Items with Index Term: onsite
Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.
Abdulai, S F; Zayed, T; Taiwo, R and Ali, A H (2025) Hybrid statistical analysis of critical alignment factors in modular integrated construction. Journal of Construction Engineering and Management, 151(9): 04025129, ISSN 0733-9364
Afful, A E; Wang, C C; Sunindijo, R Y; Frimpong, S; Boadu, E and Baah, B (2025) Evolving job roles of women in the construction industry. Journal of Construction Engineering and Management, 151(3): 03125001, ISSN 0733-9364
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(2), pp. 573-600. ISSN 0969-9988
Ahn, S; Crouch, L; Wan Kim, T and Rameezdeen, R (2020) Comparison of worker safety risks between onsite and offsite construction methods: A site management perspective. Journal of Construction Engineering and Management, 146(9): 0001890, ISSN 0733-9364
Al-Kaabi, N S (2006) A fuzzy-based construction safety advisor (CSA) for construction safety in the United Arab Emirates. PhD thesis, Ohio State University, USA.
Ali, A H; Elyamany, A; Ibrahim, A H; Kineber, A F and Daoud, A O (2024) Modelling the relationship between modular construction adoption and critical success factors for residential projects in developing countries. International Journal of Construction Management, 24(12), pp. 1314-1325. ISSN 1562-3599
Almashaqbeh, M and El-Rayes, K (2022) Minimizing transportation cost of prefabricated modules in modular construction projects. Engineering, Construction and Architectural Management, 29(10), pp. 3847-3867. ISSN 0969-9988
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Alwisy, A; Bu Hamdan, S; Barkokebas, B; Bouferguene, A and Al-Hussein, M (2019) A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings. International Journal of Construction Management, 19(3), pp. 187-205. ISSN 1562-3599
Appuhamilage, B G; Ershadi, M and Jefferies, M (2023) A review of the role of project management offices in establishing offsite construction capabilities. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) The impact of offsite construction on the workforce: Required skillset and prioritization of training needs. Journal of Construction Engineering and Management, 148(7): 04022056, ISSN 0733-9364
Assaf, M; Al-Hussein, M and Li, X (2024) Critical review of virtual reality applications in offsite construction research. Journal of Construction Engineering and Management, 150(11): 03124007, ISSN 0733-9364
Atiq Ur Rehman, M.; Khan, S. A. and Chaabane, A. (2026) An integrated decision support model for early planning in off-site construction projects. Journal of Construction Engineering and Management, 152(9): 04026142, ISSN 0733-9364
Awe, O O; Atofarati, E O; Adeyinka, M O; Musa, A P and Onasanya, E O (2024) Assessing the factors affecting building construction collapse casualty using machine learning techniques: A case of Lagos, Nigeria. International Journal of Construction Management, 24(3), pp. 261-269. ISSN 1562-3599
Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.
Ayinla, K; Cheung, F and Skitmore, M (2022) Process waste analysis for offsite production methods for house construction: A case study of factory wall panel production. Journal of Construction Engineering and Management, 148(1): 05021011, ISSN 0733-9364
Bangaru, S S; Wang, C; Zhou, X; Jeon, H W and Li, Y (2020) Gesture recognition-based smart training assistant system for construction worker earplug-wearing training. Journal of Construction Engineering and Management, 146(12): 04020144, ISSN 0733-9364
Bijleveld, F R and Dorée, A G (2014) Method-based learning: A case in the asphalt construction industry. Construction Management and Economics, 32(7-8), pp. 665-681. ISSN 01446193
Bijleveld F R, D e A G (2013) Method-based learning: A case in the asphalt construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Boser, R A and El-Gafy, M (2011) Accelerating waste minimization in residential construction: A source separation case study. International Journal of Construction Education and Research, 7(1), pp. 58-70. ISSN 1557-8771
Brett, R; Thomson, D and Dainty, A (2022) Exploring craft in construction with short-term ethnography: Reflections on a researcher's prior insight. Construction Management and Economics, 40(5), pp. 359-373. ISSN 01446193
Brogan, Elizabeth A (2022) Drainage design engineering risk on design-build transportation projects. PhD thesis, University of Colorado at Denver, USA.
Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.
Cass, Yael (2020) The challenges and opportunities faced by women in the construction industry when progressing their careers in trades and professional roles. PhD thesis, RMIT University, Australia.
Chauhan, Krishna (2024) Prefabrication in construction: A systemic approach to impact and implementation. DScTech thesis, Aalto University, Finland.
Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193
Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175
Chen, Y and Kamara, J M (2005) The use of mobile computing in construction information management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Clarkson, Luke (2021) Comprehensive monitoring strategy for tailings dams. PhD thesis, University of Queensland, Australia.
Cong, W; Goh, Y M; Zhang, S; Liang, H; Zhou, Z and Guo, N (2023) Linking leader-member exchange and informal safety communication of construction workers in China: A cognitive psychology perspective. Journal of Construction Engineering and Management, 149(10): 04023092, ISSN 0733-9364
Conway, Z; Wade, F and Smith, S D (2018) A participant observation study of gender dynamics on construction sites. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Crolla, Kristof (2018) Building simplexity: The 'more or less' of post-digital architecture practice. PhD thesis, RMIT University, Australia.
Davies, P J; Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: A contractor's perspective. Construction Management and Economics, 32(3), pp. 290-308. ISSN 01446193
Deng, Y (2015) Mapping of BIM and GIS for interoperable geospatial data management and analysis for the built environment. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Ding, G and Forsythe, P J (2013) Sustainable construction: Life cycle energy analysis of construction on sloping sites for residential buildings. Construction Management and Economics, 31(3), pp. 254-265. ISSN 1466433X
Dowsett, R; Harty, C and Davies, R (2017) Epistemological differences and new technology in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Durdyev, S and Mbachu, J (2011) On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Construction Economics and Building, 11(3), pp. 18-33. ISSN 2204-9029
Ekanayake, E M A C; Shen, G Q P; Kumaraswamy, M M; Owusu, E K and Saka, A B (2021) Modeling supply chain resilience in industrialized construction: A Hong Kong case. Journal of Construction Engineering and Management, 147(11): 05021009, ISSN 0733-9364
Elnaas H, A P G K (2013) A decision evaluation model to choose between manufacturing off-site or on-site methods for construction of house building projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Fellows, M F; Phua, F T T and Tutt, D E (2023) Building bridges: The bilingual language work of migrant construction workers. Construction Management and Economics, 41(2), pp. 153-171. ISSN 01446193
Forsythe, P (2011) Drivers of housing demolition decision making and the impact on timber waste management. Construction Economics and Building, 11(1), pp. 1-14. ISSN 2204-9029
Forsythe, P (2015) Monitoring customer perceived service quality and satisfaction during the construction process. Construction Economics and Building, 15(1), pp. 19-42. ISSN 2204-9029
Forsythe, P J (2016) Construction service quality and satisfaction for a targeted housing customer. Engineering, Construction and Architectural Management, 23(3), pp. 323-348. ISSN 0969-9988
Forsythe, P J and Sepasgozar, S M E (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(4), pp. 578-598. ISSN 0969-9988
Gao, S; Jin, R and Lu, W (2020) Design for manufacture and assembly in construction: A review. Building Research & Information, 48(5), pp. 538-550. ISSN 0961-3218
Gerth, R; Boqvist, A; Bjelkemyr, M and Lindberg, B (2013) Design for construction: Utilizing production experiences in development. Construction Management and Economics, 31(2), pp. 135-150. ISSN 1466433X
Ginigaddara, B; Perera, S; Feng, Y and Rahnamayiezekavat, P (2022) An evaluation of offsite construction skill profiles. Journal of Financial Management of Property and Construction, 27(1), pp. 16-28. ISSN 1366-4387
Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Kagioglou, M (2024) Industry 4.0 driven emerging skills of offsite construction: A multi-case study-based analysis. Construction Innovation, 24(3), pp. 747-769. ISSN 1471-4175
Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193
Ginigaddara, Buddhini (2022) Developing a skill profile prediction model for typologies of offsite construction. PhD thesis, Western Sydney University, Australia.
