J (2013) Retrofitting existing housing: How far, how much? Building Research & Information, 41(5), pp. 532-550. ISSN 0961-3218

Jordan, E; Gross, M E; Javernick-Will, A N and Garvin, M J (2011) Use and misuse of qualitative comparative analysis. Construction Management and Economics, 29(11), pp. 1159-1173. ISSN 1466433X

Joyce, S (2016) Performance driven design systems in practice. EngD thesis, University of Bath, UK.

Juan, C and Olmos, F (2019) Public-private equity joint ventures and risk transfers in motorways of the sea. Built Environment Project and Asset Management, 9(5), pp. 669-682. ISSN 2044-124X

Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.

Junjia, Y; Ales@Alias, A H; Haron, N A and Abu Bakar, N (2025) Developing a method for evaluating the value of hoisting risk response strategies: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 32(9), pp. 6115-6136. ISSN 0969-9988

Jupp, B C (2003) Forecasting value in building projects. PhD thesis, Loughborough University, UK.

Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Kalla, M; Kalaycioglu, O; Hecht, R; Schneider, S and Schmidt, C (2024) Station biophilia: Assessing the perception of greenery on railway platforms using a digital twin. Building Research & Information, 52(1-2), pp. 164-180. ISSN 0961-3218

Kalla, M; Kalaycioglu, O; Hecht, R; Schneider, S and Schmidt, C (2024) Station biophilia–assessing the perception of greenery on railway platforms using a digital twin. Building Research & Information, 52(1-2), pp. 164-180. ISSN 0961-3218

Kalutara, P; Zhang, G; Setunge, S and Wakefield, R (2017) Factors that influence Australian community buildings' sustainable management. Engineering, Construction and Architectural Management, 24(1), pp. 94-117. ISSN 0969-9988

Kamat, K J (2003) Decision making and negotiation: Establishing social order on a construction site. PhD thesis, University of Birmingham, UK.

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kang, B; Price, A D F; Thorpe, A and Edum-Fotwe, F T (2004) Developing a systems approach for managing ethics in construction project environments. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.

Kappia, J G (2006) Career dynamics within the construction industry: a trade and craft perspective. PhD thesis, Loughborough University, UK.

Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.

Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304

Kashani, H; Ashuri, B; Shahandashti, S M and Lu, J (2015) Investment valuation model for renewable energy systems in buildings. Journal of Construction Engineering and Management, 141(2): 04014074, ISSN 0733-9364

Kashem, S B (2019) Housing practices and livelihood challenges in the hazard-prone contested spaces of rural Bangladesh. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 420-434. ISSN 1759-5916

Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364

Kassem, M; Dawood, N and Mitchell, D (2012) A decision support system for the selection of curtain wall systems at the design development stage. Construction Management and Economics, 30(12), pp. 1039-1053. ISSN 1466433X

Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364

Kavishe, N; Jefferson, I and Chileshe, N (2019) Evaluating issues and outcomes associated with public-private partnership housing project delivery: Tanzanian practitioners' preliminary observations. International Journal of Construction Management, 19(4), pp. 354-369. ISSN 1562-3599

Kaya, S; Hinks, J and Alexander, K (2005) Innovation in facilities supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kayan, B A (2017) Green maintenance for heritage buildings: Paint repair appraisal. International Journal of Building Pathology and Adaptation, 35(1), pp. 63-89.

Kayan, B A and Ashraf, N N (2023) Evaluating the environmental maintenance impact (EMI): A carbon life cycle assessment (LCA) of the singgora roof tiles repair in heritage buildings. International Journal of Building Pathology and Adaptation, 41(5), pp. 905-925. ISSN 23984708

Kayan, B A; Forster, A M and Banfill, P F G (2016) Green maintenance for historic masonry buildings: An option appraisal approach. Smart and Sustainable Built Environment, 5(2), pp. 143-164. ISSN 2046-6099

Keane, C (2012) Essays in social policy and labour economics. PhD thesis, University College Dublin, Ireland.

Kehinde, J O and Mosaku, T O (2006) An empirical study of assets structure of building construction contractors in Nigeria. Engineering, Construction and Architectural Management, 13(6), pp. 634-644. ISSN 0969-9988

Keskin, F S (2021) Integration of lifecycle assessment into structural intervention scenarios for assessing environmental impacts of vulnerable buildings. PhD thesis, University of Birmingham, UK.

Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.

Khan, N A; Ullah Khan, S; Ahmed, S; Farooqi, I H; Hussain, A; Vambol, S and Vambol, V (2020) Smart ways of hospital wastewater management, regulatory standards and conventional treatment techniques: A short review. Smart and Sustainable Built Environment, 9(4), pp. 727-736. ISSN 2046-6099

Khandelwal, M and Khanapuri, V (2015) Infrastructure debt fund policy framework in India: issues and challenges. Journal of Financial Management of Property and Construction, 20(1), pp. 4-23. ISSN 1366-4387

Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708

Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(4), pp. 249-269. ISSN 0969-9988

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988

Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.

Kibwami, N and Tutesigensi, A (2015) Extending the clean development mechanism concept to building projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Kikwasi, G (2016) Risk handling options: Is insurance a fair option to transfer construction risks in Tanzanian construction industry? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kim, H; Lee, H S; Park, M; Ahn, C R and Hwang, S (2015) Productivity forecasting of newly added workers based on time-series analysis and site learning. Journal of Construction Engineering and Management, 141(9): 5015008, ISSN 0733-9364

Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364

Kim, H S (1998) Evaluation of quality during early design: A prerequisite to defining value for money for the client. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Kim, H-s (1998) Value for money in building design: Modelling the cost-quality relationships. PhD thesis, University of Reading, UK.

Kim, J and Philips, P (2012) Determinants of quits and dismissals on a long-lasting unionized industrial construction project. Journal of Construction Engineering and Management, 138(5), pp. 661-669. ISSN 0733-9364

Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.

Kim, K P and Park, K S (2016) Primary BIM dataset for refurbishing flood risk vulnerable housing in the UK. Built Environment Project and Asset Management, 6(4), pp. 365-378. ISSN 2044-124X

Kim, T W and Fischer, M (2014) Ontology for representing building users' activities in space-use analysis. Journal of Construction Engineering and Management, 140(8): 04014035, ISSN 0733-9364

Kim, W (1996) A systems approach to transportation infrastructure management: Development of a highway management system for the Virginia DOT. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kishk, M; Laing, R and Edge, M (2006) An extended whole-life application for the selection of hospital finishes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kleerekoper, L; van den Dobbelsteen, A A J F; Hordijk, G J; van Dorst, M J and Martin, C L (2015) Climate adaptation strategies: Achieving insight in microclimate effects of redevelopment options. Smart and Sustainable Built Environment, 4(1), pp. 110-136. ISSN 2046-6099

Kobeyev, S; Tokbolat, S; Nazipov, F and Satyanaga, A (2023) Design and modeling of an on-site greywater treatment system for a hotel building. International Journal of Building Pathology and Adaptation, 41(1), pp. 201-224. ISSN 23984708

Kohler, N and Hassler, U (2012) Alternative scenarios for energy conservation in the building stock. Building Research & Information, 40(4), pp. 401-416. ISSN 0961-3218

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.

Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X

Konstantinou, T; de Jonge, T; Oorschot, L; El Messlaki, S; van Oel, C and Asselbergs, T (2020) The relation of energy efficiency upgrades and cost of living, investigated in two cases of multi-residential buildings in the Netherlands. Smart and Sustainable Built Environment, 9(4), pp. 615-633. ISSN 2046-6099

Koo, D H and Ariaratnam, S T (2008) Application of a sustainability model for assessing water main replacement options. Journal of Construction Engineering and Management, 134(8), pp. 563-574. ISSN 0733-9364

Koranteng, C; Simons, B; Abrokwa Gyimah, K and Nkrumah, J (2023) Ghana's green building assessment journey: An appraisal of the thermal performance of an office building in Accra. Journal of Engineering, Design and Technology, 21(1), pp. 188-205. ISSN 1726-0531

Krajňák, M. (2026) Property tax trends in the Czech Republic. Journal of Financial Management of Property and Construction, 31(2), pp. 173-199. ISSN 1366-4387

Kranz, C N (2021) Optimizing compost incorporation for stormwater infiltration, runoff quality, and vegetation establishment in post-construction soils. PhD thesis, North Carolina State University, USA.

Kuittinen, M (2016) Does the use of recycled concrete lower the carbon footprint in humanitarian construction? International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 472-488. ISSN 1759-5916

Kuittinen, M (2023) Building within planetary boundaries: Moving construction to stewardship. Buildings & Cities, 4(1), pp. 565-574. ISSN 2632-6655

Kukah, A S K; Owusu-Manu, D G; Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(3), pp. 854-878. ISSN 1726-0531

Kulczak-Dawkins, R P (2021) Managing sustainability through architectural design decision processes: influences of values and frames. PhD thesis, University of Brighton, UK.

Kulmedov, B and Durdyev, S (2023) Cost and environmental performance of forced air and hot water heating systems in post-soviet countries. International Journal of Building Pathology and Adaptation, 41(1), pp. 170-181. ISSN 23984708

Kululanga, G K; Edum-Fotwe, F T; McCaffer, R and Price, A D F (1997) Learning techniques employed by construction contractors' organisations. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(2), pp. 38-51. ISSN 1358-9180

Kurokawa, M (2015) Tracing client interests in the course of a project: Why are some client interests incorporated whereas others are not? PhD thesis, University of Reading, UK.

