Items with Index Term: modelling

Number of items: 2272.

A. Mohy, A.; Bassioni, H. A.; Elgendi, E. O. and Hassan, T. M. (2026) Modeling spatiotemporal hazard dynamics for construction safety using graph attention networks. Journal of Engineering, Design and Technology, ISSN 1726-0531

Abanda, F H (2011) Knowledge modelling of emerging technologies for sustainable building development. PhD thesis, Oxford Brookes University, UK.

Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. PhD thesis, University of Texas at Austin, USA.

Abdal Noor, B and Yi, S (2018) Review of BIM literature in construction industry and transportation: meta-analysis. Construction Innovation, 18(4), pp. 433-452. ISSN 1471-4175

Abdalla-Salem, S B (2009) Computer-aided planning and building process. PhD thesis, Technische Universitaet Berlin, Germany.

Abdallah, M A A; El-Rayes, K and Liu, L (2016) Minimizing upgrade cost to achieve LEED certification for existing buildings. Journal of Construction Engineering and Management, 142(2): 04015073, ISSN 0733-9364

Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.

Abdel-Salam, A N (2018) Corporate social responsibility of construction and real estate development companies in developing countries: An assessment model. PhD thesis, Purdue University, USA.

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Abdelkader, E M; Moselhi, O; Marzouk, M and Zayed, T (2021) Integrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance priorities. Journal of Construction Engineering and Management, 147(9): 04021100, ISSN 0733-9364

Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.

Abdelrahman, M; Zayed, T and Elyamany, A (2008) Best-value model based on project specific characteristics. Journal of Construction Engineering and Management, 134(3), pp. 179-188. ISSN 0733-9364

Abdou, A; Lewis, J and Alzarooni, S (2004) Modelling risk for construction cost estimating and forecasting: A review. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Abdul Shukor, S (2013) A geometrical-based approach to recognise structure of complex interiors. PhD thesis, University of Warwick, UK.

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abdullahi, B; Ibrahim, Y M; Ibrahim, A and Bala, K (2020) Development of e-tendering evaluation system for Nigerian public sector. Journal of Engineering, Design and Technology, 18(1), pp. 122-149. ISSN 1726-0531

Abdullahi, B; Ibrahim, Y M; Ibrahim, A D and Bala, K (2022) Development of web-based e-tendering system for Nigerian public procuring entities. International Journal of Construction Management, 22(2), pp. 278-291. ISSN 1562-3599

Abeynayake, D N; Perera, B A K S and Hadiwattege, C (2022) A roadmap for business model adaptation in the construction industry: A structured review of business model research. Construction Innovation, 22(4), pp. 1122-1137. ISSN 1471-4175

Abeysinghe, G and Urand, D (1999) Why use enactable models of construction processes? Journal of Construction Engineering and Management, 125(6), pp. 437-447. ISSN 0733-9364

Abotaleb, I S and El-Adaway, I H (2018) First attempt toward a holistic understanding of the interdependent rippled impacts associated with out-of-sequence work in construction projects: System dynamics modeling approach. Journal of Construction Engineering and Management, 144(9): 04018084, ISSN 0733-9364

AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364

Abouelkhier, N; Shawky, D and Marzouk, M (2022) Evaluating distance perception for architecture design alternatives in immersive virtual environment: A comparative study. Construction Innovation, 22(2), pp. 205-221. ISSN 1471-4175

Abourizk, S; Halpin, D; Mohamed, Y and Hermann, U (2011) Research in modeling and simulation for improving construction engineering operations. Journal of Construction Engineering and Management, 137(10), pp. 843-852. ISSN 1943-7862

Abourizk, S M and Halpin, D W (1990) Probabilistic simulation studies for repetitive construction processes. Journal of Construction Engineering and Management, 116(4), pp. 575-594. ISSN 0733-9364

Abourizk, S M and Halpin, D W (1992) Statistical properties of construction duration data. Journal of Construction Engineering and Management, 118(3), pp. 525-544. ISSN 0733-9364

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Abraham, D M and Joanne Yeh, M H (1999) Breakwater construction: An effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(2), pp. 145-154. ISSN 0969-9988

Abraham, D M; Wirahadikusumah, R; Short, T J and Shahbahrami, S (1998) Optimization modeling for sewer network management. Journal of Construction Engineering and Management, 124(5), pp. 402-410. ISSN 0733-9364

Abrishami, S; Goulding, J; Pour, R F and Ganah, A (2015) Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities. Construction Innovation, 15(1), pp. 24-41. ISSN 1471-4175

Abrishami, S; Goulding, J and Rahimian, F (2021) Generative BIM workspace for AEC conceptual design automation: Prototype development. Engineering, Construction and Architectural Management, 28(2), pp. 482-509. ISSN 0969-9988

Abu Dabous, S; Ibrahim, F and Alzghoul, A (2025) Modelling bridge deterioration using long short-term memory neural networks: A deep learning-based approach. Smart and Sustainable Built Environment, 14(5), pp. 1632-1655. ISSN 2046-6099

Abu Dabous, S (2008) A decision support methodology for rehabilitation management of concrete bridges. PhD thesis, Concordia University, Canada.

Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988

Abu Hanipah, A F F and Tahar, K N (2018) Development of the 3D dome model based on a terrestrial laser scanner. International Journal of Building Pathology and Adaptation, 36(2), pp. 122-136. ISSN 23984708

Abu Rumman, M; Hiyassat, M; Alsmadi, B; Jamrah, A and Alqam, M (2009) A surface water management model for the Integrated Southern Ghor Project, Jordan. Construction Innovation, 9(3), pp. 298-322. ISSN 1471-4175

Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.

Abudayyeh, O Y (1991) An automated data acquisition and data storage model for improving cost and schedule control. PhD thesis, North Carolina State University, USA.

Abudayyeh, O Y and Rasdorf, W J (1991) Design of construction industry information management systems. Journal of Construction Engineering and Management, 117(4), pp. 698-715. ISSN 0733-9364

Abuimara, T; O’Brien, W; Gunay, B and Carrizo, J S (2019) Towards occupant-centric simulation-aided building design: A case study. Building Research & Information, 47(8), pp. 866-882. ISSN 0961-3218

Adabre, M A; Chan, A P C and Edwards, D J (2023) Modeling relationship between success factors (policies) and critical success criteria (goals) for sustainable housing in developing countries. International Journal of Construction Management, 23(10), pp. 1642-1652. ISSN 1562-3599

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis. PhD thesis, Brunel University, UK.

Adan, H and Fuerst, F (2015) Modelling energy retrofit investments in the UK housing market: A microeconomic approach. Smart and Sustainable Built Environment, 4(3), pp. 251-267. ISSN 2046-6099

Adas, A A (1996) The level of organizational effectiveness of the (ICI) construction firm: A multivariate model-based prediction methodology. PhD thesis, University of Waterloo, USA.

Ade, R and Rehm, M (2020) Reaching for the stars: Green construction cost premiums for homestar certification. Construction Management and Economics, 38(6), pp. 570-580. ISSN 01446193

Adebisi, J and McArthur, J J (2025) HVAC characterisation of existing Canadian buildings for decarbonisation retrofit identification. Buildings & Cities, 6(1), pp. 729-746. ISSN 2632-6655

Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.

Adekanye, O G (2019) Evaluation of building policies, programs, and potential for energy efficiency in the United States. PhD thesis, Carnegie Mellon University, USA.

Adeniyi, O (2017) Capability maturity model for assessing flood resilience capabilities of the built environment. PhD thesis, University of Northumbria, UK.

Adeyeye, K; Pasquire, C; Bouchlaghem, D and Chandler, J (2006) Exploring the efficacy of digital tools for the design and construction of hybrid buildings. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Adi Maimun, N H (2016) Price and rent effects of energy efficiency in residential properties: evidence from the Belfast Metropolitan area. PhD thesis, Ulster University, UK.