Glass, A (2011) Analysis of building-integrated renewable energy systems in modern UK homes. EngD thesis, University of Manchester, UK.
Gong, J (2009) An object recognition, tracking, and contextual reasoning based video interpretation methodology for rapid productivity analysis of construction operations. PhD thesis, University of Texas at Austin, USA.
Gong, J; Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction. Construction Management and Economics, 29(7), pp. 737-751. ISSN 1466433X
Gorse, C; Sutton, R; Johnston, D and Miles-Shenton, D (2011) Heat loss through the building fabric: Low carbon construction practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: Partnering in-between systems of production, values and interests. Construction Management and Economics, 31(2), pp. 119-134. ISSN 1466433X
Gottsche, J; Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(1), pp. 46-60. ISSN 01446193
Griffith, A (2011) Delivering best value in the small works portfolio of public sector organizations when using preferred contractors. Construction Management and Economics, 29(9), pp. 891-900. ISSN 1466433X
Guenther, P (2020) A case study of perceptions of asset tracking and inventory management technology in a small construction company. PhD thesis, Wilmington University (Delaware), USA.
Guribie, F L; Kheni, N A and Sule, M (2022) Structural equation modeling of the critical driving forces of offsite construction in Ghana. Built Environment Project and Asset Management, 12(4), pp. 667-683. ISSN 2044-124X
Hamzeh, F; Abdul, G O; Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(6), pp. 935-949. ISSN 0969-9988
Haronian, E and Sacks, R (2021) Production control in earthworks: Concepts and metrics. Journal of Construction Engineering and Management, 147(10): 04021127, ISSN 0733-9364
Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364
Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364
Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X
Hu, Z; Chan, W T and Hu, H (2023) Personalized construction safety interventions considering cognitive-related factors. Journal of Construction Engineering and Management, 149(12): 04023137, ISSN 0733-9364
Hung, Y H; Smith-Jackson, T and Winchester, W (2011) Use of attitude congruence to identify safety interventions for small residential builders. Construction Management and Economics, 29(2), pp. 113-130. ISSN 1466433X
Husam, S; Laishram, B and Johari, S (2024) Determining the extent of attributes contributing to gender inclusion of workers in the construction industry. Journal of Construction Engineering and Management, 150(10): 04024145, ISSN 0733-9364
Ingemansson Havenvid, M; Hulthen, K; Linne, A and Sundquist, V (2015) New ways of organising construction due to user demands. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.
Jiang, L; Zhao, T; Feng, C and Zhang, W (2023) Improvement of random forest by multiple imputation applied to tower crane accident prediction with missing data. Engineering, Construction and Architectural Management, 30(3), pp. 1222-1242. ISSN 0969-9988
Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.
Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.
Kaminsky, J (2013) Social sustainability of sanitation infrastructure in developing communities. PhD thesis, University of Colorado at Boulder, USA.
Kaminsky, J and Javernick-Will, A (2015) Theorizing the internal social sustainability of sanitation organizations. Journal of Construction Engineering and Management, 141(2): 04014071, ISSN 0733-9364
Khan, N A; Ullah Khan, S; Ahmed, S; Farooqi, I H; Hussain, A; Vambol, S and Vambol, V (2020) Smart ways of hospital wastewater management, regulatory standards and conventional treatment techniques: A short review. Smart and Sustainable Built Environment, 9(4), pp. 727-736. ISSN 2046-6099
Kim, B; Lee, H; Park, H and Kim, H (2012) Greenhouse gas emissions from onsite equipment usage in road construction. Journal of Construction Engineering and Management, 138(8), pp. 982-990. ISSN 0733-9364
Kittinaraporn, W; Tuprakay, S and Prasittisopin, L (2022) Effective modeling for construction activities of recycled aggregate concrete using artificial neural network. Journal of Construction Engineering and Management, 148(3): 04021206, ISSN 0733-9364
Klitgaard, A; Svidt, K and Gottlieb, S C (2020) Ethnography, impression management and shifting practices. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Kouch, K A; Panuwatwanich, K; Sancharoen, P and Sahachaisaree, S (2021) Development of augmented reality application for onsite inspection of expressway structures using microsoft hololens. Journal of Construction in Developing Countries, 26(2), pp. 87-116. ISSN 1823-6499
Kucukvar, M (2013) Life cycle sustainability assessment framework for the U.S. Built environment. PhD thesis, University of Central Florida, USA.