Kurokawa, M; Schweber, L and Hughes, W P (2014) Incorporation of different and changing client interests in the course of a project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Kurokawa, M; Schweber, L and Hughes, W P (2015) Tracing client interests in the course of the project: Why are some client interests incorporated whereas others are not? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Kwok-Chun, W and Walker, A (2000) Property rights implications of public-private joint ventures. Construction Management and Economics, 18(2), pp. 131-138. ISSN 01446193

Laefer, D F and Manke, J P (2008) Building reuse assessment for sustainable urban reconstruction. Journal of Construction Engineering and Management, 134(3), pp. 217-227. ISSN 0733-9364

Lahdenperä, P (2024) Design–build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4-5), pp. 18-42. ISSN 2204-9029

Lai, H Y and Chiang, W H (2024) Generative design of terraced concert hall: A case study of Taipei music and library centre. Building Research & Information, 52(1-2), pp. 49-67. ISSN 0961-3218

Lam, K C; Runeson, G; Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(4), pp. 359-375. ISSN 0969-9988

Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X

Laryea, S (2016) Risk apportionment in target cost contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 248-257. ISSN 17514304

Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304

Lather, J I (2019) A hybrid modeling approach using discrete event simulation and layout optimization for healthcare layout planning problems. PhD thesis, Pennsylvania State University, USA.

Lawal, Y S; Ibrahim, A M; Abubakar, M; Ishaq, Z H and Sa'ad, M M (2023) A simulation-based binomial model for building development appraisal. Journal of Engineering, Design and Technology, 21(1), pp. 75-107. ISSN 1726-0531

Leather, P and Rolfe, S J (1997) Fit for the task: The future of the small scale domestic repair and maintenance industry in the UK. Construction Management and Economics, 15(2), pp. 201-212. ISSN 01446193

Ledbetter, B S (1985) Pioneering construction engineering education. Journal of Construction Engineering and Management, 111(1), pp. 41-51. ISSN 0733-9364

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.

Lee, J S (2018) Value engineering for defect prevention on building façade. Journal of Construction Engineering and Management, 144(8): 04018069, ISSN 0733-9364

Lee, K (1994) Software options for support of three-dimensional CAD in the architectural design process: A critical evaluation by practitioners and educators. PhD thesis, Texas A&M University, USA.

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Leijten, M (2017) What lies beneath: Bounded manageability in complex underground infrastructure projects. PhD thesis, Delft University of Technology, Netherlands.

Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.

Li, J. and Li, Y. (2026) A mini review of greenhouse gas emissions and mitigation strategies in the building sector. International Journal of Building Pathology and Adaptation, 44(5), pp. 1302-1328. ISSN 2398-4708

Li, B; Akintoye, A; Edwards, P and Hardcastle, C (2004) Risk treatment preferences for PPP/PFI construction projects in the UK. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Li, B; Akintoye, A and Hardcastle, C (2002) Risks and risk treatments in public private partnership projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Li, D; Yu, L; Huang, G; Zhou, S; Feng, H and Wang, Y (2024) A real options-based investment-income valuation model for old community renewal projects in China. Engineering, Construction and Architectural Management, 31(11), pp. 4516-4537. ISSN 0969-9988

Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988

Li, H and Love, P (1997) Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management, 123(3), pp. 233-237. ISSN 0733-9364

Li, H; Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), pp. 211-220. ISSN 0969-9988

Li, K and Cheung, S O (2019) Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145(11): 04019070, ISSN 0733-9364

Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X

Li, Y C; Luk, W H and Cheng, E (2016) Hong Kong's first public sector NEC contract: Lessons learnt. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 231-237. ISSN 17514304

Li, Z; Anson, M and Li, G (2001) A procedure for quantitatively evaluating site layout alternatives. Construction Management and Economics, 19(5), pp. 459-467. ISSN 01446193

Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312

Liberatore, M J; Pollack-Johnson, B and Smith, C A (2001) Project management in construction: Software use and research directions. Journal of Construction Engineering and Management, 127(2), pp. 101-107. ISSN 0733-9364

Lin, S and Cheung, S O (2022) Exploring the concept of psychological distance and its impact on intention to settle in construction dispute negotiation. Journal of Construction Engineering and Management, 148(12): 04022133, ISSN 0733-9364

Lin, T; Lyu, S; Yang, R J and Tivendale, L (2022) Offsite construction in the Australian low-rise residential buildings application levels and procurement options. Engineering, Construction and Architectural Management, 29(1), pp. 110-140. ISSN 0969-9988

Lin, Tong (2025) Offsite construction in the Australian low-rise residential buildings: Application levels and procurement options. PhD thesis, RMIT University, Australia.

Lines, B C and Ravi Kumar, G G (2018) Developing more competitive proposals: Relationship between contractor qualifications-based proposal content and owner evaluation scores. Journal of Construction Engineering and Management, 144(5): 04018030, ISSN 0733-9364

Lingard, H (2000) The relationship between 'family friendly' employment practices and the well-being and satisfaction of white collar employees in the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Lingard, H (2002) The effect of first aid training on Australian construction workers' occupational health and safety knowledge and motivation to avoid work-related injury or illness. Construction Management and Economics, 20(3), pp. 263-273. ISSN 01446193

Lingard, H and Lin, J (2003) Managing motherhood in the Australian construction industry: Work-family balance, parental leave and part-time work. Construction Economics and Building, 3(2), pp. 15-24. ISSN 2204-9029

Lingard, H and Turner, M (2015) Improving the health of male, blue collar construction workers: A social ecological perspective. Construction Management and Economics, 33(1), pp. 18-34. ISSN 01446193

Lisø, K R; Myhre, L; Kvande, T; Thue, J V and Nordvik, V (2007) A Norwegian perspective on buildings and climate change. Building Research & Information, 35(4), pp. 437-449. ISSN 0961-3218

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988

Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175

Livingstone, N; Fiorentino, S and Short, M (2021) Planning for residential 'value'? London's densification policies and impacts. Buildings & Cities, 2(1), pp. 203-219. ISSN 2632-6655

Lokuge, W; Gamage, N and Setunge, S (2016) Fault tree analysis method for deterioration of timber bridges using an Australian case study. Built Environment Project and Asset Management, 6(3), pp. 332-344. ISSN 2044-124X

Loosemore, M; Chow, V and McGeorge, D (2014) Managing the health risks of extreme weather events by managing hospital infrastructure. Engineering, Construction and Architectural Management, 21(1), pp. 4-32. ISSN 0969-9988

Lorterapong, P and Ussavadilokrit, M (2013) Construction scheduling using the constraint satisfaction problem method. Journal of Construction Engineering and Management, 139(4), pp. 414-422. ISSN 0733-9364

Love, P E D; Edwards, D J; Irani, Z and Sharif, A (2012) Participatory action research approach to public sector procurement selection. Journal of Construction Engineering and Management, 138(3), pp. 311-322. ISSN 0733-9364

Lowe, R (2007) Technical options and strategies for decarbonizing UK housing. Building Research & Information, 35(4), pp. 412-425. ISSN 0961-3218

Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771

Lu, Na (2007) Investigation of designers' and general contractors' perceptions of offsite construction techniques in the United States construction industry. PhD thesis, Clemson University, USA.

Lu, S L and Sexton, M G (2011) New governance approaches to environmental regulation: An example of the code for sustainable homes (chs). In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Luu, D T; Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - An empirical survey. Engineering, Construction and Architectural Management, 10(3), pp. 209-218. ISSN 0969-9988

Lützkendorf, T (2018) Assessing the environmental performance of buildings: Trends, lessons and tensions. Building Research & Information, 46(5), pp. 594-614. ISSN 0961-3218

Lützkendorf, T (2020) The role of carbon metrics in supporting built-environment professionals. Buildings & Cities, 1(1), pp. 662-672. ISSN 2632-6655

Lützkendorf, T; Fan, W and Lorenz, D (2011) Engaging financial stakeholders: Opportunities for a sustainable built environment. Building Research & Information, 39(5), pp. 483-503. ISSN 0961-3218

Ma, S; Li, Z and Zhang, J (2025) A multi-attribute group decision-making framework for site selection of waste-to-energy project considering public participation. Engineering, Construction and Architectural Management, 32(12), pp. 8326-8359. ISSN 0969-9988

Ma, Q and Cheung, S O (2025) Augmenting the incentivizing power of target cost contracting in integrated project delivery. Journal of Construction Engineering and Management, 151(7): 04025069, ISSN 0733-9364

MacAskill, K and Guthrie, P (2014) Application of sustainability principles in post-disaster reconstruction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Macmillan, S; Steele, J; Kirby, P; Spence, R and Austin, S (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(3), pp. 174-180. ISSN 0969-9988

Madziva, T J (2018) The effect of partnering, infrastructure gaps and currency weakness on the cost of an infrastructure-building nonmarket strategy in emerging markets. PhD thesis, University of Pretoria, South Africa.

Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175

Mak, Wae Hoa Jonathan (2019) The design of resilient engineering infrastructure systems. PhD thesis, University of Cambridge, UK.

Makarfi Ibrahim, Y; Kaka, A; Aouad, G and Kagioglou, M (2009) Framework for a generic work breakdown structure for building projects. Construction Innovation, 9(4), pp. 388-405. ISSN 1471-4175

Maleyeff, J.; Dande, K.; Srivichaiin, K. and Weidman, D. (2026) Decision support for sustainable building modifications to mitigate climate risk. Construction Innovation, pp. 1-26. ISSN 1471-4175

Malsane, S M (2015) The application of automated rule checking to existing UK building regulations using BIM technologies. PhD thesis, University of Northumbria at Newcastle, UK.

Mangas Jr., David L (2025) Building a knowledge bridge: School counselors collaborating with construction professionals on career development. EdD thesis, Youngstown State University, USA.

Mannarino, J A (2001) Evaluation of the construction management delivery system and establishing a model for selection: A qualitative approach. PhD thesis, State University of New York at Buffalo, USA.

Mantle, E J (2007) An evaluation of 3d building modelling and visualisation packages for enhancing public participation within the planning process. PhD thesis, University of Glamorgan, UK.

Marquardt, G (2017) Economic analysis of contract choice, feelings of entitlement and contract enforcement in relationships governed by incomplete contracts. PhD thesis, University of Edinburgh, UK.

Martínez Fernández, P; Villalba Sanchís, I; Insa Franco, R and Yepes, V (2022) Slab track optimization using metamodels to improve rail construction sustainability. Journal of Construction Engineering and Management, 148(7): 04022053, ISSN 0733-9364

Massyn, M and Lamont, S (2009) Applying the briefing process on the people s housing process projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988

Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.

McCormack, M; Treloar, G J; Palmowski, L and Crawford, R (2007) Modelling direct and indirect water requirements of construction. Building Research & Information, 35(2), pp. 156-162. ISSN 0961-3218

McCowan, A K and Mohamed, S (2007) Decision support system to evaluate and compare concession options. Journal of Construction Engineering and Management, 133(2), pp. 114-123. ISSN 0733-9364

McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Meacham, B J (2000) A process for identifying, characterizing, and incorporating risk concepts into performance-based building and fire regulation development. PhD thesis, Clark University, USA.

Medda, F R and Cocconcelli, L (2018) Municipal bonds as a means of accelerating local infrastructure investment. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 220-227. ISSN 17514304

Meinke, A; Hawighorst, M; Wagner, A; Trojan, J and Schweiker, M (2017) Comfort-related feedforward information: Occupants' choice of cooling strategy and perceived comfort. Building Research & Information, 45(1-2), pp. 222-238. ISSN 0961-3218

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364

Metham, M; Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(3), pp. 501-513. ISSN 1562-3599

Milligan, C E (1992) Integrated construction coordination change response system. PhD thesis, Texas A&M University, USA.

Mills, John Ayres (2007) The myth of the standard gauge: Rail gauge choice in Australia, 1850-1901. PhD thesis, Griffith University, Australia.

Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.

Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364

Mintah, K; Higgins, D and Callanan, J (2018) A real option approach for the valuation of switching output flexibility in residential property investment. Journal of Financial Management of Property and Construction, 23(2), pp. 133-151. ISSN 1366-4387

Mintah, Kwabena (2019) Is there value in waiting? An empirical study of real options application to Australian property developments. PhD thesis, RMIT University, Australia.

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mirzadeh, I and Birgisson, B (2016) Evaluation of highway projects under government support mechanisms based on an option-pricing framework. Journal of Construction Engineering and Management, 142(4): 04015094, ISSN 0733-9364

Mishra, S (2009) Transportation infrastructure investment decision making under uncertainty and risk. PhD thesis, Wayne State University, USA.

Mistry, D and Davis, P R (2009) A client's perspective of critical success factors in project alliances. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Mohammadpour, A (2014) Retrofitting healthcare facilities to enhance patient safety and energy efficiency. PhD thesis, Pennsylvania State University, USA.

Mohanta, A and Das, S (2023) Decision support system for the early stage of green building envelope design considering energy and maintainability. Architectural Engineering and Design Management, 19(2), pp. 163-182. ISSN 1745-2007

Mollaei, A; Bachmann, C and Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6): 04025065, ISSN 0733-9364

Moncaster, A; Malmqvist, T; Forman, T; Pomponi, F and Anderson, J (2022) Embodied carbon of concrete in buildings, Part 2: Are the messages accurate? Buildings & Cities, 3(1), pp. 334-355. ISSN 2632-6655

Morgado, J and Neves, J (2014) Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. Journal of Construction Engineering and Management, 140(11): 4014050, ISSN 0733-9364

Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.

Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Morrow, S (2012) Balancing a safer and healthier frame to designing: A grounded theory. PhD thesis, Glasgow Caledonian University, UK.

Moschandreas, D J; Yoon, S H and Demirev, D (2006) Validation of the indoor environmental quality conceptual model. Building Research & Information, 34(5), pp. 483-495. ISSN 0961-3218

Mostavi, E (2018) Development of multiple criteria decision making instrument in designing of high performance commercial buildings. PhD thesis, Pennsylvania State University, USA.

Mousaei, A; Taghaddos, H; Marzieh Bagheri, S and Hermann, U (2021) Optimizing heavy lift plans for industrial construction sites using dijkstra's algorithm. Journal of Construction Engineering and Management, 147(11): 04021160, ISSN 0733-9364

Muga, H E (2009) An integrated framework for assessing the sustainability of components that make up the built environment. PhD thesis, Michigan Technological University, USA.

Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats. PhD thesis, Purdue University, USA.

Narayana Naidelage, Chamari Pushpamali (2021) The role of reverse logistics on supply chain performance. PhD thesis, Queensland University of Technology, Australia.

Ndekugri, I; Daeche, H and Zhou, D (2013) The project insurance option in infrastructure procurement. Engineering, Construction and Architectural Management, 20(3), pp. 267-289. ISSN 0969-9988

Nesan, L J (2006) Project finance model for small contractors in USA. Construction Economics and Building, 6(1), pp. 25-41. ISSN 2204-9029

Neshat, N (2013) Conceptualization, measurement and empirical exploration of selected supply chain risk constructs. DSc thesis, ETH Zürich, Switzerland.

Newton, P W and Tucker, S N (2011) Pathways to decarbonizing the housing sector: A scenario analysis. Building Research & Information, 39(1), pp. 34-50. ISSN 0961-3218

Neya, I; Yamegueu, D; Messan, A; Coulibaly, Y; Ouedraogo, A L S N and Ayite, Y M X D (2025) Effect of cement and geopolymer stabilization on the thermal comfort: Case study of an earthen building in Burkina Faso. International Journal of Building Pathology and Adaptation, 43(3), pp. 283-301. ISSN 2398-4708

Ng, F P; Björnsson, H C and Chiu, S S (2004) Valuing a price cap contract for material procurement as a real option. Construction Management and Economics, 22(2), pp. 141-150. ISSN 01446193

Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007

Nijhuis, Steven André (2022) Improving project management teaching in higher education: Towards a validated competence profile for the design of a profession specific learning line. PhD thesis, University of Twente, Netherlands.

Nikolaidis, N and Roumboutsos, A (2013) A PPP renegotiation framework: A road concession in Greece. Built Environment Project and Asset Management, 3(2), pp. 264-278. ISSN 2044-124X

Nirupama, N (2012) Risk and vulnerability assessment: A comprehensive approach. International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 103-114. ISSN 1759-5916

Nnaji, C; Lee, H W; Karakhan, A and Gambatese, J (2018) Developing a decision-making framework to select safety technologies for highway construction. Journal of Construction Engineering and Management, 144(4): 04018016, ISSN 0733-9364

Nouh Meshref, A; Elkasaby, E and Wageh, O (2026) Innovative strategic multicriteria decision-making selection model of infrastructures projects delivery systems using multiobjective optimization, case of Egypt. Construction Innovation, 26(2), pp. 353-368. ISSN 1471-4175

Nwazota, A (2023) Special purpose vehicle for infrastructure project financing through public private partnerships: the answer to infrastructure problems in developing countries? PhD thesis, University of Manchester, UK.

Obiaigwe, Innocent Onyeka (2025) Robotizing safety: Prospects and barriers of robotic technology adoption for construction injury prevention in the UK. PhD thesis, University of Salford, UK.

Obiri, K A; Bjeirmi, B; Moore, D and Boateng, P (2020) Infrastructure development in the West African extractive industry: A system thinking approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.

Ofori, G (1991) Programmes for improving the performance of contracting firms in developing countries: A review of approaches and appropriate options. Construction Management and Economics, 9(1), pp. 19-38. ISSN 01446193

Ogden, R G; Kendrick, C C and Walliman, N S R (2004) Modelling of enhanced passive and conventional cooling systems. Building Research & Information, 32(1), pp. 17-26. ISSN 0961-3218

Ogunlana, S O; Li, H and Sukhera, F A (2003) System dynamics approach to exploring performance enhancement in a construction organization. Journal of Construction Engineering and Management, 129(5), pp. 528-536. ISSN 0733-9364

Ohemeng, F A (1998) Rehabilitation versus demolition and redevelopment: A value-based decision framework for private commercial properties. PhD thesis, University of Salford, UK.

