Items with Index Term: nD modelling
Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Aouad, G F; Lee, A and Wu, S (2005) ND modelling for collaborative working in construction. Architectural Engineering and Design Management, 1(1), pp. 33-44. ISSN 1745-2007
Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007
Cakan, H (2012) Analysis and modeling of roofer and steel worker fall accidents. PhD thesis, Wayne State University, USA.
Chen, Y-K (1991) An analysis of decision strategy as applied to construction portfolios. PhD thesis, Stevens Institute of Technology, USA.
El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.
Fisher, N (1987) The use of structured data analysis as a construction management research tool. PhD thesis, University of Reading, UK.
Fu, C (2006) Integration and interoperability of IT applications and information in construction - a study in nD modelling. PhD thesis, University of Salford, UK.
Gruen, A; Behnisch, M and Kohler, N (2009) Perspectives in the reality-based generation, nD modelling, and operation of buildings and building stocks. Building Research & Information, 37(5-6), pp. 503-519. ISSN 0961-3218
Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.
Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.
Lee, A and Sexton, M G (2007) ND modelling: Industry uptake considerations. Construction Innovation, 7(3), pp. 288-302. ISSN 1471-4175
Marshall-Ponting, A J (2006) nD modelling as an enabler of inter-disciplinary thinking among construction industry stakeholders. PhD thesis, University of Salford, UK.
Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.
Ormerod, M G and Newton, R A (2005) Moving beyond accessibility: The principles of universal (inclusive) design as a dimension in nD modelling of the built environment. Architectural Engineering and Design Management, 1(2), pp. 103-110. ISSN 1745-2007
Ramanayaka, C and Rotimi, J (2011) Strategy: Towards its applicability for successful project delivery. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Saba, F (2012) A semantic-driven framework for facilitating reusability and interoperability of construction simulation modeling. PhD thesis, University of Alberta, Canada.
Seboni, L (2016) Improving the existing project manager-to-project practice of a specific organization (organization A) in Botswana. PhD thesis, University of Leeds, UK.
Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.
Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.
Vyčítal, M (2019) On BIM based automatized nD modelling for construction management. PhD thesis, Czech Technical University, Czech Republic.
Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007
fu, C; Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(1), pp. 85-98. ISSN 1471-4175
Up a level