Items with Index Term: operating cost

Number of items: 75.

Abuhishmeh, K S K (2023) Risk assessment of reinforced concrete sewer pipes under external loading and adverse environmental conditions using an adaptive neuro-fuzzy system. PhD thesis, University of Texas at Arlington, USA.

Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193

Assad, M; Hosny, O; Elhakeem, A and El Haggar, S (2015) Green building design in Egypt from cost and energy perspectives. Architectural Engineering and Design Management, 11(1), pp. 21-40. ISSN 1745-2007

Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.

Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(5-6), pp. 376-386. ISSN 0961-3218

Boussabaine, A H; Kirkham, R J and Grew, R G (1999) Estimating the cost of energy usage in sport centres: A comparative modelling approach. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Brager, G and Baker, L (2009) Occupant satisfaction in mixed-mode buildings. Building Research & Information, 37(4), pp. 369-380. ISSN 0961-3218

Chanyotha, S (1991) Generic cost estimates, site screening, and site design of low- and intermediate-level waste system. PhD thesis, University of Arizona, USA.

Da Silva, W O P; Farias, B A; Monteiro, I B; Pegorini, V; Casanova, D and Bisconsini, D R (2024) Development of global quality index of unpaved roads. Journal of Construction Engineering and Management, 150(1): 04023147, ISSN 0733-9364

Delwar, M (1998) A generic LCCA algorithm for pavement management decisions. PhD thesis, Washington State University, USA.

Disney, O and Fahlstedt, O (2021) Site overheads: The lost dimension of improved productivity? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

El-Aroud, A S (1980) Road network investment model for developing countries. PhD thesis, Pennsylvania State University, USA.

El-khawas, I N (1997) The optimal design of buildings: A life-cycle approach to energy efficiency. PhD thesis, Ohio State University, USA.

Farajmandi, M; Ali, M; Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(9), pp. 2615-2641. ISSN 0969-9988

Farzin, A; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Economic optimization of heat exchanger networks based on geometric parameters using hybrid genetic-particle swarm algorithm technique. Journal of Engineering, Design and Technology, 19(4), pp. 989-1015. ISSN 1726-0531

Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the Intario intercity highway network. PhD thesis, University of Waterloo, USA.

Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(2), pp. 159-173. ISSN 2044-124X

Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.

Gudem, M; Steinert, M; Welo, T and Leifer, L (2013) Redefining customer value in lean product development design projects. Journal of Engineering, Design and Technology, 11(1), pp. 71-89. ISSN 1726-0531

Guo, J; Chen, J and Xie, Y (2022) Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory. Engineering, Construction and Architectural Management, 29(3), pp. 1396-1426. ISSN 0969-9988

Horman, M J and Kenley, R (2005) Quantifying levels of wasted time in construction with meta-analysis. Journal of Construction Engineering and Management, 131(1), pp. 52-61. ISSN 0733-9364

Horsley, A; France, C and Quatermass, B (2003) Delivering energy efficient buildings: A design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(4), pp. 345-356. ISSN 01446193

Hughes, W P; Ancell, D; Gruneberg, S and Hirst, L (2004) Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218

Jiang, Y; Chen, H and Li, S (2009) Computation of user costs at freeway work zones using weigh-in-motion traffic data. International Journal of Construction Education and Research, 5(3), pp. 197-219. ISSN 1557-8771

Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects. PhD thesis, Heriot-Watt University, UK.

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.

Langston, Craig A (1994) The determination of equivalent value in life-cost studies: An intergenerational approach. PhD thesis, University of Technology Sydney, Australia.

Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029

Larsson, N and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(5-6), pp. 413-418. ISSN 0961-3218

Levander, E and Sardén, Y (2009) Maintenance and operating costs in off-site timber framed housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lingard, H and Saunders, A (2004) Occupational rehabilitation in the construction industry of Victoria. Construction Management and Economics, 22(10), pp. 1091-1101. ISSN 01446193

Lucko, G; Vorster, M C and Anderson-Cook, C M (2007) Unknown element of owning costs-impact of residual value. Journal of Construction Engineering and Management, 133(1), pp. 3-9. ISSN 0733-9364

Macsporran, C and Tucker, S N (1996) Target budget levels for building operating costs. Construction Management and Economics, 14(2), pp. 103-119. ISSN 01446193

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Matthews, J C (2010) Integrated, multi-attribute decision support system for the evaluation of underground utility construction methods. PhD thesis, Louisiana Tech University, USA.

Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs. PhD thesis, Oklahoma State University, USA.

Mostafaeipour, A; Qolipour, M; Rezaei, M and Goudarzi, H (2020) Techno-economic assessment of using wind power system for tribal region of Gachsaran in Iran. Journal of Engineering, Design and Technology, 18(2), pp. 293-307. ISSN 1726-0531

Mousaei, A; Taghaddos, H; Marzieh Bagheri, S and Hermann, U (2021) Optimizing heavy lift plans for industrial construction sites using dijkstra's algorithm. Journal of Construction Engineering and Management, 147(11): 04021160, ISSN 0733-9364

Moussavi Nadoushani, Z S; Hammad, A W A and Akbarnezhad, A (2017) Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs. Journal of Construction Engineering and Management, 143(1): 04016089, ISSN 0733-9364

Mulu, T and Smith, N J (2008) Innovative road infrastructure financing in Jamaica and the developing countries. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Navon, R and Arkin, H (1993) Economic comparison of an air-conditioner and a desert cooler for residences in arid areas. Construction Management and Economics, 11(1), pp. 62-70. ISSN 01446193

O'Brien, P J (2007) Timely completion of school construction projects in Ohio as a function of compliance with contractual schedule development timelines. PhD thesis, Walden University, USA.