Labik, O; Nahmens, I; Ikuma, L and Harvey, C (2023) On-site versus in-factory installation of solar-plus-storage in modular construction. Journal of Construction Engineering and Management, 149(5): 05023003, ISSN 0733-9364
Lei, Zhen (2015) Automated simulation model for crane motion planning in heavy industrial projects. PhD thesis, University of Alberta, Canada.
Li, X; Chen, R; Chen, W and Jim, C Y (2025) Safety-risk assessment system for prefabricated building construction in China. Engineering, Construction and Architectural Management, 32(12), pp. 8073-8096. ISSN 0969-9988
Li, H; Chan, G and Skitmore, M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics, 31(6), pp. 596-605. ISSN 1466433X
Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(1), pp. 106-133. ISSN 1471-4175
Lindhard, S M; Hamzeh, F; Gonzalez, V A; Wandahl, S and Ussing, L F (2019) Impact of activity sequencing on reducing variability. Journal of Construction Engineering and Management, 145(3): 04019001, ISSN 0733-9364
Lingard, H and Turner, M (2015) Improving the health of male, blue collar construction workers: A social ecological perspective. Construction Management and Economics, 33(1), pp. 18-34. ISSN 01446193
Liu, J; Yan, X and Gao, W (2024) A dualistic perspective of opportunity and risk: The impact of head-mounted augmented reality on construction onsite hazard identification of workers. Journal of Construction Engineering and Management, 150(11): 04024160, ISSN 0733-9364
Liu, R and Fischer, M (2025) A context taxonomy for construction field crew members. Journal of Construction Engineering and Management, 151(3): 04024214, ISSN 0733-9364
Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364
Loganathan, S and Forsythe, P (2020) Unravelling the influence of teamwork on trade crew productivity: A review and a proposed framework. Construction Management and Economics, 38(11), pp. 1040-1060. ISSN 01446193
Loganathan, S; Forsythe, P and Kalidindi, S N (2018) Work practices of onsite construction crews and their influence on productivity. Construction Economics and Building, 18(3), pp. 18-39. ISSN 2204-9029
Loganathan, Santhosh (2023) A framework for analysing the influence of teamwork processes of onsite construction trade crews on productivity. PhD thesis, University of Technology Sydney, Australia.
Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771
Lu, Na (2007) Investigation of designers' and general contractors' perceptions of offsite construction techniques in the United States construction industry. PhD thesis, Clemson University, USA.
Lu, Y and Zhang, J (2022) Bibliometric analysis and critical review of the research on big data in the construction industry. Engineering, Construction and Architectural Management, 29(9), pp. 3574-3592. ISSN 0969-9988
Lundgren, R; Kyrö, R and Olander, S (2024) The lifecycle impact and value capture of circular business models in the built environment. Construction Management and Economics, 42(6), pp. 527-544. ISSN 01446193
Manrique Delgado, B; Cao, S; Hasan, A and Sirén, K (2018) Energy and exergy analysis of prosumers in hybrid energy grids. Building Research & Information, 46(6), pp. 668-685. ISSN 0961-3218
Martin, H; Watson, C and Brooks, T (2025) Synergizing BIM and riba in architectural practice-technology workflow efficiencies, challenges, and insights. Architectural Engineering and Design Management, 21(1), pp. 35-59. ISSN 1745-2007
Maund, K; Gajendran, T and Brewer, G (2014) Examining the barriers to successful onsite construction environmental management operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
McCarney, M and Gibb, A G (2012) Interface management from an offsite construction perspective. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
McCormick, D F (2010) A mixed methods study of leader values while applying servant leadership in a construction-related company. PhD thesis, University of Phoenix, USA.
McMeel, D (2009) The artistry of construction: an investigation into construction as a creative process and the influence of mobile phones within domestic scale construction projects. PhD thesis, University of Edinburgh, UK.