Adrian, J J (1974) Modeling construction method productivity. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Adul-Hamid, R (1996) Construction duration prediction using neural network methodology. PhD thesis, University of Manchester, UK.

Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.

Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.

Agarwal, S; Kant, R and Shankar, R (2022) Humanitarian supply chain management: Modeling the pre and post-disaster relief operations. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 421-439. ISSN 1759-5916

Agbesi, K; Fugar, F D and Adjei-Kumi, T (2018) Modelling the adoption of sustainable procurement in construction organisations. Built Environment Project and Asset Management, 8(5), pp. 461-476. ISSN 2044-124X

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Aghimien, E I; Aghimien, L M; Petinrin, O O and Aghimien, D O (2021) High-performance computing for computational modelling in built environment-related studies: A scientometric review. Journal of Engineering, Design and Technology, 19(5), pp. 1138-1157. ISSN 1726-0531

Ahankoob, A.; Abbasnejad, B.; Nazareth, I.; Macasaet, P. and Wong, P. S. (2026) Optimising virtual site assessment process for mounted PV array design: An immersive BIM-based approach for existing buildings. Smart and Sustainable Built Environment, pp. 1-26. ISSN 2046-6099

Ahankoob, A.; Calixto, V.; Abbasnejad, B. and Wong, P. S. P. (2026) A generative BIM approach for DfMA integration into building facade design. International Journal of Construction Management, 26(9), pp. 1858-1878. ISSN 1562-3599

Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahiaga-Dagbui D D, T O and Smith S D, W S (2013) A neuro-fuzzy hybrid model for predicting final cost of water infrastructure projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahmad, I (1990) Decision-support system for modeling bid/no-bid decision problem. Journal of Construction Engineering and Management, 116(4), pp. 595-608. ISSN 0733-9364

Ahmad, T and Aibinu, A A (2017) Project delivery attributes influencing green building project outcomes: A review and future research directions. Built Environment Project and Asset Management, 7(5), pp. 471-489. ISSN 2044-124X

Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Ahmed, H S (2016) The use of System Dynamics simulation models in project management education. PhD thesis, University of Sunderland, UK.

Ahmed, M O and El-adaway, I H (2023) An integrated game-theoretic and reinforcement learning modeling for multi-stage construction and infrastructure bidding. Construction Management and Economics, 41(3), pp. 183-207. ISSN 01446193

Ahmed, M O; Khalef, R; Ali, G G and El-Adaway, I H (2021) Evaluating deterioration of tunnels using computational machine learning algorithms. Journal of Construction Engineering and Management, 147(10): 04021125, ISSN 0733-9364

Ahmed, S and El-Sayegh, S (2024) Relevant criteria for selecting project delivery methods in sustainable construction. International Journal of Construction Management, 24(5), pp. 512-520. ISSN 1562-3599

Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599

Ahn, S and Lee, S (2015) Methodology for creating empirically supported agent-based simulation with survey data for studying group behavior of construction workers. Journal of Construction Engineering and Management, 141(1): 04014065, ISSN 0733-9364

Aibinu, A A; Dassanayake, D; Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(2), pp. 190-213. ISSN 0969-9988

Aiyetan, O A and Dillip, D (2018) System dynamics approach to mitigating skilled labour shortages in the construction industry: A South Africa context. Construction Economics and Building, 18(4), pp. 45-63. ISSN 2204-9029

Ajibike, W A; Adeleke, A Q; Mohamad, F; Bamgbade, J A and Moshood, T D (2023) The impacts of social responsibility on the environmental sustainability performance of the Malaysian construction industry. International Journal of Construction Management, 23(5), pp. 780-789. ISSN 1562-3599

Akadiri, O P (2011) Development of a multi-criteria approach for the selection of sustainable materials for building projects. PhD thesis, University of Wolverhampton, UK.

Akar, G (2009) Analysis of activity choice: The role of activity attributes and individual schedules. PhD thesis, University of Maryland, College Park, USA.

Akbas, R (2003) Geometry-based modeling and simulation of construction processes. PhD thesis, Stanford University, USA.

Akin, S; Eghbali, A; Nwagwu, C and Hertwich, E (2025) Western Asian and Northern African residential building stocks: archetype analysis. Buildings & Cities, 6(1), pp. 219-238. ISSN 2632-6655

Akinci, B; Kiziltas, S; Ergen, E; Karaesmen, I Z and Keceli, F (2006) Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study. Journal of Construction Engineering and Management, 132(11), pp. 1148-1157. ISSN 0733-9364

Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites. PhD thesis, Stanford University, USA.

Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.

Aktas, E (2001) Structural design code calibration using reliability-based cost optimization. PhD thesis, University of Pittsburgh, USA.

Al-Bataineh, M; Abourizk, S and Parkis, H (2013) Using simulation to plan tunnel construction. Journal of Construction Engineering and Management, 139(5), pp. 564-571. ISSN 0733-9364

Al-Fadhali, N (2024) An amos-SEM approach to evaluating stakeholders' influence on construction project delivery performance. Engineering, Construction and Architectural Management, 31(2), pp. 638-661. ISSN 0969-9988

Al-Gahtani, K; Alsugair, A; Alsanabani, N; Alabduljabbar, A and Almutairi, B (2024) Forecasting delay-time model for Saudi construction projects using DEMATEL–sd technique. International Journal of Construction Management, 24(11), pp. 1225-1239. ISSN 1562-3599

Al-Hadidi, S; Sweis, G; Abu-Khader, W; Abu-Rumman, G and Sweis, R (2024) Managing future urbanization growth patterns using genetic algorithm modeling. Engineering, Construction and Architectural Management, 31(7), pp. 2648-2668. ISSN 0969-9988

Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193

Al-Hammad, I A (1991) A knowledge-based framework for construction methods selection. PhD thesis, University of British Columbia, Canada.

Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.

Al-Hashim, A; Benkari, N and Al-Saadi, S (2024) Evaluating the sustainable features of vernacular architecture in hot-arid regions: field surveys and analysis in two vernacular houses in Al Batinah region (Oman). Architectural Engineering and Design Management, 20(5), pp. 1118-1140. ISSN 1745-2007

Al-Humaidi, H M (2016) Construction projects bid or not bid approach using the fuzzy technique for order preference by similarity FTOPSIS method. Journal of Construction Engineering and Management, 142(12): 04016068, ISSN 0733-9364

Al-Kayed, A. A.; Rotimi, F. E.; Purushothaman, M. B.; Pawley, M. and Ghaffarian Hoseini, A. (2026) Modelling the enablers of effective digital technology implementation for competitiveness enhancement among subcontracting organisations in new zealand's residential construction industry. Journal of Engineering, Design and Technology, 24(4), pp. 894-919. ISSN 1726-0531

Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599

Al-Muqdadi, F (2020) Assessing the potentials of heritage building information modelling (HBIM) in damaged heritage reconstruction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.

Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.

Al-Otaibi, S (2021) Assessing the impact of transport investment and railway accessibility on economic productivity. PhD thesis, Loughborough University, UK.

Al-Sakkaf, A; Bagchi, A; Zayed, T and Mahmoud, S (2023) Sustainability assessment model for heritage buildings. Smart and Sustainable Built Environment, 12(1), pp. 105-127. ISSN 2046-6099

Al-Sharif, F and Kaka, A (2005) Private finance intiative project's financial modelling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Shehri, Y (2015) Relationship between personality trait and multi-national construction workers safety performance in Saudi Arabia. PhD thesis, Loughborough University, UK.

Al-Sibaie, E Z; Alashwal, A M; Abdul-Rahman, H and Zolkafli, U K (2014) Determining the relationship between conflict factors and performance of international construction projects. Engineering, Construction and Architectural Management, 21(4), pp. 369-382. ISSN 0969-9988

Al-Subaihawi, S W (2023) Real-time hybrid simulation of complex structural systems subjected to multi-natural hazards. PhD thesis, Lehigh University, USA.