Oke, A E; Aliu, J; Agbaje, D H; Ebekozien, A; Aghimien, D O; Leo-Olagbaye, F and Clinton, C (2025) Exploring constraints in integrating indoor environmental quality (IEQ) into building designs: A case of Nigerian quantity surveying firms. Construction Innovation, 25(6), pp. 1657-1679. ISSN 1471-4175

Okoro, C S; Musonda, I and Agumba, J N (2022) Exploring the underlying structures of sustainability performance measures: A study of transportation projects in South Africa. International Journal of Construction Management, 22(8), pp. 1550-1558. ISSN 1562-3599

Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.

Oleinik, P (2018) Method for creating a work management plan of a construction company. International Journal of Construction Management, 18(5), pp. 446-451. ISSN 1562-3599

Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: Reflections on Sierra Leone infrastructure scheme and the lungi bridge project. Journal of Financial Management of Property and Construction, 28(1), pp. 127-144. ISSN 1366-4387

Opawole, A; Babatunde, S O; Kajimo-Shakantu, K and Ateji, O A (2020) Analysis of barriers to the application of life cycle costing in building projects in developing countries: A case of Nigeria. Smart and Sustainable Built Environment, 9(4), pp. 503-521. ISSN 2046-6099

Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708

Orero, E (2019) Exploring options in infrastructure financing in Africa: steering of public private partnerships (PPPs) in Kenya. PhD thesis, Royal Holloway, University of London, UK.

Osipova, E and Eriksson, P E (2011) How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), pp. 1149-1158. ISSN 1466433X

Osman, H M and El-Diraby, T E (2011) Knowledge-enabled decision support system for routing urban utilities. Journal of Construction Engineering and Management, 137(3), pp. 198-213. ISSN 0733-9364

Oswald, D; Smith, S and Sherratt, F (2014) A Spanish subcontractor in a UK culture. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Otchere-Darko, E; Atuah, L; Opoku, R and Koranteng, C (2025) Redefining green roof systems with climbers: Simulation of a conceptual model for thermal-radiative performance and plant vitality. International Journal of Building Pathology and Adaptation, 43(3), pp. 528-547. ISSN 2398-4708

Oyedele, J B (2012) Captial markets and the delivery vehicles for international infrastructure investments. PhD thesis, University of Ulster, UK.

Paidakaki, A and Moulaert, F (2017) Does the post-disaster resilient city really exist? A critical analysis of the heterogeneous transformative capacities of housing reconstruction "resilience cells". International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 275-291. ISSN 1759-5916

Panda, A and Bower, A (2020) Cyber security and the disaster resilience framework. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 507-518. ISSN 1759-5916

Pantouvakis, J P and Manoliadis, O G (2008) A compromise programming model for site selection of borrow pits. Construction Management and Economics, 26(5), pp. 433-446. ISSN 1466433X

Park, H; Meacham, B J; Dembsey, N A and Goulthorpe, M (2014) Integration of fire safety and building design. Building Research & Information, 42(6), pp. 696-709. ISSN 0961-3218

Park, J; Brown, J; Al-Hasani, L E; Gentry, T R; Kurtis, K E and Cho, Y K (2024) Cost-effective thermal control planning for mass concrete construction using nomograms. Journal of Construction Engineering and Management, 150(10): 06024001, ISSN 0733-9364

Parker, S (2016) A phenomenological study of mentoring women of color in the construction industry. DM thesis, University of Phoenix, USA.

Patcharachavalit, N; Limsawasd, C and Athigakunagorn, N (2023) Multiobjective optimization for improving sustainable equipment options in road construction projects. Journal of Construction Engineering and Management, 149(1): 04022160, ISSN 0733-9364

Patterson, R (2009) Using NEC contracts to manage risk and avoid disputes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 157-167. ISSN 17514312

Patty, R M (1993) A construction engineering platform for the integration of constructability concepts and lessons learned at the point of design. PhD thesis, Purdue University, USA.

Peansupap, V and Walker, D (2005) Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: A micro analysis. Construction Innovation, 5(3), pp. 135-157. ISSN 1471-4175

Pearce, A R (1999) Sustainability and the built environment: A metric and process for prioritizing improvement opportunities. PhD thesis, Georgia Institute of Technology, USA.

Peat, M (2009) Promotion of materials and products with sustainable credentials. Architectural Engineering and Design Management, 5(1-2), pp. 46-52. ISSN 1745-2007

Pellegrini-Masini, G; Bowles, G; Peacock, A D; Ahadzi, M and Banfill, P F G (2010) Whole life costing of domestic energy demand reduction technologies: Householder perspectives. Construction Management and Economics, 28(3), pp. 217-229. ISSN 1466433X

Pellegrino, R; Carbonara, N and Costantino, N (2019) Public guarantees for mitigating interest rate risk in PPP projects. Built Environment Project and Asset Management, 9(2), pp. 248-261. ISSN 2044-124X

Pellegrino, R; Vajdic, N and Carbonara, N (2013) Real option theory for risk mitigation in transport PPPs. Built Environment Project and Asset Management, 3(2), pp. 199-213. ISSN 2044-124X

Pereira, P F; Ramos, N M M and Simões, M L (2020) Data-driven occupant actions prediction to achieve an intelligent building. Building Research & Information, 48(5), pp. 485-500. ISSN 0961-3218

Perrucci, D V (2021) Methods for scenario modeling of post-disaster temporary housing. PhD thesis, Vanderbilt University, USA.

Petkov, I (2022) Optimal decarbonization conditions for buildings & districts: A model-based techno-economic perspective. DSc thesis, ETH Zürich, Switzerland.

Pham, T Q D; Le-Hong, T and Tran, X V (2023) Efficient estimation and optimization of building costs using machine learning. International Journal of Construction Management, 23(5), pp. 909-921. ISSN 1562-3599

Porteous, C D A; Sharpe, T R; Menon, R A; Shearer, D; Musa, H; Baker, P H; Sanders, C H; Strachan, P A; Kelly, N J and Markopoulos, A (2012) Energy and environmental appraisal of domestic laundering appliances. Building Research & Information, 40(6), pp. 679-699. ISSN 0961-3218

Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.

Potter, E M; Egbelakin, T; Phipps, R and Balaei, B (2018) Emotional intelligence and transformational leadership behaviours of construction project managers. Journal of Financial Management of Property and Construction, 23(1), pp. 73-89. ISSN 1366-4387

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Manu, P; Che Ibrahim, C K I and Aigbavboa, C O (2021) The effectiveness of interactive virtual reality for furniture, fixture and equipment design communication: An empirical study. Engineering, Construction and Architectural Management, 28(5), pp. 1440-1467. ISSN 0969-9988

Pretorius, F; so, W M and Chau, K W (2005) An analysis of variable rate residential mortgage prepayment in Hong Kong using aggregate data. Journal of Financial Management of Property and Construction, 10(3), pp. 147-158. ISSN 1366-4387

Prince, M W (1992) Implications of perception and strategy for engineers in construction management. Construction Management and Economics, 10(2), pp. 93-105. ISSN 01446193

Priyan, P.; Le, A.; Domingo, N. and To, T. H. Q. (2026) Zero-carbon refurbishment: Current practices and attitudes from a New Zealand interview study. International Journal of Building Pathology and Adaptation, 44(3), pp. 583-598. ISSN 2398-4708

Puddicombe, M S (1998) Interorganizational project strategy: contracts, contacts, and performance in the building industry. PhD thesis, Boston University, USA.

Pudney, Steven Grant (2010) Asset renewal decision modelling with application to the water utility industry. PhD thesis, Queensland University of Technology, Australia.

Qadourah, J A (2024) Evaluating solar-active shading solutions: a study of energy performance in Mediterranean residential architecture. Architectural Engineering and Design Management, 20(5), pp. 1222-1237. ISSN 1745-2007

Qi, X; Du, Q; Zou, P X W and Huang, N (2024) Developing a weighted synergy network-based model for selecting prefabricated construction services. Engineering, Construction and Architectural Management, 31(6), pp. 2306-2326. ISSN 0969-9988

Qu, Yingying (2017) An investigation of opportunistic behaviour in public-private partnerships. PhD thesis, University of New South Wales, Australia.

Quirke, P and Wall, J (2007) The use of public private partnerships in the delivery of capital projects in higher education in Ireland. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.

Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.

Rahmani Asl, M (2015) A building information model (BIM) based framework for performance optimization. PhD thesis, Texas A&M University, USA.

Raji, B (2018) Sustainable high-rises: Design strategies for energy-efficient and comfortable tall office buildings in various climates. PhD thesis, Delft University of Technology, Netherlands.

Ramadan, R; Ghanem, H; Khatib, J M and ElKordi, A M (2025) Effect of plant-based natural fibers on the mechanical properties and volume change of cement paste. International Journal of Building Pathology and Adaptation, 43(4), pp. 693-711. ISSN 2398-4708

Rana, Ansar Rehman (2024) A proposal to reduce the complexity of the Australian law of contract. PhD thesis, University of Adelaide, Australia.

