Items with Index Term: nuclear power
AlShemeili, H; Davidson, R and Khalid, K (2024) Impact of empowering leadership on safety behavior and safety climate: Mediating and moderating role of safety monitoring. Journal of Engineering, Design and Technology, 22(4), pp. 1282-1305. ISSN 1726-0531
Barbachyn, S M; Devine, R D; Thrall, A P and Kurama, Y C (2017) Economic evaluation of high-strength materials in stocky reinforced concrete shear walls. Journal of Construction Engineering and Management, 143(10): 04017074, ISSN 0733-9364
Bird, R and Wearne, S (2017) Contract structure for nuclear power projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 131-137. ISSN 17514304
Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry. PhD thesis, Stanford University, USA.
Chang, L M and Borcherding, J D (1986) Craftsman questionnaire sampling. Journal of Construction Engineering and Management, 112(4), pp. 543-556. ISSN 0733-9364
Chang, L-M (1983) Evaluation and improvement of craftsman questionnaire in measuring construction productivity. PhD thesis, University of Texas at Austin, USA.
Christina, D; Loosemore, M and Newton, S (2016) The dimensionality of public trust in public private partnership projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Cooper, L P (2008) How project teams conceive of and manage pre-quantitative risk. PhD thesis, University of Southern California, USA.
Elazhary, M. and El-Adaway, I. H. (2026) Managing risks under nuclear power plant projects: A latent similarity-guided contract customization. Journal of Construction Engineering and Management, 152(7): 04026089, ISSN 0733-9364
Feldbauer, R R (2019) Mindful project management: a framework to enhance underperformance managing large hospital builds by incorporating principles adapted from High Reliability Organizations. PhD thesis, University of Liverpool, UK.
Friedrich, D R; Daly, J P and Dick, W G (1987) Revisions, repairs, and rework on large projects. Journal of Construction Engineering and Management, 113(3), pp. 488-500. ISSN 0733-9364
Garrett, J W and Teizer, J (2009) Human factors analysis classification system relating to human error awareness taxonomy in construction safety. Journal of Construction Engineering and Management, 135(8), pp. 754-763. ISSN 0733-9364
Herzog, H W and Schlottmann, A M (1988) Local business cycle severity and induced labour mobility: The case of the construction workforce. Construction Management and Economics, 6(3), pp. 247-258. ISSN 01446193
Invernizzi, D C; Locatelli, G and Brookes, N J (2020) Characterising nuclear decommissioning projects: An investigation of the project characteristics that affect the project performance. Construction Management and Economics, 38(10), pp. 947-963. ISSN 01446193
Jansma, G L (1987) A methodology for making construction productivity comparisons. PhD thesis, University of Texas at Austin, USA.
Lal, H (2013) Nuclear decommissioning contracts: The legal and commercial issues. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 94-102. ISSN 17514304
Liou, F S and Borcherding, J D (1986) Work sampling can predict unit rate productivity. Journal of Construction Engineering and Management, 112(1), pp. 90-103. ISSN 0733-9364
Lloyd, C A (2020) Modular manufacture and construction of small nuclear power generation systems. PhD thesis, University of Cambridge, UK.
Locatelli, G and Mancini, M (2012) Looking back to see the future: Building nuclear power plants in Europe. Construction Management and Economics, 30(8), pp. 623-637. ISSN 1466433X
Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.
Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.
Mukhopadhyay, S; Halligan, J and Hastak, M (2016) Assessment of major causes: Nuclear power plant disasters since 1950. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 521-543. ISSN 1759-5916
Oti, A H; Farrell, P; Abanda, F H; McMahon, P; Mahamadu, A M; Mzyece, D; Akintola, A A and Prinja, N (2022) A BIM-driven framework for integrating rules and regulations in the decommissioning of nuclear power plants. Construction Innovation, 22(4), pp. 809-830. ISSN 1471-4175
Segol, G (1990) An option pricing model with three stochastic variables and its application to risky projects. PhD thesis, Golden Gate University, USA.
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Sherman, R; Parrish, K and Lamanna, A (2021) Identifying and categorizing risks incumbent in us nuclear power plant construction. Journal of Construction Engineering and Management, 147(4): 02018, ISSN 0733-9364
Sherman, Rachael Paige (2020) Assessing the impact of regulation on the performance of power and pipeline projects. PhD thesis, Arizona State University, USA.
Stemp, B A and Walewski, J (2011) Lampson transi-lift mobile crane: Concept, design, and use. Journal of Construction Engineering and Management, 137, pp. 785-792. ISSN 0733-9364
Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.
Taylor, T R B and Ford, D N (2008) Managing tipping point dynamics in complex construction projects. Journal of Construction Engineering and Management, 134(6), pp. 421-431. ISSN 0733-9364
Taylor, T R B; Ford, D N and Reinschmidt, K F (2012) Impact of public policy and societal risk perception on US civilian nuclear power plant construction. Journal of Construction Engineering and Management, 138(8), pp. 972-981. ISSN 0733-9364
Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: A review. Journal of Engineering, Design and Technology, 14(3), pp. 526-542.
Valentin, V (2011) Impact assessment of inter-organizational dynamics on the performance metrics of capital-intensive projects. PhD thesis, Purdue University, USA.
Willenbrock, J H; Thomas, H R and Francis, P J (1987) Factors affecting outage construction efficiency. Journal of Construction Engineering and Management, 113(1), pp. 99-116. ISSN 0733-9364
Xing, J (2024) Functional reasoning support for nuclear power plant field operators. PhD thesis, Carnegie Mellon University, USA.