Items with Index Term: multivariate analysis

Number of items: 54.

Akomah, B B and Ramani, P V (2025) Confirmatory factor analysis of the positive factors influencing the performance of Ghanaian construction projects. Construction Innovation, 25(4), pp. 1250-1286. ISSN 1471-4175

Al-Mohammad, M S; Haron, A T; Aloko, M N and Rahman, R A (2023) Factors affecting BIM implementation in post-conflict low-income economies: The case of Afghanistan. Journal of Engineering, Design and Technology, 21(1), pp. 299-318. ISSN 1726-0531

Amponsah, Richard (2011) Improving project management practice in Ghana with focus on agriculture, banking and construction sectors of the Ghanaian economy. PhD thesis, RMIT University, Australia.

Anondho, B; Soeleiman, L; Latief, Y and Mochtar, K (2023) The influence of external factors on construction project performance based on estimated duration in Jakarta. International Journal of Construction Management, 23(13), pp. 2270-2278. ISSN 1562-3599

Avila, J; Rapp, R; Dunbar, S and Jackson, A T (2021) Burnout and worklife in disaster restoration: Maslach burnout inventory and areas of worklife survey. Journal of Construction Engineering and Management, 147(2): 04020171, ISSN 0733-9364

Bellizzi, J A (1978) A multivariate analysis of buying in the commercial construction industry. PhD thesis, University of Nebraska - Lincoln, USA.

Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.

Bowen, P; Govender, R and Edwards, P (2018) Determinants of aids knowledge among construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Carroll, B W (1985) Bias and organizational outcomes. PhD thesis, American University, USA.

Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.

Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), pp. 369-391. ISSN 2044-124X

Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364

Che Ibrahim, C K I; Mohamad Sabri, N A; Belayutham, S and Mahamadu, A (2019) Exploring behavioural factors for information sharing in BIM projects in the Malaysian construction industry. Built Environment Project and Asset Management, 9(1), pp. 15-28. ISSN 2044-124X

Chen, Y; Dib, H; Cox, R F; Shaurette, M and Vorvoreanu, M (2016) Structural equation model of building information modeling maturity. Journal of Construction Engineering and Management, 142(9): 04016032, ISSN 0733-9364

Cleary, J (2024) Data driven insights into building project performance and outcomes through advanced data analytics. PhD thesis, Arizona State University, USA.

Ekambaram, P; Love, P E D; Kumaraswamy, M M and Ng, T S T (2014) Causal ascription of rework in building and civil engineering projects: A multivariate exploration. Engineering, Construction and Architectural Management, 21(1), pp. 111-126. ISSN 0969-9988

Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236

Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.

Francom, T C and El Asmar, M (2015) Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate analyses. Journal of Construction Engineering and Management, 141(9): 4015028, ISSN 0733-9364

Fraser, C and Zhu, C (2008) Stakeholder perception of construction site managers' effectiveness. Construction Management and Economics, 26(6), pp. 579-590. ISSN 1466433X

Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Hosseini, M R (2022) Assessing the level of awareness of smart building technologies (sbts) in the developing countries. Journal of Engineering, Design and Technology, 20(3), pp. 696-711. ISSN 1726-0531

Heredia Rojas, Boris Fabrizio (2017) The contingent effects of value creation processes on project value: An empirical analysis from project managers' perspective. PhD thesis, University of Sydney, Australia.

Ho, M F C and Ng, C W V (2003) Quantity surveyors' background and training, and their ethical concepts, conceptions and interests considerations. Construction Management and Economics, 21(1), pp. 43-67. ISSN 01446193

Ikediashi, D I; Ansa, O A; Ujene, A O and Akoh, S R (2025) Barriers to BIM for facilities management adoption in Nigeria: A multivariate analysis. International Journal of Building Pathology and Adaptation, 43(3), pp. 391-413. ISSN 2398-4708

Kazan, E E (2013) Analysis of fatal and nonfatal accidents involving earthmoving equipment operators and on-foot workers. PhD thesis, Wayne State University, USA.