Ranasinghe, M (1999) Private sector participation in infrastructure projects: A methodology to analyse viability of BOT. Construction Management and Economics, 17(5), pp. 613-623. ISSN 01446193

Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708

Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708

Rausch, C; Lu, R; Talebi, S and Haas, C (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 23(3), pp. 565-578. ISSN 1562-3599

Ravirala, V (1995) Multi-criteria optimization methodologies for highway program development. PhD thesis, Rensselaer Polytechnic Institute, USA.

Reynoso Vanderhorst, H D; Heesom, D; Suresh, S; Renukappa, S and Burnham, K (2023) Barriers and cost model of implementing unmanned aerial system (uas) services in a decentralised system: Case of the Dominican Republic. Construction Innovation, 23(4), pp. 833-857. ISSN 1471-4175

Rezaei Nasab, S S; Tayefi Nasrabadi, A; Asadi, S and Haj Seiyed Taghia, S A (2022) Investigating the probability of designing net-zero energy buildings with consideration of electric vehicles and renewable energy. Engineering, Construction and Architectural Management, 29(10), pp. 4061-4087. ISSN 0969-9988

Ribeiro, F L (1999) Appraisal of value engineering in design in Portugal. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Ridgeway, L L (2003) An evaluation of the current status of the OSHA hazard communication program within the western Kentucky construction industry. PhD thesis, Southern Illinois University at Carbondale, USA.

Riffell, Z D (2019) Time on task across skill sets in construction trades classrooms: Preparation of skilled craft workers. PhD thesis, University of South Florida, USA.

Robertson, B (2020) On-site installation flexibility for disruption management in modular off-site construction systems. PhD thesis, University of Cambridge, UK.

Rodionova, A (2022) Robust and reliable building renovation strategies for environmental and economic performance. DSc thesis, ETH Zürich, Switzerland.

Rodrigues, C A (2017) Life-cycle environmental and cost assessment of building retrofits: Evaluating conventional and streamlined approaches. PhD thesis, Universidade de Coimbra, Portugal.

Rogers, M (1998) Systematic decision-making in the environmental assessment of civil engineering projects. PhD thesis, University College Dublin, Ireland.

Rogers, M (2000) Using ELECTRE to aid the choice of housing construction process within structural engineering. Construction Management and Economics, 18(3), pp. 333-342. ISSN 01446193

Roggema, R (2020) Towards sustainable cities: About redundancy, voids and the potentials of the land. Smart and Sustainable Built Environment, 9(3), pp. 283-306. ISSN 2046-6099

Rose, Colin (2019) Systems for reuse, repurposing and upcycling of existing building components. PhD thesis, University College London, UK.

Rousseau, L. S. A.; Amini, S.; Akin, S. and Hertwich, E. G. (2026) Retrofitting Norwegian residential buildings: An archetype-based dynamic stock model. Buildings & Cities, 7(1), pp. 757-774. ISSN 2632-6655

Rousseau, D and Chen, Y (2001) Sustainability options for China's residential building sector. Building Research & Information, 29(4), pp. 293-301. ISSN 0961-3218

Sacks, A; Nisbet, A; Ross, J and Harinarain, N (2012) Life cycle cost analysis: A case study of Lincoln on the Lake. Journal of Engineering, Design and Technology, 10(2), pp. 228-254. ISSN 1726-0531

Saeb, A; Mohd Danuri, M S B; Zakaria, N B and Mohamed, O B (2020) A case study of dispute resolution methods pertaining to the construction standard form in Iran. International Journal of Construction Education and Research, 16(3), pp. 211-230. ISSN 1557-8771

Saeed, F; Mostafa, K; Rauch, C and Hegazy, T (2023) Environmental impact and cost assessment for reusing waste during end-of-life activities on building projects. Journal of Construction Engineering and Management, 149(10): 04023099, ISSN 0733-9364

Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988

Saja, A M A; Teo, M; Goonetilleke, A; Ziyath, A M and Gunatilake, J (2020) Selection of surrogates to assess social resilience in disaster management using multi-criteria decision analysis. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 453-480. ISSN 1759-5916

Sajid, Z W; Khan, S A; Hussain, F; Ullah, F; Khushnood, R A and Soliman, N (2026) Assessing economic and environmental performance of infill materials through BIM: A life cycle approach. Smart and Sustainable Built Environment, 15(1), pp. 9-39. ISSN 2046-6099

Saka, A B and Chan, D W M (2019) A global taxonomic review and analysis of the development of BIM research between 2006 and 2017. Construction Innovation, 19(3), pp. 465-490. ISSN 1471-4175

Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.

Salmio, E and Huuhka, S (2026) Environmental impacts of reclaimed bricks: Comparing different deconstruction methods. Buildings & Cities, 7(1), pp. 323-340. ISSN 2632-6655

Salter, J; Lu, Y; Kim, J C; Kellett, R; Girling, C; Inomata, F and Krahn, A (2020) Iterative 'what-if' neighborhood simulation: Energy and emissions impacts. Buildings & Cities, 1(1), pp. 293-307. ISSN 2632-6655

Sandanayake, M; Yang, W; Chhibba, N and Vrcelj, Z (2022) Residential building defects investigation and mitigation: a comparative review in Victoria, Australia, for understanding the way forward. Engineering, Construction and Architectural Management, 29(9), pp. 3689-3711. ISSN 0969-9988

Sandanayake, M S; Vrcelj, Z; Bouras, Y; Chau, H W and Hastings, P (2024) Simplified rating tool to evaluate sustainable practices of small-scale infrastructure projects in Australia – a comparative review. Smart and Sustainable Built Environment, 13(5), pp. 1260-1280. ISSN 2046-6099

Sanford, Heather L (2020) Experiences millennial women have used to improve their opportunities for leadership roles in construction. DM thesis, Colorado Technical University, USA.

Santero, N J (2009) Pavements and the environment: A life-cycle assessment approach. PhD thesis, University of California, Berkeley, USA.

Santos, P A S; Cortez, B and Carvalho, M T M (2025) Integrating GIS and BIM with MCDM for infrastructure planning: A comprehensive framework. Engineering, Construction and Architectural Management, 32(6), pp. 4197-4226. ISSN 0969-9988

Santoso, D S and Bourpanus, N (2019) Moving to e-bidding: Examining the changes in the bidding process and the bid mark-up decisions of Thai contractors. Journal of Financial Management of Property and Construction, 24(1), pp. 2-18. ISSN 1366-4387

Sari, R. and Pekeriçli, M. K. (2026) Possibility of personalization and customization of the workplace by knowledge workers. Building Research & Information, 54(4), pp. 410-428. ISSN 0961-3218

Sarigul, F. H. and Gunaydin, H. M. (2026) Integrated BIM, GIS and interoperable digital technologies in lifecycle management of building construction projects: Systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1808-1845. ISSN 2046-6099

Sassi, P (2008) Defining closed-loop material cycle construction. Building Research & Information, 36(5), pp. 509-519. ISSN 0961-3218

Saunders, F C; Sherry, A H and Gale, A W (2016) Dualities and dilemmas: Contending with uncertainty in large-scale safety-critical projects. Construction Management and Economics, 34(9), pp. 657-675. ISSN 01446193

Sawant, R J (2008) The economics of large scale infrastructure project finance: An empirical examination of the propensity to project finance. PhD thesis, Tufts University, USA.

Schade, J; Olofsson, T and Schreyer, M (2011) Decision-making in a model-based design process. Construction Management and Economics, 29(4), pp. 371-382. ISSN 1466433X

Schiller, G; Blum, A; Hecht, R; Oertel, H; Ferber, U and Meinel, G (2021) Urban infill development potential in Germany: Comparing survey and GIS data. Buildings & Cities, 2(1), pp. 36-54. ISSN 2632-6655

Schneider, K (2023) Three essays on investment-based asset pricing. PhD thesis, University of Manchester, UK.

Schoenwitz, M; Naim, M and Potter, A (2012) The nature of choice in mass customized house building. Construction Management and Economics, 30(3), pp. 203-219. ISSN 1466433X

Schultmann, F and Sunke, N (2007) Energy-oriented deconstruction and recovery planning. Building Research & Information, 35(6), pp. 602-615. ISSN 0961-3218

Scrase, J I (2001) Curbing the growth in UK commercial energy consumption. Building Research & Information, 29(1), pp. 51-61. ISSN 0961-3218

Segol, G (1990) An option pricing model with three stochastic variables and its application to risky projects. PhD thesis, Golden Gate University, USA.

Sengonzi, R (2011) A framework for achieving whole life value of healthcare facilities through briefing and optioneering. PhD thesis, Loughborough University, UK.

Sexton, M; Goulding, J; Zhang, X; Kagioglou, M; Aouad, G; Cooper, R and Barrett, P (2005) The role of the hycon design-support tool in elevating hybrid concrete as a design option for structural frames. Engineering, Construction and Architectural Management, 12(6), pp. 568-586. ISSN 0969-9988

Shah, Mohammad Aminur Rahman A R (2017) Decision support framework for sustainability assessment of flood mitigation projects. PhD thesis, Griffith University, Australia.

Shahi, S; Beesley, P and Haas, C T (2023) Creating space and time for innovation: a methodology for building adaptation design appraisal using physics-based simulation tools and interactive multi-objective optimization. Engineering, Construction and Architectural Management, 30(3), pp. 1098-1121. ISSN 0969-9988

Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. PhD thesis, Georgia Institute of Technology, USA.

Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.

Shan, L; Garvin, M J and Kumar, R (2010) Collar options to manage revenue risks in real toll public-private partnership transportation projects. Construction Management and Economics, 28(10), pp. 1057-1069. ISSN 1466433X

Shang, G; Pheng, L S and Fai, B P K (2025) Receptiveness of mass-engineered timber (MET) residential buildings among young stakeholders. Smart and Sustainable Built Environment, 14(3), pp. 696-714. ISSN 2046-6099

Shaofeng, L; Jincai, F; Pinghua, Z and Xiang, L (2018) Stability analysis of two parallel closely spaced tunnels based on convergence-confinement principle. Journal of Construction Engineering and Management, 144(6): 04018041, ISSN 0733-9364

Sharifi, A A and Farahinia, A H (2023) A theoretical framework for developing the mau model to determine the most appropriate use for historic buildings. Engineering, Construction and Architectural Management, 30(1), pp. 238-258. ISSN 0969-9988

Shash, A A (1993) Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), pp. 111-118. ISSN 01446193

Shealy, T; Klotz, L; Weber, E U; Johnson, E J and Bell, R G (2016) Using framing effects to inform more sustainable infrastructure design decisions. Journal of Construction Engineering and Management, 142(9): 04016037, ISSN 0733-9364

Shealy III, E W (2015) Decision environments to encourage more sustainable infrastructure outcomes. PhD thesis, Clemson University, USA.

Shell, J F (2006) Decision-making strategies used by California school districts' chief business officials in the selection of construction management services as a project delivery system for construction projects over five million dollars. EdD thesis, University of La Verne, USA.

Shen, Q (1993) A knowledge based structure for implementing Value Management in the design of office buildings. PhD thesis, University of Salford, UK.

Shen, Y; Lin, Z and Wang, Z (2022) Single-side accumulative jacking construction method for large-span arched latticed shells. Journal of Construction Engineering and Management, 148(12): 06022001, ISSN 0733-9364

Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364

Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach. DArch thesis, University of Michigan, USA.

Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.

Shim, E and Kim, B C (2014) Batch-size based repetitive scheduling method (BRSM). International Journal of Construction Education and Research, 10(2), pp. 140-156. ISSN 1557-8771

Shipworth, D (2006) Qualitative modelling of sustainable energy scenarios: An extension of the bon qualitative input-output model. Construction Management and Economics, 24(7), pp. 695-703. ISSN 1466433X

Shooshtarian, S; Hosseini, M R; Kocaturk, T; Arnel, T and T. Garofano, N (2023) Circular economy in the Australian AEC industry: Investigation of barriers and enablers. Building Research & Information, 51(1), pp. 56-68. ISSN 0961-3218

Short, C A; Noakes, C J; Gilkeson, C A and Fair, A (2014) Functional recovery of a resilient hospital type. Building Research & Information, 42(6), pp. 657-684. ISSN 0961-3218

Short, K M (2013) The impact of experiential learning: Assessing the outcomes of internship experiences for students entering the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shrestha, H D; Yatabe, R; Bhandary, N P and Subedi, J (2012) Vulnerability assessment and retrofitting of existing school buildings: A case study of Aceh. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 52-65. ISSN 1759-5916

Shrestha, K (2023) Cost comparison of highway rest area operations: In-house workforce versus outsourcing methods. Journal of Construction Engineering and Management, 149(8): 04023062, ISSN 0733-9364

Shrivastava, S and Chini, A (2012) Using building information modeling to assess the initial embodied energy of a building. International Journal of Construction Management, 12(1), pp. 51-63. ISSN 1562-3599

Shuster, W D; Burkman, C E; Grosshans, J; Dadio, S and Losco, R (2015) Green residential demolitions: Case study of vacant land reuse in storm water management in cleveland. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Shwarka, M and Anigbogu, N A (2012) Impact of the public procurement reform on public building project delivery in Nigeria. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Siebert, M (2019) Concrete and the barriers to innovation in UK housebuilding. PhD thesis, University of Nottingham, UK.

Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531

Simpson, E; Bradley, D and O’Keeffe, J (2018) Failure is an option: An innovative engineering curriculum. International Journal of Building Pathology and Adaptation, 36(3), pp. 268-282. ISSN 23984708

Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193

Sing, T-F (2002) Irreversibility and uncertainty in property investment. Journal of Financial Management of Property and Construction, 7(1), pp. 17-29. ISSN 1366-4387

Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Singh, M M; Sawhney, A and Borrmann, A (2019) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(1), pp. 15-31. ISSN 1562-3599

Singla, H K and Samanta, P K (2019) Determinants of dividend payout of construction companies: A panel data analysis. Journal of Financial Management of Property and Construction, 24(1), pp. 19-38. ISSN 1366-4387

Siva Rama Krishna, U and Naga Satish Kumar, C (2022) A case study on maintenance of bituminous concrete pavement considering life cycle cost analysis and carbon footprint estimation. International Journal of Construction Management, 22(9), pp. 1756-1764. ISSN 1562-3599

Skitmore, R M (1986) A model of the construction project selection and bidding decision. PhD thesis, University of Salford, UK.

Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(1), pp. 3-20. ISSN 1745-2007

Smith, J and Wyatt, R (1999) Strategic needs analysis: Preliminary results. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Smith, Jim (2002) Strategic client briefing: A model for building project inception. PhD thesis, University of Melbourne, Australia.

Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Smith, S and Roy, R (2002) Product configuration in the house-building industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.

Spennemann, D H R (2025) Removal or preservation in place? A review of the conservation management options for asbestos cement sheeting in heritage properties. International Journal of Building Pathology and Adaptation, 43(6), pp. 1406-1422. ISSN 2398-4708

Staal, A A G (2019) Managing innovative suppliers: Exploring company, procurement, and performance variables in New Zealand construction supply chains. PhD thesis, Auckland University of Technology, New Zealand.

Steele, J (2000) The interdisciplinary conceptual design of buildings. PhD thesis, Loughborough University, UK.

Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.

Stoyell, J L (2004) Eco-design decision-making: towards sustainable engineering design of large made-to-order products. PhD thesis, University of Newcastle upon Tyne, UK.

Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.

Ströbele, B and Lützkendorf, T (2019) Communicating environmental information: Rethinking options for construction products. Building Research & Information, 47(6), pp. 681-696. ISSN 0961-3218

Sugar, K; Mose, T M; Nolden, C; Davis, M; Eyre, N; Sanchez-Graells, A and van der Horst, D (2022) Local decarbonisation opportunities and barriers: UK public procurement legislation. Buildings & Cities, 3(1), pp. 895-911. ISSN 2632-6655

Sun, H; Wang, Y and Meng, J (2019) A trading and pricing method of expansion options for BOT freeway projects in China. Engineering, Construction and Architectural Management, 26(7), pp. 1406-1423. ISSN 0969-9988

Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364

Sundaraj, G (2012) The significance and co-dependency of 'robustness' in PFI projects: A granting authority perspective. PhD thesis, University of Salford, UK.

Sundararajan, S K and Tseng, C L (2017) Managing project performance risks under uncertainty: Using a dynamic capital structure approach in infrastructure project financing. Journal of Construction Engineering and Management, 143(8): 04017046, ISSN 0733-9364

Sundquist, V; Gadde, L-E and Hulthén, K (2018) Reorganizing construction logistics for improved performance. Construction Management and Economics, 36(1), pp. 49-65. ISSN 0144-6193

Sunindijo, R Y and Kamardeen, I (2020) Psychological challenges confronting graduate construction students in Australia. International Journal of Construction Education and Research, 16(3), pp. 151-166. ISSN 1557-8771

Swai, L L P and Arewa, A O (2018) Potentiality of emerging technologies to minimise late-payments quandary in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Sällström Eriksson, L and Lidelöw, S (2025) Maintaining or replacing a building's windows: A comparative life cycle study. International Journal of Building Pathology and Adaptation, 43(4), pp. 766-786. ISSN 2398-4708

Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175

Tam, C M; Tong, T K L and Lau, C T (2003) ELECTRE III in evaluating performance of construction plants: Case study on concrete vibrators. Construction Innovation, 3(1), pp. 45-61. ISSN 1471-4175

Tan, Loke Mun (1992) The development of group self build housing in Victoria. PhD thesis, University of Melbourne, Australia.

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2005) A GA-based borrowing strategy for construction smes in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (E-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(5), pp. 499-513. ISSN 1466433X

Tang, W; Cui, Q; Zhang, F and Chen, Y (2019) Urban rail-transit project investment benefits based on compound real options and trapezoid fuzzy numbers. Journal of Construction Engineering and Management, 145(1): 05018016, ISSN 0733-9364

Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand. PhD thesis, University of Newcastle upon Tyne, UK.

Tansey P, M X C D (2013) A critical review of response strategies adopted by construction companies during an economic recession. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Tarpio, J and Lehtovuori, P (2026) Horizontal building extensions: Potential in Finnish blocks of flats. Buildings & Cities, 7(1), pp. 445-466. ISSN 2632-6655

Tatum, C B (2018) Learning construction engineering: Why, what, and how? Journal of Construction Engineering and Management, 144(3): 04018004, ISSN 0733-9364

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Taylor, M D (2003) Economic appraisal and risk analysis of construction automation. PhD thesis, Edinburgh Napier University, UK.