Al-Tabbaa, O and Rustom, R (2011) General framework for designing multi-use simulation modules for estimating project durations. Construction Innovation, 11(3), pp. 321-337. ISSN 1471-4175

Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988

Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.

AlKheder, S; Al Otaibi, H; Al Baghli, Z; Al Ajmi, S and Alkhedher, M (2025) Analytic hierarchy process (AHP) assessment of Kuwait mega construction projects' complexity. Engineering, Construction and Architectural Management, 32(3), pp. 1903-1946. ISSN 0969-9988

Alabi, A G F; Ajiboye, T K and Olusegun, H D (2010) Investigating the cutting forces in heat treated medium carbon steel when turning on a lathe machine. Journal of Engineering, Design and Technology, 8(1), pp. 80-93. ISSN 1726-0531

Alam, Sadaf (2024) Development of the framework and the methodologies towards nzebs in Finland. PhD thesis, Aalto University, Finland.

Alarc N, L F and Bastias, A (2000) A computer environment to support the strategic decision-making process in construction firms. Engineering, Construction and Architectural Management, 7(1), pp. 63-75. ISSN 0969-9988

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.

Alarćon, L F and Ashley, D B (1996) Modeling project performance for decision making. Journal of Construction Engineering and Management, 122(3), pp. 265-273. ISSN 0733-9364

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X

Alashwal, A M and Fong, P S W (2015) Empirical study to determine fragmentation of construction projects. Journal of Construction Engineering and Management, 141(7): 4015016, ISSN 0733-9364

Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: Delay of international funded road projects. Engineering, Construction and Architectural Management, 30(4), pp. 1746-1767. ISSN 0969-9988

Albagoury, S. H. and AbdelMaksoud, K. M. (2026) Integrating socio-economic impact assessment into the reconstruction plan for Derna, Libya. International Journal of Disaster Resilience in the Built Environment, pp. 1-13. ISSN 1759-5908

Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(5), pp. 493-515. ISSN 0969-9988

Alexander, D; Hallowell, M and Gambatese, J (2017) Precursors of construction fatalities. II: Predictive modeling and empirical validation. Journal of Construction Engineering and Management, 143(7): 04017024, ISSN 0733-9364

Algithami, S M (2017) The use of a system dynamics approach for modelling maturity of total quality management in Saudi construction firms. PhD thesis, University of Reading, UK.

Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.

Alhamoudi, A. M. and Osunsanmi, T. O. (2026) Modelling the training strategies for reskilling UK construction workers in the Fourth Industrial Revolution era: A structural equation model approach. Smart and Sustainable Built Environment, 15(5), pp. 1967-1990. ISSN 2046-6099

Alhasan, S; Amoudi, O; Tong, M and Kumar, B (2019) Effectiveness of adopting BIM on quantity surveying profession during the project life cycle. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364

Ali, A H; Elyamany, A; Ibrahim, A H; Kineber, A F and Daoud, A O (2024) Modelling the relationship between modular construction adoption and critical success factors for residential projects in developing countries. International Journal of Construction Management, 24(12), pp. 1314-1325. ISSN 1562-3599

Ali, A H and Kineber, A F (2025) Unveiling and modelling the impact of safety drivers on the overall success of construction projects in developing countries. International Journal of Construction Management, 25(11), pp. 1357-1379. ISSN 1562-3599

Ali, S; Zayed, T and Hegab, M (2007) Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems. Journal of Construction Engineering and Management, 133(10), pp. 743-748. ISSN 0733-9364

Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499

Aljarman, M (2016) Emerging risk from the application of building information modelling through the life cycle of projects. PhD thesis, University of Liverpool, UK.

Alkriz, K and Mangin, J C (2005) A new model for optimizing the location of cranes and construction facilities using genetic algorithms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.

Allam, A S; Bassioni, H; Ayoub, M and Kamel, W (2024) A framework for obtaining a BIM-compatible design solution based on quantitative decisions on building performance. International Journal of Construction Management, 24(11), pp. 1176-1190. ISSN 1562-3599

Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method. PhD thesis, University of Alberta, Canada.

Almarri, K; Boussabaine, H and Al Nauimi, H (2023) The influence of risks on the outturn cost of ICT infrastructure network projects. Construction Innovation, 23(1), pp. 85-104. ISSN 1471-4175

Almashaqbeh, M and El-Rayes, K (2022) Minimizing transportation cost of prefabricated modules in modular construction projects. Engineering, Construction and Architectural Management, 29(10), pp. 3847-3867. ISSN 0969-9988

Almeida, L; Tam, V W Y; Le, K N and She, Y (2020) Effects of occupant behaviour on energy performance in buildings: A green and non-green building comparison. Engineering, Construction and Architectural Management, 27(8), pp. 1939-1962. ISSN 0969-9988

Alnaser, N W and Alnaser, W E (2022) Modelling the yield of 8.64 kw PV panels installed on a rooftop of a building in the Kingdom of Bahrain. Smart and Sustainable Built Environment, 11(1), pp. 162-174. ISSN 2046-6099

Alqahtani, A and Whyte, A (2016) Estimation of life-cycle costs of buildings: Regression vs artificial neural network. Built Environment Project and Asset Management, 6(1), pp. 30-43. ISSN 2044-124X

Alqershy, M T; Shi, Q and Anbar, D R (2025) Analysing the interplay of isomorphic pressures, perceived benefits and top management support on social responsibility performance of Belt and Road megaprojects. Engineering, Construction and Architectural Management, 32(6), pp. 4074-4099. ISSN 0969-9988

Alrashed, F A (2015) Design and application of zero-energy homes in Saudi Arabia. PhD thesis, Glasgow Caledonian University, UK.

Alrefaie, A M; Abdul-Samad, Z; Salleh, H; Alashwal, A M and Amos, D (2023) Modelling labour productivity of reinforcement bar using polynomial regression: A study on a tropical country's weather. International Journal of Construction Management, 23(10), pp. 1633-1641. ISSN 1562-3599

Alreshidi, E (2015) Towards facilitating team collaboration during construction project via the development of cloud-based BIM governance solution. PhD thesis, Cardiff University, UK.

Alsamadani, R; Hallowell, M and Javernick-Will, A N (2013) Measuring and modelling safety communication in small work crews in the US using social network analysis. Construction Management and Economics, 31(6), pp. 568-579. ISSN 1466433X

Alsamadani, R M (2013) Measuring, modeling, and assessing safety communication in construction crews in the US using social network analysis. PhD thesis, University of Colorado at Boulder, USA.

Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364

Alsharqawi, M; Zayed, T and Shami, A (2020) Ground penetrating radar-based deterioration assessment of RC bridge decks. Construction Innovation, 20(1), pp. 1-17. ISSN 1471-4175

Alshboul, O; Shehadeh, A; Al-Kasasbeh, M; Al Mamlook, R E; Halalsheh, N and Alkasasbeh, M (2022) Deep and machine learning approaches for forecasting the residual value of heavy construction equipment: A management decision support model. Engineering, Construction and Architectural Management, 29(10), pp. 4153-4176. ISSN 0969-9988

Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.

Alsulami, Badr T (2012) Incorporating complexity and uncertainty into appraising sustainability of civil infrastructure systems: Hybrid fuzzy modelling approach. PhD thesis, Griffith University, Australia.

Altawil, Shadi N A (2017) Multi-level knowledge extraction and modeling to support job hazard analysis process for oil and gas pipeline projects. PhD thesis, University of Alberta, Canada.

Aluko, R O; Adenuga, O A; Kukoyi, P O; Soyingbe, A A and Oyedeji, J O (2016) Predicting the academic success of architecture students by pre-enrolment requirement: Using machine-learning techniques. Construction Economics and Building, 16(4), pp. 86-98. ISSN 2204-9029

Aluko, R O; Daniel, E I; Shamsideen Oshodi, O; Aigbavboa, C O and Abisuga, A O (2018) Towards reliable prediction of academic performance of architecture students using data mining techniques. Journal of Engineering, Design and Technology, 16(3), pp. 385-397. ISSN 1726-0531

Alutaibi, A (2018) The impact of facility management practices on tenant satisfaction forresidential complexes in the Kingdom of Saudi Arabiaresidential complexes in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.

Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process. PhD thesis, University of Alberta, Canada.

Alves, N M F and Bártolo, P J S (2002) Reversing design through computer vision. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Alwisy, A; Bouferguene, A and Al-Hussein, M (2020) Framework for target cost modelling in construction projects. International Journal of Construction Management, 20(2), pp. 89-104. ISSN 1562-3599

Alzaed, A (2012) User centered passive building design. PhD thesis, University of Liverpool, UK.

Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.

Alzahrani, Sami Salem (2015) Developing a project management maturity model to initiate sustainable project performance and modernisation in the Kingdom of Saudi Arabia. PhD thesis, University of Adelaide, Australia.

Alzubaidi, H J (1993) Maintenance modelling of a major hospital complex. PhD thesis, University of Salford, UK.

Amade, B; Moneke, U U and Okorie, C E (2024) Modelling the hindrances to building information modelling adoption on construction projects in Nigeria. Journal of Construction in Developing Countries, 29(1), pp. 23-46. ISSN 1823-6499

Amadi, A I (2021) A back-end view to climatic adaptation: Partitioning weather-induced cement demand variance in wet humid environment. International Journal of Building Pathology and Adaptation, 39(2), pp. 153-174. ISSN 23984708

Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988

Amewornu, E M and Nwulu, N I (2021) A framework for the techno-economic and reliability analysis of grid connected microgrids. Journal of Engineering, Design and Technology, 19(3), pp. 659-685. ISSN 1726-0531

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599

Ammar, A I (2001) Profitability of electrical contractors using financial and economical data: The effect of company's size. PhD thesis, University of Wisconsin - Madison, USA.

Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599

Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599

Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599

Amponsah, I (2008) Emerging civil infrastructure and environmental sustainability: Life-cycle assessment and multiobjective optimization. PhD thesis, University of South Carolina, USA.

An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988

Anagnostopoulos, I (2018) Generating as-is BIMs of existing buildings: from planar segments to spaces. PhD thesis, University of Cambridge, UK.

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Andam, K A (1979) Computer aided design of precast concrete industrial buildings. PhD thesis, University of Newcastle upon Tyne, UK.

Anderson, S D; Fisher, D J and Rahman, S P (2000) Integrating constructability into project development: A process approach. Journal of Construction Engineering and Management, 126(2), pp. 81-88. ISSN 0733-9364

Andrawus, J; Watson, J and Kishk, M (2007) Maintenance optimisation of wind turbines: Lessons for the built environment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.

Ansari, R (2019) Dynamic simulation model for project change-management policies: Engineering project case. Journal of Construction Engineering and Management, 145(7): 05019008, ISSN 0733-9364

Antwi Afari, E. N.; Acquah, I. S. K.; Issau, K. and Arko-Folson, G. (2026) Modelling the nexus between sustainable project management and project success: Evidence from Ghana. Journal of Engineering, Design and Technology, 24(5), pp. 1279-1297. ISSN 1726-0531

Ao, Y; Peng, P; Li, M; Li, J; Wang, Y and Martek, I (2025) Empowering architecture, engineering and construction students through building information modeling competitions: a deep dive into behavioral motivation. Engineering, Construction and Architectural Management, 32(7), pp. 4475-4494. ISSN 0969-9988

Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.

Aouad, G F; Child, T; Brandon, P S and Sarshar, M (1998) Linking construction information through VR using an object oriented environment. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Aouad, G F; Kirkham, J A; Cooper, G S; Ford, S; Sarshar, M; Brandon, P S; Brown, F E; Oxman, R E and Young, B (1993) Information modelling in the construction industry: The information engineering approach. Construction Management and Economics, 11(5), pp. 384-397. ISSN 01446193

Aouad, G F; Sun, M and Faraj, I (2002) Automatic generation of data representations for construction applications. Construction Innovation, 2(3), pp. 151-165. ISSN 1471-4175

Apipattanavis, S (2007) Stochastic nonparametric methods for multi-site weather generation and flood frequency estimation: Applications to construction delay, hydrology and agricultural modeling. PhD thesis, University of Colorado at Boulder, USA.

Apostolopoulos, C (2015) Risk assessment for change management within project management: a hierarchical model process approach. PhD thesis, City, University of London, UK.

Appleton, B J A; Niaz, M A; Abourizk, S M; Al-Hussein, M and Mohamed, Y (2006) Priority rating logic simulation model for tower crane operations management. Journal of Construction Research, 7(1), pp. 133-147. ISSN 1609-9451

Apu, N and Sinha, R (2020) Seismic fragility assessment of ductile reinforced concrete building frames. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 425-442. ISSN 1759-5916

Arabiat, A (2013) Modelling construction client risk performance using organisation behaviour parameters. PhD thesis, Loughborough University, UK.

Aragon, V; Gauthier, S; Warren, P; James, P A B and Anderson, B (2019) Developing English domestic occupancy profiles. Building Research & Information, 47(4), pp. 375-393. ISSN 0961-3218

Arai, K and Morimoto, E (2014) A comparative analysis of the desired and actual bidding behaviour of construction companies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Arain, F M and Pheng, L S (2007) Modeling for management of variations in building projects. Engineering, Construction and Architectural Management, 14(5), pp. 420-433. ISSN 0969-9988

Arakawa Martins, L; Soebarto, V; Williamson, T and Pisaniello, D (2022) Personal thermal comfort models: A deep learning approach for predicting older people's thermal preference. Smart and Sustainable Built Environment, 11(2), pp. 245-270. ISSN 2046-6099

Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007

Arashida, R. and Horita, M. (2026) A data-driven framework for causal modeling of design change propagation in civil infrastructure. Journal of Construction Engineering and Management, 152(10): 04026158, ISSN 0733-9364

Arashpour, M; Heidarpour, A; Akbar Nezhad, A; Hosseinifard, Z; Chileshe, N and Hosseini, R (2020) Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality. Construction Management and Economics, 38(6), pp. 502-514. ISSN 01446193

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2013) A new approach for modelling variability in residential construction projects. Construction Economics and Building, 13(2), pp. 83-92. ISSN 2204-9029

Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.

Arayici, Y and Aouad, G (2004) Industry driven innovative systems development for the construction industry: The DIVERCITY project. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Arboleda, C A and Abraham, D M (2006) Evaluation of flexibility in capital investments of infrastructure systems. Engineering, Construction and Architectural Management, 13(3), pp. 254-274. ISSN 0969-9988

Arefizadeh, H and Shahir, H (2020) Three-dimensional analysis of anchored wall with concrete bearing pads. Journal of Engineering, Design and Technology, 18(6), pp. 1469-1486. ISSN 1726-0531

Argyroudis, S A; Nasiopoulos, G; Mantadakis, N and Mitoulis, S A (2021) Cost-based resilience assessment of bridges subjected to earthquakes. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 209-222. ISSN 1759-5916

Ariaratnam, S T and MacLeod, C W (2002) Financial outlay modeling for a local sewer rehabilitation strategy. Journal of Construction Engineering and Management, 128(6), pp. 486-495. ISSN 0733-9364

Arico, Manuela (2025) Application of scan-to-BIM approaches to HBIM digitisations in architectural heritage environment for documentation, management and conservation purposes. PhD thesis, Università degli Studi di Palermo, Italy.

Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.

Ariyachandra, M R M F and Brilakis, I (2020) Detection of railway masts in airborne lidar data. Journal of Construction Engineering and Management, 146(9): 04020105, ISSN 0733-9364

Arman, M H R (2014) Using option theory to manage risks in highway winter operations. PhD thesis, Purdue University, USA.

Arnold, J A (2000) Information interoperation for internet-based component engineering analysis. PhD thesis, Stanford University, USA.

Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.

Arslan, M (1993) Public investment and infrastructure planning: A policy modelling approach for the Turkish investment sector. PhD thesis, Colorado State University, USA.

