Items with Index Term: net present value
Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.
Almarri, K and Boussabaine, H (2021) Re-evaluating the risk costing agenda in PPP projects. Built Environment Project and Asset Management, 11(1), pp. 22-37. ISSN 2044-124X
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Amadi, A I (2026) Construction economics at early stage: Order of cost estimating, life cycle costing and development appraisal of a proposed office complex. International Journal of Building Pathology and Adaptation, 44(1), pp. 70-90. ISSN 2398-4708
Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364
Ansari, R (2019) Dynamic simulation model for project change-management policies: Engineering project case. Journal of Construction Engineering and Management, 145(7): 05019008, ISSN 0733-9364
Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.
Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364
Azcarate-Aguerre, J F; Conci, M; Zils, M; Hopkinson, P and Klein, T (2022) Building energy retrofit-as-a-service: A total value of ownership assessment methodology to support whole life-cycle building circularity and decarbonisation. Construction Management and Economics, 40(9), pp. 676-689. ISSN 01446193
Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029
Baker, L M (1984) A labor market model to manage costs risk in construction project management. PhD thesis, Colorado School of Mines, USA.
Burchett, J F and Tummala, V M R (1998) The application of the risk management process in capital investment decisions for EHV transmission line projects. Construction Management and Economics, 16(2), pp. 235-244. ISSN 01446193
Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), pp. 369-391. ISSN 2044-124X
Chan, K H (2012) Critical factors in minimizing lighting energy. Architectural Engineering and Design Management, 8(1), pp. 21-29. ISSN 1745-2007
Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387
Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X
Chen, B; Mao, C K and Hu, J L (2015) The optimal debt ratio of public-private partnership projects. International Journal of Construction Management, 15(3), pp. 239-253. ISSN 1562-3599
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.
Chiang, Y H; Cheng, E W L and Lam, P T I (2010) Employing the net present value-consistent IRR methods for PFI contracts. Journal of Construction Engineering and Management, 136(7), pp. 811-814. ISSN 0733-9364
Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193
Dias, A and Ioannou, P G (1995) Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Engineering and Management, 121(4), pp. 404-414. ISSN 0733-9364
DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.
Ehoff Jr., C E (1992) Removed from scheduled maintenance: An inquiry into the problems threatening the survival of United States elevator manufacturers. PhD thesis, Golden Gate University, USA.
El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Elkhayat, Y O; Ibrahim, M G; Tokimatsu, K and Ali, A A M M (2020) Life cycle cost analysis on three high-performance glazing systems for an office building in New Cairo, Egypt. Architectural Engineering and Design Management, 17(1-2), pp. 131-145. ISSN 1745-2007
Espinoza, D and Morris, J W F (2013) Decoupled NPV: A simple, improved method to value infrastructure investments. Construction Management and Economics, 31(5), pp. 471-496. ISSN 1466433X
Espinoza, D; Rojo, J; Cifuentes, A and Morris, J (2020) DNPV: A valuation methodology for infrastructure and capital investments consistent with prospect theory. Construction Management and Economics, 38(3), pp. 259-274. ISSN 01446193
Farrell, M L (1996) Real property valuation in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 1(1), pp. 5-20. ISSN 1366-4387
Ghanbari, M; Olaikhan, A A J and Skitmore, M (2025) Enhancing project portfolio selection for construction holding firms: A multi-objective optimization framework with risk analysis. Engineering, Construction and Architectural Management, 32(8), pp. 5534-5557. ISSN 0969-9988
Girmscheid, G (2009) NPV model for evaluating the economic efficiency of municipal street maintenance by private providers. Journal of Construction Engineering and Management, 135(8), pp. 701-709. ISSN 0733-9364
Green, S D (1989) Tendering: Optimization and rationality. Construction Management and Economics, 7(1), pp. 53-63. ISSN 01446193
Guo, Y; Su, Y; Chen, C and Martek, I (2024) Inclusion of "managing flexibility" valuations in the pricing of PPP projects: A multi-objective decision-making method. Engineering, Construction and Architectural Management, 31(11), pp. 4562-4584. ISSN 0969-9988
Harajli, H A (2009) Cost-benefit analysis of microgenerators: An integrated appraisal perspective. PhD thesis, University of Bath, UK.
Hawas, F and Cifuentes, A (2014) Valuation of projects with stochastic cash flows and intertemporal correlations: Practical modeling guidelines. Journal of Construction Engineering and Management, 140(6): 6014003, ISSN 0733-9364
Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. Construction Management and Economics, 20(2), pp. 143-156. ISSN 01446193
Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.
Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.
Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X
Jagboro, G O (1998) The effect of payment for advance purchase of building materials on contractor's cash-flow projections. Journal of Financial Management of Property and Construction, 3(3), pp. 71-83. ISSN 1366-4387
Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.
Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988
Jin, H; Liu, S; Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), pp. 2347-2363. ISSN 0969-9988
Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.
Kamel, M; Khallaf, R and Nosaier, I (2023) Net present value-time curve behaviour of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1924-1931. ISSN 1562-3599
Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599
Khan, I H and Munawer, T (2024) A systematic review of economic sustainability of vertical greenery systems in buildings. Construction Economics and Building, 24(1-2), pp. 119-143. ISSN 2204-9029
Khan, I H and Munawer, T (2024) A systematic review of economic sustainability of vertical greenery systems for buildings. Construction Economics and Building, 24(1-2), pp. 119-143. ISSN 2204-9029
Kong, D; Tiong, R L K; Cheah, C Y J; Permana, A and Ehrlich, M (2008) Assessment of credit risk in project finance. Journal of Construction Engineering and Management, 134(11), pp. 876-884. ISSN 0733-9364
Lashgari, Martin (2014) Comparative study of base-isolated and fixed-base buildings using a damage/cost approach. PhD thesis, University of Nebraska - Lincoln, USA.