Taylor, M D and Wamuziri, S C (2002) Strategic construction mechatronics valuation: A real option-pricing approach. Journal of Financial Management of Property and Construction, 7(2), pp. 75-90. ISSN 1366-4387

Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Teo, Ai Lin Evelyn (1997) Strategic market positioning in the construction industry: Models for evaluating mobility and diversification. PhD thesis, University of New South Wales, Australia.

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Tezel, A and Koskela, L (2023) Off-site construction in highways projects: Management, technical, and technology perspectives from the United Kingdom. Construction Management and Economics, 41(6), pp. 475-499. ISSN 01446193

Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tharun, T; Thounaojam, N; Devkar, G and Laishram, B (2025) Proactive contract theory-based resilience framework development for public-private partnerships. Construction Economics and Building, 25(2), pp. 253-275. ISSN 2204-9029

Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.

Thomas, T (1998) Domestic water supply using rainwater harvesting. Building Research & Information, 26(2), pp. 94-101. ISSN 0961-3218

Thompson Jr., R C (2012) Risk measurement, allocation, and pricing in network schedule systems. PhD thesis, Catholic University of America, USA.

Thorpe, D (2012) Evaluating factors in sustainable road construction and management: A life cycle approach. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tijani, B; Falana, J N; Jin, X and Osei-Kyei, R (2023) Suicide in the construction industry: Literature review. International Journal of Construction Management, 23(10), pp. 1684-1693. ISSN 1562-3599

Tiruneh, Getaneh Gezahegne (2021) Hybrid neuro-fuzzy model for construction organizational competencies and performance. PhD thesis, University of Alberta, Canada.

Tokede, O. O.; Weththasinghe, K. K.; Kumer Shill, S.; Wijayasundara, M. and Subhani, M. (2025) Comparative evaluation of different material options for moment-resisting framing systems in buildings. Architectural Engineering and Design Management, 21(6), pp. 1541-1561. ISSN 1745-2007

Tokede, O; Udawatta, N and Luther, M (2018) Retrofitting heritage office buildings in the UK: A case study. Built Environment Project and Asset Management, 8(1), pp. 39-50. ISSN 2044-124X

Tokede, O O (2016) Developing whole-life cost models for retrofit options in office buildings. PhD thesis, Edinburgh Napier University, UK.

Tomkins, C D (2008) Allocation and pricing of water resources. PhD thesis, Stanford University, USA.

Tonetto, L M; Brust-Renck, P G; Ruecker, S; Fogliatto, F S and Pacheco, D A D J (2021) Differences in thinking styles across professionals with different academic backgrounds when developing a product. Architectural Engineering and Design Management, 17(1-2), pp. 3-16. ISSN 1745-2007

Too, E G (2012) A capability model to improve infrastructure asset performance. Journal of Construction Engineering and Management, 138(7), ISSN 0733-9364

Torriti, J (2012) Multiple-project discount rates for cost-benefit analysis in construction projects: A formal risk model for microgeneration renewable energy technologies. Construction Management and Economics, 30(9), pp. 739-747. ISSN 1466433X

Tozer, L; Macrae, H and Smit, E (2023) Achieving deep-energy retrofits for households in energy poverty. Buildings & Cities, 4(1), pp. 258-273. ISSN 2632-6655

Tran, C N N; Tam, V W Y; Le, K N and Illankoon, I M C S (2023) Environmental impacts assessment for Australian buildings: Thermal resistance and environmental impacts relationship. International Journal of Construction Management, 23(2), pp. 243-252. ISSN 1562-3599

Trigunarsyah, B (2004) A review of current practice in constructability improvement: Case studies on construction projects in Indonesia. Construction Management and Economics, 22(6), pp. 567-580. ISSN 01446193

Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: An example analysis for Indonesia. Construction Management and Economics, 22(8), pp. 861-876. ISSN 01446193

Trinius, W and Sjöström, C (2005) Service life planning and performance requirements. Building Research & Information, 33(2), pp. 173-181. ISSN 0961-3218

Tsai, M-T (2008) Real option-based procurement for transportation services. PhD thesis, University of California, Irvine, USA.

Tse, R Y C and Love, P E D (2001) Property rights implications of public-private joint ventures: A comment. Construction Management and Economics, 19(7), pp. 663-668. ISSN 01446193

Tse, R Y C and Love, P E D (2003) An economic analysis of the effect of delays on project costs. Journal of Construction Research, 4(2), pp. 155-160. ISSN 1609-9451

Tserng, H P; Liao, H H; Jaselskis, E J; Tsai, L K and Chen, P C (2012) Predicting construction contractor default with barrier option model. Journal of Construction Engineering and Management, 138(5), pp. 621-630. ISSN 0733-9364

Tserng, H P; Liao, H H; Tsai, L K and Chen, P C (2011) Predicting construction contractor default with option-based credit models-models' performance and comparison with financial ratio models. Journal of Construction Engineering and Management, 137(6), pp. 412-420. ISSN 0733-9364

Tsz Wai, C; Wai Yi, P; Ibrahim Olanrewaju, O; Abdelmageed, S; Hussein, M; Tariq, S and Zayed, T (2023) A critical analysis of benefits and challenges of implementing modular integrated construction. International Journal of Construction Management, 23(4), pp. 656-668. ISSN 1562-3599

Tuohy, P (2009) Regulations and robust low-carbon buildings. Building Research & Information, 37(4), pp. 433-445. ISSN 0961-3218

Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: A review. Journal of Engineering, Design and Technology, 14(3), pp. 526-542.

Utomo, C and Rahmawati, Y (2020) Agreement options for negotiation on material location decision of housing development. Construction Innovation, 20(2), pp. 209-222. ISSN 1471-4175

Vahdatmanesh, M and Firouzi, A (2018) Price risk management in BOT railroad construction projects using financial derivatives. Journal of Financial Management of Property and Construction, 23(3), pp. 349-362. ISSN 1366-4387

Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: The case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), pp. 3395-3414. ISSN 0969-9988

Vahdatmanesh, M; Firouzi, A and Rotimi, J O B (2022) Real options analysis of revenue risk sharing in post-disaster housing reconstruction. Journal of Financial Management of Property and Construction, 27(3), pp. 281-305. ISSN 1366-4387

Van Timmeren, A and Sidler, D (2007) The sustainable implant: Decentralised sanitation and energy reuse (Desaer) in the built environment. Construction Innovation, 7(1), pp. 22-37. ISSN 1471-4175

Vatankhah, M; Vakilinezhad, R; Zakeri, S M H and Fattahi, K (2024) Optimizing energy and daylight performance of vernacular dwellings for contemporary architecture: A parametric analysis. Architectural Engineering and Design Management, 20(6), pp. 1795-1814. ISSN 1745-2007

Verhaart, J; Veselý, M and Zeiler, W (2015) Personal heating: Effectiveness and energy use. Building Research & Information, 43(3), pp. 346-354. ISSN 0961-3218

Veselka, J (2023) BIM data structure in the building optimization: Methodology for model development. PhD thesis, Czech Technical University, Czech Republic.

Vinodh, S and Jayakrishna, K (2014) Development of integrated ecqfd, LCA and sustainable analysis model: A case study in an automotive component manufacturing organization. Journal of Engineering, Design and Technology, 12(1), pp. 102-127. ISSN 1726-0531

Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.

Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(4), pp. 1295-1318. ISSN 0969-9988

Vives, A; Benavides, J and Paris, A M (2010) Selecting infrastructure delivery modalities: No time for ideology or semantics. Journal of Construction Engineering and Management, 136(4), pp. 412-418. ISSN 0733-9364

Vlatas, D A (1986) Owner and contractor review to reduce claims. Journal of Construction Engineering and Management, 112(1), pp. 104-111. ISSN 0733-9364

Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(2), pp. 702-715. ISSN 0969-9988

Waldman, B; Huang, M and Simonen, K (2020) Embodied carbon in construction materials: A framework for quantifying data quality in epds. Buildings & Cities, 1(1), pp. 625-636. ISSN 2632-6655

Walker, L (2022) Scenario-based robustness assessment for low-emission building retrofit. DSc thesis, ETH Zürich, Switzerland.

Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193

Wamuziri, S (2013) Payment options in collaborative procurement of major construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 12-20. ISSN 17514304

Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wang, Y; Li, Y and Zhuang, J (2025) Research on the green development path of prefabricated building industry based on intelligent technology. Engineering, Construction and Architectural Management, 32(12), pp. 8390-8422. ISSN 0969-9988

Wang, D (2004) The Chinese construction industry from the perspective of industrial organization. PhD thesis, Northwestern University, USA.