Oduyemi, O; Okoroh, M and Dean, A (2015) Developing an artificial neural network model for life cycle costing in buildings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ogden, R G; Kendrick, C C and Walliman, N S R (2004) Modelling of enhanced passive and conventional cooling systems. Building Research & Information, 32(1), pp. 17-26. ISSN 0961-3218

Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531

Oliver, N N and Brümmer, D G (2007) Factors influencing water consumption in South African schools. Journal of Engineering, Design and Technology, 5(1), pp. 81-94. ISSN 1726-0531

Outcault, S; Alston-Stepnitz, E; Sanguinetti, A; DePew, A N and Magaña, C (2022) Building lower-carbon affordable housing: Case studies from California. Building Research & Information, 50(6), pp. 646-661. ISSN 0961-3218

Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Patsiadas, P (2006) Public private partnership in motorway service areas: Decision making, investment analysis and best practice tools. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Patterson, R L and Trebes, B (2013) NEC contracts for design-build-operate contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 260-268. ISSN 17514312

Prozzi, J A (2001) Modeling pavement performance by combining field and experimental data. PhD thesis, University of California, Berkeley, USA.

Rambaldi, A N (1992) A regional market model for construction aggregate materials. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Rich, F A (2020) Managing the wear of heavy construction equipment steel track undercarriage by soil sand content. PhD thesis, Indiana State University, USA.

Rodrigues, C A (2017) Life-cycle environmental and cost assessment of building retrofits: Evaluating conventional and streamlined approaches. PhD thesis, Universidade de Coimbra, Portugal.

Sadoughi, A; Kouhirostami, M; Kouhirostamkolaei, M; Qi, B and Costin, A (2024) Autonomous building design for manufacturing and assembly: A systematic review of design application, challenges, and opportunities. Journal of Construction Engineering and Management, 150(9): 03124006, ISSN 0733-9364

Segol, G (1990) An option pricing model with three stochastic variables and its application to risky projects. PhD thesis, Golden Gate University, USA.

Shaurette, M (2015) Higher hourly cost compensation for heavy equipment used in demolition activity. International Journal of Construction Education and Research, 11(4), pp. 280-291. ISSN 1557-8771

Sheth, A and Sarkar, D (2020) Socio-economic feasibility analysis for sustainable mass rapid transit project in Western India. Journal of Construction in Developing Countries, 25(2), pp. 129-151. ISSN 1823-6499

Short, C A; Woods, A W; Drumright, L; Zia, R and Mingotti, N (2022) An alternative approach to delivering safe, sustainable surgical theatre environments. Buildings & Cities, 3(1), pp. 316-333. ISSN 2632-6655

Shrestha, K (2023) Cost comparison of highway rest area operations: In-house workforce versus outsourcing methods. Journal of Construction Engineering and Management, 149(8): 04023062, ISSN 0733-9364

Smith, J; Mills, A and Iyer-Raniga, U (2004) Benchmarking the implementation of continuing professional development in the victorian construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Soares, R (1999) User cost customization for a Florida bridge management system. PhD thesis, University of Florida, USA.

Sun, C; MacKley, A and Edara, P (2014) Programmatic examination of missouri incentive/disincentive contracts for mitigating work zone traffic impacts. Journal of Construction Engineering and Management, 140(1): 05013004, ISSN 0733-9364

Sylvester, K E (1999) An analysis of the benefits of photovoltaic-coated glazing on owning and operating costs of high rise commercial buildings. PhD thesis, Texas A&M University, USA.

Terblanche, R; May, C and Steward, J (2025) Implementing and operating net zero buildings in South Africa. Buildings & Cities, 6(1), pp. 255-271. ISSN 2632-6655

Wang, B; Zhang, S; Wang, X and Feng, Z (2018) The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: Balancing public and private benefits. Construction Management and Economics, 36(11), pp. 611-622. ISSN 01446193

Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(7), pp. 1348-1366. ISSN 0969-9988

Whittaker, J (1987) Equipment rates from revenue requirements. Journal of Construction Engineering and Management, 113(2), pp. 173-178. ISSN 0733-9364

Windapo, A O and Moghayedi, A (2020) Adoption of smart technologies and circular economy performance of buildings. Built Environment Project and Asset Management, 10(4), pp. 585-601. ISSN 2044-124X

Wright, P H (1989) Key factors for the evaluation of the quality of rural shelter structures. EdD thesis, West Virginia University, USA.

Yuan, L L (1998) Analysing operating costs of town councils. Journal of Financial Management of Property and Construction, 3(1), pp. 83-92. ISSN 1366-4387

This list was generated on Sat Aug 22 01:41:48 2026 UTC.