Mkandawire, K; Kabiri, S and Connaughton, J (2023) Knowledge transaction between offsite and onsite interfaces. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Mkandawire, K; Kabiri, S; Mbugua, L and Connaughton, J (2022) Managing interfaces between offsite and onsite construction. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Mofolasayo, A (2025) Multi-variable evaluation of factors that contribute to the environmental impact of onsite and offsite building construction: An illustration using roof panel fastening schedule. International Journal of Construction Management, 25(16), pp. 1938-1951. ISSN 1562-3599
Mohamed, Yamen (2023) Adopting modern methods of construction in low-income housing projects in Egypt. PhD thesis, London South Bank University, UK.
Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.
Mostafa, S and Chileshe, N (2015) Discrete-event simulation model for offsite manufacturing in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mostafa, S; Chileshe, N and Zuo, J (2014) A synergistic supply chain enhancing offsite manufacturing uptake in Australian house building. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099
Nassri, S; Talebi, S; Elghaish, F; Koohestani, K; McIlwaine, S; Hosseini, M R; Poshdar, M and Kagioglou, M (2023) Labor waste in housing construction projects: An empirical study. Smart and Sustainable Built Environment, 12(2), pp. 325-340. ISSN 2046-6099
Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X
Newaz, M T; Davis, P; Sher, W and Simon, L (2022) Factors affecting construction waste management streams in Australia. International Journal of Construction Management, 22(13), pp. 2625-2633. ISSN 1562-3599
Nguyen, D T and Le, P L (2022) Twenty-year application of logistics and supply chain management in the construction industry. Construction Management and Economics, 40(10), pp. 796-834. ISSN 01446193
Oviedo Haito, Ricardo Juan José (2015) Strategies to develop specialist trade contractors. PhD thesis, Universidade de São Paulo, Brazil.
Padmasiri, Dinithi (2024) A qualitative investigation of information technology (it) managers' emotion regulation: Insights into the impact of organisational culture and work-family spillover. PhD thesis, University of New South Wales, Australia.
Palaniappan, S; Bashford, H; Li, K; Fafitis, A and Stecker, L (2009) Carbon emissions based on transportation for post-tensioned slab foundation construction: A production home building study in the greater phoenix arizona area. International Journal of Construction Education and Research, 5(4), pp. 236-260. ISSN 1557-8771
Paneru, S; Suh, S; Seo, W and Rausch, C (2024) Evaluating the decarbonization potential of industrialized construction: A review of the current state, opportunities, and challenges. Journal of Construction Engineering and Management, 150(9): 03124005, ISSN 0733-9364
Park, J; Kim, K and Cho, Y K (2017) Framework of automated construction-safety monitoring using cloud-enabled BIM and BLE mobile tracking sensors. Journal of Construction Engineering and Management, 143(2): 05016019, ISSN 0733-9364
Piao, Y; Xu, W; Wang, T K and Chen, J H (2021) Dynamic fall risk assessment framework for construction workers based on dynamic Bayesian network and computer vision. Journal of Construction Engineering and Management, 147(12): 04021171, ISSN 0733-9364
Polesie, P M A (2012) Reducing the use of resources in medium-sized Swedish construction enterprises: Production managers' views. Construction Management and Economics, 30(3), pp. 193-202. ISSN 01446193
Prince, J R (2004) Evaluating the impact of onsite design on project performance. PhD thesis, Clemson University, USA.
Raymond, A J; Kendall, A; Dejong, J T; Kavazanjian, E; Woolley, M A and Martin, K K (2021) Life cycle sustainability assessment of fugitive dust control methods. Journal of Construction Engineering and Management, 147(3): 04020181, ISSN 0733-9364
Razavi, S N; Montaser, A and Moselhi, O (2012) RFID deployment protocols for indoor construction. Construction Innovation, 12(2), pp. 239-258. ISSN 1471-4175
Rener, A T (2022) Innovative methodologies to enhance productivity, supply chain, and sustainability in industrialized construction. PhD thesis, Lawrence Technological University, USA.