Asadi, M and Karami, J (2020) Modeling of the city evacuation plan in case of earthquake with particle swarm optimization (PSO) and imperialist competition algorithm (ICA). International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 134-151. ISSN 1759-5916

Asfour, O S and Gadi, M B (2006) Effect of integrating wind catchers with curved roofs on natural ventilation performance in buildings. Architectural Engineering and Design Management, 2(4), pp. 289-304. ISSN 1745-2007

Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.

Ashuri, B; Wang, J; Shahandashti, M and Baek, M (2019) A data envelopment analysis (DEA) model for building energy benchmarking. Journal of Engineering, Design and Technology, 17(4), pp. 747-768. ISSN 1726-0531

Asif, M; Hassanain, M A; Nahiduzzaman, K M and Sawalha, H (2019) Techno-economic assessment of application of solar PV in building sector: A case study from Saudi Arabia. Smart and Sustainable Built Environment, 8(1), pp. 34-52. ISSN 2046-6099

Assaad, R; El-Adaway, I H and Abotaleb, I S (2020) Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5): 04020030, ISSN 0733-9364

Assad, M; Hosny, O; Elhakeem, A and El Haggar, S (2015) Green building design in Egypt from cost and energy perspectives. Architectural Engineering and Design Management, 11(1), pp. 21-40. ISSN 1745-2007

Assaf, M; Al-Hussein, M and Li, X (2024) Critical review of virtual reality applications in offsite construction research. Journal of Construction Engineering and Management, 150(11): 03124007, ISSN 0733-9364

Atanasov, V; Greenwood, D; Thurairajah, N and Hatcher, C (2021) Forensic delay analysis: An investigation of the reasons for disagreements in time-related disputes. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387

Atin, A (2016) Project risk propagation modeling of engineering, procurement and construction. PhD thesis, Wayne State University, USA.

Atkin, B (1993) Stereotypes and themes in building designs: Insights for model builders. Construction Management and Economics, 11(2), pp. 119-130. ISSN 01446193

Atkin, B L and Gill, E M (1986) Cad and management of construction projects. Journal of Construction Engineering and Management, 112(4), pp. 557-565. ISSN 0733-9364

Attwell, D N (1989) Bayesian models for sequential bidding and related theoretical topics. PhD thesis, University of Warwick, UK.

Auchey, F L and Auchey, G J (2004) Picking successful projects by using the prism lltm model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193

Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Avetisyan, H G (2013) Sustainable infrastructure modeling and policy analyses: Construction, energy and transportation industries. PhD thesis, University of Maryland, College Park, USA.

Awad, A M (2005) The interaction between project finance of a large-scale construction project and macroeconomic indicators and policies. PhD thesis, University of Nottingham, UK.

Ayadi, A; Nasraoui, H; Driss, Z; Bouabidi, A and Abid, M S (2018) Unsteady state of a solar chimney power plant accoupled with a turbine: Case study. Journal of Engineering, Design and Technology, 16(2), pp. 244-255. ISSN 1726-0531

Ayda Montaser, K and Heidari, S (2021) Optimizing window size by integrating energy and lighting analyses considering occupants' visual satisfaction. Built Environment Project and Asset Management, 11(4), pp. 673-686. ISSN 2044-124X

Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.

Ayinla, K; Cheung, F and Tawil, R A (2019) Towards an ontology-based approach to measuring productivity for offsite manufacturing method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193

Ayinla, K; Saka, A; Seidu, R and Madanayake, U (2023) The impact of artificial intelligence on construction costing practice. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.

Azhar, S; Khalfan, M and Maqsood, T (2012) Building information modeling (BIM): Now and beyond. Construction Economics and Building, 12(4), pp. 15-28. ISSN 2204-9029

Azman, M A; Abdul-Samad, Z; Lee, B L; Skitmore, M; Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(2), pp. 618-637. ISSN 0969-9988

Azman, Mohd Azrai (2020) Diversification, institutions, and productivity performance of large construction firms in Malaysia. PhD thesis, Queensland University of Technology, Australia.

Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364

Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364

Babalola, Akinloluwa S (2025) Application of immersive technologies for occupational safety and health management in the construction industry. PhD thesis, University of Manchester, UK.

Baborska-Narozny, M; Bandurski, K and Grudzinska, M (2025) Understanding shading through home-use experience, measurement and modelling. Buildings & Cities, 6(1), pp. 466-489. ISSN 2632-6655

Badi, S and Diamantidou, D (2017) A social network perspective of building information modelling in Greek construction projects. Architectural Engineering and Design Management, 13(6), pp. 406-422. ISSN 1745-2007

Bae, J (2025) Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods. Engineering, Construction and Architectural Management, 32(9), pp. 5863-5884. ISSN 0969-9988

Bae, Y J (2016) Integrated design tool of building system optimization for building life cycle cost. PhD thesis, Purdue University, USA.

Bageis, A S and Fortune, C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), pp. 53-71. ISSN 1466433X

Bageis, A S O (2008) Contractors' decision to bid: development of a bid/no bid strategic decision model. PhD thesis, Heriot-Watt University, UK.

Bagies, A and Fortune, C (2006) Bid/no-bid decision modelling for construction projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Bai, L; Kang, S; Zhang, K; Zhang, B and Pan, T (2024) Modeling for external stakeholder risk assessment of project portfolios. Engineering, Construction and Architectural Management, 31(2), pp. 737-766. ISSN 0969-9988

Bai, L; Xie, X; Sun, Y; Qu, X and Han, X (2025) Assessing project criticality in project portfolio: A vulnerability modeling approach. Engineering, Construction and Architectural Management, 32(5), pp. 2890-2919. ISSN 0969-9988

Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.

Baker, D and Nateque Mahmood, M (2012) Developing tools to support complex infrastructure decision-making. Smart and Sustainable Built Environment, 1(1), pp. 59-72. ISSN 2046-6099

Bakhtiari, S (2024) Multi-hazard risk assessment of the interconnected infrastructure systems. PhD thesis, University of Western Ontario, Canada.

Bakry, I; Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(6), pp. 782-800. ISSN 0969-9988

Baldauf, J P; Formoso, C T and Tzortzopoulos, P (2021) Method for managing requirements in healthcare projects using building information modelling. Engineering, Construction and Architectural Management, 28(8), pp. 2090-2118. ISSN 0969-9988

Baldwin, A; Li, H; Huang, T; Kong, C W; Guo, H L; Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(2), pp. 150-161. ISSN 0969-9988

Baldwin, A N; Austin, S A; Hassan, T M and Thorpe, A (1999) Modelling information flow during the conceptual and schematic stages of building design. Construction Management and Economics, 17(2), pp. 155-167. ISSN 01446193

Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.

Ballesteros-Pérez, P; González-Cruz, M C; Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(9), pp. 752-770. ISSN 01446193

Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193

Ballesteros-Pérez, P and Skitmore, M (2017) On the distribution of bids for construction contract auctions. Construction Management and Economics, 35(3), pp. 106-121. ISSN 01446193

Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364

Balogun, T B (2014) Towards a life cycle framework for bridge management systems in the UK: Insights from a critical review of international approaches and models. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Banerjee, S (2007) Statistical, empirical and mechanistic fragility analysis of concrete bridges. PhD thesis, University of California, Irvine, USA.

Baniassadi, F; Alvanchi, A and Mostafavi, A (2018) A simulation-based framework for concurrent safety and productivity improvement in construction projects. Engineering, Construction and Architectural Management, 25(11), pp. 1501-1515. ISSN 0969-9988

Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(3), pp. 207-222. ISSN 1562-3599

Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599

Bapat, H; Sarkar, D and Gujar, R (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India. International Journal of Construction Management, 23(12), pp. 2077-2086. ISSN 1562-3599

Barati, M K and Bankaru-Swamy, S (2026) A living lab approach to co-designing climate adaptation strategies. Buildings & Cities, 7(1), pp. 39-57. ISSN 2632-6655

Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364

Barati, Khalegh (2018) Modeling fuel use, emissions and mass of on-road construction equipment through monitoring field operations. PhD thesis, University of New South Wales, Australia.