Wanigarathna, N; Jones, K; Pascale, F; Morga, M and Meslem, A (2023) Cost–benefit analysis to appraise technical mitigation options for earthquake-induced liquefaction disaster events. Journal of Financial Management of Property and Construction, 28(2), pp. 220-241. ISSN 1366-4387

Warszawski, A (2003) Parametric analysis of the financing cost in a building project. Construction Management and Economics, 21(5), pp. 447-459. ISSN 01446193

Warszawski, A and Rosenfeld, Y (1994) Robot for interior-finishing works in building: Feasibility analysis. Journal of Construction Engineering and Management, 120(1), pp. 132-151. ISSN 0733-9364

Watermeyer, R B (2012) A framework for developing construction procurement strategy. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 223-237. ISSN 17514312

Watson, N (2016) Developing material selection strategies to improve the embodied impacts of buildings. EngD thesis, University of Bath, UK.

Watts, N; Watson, P A and Griffith, A (1999) Building procurement: The partnering paradigm. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Wei, Y; Choi, H and Lei, Z (2022) A generative design approach for modular construction in congested urban areas. Smart and Sustainable Built Environment, 11(4), pp. 1163-1181. ISSN 2046-6099

Wiesweg, N; Schäpers, P; Bernhold, T and Hartmann, T (2024) On the challenges of inter-organisational data in real estate: The role of knowledge sharing. Engineering, Construction and Architectural Management, 31(1), pp. 247-263. ISSN 0969-9988

Williams, C C; Nadin, S J and Windebank, J (2011) Undeclared work in the European construction industry: Evidence from a 2007 Eurobarometer survey. Construction Management and Economics, 29(8), pp. 853-867. ISSN 1466433X

Williams, K; Gupta, R; Hopkins, D; Gregg, M; Payne, C; Joynt, J L R; Smith, I and Bates-Brkljac, N (2013) Retrofitting England's suburbs to adapt to climate change. Building Research & Information, 41(5), pp. 517-531. ISSN 0961-3218

Williams, L M (2000) Strategic decision support for project portfolio management in the public sector. PhD thesis, University of California, Los Angeles, USA.

Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988

Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, C H; Holt, G D and Harris, P (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences. Engineering, Construction and Architectural Management, 8(4), pp. 257-271. ISSN 0969-9988

Wong, J-M (2008) Extending performance-based design methods by applying structural engineering design patterns. PhD thesis, University of California, Berkeley, USA.

Woodhead, R M and Downs, C G (2002) Facilitation as a research method to improve value management capabilities. Journal of Construction Research, 3(2), pp. 209-216. ISSN 1609-9451

Woodroffe, N J A and Ariaratnam, S T (2009) Contractor perspective on factors for evaluating installation options for small-diameter utilities. Journal of Construction Engineering and Management, 135(2), pp. 75-87. ISSN 0733-9364

Wright, P H (1989) Key factors for the evaluation of the quality of rural shelter structures. EdD thesis, West Virginia University, USA.

Wurthmann, K A (2023) Designing photovoltaic arrays for groundwater pumping for remote agriculture using synthetically generated daily rainfall and irrigation needs. Journal of Engineering, Design and Technology, 21(6), pp. 1803-1826. ISSN 1726-0531

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Xia, B; Wu, T; Skitmore, M; Chen, Q; Li, M and Zuo, J (2016) Delivering sustainable communities: A case study in China. Built Environment Project and Asset Management, 6(3), pp. 253-267. ISSN 2044-124X

Xie, W; Zhao, T; Wang, H and Tang, J (2017) Construction techniques used to automatically pass standard box girders through special passenger-line tunnels. Journal of Construction Engineering and Management, 143(5): 05016027, ISSN 0733-9364

Xin, Z.; Dong, J.; Zeng, H.; Xiong, Z.; Wang, B.; Yan, J. and Wang, Z. (2026) Key parameters and integrated techniques for mechanized tunnel construction via drilling and blasting method. Journal of Construction Engineering and Management, 152(9): 04026148, ISSN 0733-9364

Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.

Yadollahi, M; Ebrahimi Saryazdi, S M; Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), pp. 2670-2682. ISSN 1562-3599

Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.

Yang, L and Shi, J J (2010) Experimental study on the impact of rainfall on RCC construction. Journal of Construction Engineering and Management, 136(5), pp. 477-483. ISSN 0733-9364

Yankah, J E (2018) An integrated framework of marketing in construction contracting enterprises in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.

Yari, N (2018) New model for bridge management system (bms): Bridge repair priority ranking system (brprs), case based reasoning for bridge deterioration, cost optimization, and preservation strategy. PhD thesis, University of New Hampshire, USA.

Ye, Y; Xia, P; Zhou, T and Du, J (2023) Spatial memory of BIM and virtual reality: Mental mapping study. Journal of Construction Engineering and Management, 149(7): 04023042, ISSN 0733-9364

Yilmaz, N and Donaldson, A B (2005) Consideration of wind barriers for an inner courtyard. Architectural Engineering and Design Management, 1(4), pp. 281-293. ISSN 1745-2007

Yoon, Y and Gangarao, H (2021) Prioritization framework for rockfall countermeasures for rock-cut slopes for rural roads. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988

Yu, B (2013) Environmental implications of pavements: A life cycle view. PhD thesis, University of South Florida, USA.

Zachariah, J-A L (2003) Towards sustainable homes through optimization: An approach to balancing life cycle environmental impacts and life cycle costs in residential buildings. PhD thesis, University of Toronto, Canada.

Zafar, J and Chileshe, N (2018) Analysis of health and well-being practices among older construction site-based workers in South Australia. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364

Zaman, U; Florez-Perez, L; Abbasi, S and Nawaz, M S (2024) Exploring the both-and success paradox in mega construction projects: multi-dimensional assessments of paradoxical leadership, project agility and megaproject success. Engineering, Construction and Architectural Management, 31(9), pp. 3826-3851. ISSN 0969-9988

Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193

Zawdie, G and Langford, D A (2002) Influence of construction-based infrastructure on the development process in Sub-Saharan Africa. Building Research & Information, 30(3), pp. 160-170. ISSN 0961-3218

Zeng, Q and Pishdad-Bozorgi, P (2025) The evolution of sustainable building rating tools: A systematic literature review. Smart and Sustainable Built Environment, 14(4), pp. 1230-1263. ISSN 2046-6099

Zhang, H; Xing, F and Liu, J (2011) Rehabilitation decision-making for buildings in the Wenchuan area. Construction Management and Economics, 29(6), pp. 569-578. ISSN 1466433X

Zhang, S; Li, J; Li, Y and Zhang, X (2021) Revenue risk allocation mechanism in public-private partnership projects: Swing option approach. Journal of Construction Engineering and Management, 147(1): 04020153, ISSN 0733-9364

Zhang, X; Goulding, J S; Sexton, M G; Aouad, G and Kagioglou, M (2006) HyCon: Virtual prototyping in hybrid concrete construction frame design. Construction Innovation, 6(1), pp. 47-60. ISSN 1471-4175

Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988

Zhao, J; Thurairajah, N; Greenwood, D; Liu, H and Yuan, J (2023) Unpacking the context of value for money assessment in global markets: A procurement option framework for public-private partnerships. Engineering, Construction and Architectural Management, 30(8), pp. 3583-3601. ISSN 0969-9988

Zhao, N (2021) Developing a framework for roading infrastructure projects procurement system selection. PhD thesis, Auckland University of Technology, New Zealand.

Zhao, S and De Angelis, E (2020) Reducing mould risk during the building design stage: Case studies in South-East China. Journal of Construction in Developing Countries, 25(1), pp. 1-20. ISSN 1823-6499

Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364

Zheng, X; Li, R; Han, Y; Xue, R and Bai, J (2023) The dilemma of operator selection in urban rail transit PPP project operations: A LASSO approach. Journal of Construction Engineering and Management, 149(7): 05023007, ISSN 0733-9364

Zhou, X (2011) Managing commodity risks in highway contracts: Quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts. PhD thesis, Texas A&M University, USA.

Zulu, S; Zulu, E and Chabala, M (2022) Factors influencing households' intention to adopt solar energy solutions in Zambia: Insights from the theory of planned behaviour. Smart and Sustainable Built Environment, 11(4), pp. 951-971. ISSN 2046-6099

al Nageim, H; Nagar, R and Lisboa, P J G (2007) Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings. Construction Innovation, 7(3), pp. 240-253. ISSN 1471-4175

de Oliveira, R (1994) A methodology for housing design. PhD thesis, University of Waterloo, Canada.

de Villiers, A J (1988) Procurement of rural primary schools in southern Africa: An approach to resource optimization. PhD thesis, University of Pretoria, South Africa.

fu, C; Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(1), pp. 85-98. ISSN 1471-4175

van Stijn, A (2023) Developing circular building components: Between ideal and feasible. PhD thesis, Delft University of Technology, Netherlands.

van Stijn, A and Gruis, V (2020) Towards a circular built environment: An integral design tool for circular building components. Smart and Sustainable Built Environment, 9(4), pp. 635-653. ISSN 2046-6099

van den Boomen, M; Leontaris, G and Wolfert, A R M (2019) Replacement optimization of ageing infrastructure under differential inflation. Construction Management and Economics, 37(11), pp. 659-674. ISSN 01446193

van der Meer, J; Hartmann, A; van der Horst, A and Dewulf, G (2020) Multi-criteria decision analysis and quality of design decisions in infrastructure tenders: A contractor's perspective. Construction Management and Economics, 38(2), pp. 172-188. ISSN 01446193

This list was generated on Sat Aug 22 02:10:53 2026 UTC.