Rotimi, F E; Brauner, M; Burfoot, M; Naismith, N; Silva, C W C and Mohaghegh, M (2024) Work environment challenge and the wellbeing of women in construction industry in New Zealand – the mediating role of work morale. Engineering, Construction and Architectural Management, 31(11), pp. 4417-4438. ISSN 0969-9988
Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175
Salama, T and Said, H (2025) Agility assessment framework for modular and offsite construction. Construction Innovation, 25(2), pp. 193-223. ISSN 1471-4175
Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175
Sampson Mamphweli, N and Leroy Meyer, E (2013) Performance monitoring system for a biomass gasifier. Journal of Engineering, Design and Technology, 11(1), pp. 7-18. ISSN 1726-0531
Santero, N J (2009) Pavements and the environment: A life-cycle assessment approach. PhD thesis, University of California, Berkeley, USA.
Sanvido, V E and Paulson, B C (1991) Site analysis using controller-function charts. Journal of Construction Engineering and Management, 117(2), pp. 226-241. ISSN 0733-9364
Selman, A D; Guðjónsdóttir, S and Gade, A N (2021) Is the Danish construction sector ready for sustainable and circular construction sites? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Shahparvari, M (2023) Minimisation of rework in UK housing construction: contribution of subcontractors. PhD thesis, London South Bank University, UK.
Shen, Y (2013) An investigation of safety climate on Hong Kong construction sites. PhD thesis, University of Hong Kong, Hong Kong.
Shih, C S R; Arroyo, G A and Doro-on, A M (2004) Innovative sustainable design approaches for onsite sewage treatment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Shohet, I M and Laufer, A (1996) Exterior cladding methods: A technoeconomic analysis. Journal of Construction Engineering and Management, 122(3), pp. 242-247. ISSN 0733-9364
Shrestha, H D; Yatabe, R; Bhandary, N P and Subedi, J (2012) Vulnerability assessment and retrofitting of existing school buildings: A case study of Aceh. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 52-65. ISSN 1759-5916
Simmonds, D M (2015) Information technology and sustainability: An empirical study of the value of the building automation system. PhD thesis, University of South Florida, USA.
Song, Z; Yang, F; Boezeman, E J and Li, X (2020) Do new-generation construction professionals be provided what they desire at work? A study on work values and supplies-values fit. Engineering, Construction and Architectural Management, 27(10), pp. 2835-2858. ISSN 0969-9988
Styhre, A (2011) In the circuit of credibility: Construction workers and the norms of 'a good job'. Construction Management and Economics, 29(2), pp. 199-209. ISSN 1466433X
Styhre, A and Josephson, P E (2007) Coaching the site manager: Effects on learning and managerial practice. Construction Management and Economics, 25(12), pp. 1295-1304. ISSN 1466433X
Sundquist, V; Gadde, L-E and Hulthén, K (2018) Reorganizing construction logistics for improved performance. Construction Management and Economics, 36(1), pp. 49-65. ISSN 0144-6193
Sunindijo, R Y and Zou, P X W (2013) Conceptualizing safety management in construction projects. Journal of Construction Engineering and Management, 139(9), pp. 1144-1153. ISSN 0733-9364
Sutrisna, M; Ramanayaka, C D D and Goulding, J S (2018) Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), pp. 381-397. ISSN 1745-2007
Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4): 04025012, ISSN 0733-9364
Ter Huurne, R; Scholtenhuis, L O and Dorée, A (2022) Change triggers in early innovation stages: How technology pilots enable routine reflection. Journal of Construction Engineering and Management, 148(9): 05022005, ISSN 0733-9364
Thuesen, C; Jensen, J S and Gottlieb, S C (2009) Making the long tail work: Reflections on the development of the construction industry the past 25 years. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Tian, Z; Yu, Y; Xu, F and Zhang, Z (2023) Dynamic hazardous proximity zone design for excavator based on 3D mechanical arm pose estimation via computer vision. Journal of Construction Engineering and Management, 149(7): 04023048, ISSN 0733-9364
Turner, M; Holdsworth, S; Scott-Young, C M and Sandri, K (2021) Resilience in a hostile workplace: The experience of women onsite in construction. Construction Management and Economics, 39(10), pp. 839-852. ISSN 01446193
Tuvayanond, W; Kamchoom, V and Prasittisopin, L (2026) Efficient machine learning for strength prediction of ready-mix concrete production (prolonged mixing). Construction Innovation, 26(2), pp. 369-394. ISSN 1471-4175
Twum, B A; Kabiri, S and Tutt, D (2023) Managing onsite production pressure and its impact on safety performance in construction: An activity theory analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.