Barbachyn, S M; Devine, R D; Thrall, A P and Kurama, Y C (2017) Economic evaluation of high-strength materials in stocky reinforced concrete shear walls. Journal of Construction Engineering and Management, 143(10): 04017074, ISSN 0733-9364

Barros, B A F S and Sotelino, E D (2023) Constructability and sustainability studies in conceptual projects: A BIM-based approach. Journal of Construction Engineering and Management, 149(4): 04023012, ISSN 0733-9364

Barros, Natalia Nakamura (2024) Integrative model of life cycle assessment with internet of things, BIM and machine learning. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades. PhD thesis, University of California, Berkeley, USA.

Basheer, M; Elnour, Z; Siddig, K and Grethe, H (2025) Economic impacts of large dams on downstream brickmaking in developing countries. Construction Management and Economics, 43(3), pp. 213-225. ISSN 0144-6193

Bassioni, H A; Hassan, T M and Price, A D F (2008) Evaluation and analysis of criteria and sub-criteria of a construction excellence model. Engineering, Construction and Architectural Management, 15(1), pp. 21-41. ISSN 0969-9988

Bataw, A (2016) On the integration of building information modelling in undergraduate civil engineering programmes in the United Kingdom. PhD thesis, University of Manchester, UK.

Batista Silveira Dos Santos, L F (2020) Efficient modeling strategies for performance-based building design supported by daylight and building energy simulations. PhD thesis, University of California, Berkeley, USA.

Batra, S (2025) Exploring the application of PLS-SEM in construction management research: A bibliometric and meta-analysis approach. Engineering, Construction and Architectural Management, 32(4), pp. 2697-2727. ISSN 0969-9988

Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.

Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge. PhD thesis, Heriot-Watt University, UK.

Bayrak, T and Kaka, A (2004) Evaluation of digital photogrammetry and 3D CAD modelling applications in construction management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Bayraktar, M E and Hastak, M (2010) Scoring approach to construction bond underwriting. Journal of Construction Engineering and Management, 136(9), pp. 957-967. ISSN 0733-9364

Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.

Bee-Hua, G (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(2), pp. 231-241. ISSN 01446193

Belhadj, T A (1989) Computer aided architectural evaluation and design: a cost modelling experiment. PhD thesis, University of Sheffield, UK.

Beliveau, Y J; Dixit, S S; Dal, T and Morad, A A (1993) Multitask motion planning for material handling in construction. Journal of Construction Engineering and Management, 119(1), pp. 180-191. ISSN 0733-9364

Bennett, W G and Karunarathna, H (2020) Coastal flood alleviation through management interventions under changing climate conditions. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 187-203. ISSN 1759-5916

Berends, T C (2007) Contracting economics of large engineering and construction projects. PhD thesis, Delft University of Technology, Netherlands.

Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.

Bernold, L E (1989) Simulation of nonsteady construction processes. Journal of Construction Engineering and Management, 115(2), pp. 163-178. ISSN 0733-9364

Betz, T; Brucker, R; Wilson, C and Wilson, R (2025) Developing corrosion-related reliability models using natural language processing. Built Environment Project and Asset Management, 15(6), pp. 1106-1121. ISSN 2044-124X

Bhandari, S; Hallowell, M R; Alruqi, W and Salas, R (2021) Modeling the relationship between personal risk tolerance, work-related risk tolerance, and risk-taking behavior of construction workers. Journal of Construction Engineering and Management, 147(4), ISSN 0733-9364

Bhurisith, I and Touran, A (2002) Case study of obsolescence and equipment productivity. Journal of Construction Engineering and Management, 128(4), pp. 357-361. ISSN 0733-9364

Bidanset, P; McCord, M; Davis, P and Sunderman, M (2019) An exploratory approach for enhancing vertical and horizontal equity tests for ad valorem property tax valuations using geographically weighted regression. Journal of Financial Management of Property and Construction, 24(2), pp. 231-250. ISSN 1366-4387

Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.

Bilec, Melissa M (2007) A hybrid life cycle assessment model for construction processess. PhD thesis, University of Pittsburgh, USA.

Bina, K and Moghadas, N (2021) BIM-abm simulation for emergency evacuation from conference hall, considering gender segregation and architectural design. Architectural Engineering and Design Management, 17(5-6), pp. 361-375. ISSN 1745-2007

Binsarra, F A (2016) Uncovering the structure and the dynamic of information propagation in building. PhD thesis, University of Liverpool, UK.

Binti Ismail, S H (2016) Musculoskeletal modelling for ergonomics: shoulder & low back loading in bricklaying. PhD thesis, Imperial College London, UK.

Birkes, A Y (1999) Multimedia data definition and requirements for construction applications. PhD thesis, Georgia Institute of Technology, USA.

Bisola, T (2024) Business modelling for cloud-based building information modelling (cbim). DE thesis, Technische Universitaet Berlin, Germany.

Bittner, Ksenia (2020) Building information extraction and refinement from vhr satellite imagery using deep learning techniques. PhD thesis, Osnabrück University, Germany.

Bjork, B-C (1996) Requirements and information structures for building product data models. DTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Björk, B (2002) A formalised model of the information and materials handling activities in the construction process. Construction Innovation, 2(3), pp. 133-149. ISSN 1471-4175

Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.

Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180

Blackwood, D J; Sarkar, S and Price, A D F (1998) Modelling levels of accuracy in design cost estimation. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Blindheim, J; Elverum, C W; Welo, T and Steinert, M (2020) Concept evaluation in new product development: A set-based method utilizing rapid prototyping and physical modelling. Journal of Engineering, Design and Technology, 18(5), pp. 1139-1151. ISSN 1726-0531

Boateng, P; Ahiaga-Dagbui, D; Chen, Z and Ogunlana, S (2015) Modelling economic risks in megaproject construction: A systemic approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Boateng, P; Omotayo, T; Osunsanmi, T and Ekundayo, D (2025) Socio-ecological risks management dynamic simulation in megaproject development of the edinburgh tram network. International Journal of Building Pathology and Adaptation, 43(1), pp. 75-92. ISSN 2398-4708

Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364

Bokor, O (2022) Improving labour productivity in construction. A hybrid machine learning approach. PhD thesis, University of Northumbria at Newcastle, UK.

Bond, S and Dermisi, S (2017) Using GIS to measure the impact of the Canterbury earthquakes on house prices in Christchurch, NZ. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 123-138. ISSN 1759-5916

Bonev, M; Wörösch, M and Hvam, L (2015) Utilizing platforms in industrialized construction: A case study of a precast manufacturer. Construction Innovation, 15(1), pp. 84-106. ISSN 1471-4175

Booth, Peter Charles (2023) Digitally integrated material practice: Computational methods of engaging non-standardised plantation hardwood in architecture. PhD thesis, University of Technology Sydney, Australia.

Bordalo, R; De Brito, J; Gaspar, P L and Silva, A (2011) Service life prediction modelling of adhesive ceramic tiling systems. Building Research & Information, 39(1), pp. 66-78. ISSN 0961-3218

Borg, M (2001) Environmental assessment of materials, components and buildings: Building-specific considerations, open-loop recycling, variations in assessment results and the usage phase of buildings. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Borgeson, S and Brager, G (2011) Comfort standards and variations in exceedance for mixed-mode buildings. Building Research & Information, 39(2), pp. 118-133. ISSN 0961-3218

Bosche, F N (2008) Automated recognition of three-dimensional CAD model objects in dense laser range point clouds. PhD thesis, University of Waterloo, Canada.

Bosché, F; Turkan, Y; Haas, C T and Haas, R (2010) Fusing 4D modelling and laser scanning for construction schedule control. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.

