Items with Index Term: off-site manufacturing
Agapiou, A (2020) Factors influencing the selection of a procurement route for UK off-site housebuilding. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 3-15. ISSN 17514304
Al Asali, M W (2020) Craft-inclusive construction: design strategies for thin-tile vaulting. PhD thesis, University of Cambridge, UK.
Arashpour, M; Heidarpour, A; Akbar Nezhad, A; Hosseinifard, Z; Chileshe, N and Hosseini, R (2020) Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality. Construction Management and Economics, 38(6), pp. 502-514. ISSN 01446193
Bendi, D; Rana, M Q; Arif, M; Lamb, S M; Sawhney, A and Kaushik, A K (2022) Assessing off-site readiness in construction organisations: Cases from India. Construction Innovation, 22(2), pp. 320-341. ISSN 1471-4175
Brandín, R and Abrishami, S (2021) Information traceability platforms for asset data lifecycle: Blockchain-based technologies. Smart and Sustainable Built Environment, 10(3), pp. 364-386. ISSN 2046-6099
Correia, J M; Sutrisna, M and Zaman, A U (2020) Factors influencing the implementation of off-site manufacturing in commercial projects in Western Australia: A proposed research agenda. Journal of Engineering, Design and Technology, 18(6), pp. 1449-1468. ISSN 1726-0531
Davies, R J (2003) Formulating competitive strategy in the UK housebuilding industry: Executive summary. EngD thesis, University of Warwick, UK.
Elnaas, E (2014) The decision to use off-site manufacturing systems for house-building projects in the UK. PhD thesis, University of Brighton, UK.
Elnaas, H; Ashton, P and Gidado, K (2009) Decision making process for using off-site manufacturing systems for housing projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Elnaas H, A P G K (2013) A decision evaluation model to choose between manufacturing off-site or on-site methods for construction of house building projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304
Ghasemi Poor Sabet, Pejman (2020) A hybrid OSM–BIM framework for construction management system. PhD thesis, Curtin University, Australia.
Hamid, Z A and Anuar Mohamad Kamar, K (2012) Aspects of off-site manufacturing application towards sustainable construction in Malaysia. Construction Innovation, 12(1), pp. 4-10. ISSN 1471-4175
Hu, X and Chong, H Y (2022) Integrated frameworks of construction procurement systems for off-site manufacturing projects: Social network analysis. International Journal of Construction Management, 22(11), pp. 2089-2097. ISSN 1562-3599
Hu, X; Chong, H Y; Wang, X and London, K (2019) Understanding stakeholders in off-site manufacturing: A literature review. Journal of Construction Engineering and Management, 145(8): 03119003, ISSN 0733-9364
Larsson, J and Simonsson, P (2012) Barriers and drivers for increased use of off-site bridge construction in Sweden. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Leghissa, G (2019) Collaboration between construction firms and the supply chain for the implementation of innovation strategies. PhD thesis, Loughborough University, UK.
Li, Z and Mok Paik, S (2025) Resource cost optimization strategies in off-site manufacturing for modern construction methods: A lean theory perspective case study in Ireland. International Journal of Construction Management, 25(16), pp. 1892-1900. ISSN 1562-3599
Liu, Q; Ye, G and Feng, Y (2020) Workers' safety behaviors in the off-site manufacturing plant. Engineering, Construction and Architectural Management, 27(3), pp. 765-784. ISSN 0969-9988
Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364
Meiling, J; Backlund, F and Johnsson, H (2012) Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management, 19(2), pp. 141-158. ISSN 0969-9988
Meiling, J and Sandberg, M (2009) Towards a feedback model for offsite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Mostafa, S and Chileshe, N (2018) Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia. Architectural Engineering and Design Management, 14(1-2), pp. 139-157. ISSN 1745-2007
Mostafa, S; Tam, V W; Dumrak, J and Mohamed, S (2020) Leagile strategies for optimizing the delivery of prefabricated house building projects. International Journal of Construction Management, 20(8), pp. 867-881. ISSN 1562-3599
Mándoki, R (2022) The social sustainability of standardisation in the Hungarian residential building sector. PhD thesis, University of Cambridge, UK.
Mándoki, R and Orr, J (2023) The social acceptance of mass produced residential buildings among Hungarian young adults. Architectural Engineering and Design Management, 19(2), pp. 148-162. ISSN 1745-2007
Sabet, P; Jonescu, E; Chong, H Y and Ramanyaka, C E (2025) Interacting possibilities between building information modelling and off-site manufacturing for performance improvement. Construction Economics and Building, 25(1), pp. 221-243. ISSN 2204-9029
Shafiee, S; Piroozfar, P; Hvam, L; Farr, E R P; Huang, G Q; Pan, W; Kudsk, A; Rasmussen, J B and Korell, M (2020) Modularisation strategies in the AEC industry: A comparative analysis. Architectural Engineering and Design Management, 16(4), pp. 270-292. ISSN 1745-2007
Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175
Toledo, L; Wright, A and Cropper, P (2025) Case study investigation of overheating in low-energy homes: Insights from a post-occupancy evaluation in England. Building Research & Information, 53(1-2), pp. 139-164. ISSN 0961-3218
Vithanage, S C; Sing, M C P; Davis, P and Newaz, M T (2022) Assessing the off-site manufacturing workers' influence on safety performance: A Bayesian network approach. Journal of Construction Engineering and Management, 148(1): 04021185, ISSN 0733-9364
Wuni, I Y and Shen, G Q (2020) Stakeholder management in prefabricated prefinished volumetric construction projects: Benchmarking the key result areas. Built Environment Project and Asset Management, 10(3), pp. 407-421. ISSN 2044-124X
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2022) Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2108-2120. ISSN 1562-3599
Yang, Z.; Lu, W.; Wu, L. and Xu, J. (2026) Analysis of workflow variability in modular integrated construction manufacturing using cooperative game theory. Journal of Construction Engineering and Management, 152(8): 04026115, ISSN 0733-9364
Zeng, N; Liu, Y; Wang, C; Chen, Q; Liu, Y and Li, Q (2026) On- and off-site coordination in a modular construction supply chain: Domain-spanning production flow framing and evaluation. Journal of Construction Engineering and Management, 152(2): 04025245, ISSN 0733-9364
Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective. PhD thesis, University of Strathclyde, UK.
Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304
Zou, Y; Wu, Y; Guo, B H W; Papadonikolaki, E; Dimyadi, J and Hung, S N (2022) Investigating the New Zealand off-site manufacturing industry's readiness for automated compliance checking. Journal of Construction Engineering and Management, 148(12): 05022013, ISSN 0733-9364
Up a level