Verburg, Willem Hendrik (2021) The development of a design-for-assembly method for construction and infrastructure projects. PhD thesis, University of Twente, Netherlands.
Vithanage, S C; Sing, M C P; Davis, P and Newaz, M T (2022) Assessing the off-site manufacturing workers' influence on safety performance: A Bayesian network approach. Journal of Construction Engineering and Management, 148(1): 04021185, ISSN 0733-9364
Wang, G; Liu, M; Cao, D and Tan, D (2022) Identifying high-frequency–low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai. Engineering, Construction and Architectural Management, 29(2), pp. 940-960. ISSN 0969-9988
Wang, J; Luo, H; Pena-Mora, F; Zhou, W and Fang, W (2024) An integrated BIM-IoT framework for real-time quality monitoring in construction site. Journal of Construction Engineering and Management, 150(11): 05024013, ISSN 0733-9364
Wang, M; Wang, C C; Zlatanova, S; Shen, X and Brilakis, I (2024) A streamlined laser scanning verticality check method for installation of prefabricated wall panels. Journal of Construction Engineering and Management, 150(11): 04024159, ISSN 0733-9364
Wang, P; Wu, P; Wang, X; Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2109-2133. ISSN 0969-9988
Wang, X (2024) Context-aware worker intent interpretation for human-robot collaboration in construction. PhD thesis, University of Wisconsin - Madison, USA.
Withana-Gamage, I S (2011) A waste minimisation framework for the procurement of design and build construction projects. PhD thesis, Loughborough University, UK.
Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.
Wuni, I Y; Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(5), pp. 1864-1882. ISSN 0969-9988
Xiang, Y; Bu, J; Zhu, K; Ma, K; Opoku, A; Florez-Perez, L; Zhang, H and Wu, Y (2023) Reconsidering adaptive industrialized construction in Chinese rural areas: Responding to the challenge of COVID-19. Building Research & Information, 51(3), pp. 316-332. ISSN 0961-3218
Yang, X; Jefferson, W and Bulbul, T (2025) Evaluation of construction worker perceptions of wearable proximity sensors during the COVID-19 pandemic. Journal of Construction Engineering and Management, 151(3): 04024217, ISSN 0733-9364
Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364
Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.
Yue, H; Ye, G; Yang, J; Yan, Y; Chen, S; Yang, L and Chen, Y (2025) Cost–benefit analysis of four-party construction safety supervision. Journal of Construction Engineering and Management, 151(2): 04024206, ISSN 0733-9364
Zaher, M; Greenwood, D and Marzouk, M (2018) Mobile augmented reality applications for construction projects. Construction Innovation, 18(2), pp. 152-166. ISSN 1471-4175
Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364
Zhang, J; Zhou, Q and Zhang, S (2022) Case study of field application of prefabricated anchoring frame beam structure in slope supporting projects. Journal of Construction Engineering and Management, 148(9): 05022008, ISSN 0733-9364
Zhang, M; Cao, Z; Yang, Z and Zhao, X (2020) Utilizing computer vision and fuzzy inference to evaluate level of collision safety for workers and equipment in a dynamic environment. Journal of Construction Engineering and Management, 146(6): 04020051, ISSN 0733-9364
Zhang, S; Bogus, S M; Lippitt, C D; Kamat, V and Lee, S (2022) Implementing remote-sensing methodologies for construction research: An unoccupied airborne system perspective. Journal of Construction Engineering and Management, 148(9): 03122005, ISSN 0733-9364
Zhang, S; Du, C; Sa, W; Wang, C and Wang, G (2014) Bayesian-based hybrid simulation approach to project completion forecasting for underground construction. Journal of Construction Engineering and Management, 140(1): 04013031, ISSN 0733-9364
Zhang, Xuan (2025) Coordination and optimization of prefabricated building supply chain for sustainability development. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Up a level