King Lewis, A and Shan, Y (2024) Persistence of women in the construction industry. Journal of Construction Engineering and Management, 150(7): 04024061, ISSN 0733-9364

Lee, Z P; Rahman, R A and Doh, S I (2022) Application of decision support tool in design-build projects: A quasi-experiment with novice decision makers. Built Environment Project and Asset Management, 12(4), pp. 537-555. ISSN 2044-124X

Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193

Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.

Markus, A M (1988) A research discrepancy model for building trades training programs. PhD thesis, University of Florida, USA.

Meiling, J; Backlund, F and Johnsson, H (2012) Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management, 19(2), pp. 141-158. ISSN 0969-9988

Messah, Y; Wirahadikusumah, R and Abduh, M (2023) Structural equation model (SEM) of the factors affecting sustainable procurement for construction work. International Journal of Construction Management, 23(13), pp. 2221-2229. ISSN 1562-3599

Mihara, H; Yoshida, T; Suzuki, K and Hojo, T (2012) A study on new construction techniques and skills training with focus on the plastering subcontractor in Japan. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.

Monteiro, Nathalie da Silva Cavalcanti (2019) Analysis of the strategic management of civil construction companies in curitiba and the metropolitan region in light of the perception of change in the economic scenario. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Paul, C A; Aghimien, D O; Ibrahim, A D and Ibrahim, Y M (2021) Measures for curbing unethical practices among construction industry professionals: Quantity surveyors' perspective. Construction Economics and Building, 21(2), pp. 1-17. ISSN 2204-9029

Ramani, P V and Akomah, B B (2025) The negative factors that influence the performance of Ghanaian construction projects. Construction Economics and Building, 25(2), pp. 112-142. ISSN 2204-9029

Sambasivan, M; Deepak, T J; Salim, A N and Ponniah, V (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics and structural equation modeling approach. Engineering, Construction and Architectural Management, 24(2), pp. 308-325. ISSN 0969-9988

Sani, H (1988) An investigation into the influences upon and determinants of perceived quality achievement in the management of construction projects by multivariate analysis. PhD thesis, Heriot-Watt University, UK.

Sawacha, E O-O (1993) An investigation into safety attitudes and safety performance in the construction industry. PhD thesis, Brunel University, UK.

Seddiki, M; Bennadji, A and Tehami, M (2020) Barriers to the adoption of energy efficiency measures in Mostaganem, Algeria. Journal of Construction in Developing Countries, 25(2), pp. 39-61. ISSN 1823-6499

Sharma, N and Laishram, B (2025) Unveiling the path to the cost of quality implementation in the construction industry: Multivariate analysis. Journal of Construction Engineering and Management, 151(2): 04024202, ISSN 0733-9364

Shetterly, D R (1998) The influence of contract design on contractor performance: A multivariate analysis. PhD thesis, University of Maryland, Baltimore County, USA.

Smith, V R R (2008) Impact to alternative contracting methods using multivariate analysis in the regulatory environment. PhD thesis, Georgia Institute of Technology, USA.

Tan, R R (1996) Information technology and perceived competitive advantage: An empirical study of engineering consulting firms in Taiwan. Construction Management and Economics, 14(3), pp. 227-240. ISSN 01446193

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(6), pp. 631-647. ISSN 0969-9988

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Van Dijken, F; Van Bronswijk, J E M H and Sundell, J (2006) Indoor environment and pupils' health in primary schools. Building Research & Information, 34(5), pp. 437-446. ISSN 0961-3218

Wong, C H; Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), pp. 99-116. ISSN 0969-9988

Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364

Yılmaz, M B and Rızvanoğlu, K (2022) Understanding users' behavioral intention to use voice assistants on smartphones through the integrated model of user satisfaction and technology acceptance: A survey approach. Journal of Engineering, Design and Technology, 20(6), pp. 1738-1764. ISSN 1726-0531

Zughaibi, A M (1987) Construction productivity in Saudi Arabia: The influence of multinational labor force. PhD thesis, University of Texas at Austin, USA.

du Toit, J and Wagner, C (2020) The effect of housing type on householders' self-reported participation in recycling. Smart and Sustainable Built Environment, 9(4), pp. 395-412. ISSN 2046-6099

This list was generated on Sat Aug 22 01:48:36 2026 UTC.