Lawal, Y S; Ibrahim, A M; Abubakar, M; Ishaq, Z H and Sa'ad, M M (2023) A simulation-based binomial model for building development appraisal. Journal of Engineering, Design and Technology, 21(1), pp. 75-107. ISSN 1726-0531
Lee, H W; Choi, K and Gambatese, J A (2014) Real options valuation of phased investments in commercial energy retrofits under building performance risks. Journal of Construction Engineering and Management, 140(6): 5014004, ISSN 0733-9364
Li, D; Yu, L; Huang, G; Zhou, S; Feng, H and Wang, Y (2024) A real options-based investment-income valuation model for old community renewal projects in China. Engineering, Construction and Architectural Management, 31(11), pp. 4516-4537. ISSN 0969-9988
Liberatore, M J; Pollack-Johnson, B and Smith, C A (2001) Project management in construction: Software use and research directions. Journal of Construction Engineering and Management, 127(2), pp. 101-107. ISSN 0733-9364
Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Lucko, G (2013) Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), pp. 238-253. ISSN 1466433X
Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.
Mak, Wae Hoa Jonathan (2019) The design of resilient engineering infrastructure systems. PhD thesis, University of Cambridge, UK.
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
Masoumi, R (2015) A framework for project portfolio formation using a hybrid of multicriteria decision-making methods. PhD thesis, Northeastern University, USA.
Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364
Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance. PhD thesis, University of Manchester, UK.
Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988
Nguyen, A; Mollik, A and Chih, Y Y (2018) Managing critical risks affecting the financial viability of public-private partnership projects: Case study of toll road projects in Vietnam. Journal of Construction Engineering and Management, 144(12): 05018014, ISSN 0733-9364
Nguyen, N; Almarri, K and Boussabaine, H (2021) A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects. Built Environment Project and Asset Management, 11(1), pp. 4-21. ISSN 2044-124X
Okpala, D C (1991) Evaluation and selection of construction projects in Nigeria. Construction Management and Economics, 9(1), pp. 51-61. ISSN 01446193
Pittenger, D M (2012) Stochastic life cycle cost analysis for sustainable pavement preservation treatments. PhD thesis, University of Oklahoma, USA.
Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.
Ranasinghe, M and Russell, A D (1992) Analytical approach for economic risk quantification of large engineering projects : Validation. Construction Management and Economics, 10(1), pp. 45-68. ISSN 01446193
Rethnam, O R; Palaniappan, S and Ashokkumar, V (2020) Life cycle cost analysis of 1mw power generation using roof-top solar PV panels. Built Environment Project and Asset Management, 10(1), pp. 124-139. ISSN 2044-124X
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.
Sarkar, D and Sheth, A (2023) Public private partnership model for sustainable bus rapid transit system in Ahmedabad, India. International Journal of Construction Management, 23(7), pp. 1233-1243. ISSN 1562-3599
Shash, A A (2005) Financial analysis for replacement of construction equipment in Saudi Arabia. Construction Economics and Building, 5(1), pp. 16-22. ISSN 2204-9029
Siva Rama Krishna, U and Naga Satish Kumar, C (2022) A case study on maintenance of bituminous concrete pavement considering life cycle cost analysis and carbon footprint estimation. International Journal of Construction Management, 22(9), pp. 1756-1764. ISSN 1562-3599
Skibniewski, M and Hendrickson, C (1988) Analysis of robotic surface finishing work on construction site. Journal of Construction Engineering and Management, 114(1), pp. 53-68. ISSN 0733-9364
Skibniewski, M J (1986) Engineering and economic analysis of robotics application potential in selected construction operations. PhD thesis, Carnegie Mellon University, USA.
Sospeter, N G and Awuzie, B O (2024) Capital budgeting implementation by public sector construction firms in tanzania's housebuilding industry: An exploratory study. Journal of Construction in Developing Countries, 29(1), pp. 87-109. ISSN 1823-6499
Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364
Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599
Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Torriti, J (2012) Multiple-project discount rates for cost-benefit analysis in construction projects: A formal risk model for microgeneration renewable energy technologies. Construction Management and Economics, 30(9), pp. 739-747. ISSN 1466433X
Verma, S; Mandal, S N; Robinson, S; Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: A developing economy case study. Built Environment Project and Asset Management, 11(2), pp. 392-408. ISSN 2044-124X
Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(7), pp. 1348-1366. ISSN 0969-9988
Wibowo, A (2006) CAPM-based valuation of financial government supports to infeasible and risky private infrastructure projects. Journal of Construction Engineering and Management, 132(3), pp. 239-248. ISSN 0733-9364
Wibowo, A and Kochendoerfer, B (2011) Selecting BOT/PPP infrastructure projects for government guarantee portfolio under conditions of budget and risk in the Indonesian context. Journal of Construction Engineering and Management, 137(7), pp. 512-522. ISSN 0733-9364
Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387
Woodhead, R M and Downs, C G (2002) Facilitation as a research method to improve value management capabilities. Journal of Construction Research, 3(2), pp. 209-216. ISSN 1609-9451
Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364
Yadollahi, M; Ebrahimi Saryazdi, S M; Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), pp. 2670-2682. ISSN 1562-3599
Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(5), pp. 471-482. ISSN 01446193
Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.
de la Garza, J M and Melin, J W (1986) Prepayment ability to offset inflation. Journal of Construction Engineering and Management, 112(4), pp. 514-529. ISSN 0733-9364
van den Boomen, M (2020) Replacement optimisation for public infrastructure assets: Quantitative optimisation modelling taking typical public infrastructure related features into account. PhD thesis, Delft University of Technology, Netherlands.