Bourgeois, D; Reinhart, C F and Ward, G (2008) Standard daylight coefficient model for dynamic daylighting simulations. Building Research & Information, 36(1), pp. 68-82. ISSN 0961-3218

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration I: Principles. Engineering, Construction and Architectural Management, 8(2), pp. 104-113. ISSN 0969-9988

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration ii: Application. Engineering, Construction and Architectural Management, 8(2), pp. 114-129. ISSN 0969-9988

Boussabaine, A H and Kaka, A P (1998) A neural networks approach for cost flow forecasting. Construction Management and Economics, 16(4), pp. 471-479. ISSN 01446193

Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), pp. 1011-1020. ISSN 01446193

Boussabaine, A H; Kirkham, R J and Grew, R G (1999) Estimating the cost of energy usage in sport centres: A comparative modelling approach. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Boussabaine, A H; Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(3), pp. 213-224. ISSN 0969-9988

Bowen, P; Edwards, P; Lingard, H and Cattell, K (2014) Predictive modeling of workplace stress among construction professionals. Journal of Construction Engineering and Management, 140(3): 4013055, ISSN 0733-9364

Bowen, P; Govender, R and Edwards, P (2017) Condom use by South African construction workers. Construction Management and Economics, 35(7), pp. 432-444. ISSN 01446193

Bowen, P A (1993) A communication-based approach to price modelling and price forecasting in the design phase of the traditional building procurement process in South Africa. Unpublished PhD thesis, University of Port Elizabeth, South Africa.

Bowen, P A and Edwards, P J (1985) Cost modelling and price forecasting: Practice and theory in perspective. Construction Management and Economics, 3(3), pp. 199-215. ISSN 01446193

Bowles, G; Dagpunar, J S and Gow, H (1997) Financial management of planned maintenance for housing associations. Construction Management and Economics, 15(4), pp. 315-326. ISSN 01446193

Bowles, Graeme (1995) Annual sinking fund modelling for housing association major repairs provision. PhD thesis, Abertay University, UK.

Boyd, D (2021) A critical inquiry into the hyperreality of digitalization in construction. Construction Management and Economics, 39(7), pp. 549-564. ISSN 01446193

Boz, M A (2013) Developing a systems method to assess the sustainability of civil infrastructure projects. PhD thesis, Mississippi State University, USA.

Brady, M (1991) Growing a housebuilder: Investigating a context for learning and modeling principles of transpersonal psychology. PhD thesis, Institute of Transpersonal Psychology, USA.

Brauner, M (2020) Developing an optimized sustainability assessment tool for building information modelling (BIM) systems: incorporation of hygrothermal modelling into BIM. PhD thesis, Auckland University of Technology, New Zealand.

Bressan, Nicolò Maria (2024) VR as design management tool. PhD thesis, Università Iuav di Venezia, Italy.

Briscoe, G (2008) Studies of the UK labour market with special reference to the construction sector. PhD thesis, Coventry University, UK.

Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.

Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X

Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.

Bu, Guoping (2013) Development of an integrated deterioration method for long-term bridge performance prediction. PhD thesis, Griffith University, Australia.

Bulur, H G (2024) Analyzing decision making behaviour under risk and uncertainty with the help of computational cognitive modeling and neuroscience perspectives. PhD thesis, Middle East Technical University, Turkey.

Bunemer, Ricardo (2020) Construction 4.0 proposal for digital technological innovations for the civil construction sector: Case study of a smart house. PhD thesis, Universidade Estadual de Campinas, Brazil.

Bunjaridh, Y.; Rahman, R. A.; Yusof, L. M. and Papadonikolaki, E. (2025) Modeling the organizational attributes and strategies for developing accurate digital twins: The case of constructed facilities. International Journal of Building Pathology and Adaptation, 44(4), pp. 910-934. ISSN 2398-4708

Burroughs, S (2006) Strength of compacted earth: Linking soil properties to stabilizers. Building Research & Information, 34(1), pp. 55-65. ISSN 0961-3218

Buys, F and Nkado, R (2006) A survey of maintenance management systems in South African tertiary educational institutions. Construction Management and Economics, 24(10), pp. 997-1005. ISSN 1466433X

Bártolo, H M G and Bártolo, P J S (2001) Computer aided concurrent design. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Bélafi, Z D (2018) Analysis and modelling of occupant behaviour to support building design and performance optimisation. PhD thesis, Budapest University of Technology and Economics, Hungary.

Cabahug, R R; Edwards, D J and Nicholas, J (2004) Classifying plant operator maintenance proficiency: Examining personal variables. Building Research & Information, 32(2), pp. 119-127. ISSN 0961-3218

Cabral, I F (2015) A systematic methodology to analyse the performance and design configurations of business interoperability in cooperative industrial networks. PhD thesis, Universidade NOVA de Lisboa, Portugal.

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Cakan, H (2012) Analysis and modeling of roofer and steel worker fall accidents. PhD thesis, Wayne State University, USA.

Cakan, H; Kazan, E and Usmen, M (2014) Investigation of factors contributing to fatal and non-fatal roofer fall accidents. International Journal of Construction Education and Research, 10(4), pp. 300-317. ISSN 1557-8771

Calderon, C and Keirstead, J (2012) Modelling frameworks for delivering low-carbon cities: Advocating a normalized practice. Building Research & Information, 40(4), pp. 504-517. ISSN 0961-3218

Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.

Calvert, G S (2021) A multiple defect approach to bridge life cycle modelling. PhD thesis, University of Nottingham, UK.

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Cammarano, S; Pellegrino, A; Lo Verso, V R M and Aghemo, C (2015) Assessment of daylight in rooms with different architectural features. Building Research & Information, 43(2), pp. 222-237. ISSN 0961-3218

Cao, J; Said, H; Savov, A and Hall, D (2024) Graph-based evolutionary search for optimal hybrid modularization of building construction projects. Journal of Construction Engineering and Management, 150(8): 04024098, ISSN 0733-9364

Cardin, M-A (2011) Quantitative performance-based evaluation of a procedure for flexible design concept generation. PhD thesis, Massachusetts Institute of Technology, USA.

Carmichael, D G and Balatbat, M C A (2010) A contractor's analysis of the likelihood of payment of claims. Journal of Financial Management of Property and Construction, 15(2), pp. 102-117. ISSN 1366-4387

Carmichael, D G and Mustaffa, N K (2018) Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(2), pp. 227-245. ISSN 1471-4175

Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.

Carpino, C; Loukou, E; Heiselberg, P and Arcuri, N (2020) Energy performance gap of a nearly zero energy building (nZEB) in Denmark: The influence of occupancy modelling. Building Research & Information, 48(8), pp. 899-921. ISSN 0961-3218

Castriotto, Caio Magalhães (2023) Reciprocal link a new connection system for reciprocal frame structures developed by algorithmic modeling and digital fabrication. PhD thesis, Universidade Estadual de Campinas, Brazil.

Cattell, D W; Bowen, P A and Kaka, A P (2010) The risks of unbalanced bidding. Construction Management and Economics, 28(4), pp. 333-344. ISSN 1466433X

Cattell, D W; Bowen, P A and Kaka, A R (2008) A simplified unbalanced bidding model. Construction Management and Economics, 26(12), pp. 1283-1290. ISSN 1466433X

Cebrat, K; Narożny, J; Baborska-Narozny, M and Smektała, M (2025) Modelling site-specific outdoor temperature for buildings in urban environments. Buildings & Cities, 6(1), pp. 490-510. ISSN 2632-6655

Cerrahoğlu, M and Maden, F (2024) Design of transformable transitional shelter for post disaster relief. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 227-243. ISSN 1759-5916

Chadalawada, J (2017) Data driven modelling and knowledge discovery in water resources engineering. PhD thesis, National University of Singapore, Singapore.

Chakravarty, S (2002) Essays on contracting in the construction industry. PhD thesis, University of Southern California, USA.

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193

Chan, A P C; Chan, D W M and Yeung, J F Y (2009) Overview of the application of "fuzzy techniques" in construction management research. Journal of Construction Engineering and Management, 135(11), pp. 1241-1252. ISSN 0733-9364

Chan, A P C; Wong, J M W and Chiang, Y H (2003) Modelling labour demand at project level: An empirical study in Hong Kong. Journal of Engineering, Design and Technology, 1(2), pp. 135-150. ISSN 1726-0531

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193

Chan, I Y S and Chen, H (2024) Towards an integrative analysis of underground environment and human health: A survey and field measurement approach. Engineering, Construction and Architectural Management, 31(5), pp. 1807-1834. ISSN 0969-9988

Chan, Man-Yin Ede (2018) Enablers for knowledge management implementation by large construction organisations in Hong Kong. PhD thesis, Griffith University, Australia.

Chan, S L and Leung, N N (2004) Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), pp. 935-943. ISSN 0733-9364

Chan, T K (2017) Global supply chains: A preliminary analysis of the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988

Chang, C Y (2014) Principal-agent model of risk allocation in construction contracts and its critique. Journal of Construction Engineering and Management, 140(1): 04013032, ISSN 0733-9364

Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364

Chang, D Y-M (1986) RESQUE: A resource based simulation system for construction process planning. PhD thesis, University of Michigan, USA.

Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.

Chang, M (2016) Investigating and improving bridge management system methodologies under uncertainty. PhD thesis, Utah State University, USA.

Chang, S; Castro-Lacouture, D and Yamagata, Y (2020) Estimating building electricity performance gaps with internet of things data using Bayesian multilevel additive modeling. Journal of Construction Engineering and Management, 146(12): 05020017, ISSN 0733-9364

Chao, C-H (2001) Formulation of an e -business inter-enterprise collaboration for the construction industry. PhD thesis, Northwestern University, USA.

Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364

Chapman, C (2023) Green and grey drainage infrastructure: costs and benefits of reducing surface water flood risk. PhD thesis, University of Oxford, UK.

Charbel, G; Assaad, R H; Tejada, T R and Karaa, F (2025) Modeling the interdependencies between the risk factors contributing to preconstruction delays in construction projects. Journal of Construction Engineering and Management, 151(4): 04025022, ISSN 0733-9364

Charbel, G; Assaad, R H; Qiao, Y and Labi, S (2025) Predicting the level of competition and determining optimal bidding strategies for bundled projects: Integrating machine-learning algorithms and probabilistic modeling. Journal of Construction Engineering and Management, 151(11): 04025178, ISSN 0733-9364

Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Charoenvisal, K (2013) A BIM interoperable web-based dss for vegetated roofing system selection. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chathurangi, B. N. M.; Kamardeen, I. and Firose, M. M. (2026) Mitigating gendered career challenges in construction through psychological capital. Journal of Construction Engineering and Management, 152(10): 04026172, ISSN 0733-9364

Chau, K W (1995) The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: Empirical evidence from Hong Kong. Construction Management and Economics, 13(1), pp. 15-21. ISSN 01446193

Chauhan, S S (1999) Dam safety risk assessment modeling with uncertainty analysis. PhD thesis, Utah State University, USA.

Chavoshy, A; Amini Hosseini, K and Hosseini, M (2018) Resiliency cube: A new approach for parametric analysis of earthquake resiliency in urban road networks. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 317-332. ISSN 1759-5916

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Chen, H; Zhu, Y and Luo, X (2022) Tablegraph: An image segmentation-based table knowledge interpretation model for civil and construction inspection documentation. Journal of Construction Engineering and Management, 148(10): 04022103, ISSN 0733-9364

Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193

Chen, L and Fong, P S W (2013) Visualizing evolution of knowledge management capability in construction firms. Journal of Construction Engineering and Management, 139(7), pp. 839-851. ISSN 0733-9364

Chen, N (2017) An investigation of the influence of project complexity on communications in engineering construction projects. PhD thesis, University of Hong Kong, Hong Kong.

Chen, Q (2007) An object model framework for interface management in building information models. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chen, Q; Reichard, G and Beliveau, Y (2010) Object model framework for interface modeling and IT-oriented interface management. Journal of Construction Engineering and Management, 136(2), pp. 187-198. ISSN 0733-9364

Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.

Chen, T; Hu, H and Zhu, F (2020) Developing a hierarchical road layout method for large-scale construction site. Journal of Construction Engineering and Management, 146(9): 04020115, ISSN 0733-9364

Chen, W; Hu, C; Zou, R; Yang, Q; Chen, Y; Xing, J and Mou, C (2025) Evolutionary method of digital twin model for building physics mechanism. Architectural Engineering and Design Management, 21(2), pp. 356-378. ISSN 1745-2007

Chen, X; Chang-Richards, A Y; Pelosi, A; Jia, Y; Shen, X; Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: A systematic review. Engineering, Construction and Architectural Management, 29(8), pp. 3181-3209. ISSN 0969-9988

Chen, Xilin (2025) Sustainability of underground infrastructure: Digitalisation-based embodied carbon assessment and design optimisation. PhD thesis, Monash University, Australia.

Chen, Y; Dib, H and Cox, R F (2014) A measurement model of building information modelling maturity. Construction Innovation, 14(2), pp. 186-209. ISSN 1471-4175

Chen, Y-K (1991) An analysis of decision strategy as applied to construction portfolios. PhD thesis, Stevens Institute of Technology, USA.

Cheng, E W L and Li, H (2004) Development of a practical model of partnering for construction projects. Journal of Construction Engineering and Management, 130(6), pp. 790-798. ISSN 0733-9364

Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.

Cheng, L Y; Wen, D C and Jiang, H C (2014) The performance excellence model in construction enterprises: An application study with modelling and analysis. Construction Management and Economics, 32(11), pp. 1078-1092. ISSN 01446193

Cheng, M Y and O'Connor, J T (1996) Arcsite: Enhanced GIS for construction site layout. Journal of Construction Engineering and Management, 122(4), pp. 329-336. ISSN 0733-9364

Cheng, M Y; Su, C W and You, H Y (2003) Optimal project organizational structure for construction management. Journal of Construction Engineering and Management, 129(1), pp. 70-79. ISSN 0733-9364

Cheng, M Y and Yang, S C (2001) GIS-based cost estimates integrating with material layout planning. Journal of Construction Engineering and Management, 127(4), pp. 291-299. ISSN 0733-9364

Cheng, M-Y (1992) Automated site layout of temporary construction facilities using geographic information systems (GIS). PhD thesis, University of Texas at Austin, USA.

Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.

Cheung, S; Wong, P S P; Fung, A Y S and Coffey, W V (2008) Examining the use of bid information in predicting the contractor's performance. Journal of Financial Management of Property and Construction, 13(2), pp. 111-122. ISSN 1366-4387

Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.

Chiang, R (2002) Agency and incentive contract in private investment of transport project: An exploration of fundamental relationships. PhD thesis, Massachusetts Institute of Technology, USA.

Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X

Chileshe, N and Haupt, T C (2005) Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(2), pp. 140-154. ISSN 1726-0531

Chin, J. Y.; Ng, C. T.; Sa'ari, R.; Ng, H. S. and Thong, J. W. (2026) Energy retrofitting by using building information modelling-based energy model. International Journal of Building Pathology and Adaptation, 44(4), pp. 1062-1097. ISSN 2398-4708

Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Chinda, Thanwadee (2008) A system dynamics approach to construction safety culture. PhD thesis, Griffith University, Australia.

Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.

Cho, C; Kim, K; Park, J and Cho, Y K (2018) Data-driven monitoring system for preventing the collapse of scaffolding structures. Journal of Construction Engineering and Management, 144(8): 04018077, ISSN 0733-9364

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.

Cho, Y (2000) The Korean housebuilding industry: aspects of growth, efficiency and diversification, 1980-1995. PhD thesis, London School of Economics and Political Science, UK.

Cho, Y K; Haas, C T; Sreenivasan, S V and Liapi, K (2004) Position error modeling for automated construction manipulators. Journal of Construction Engineering and Management, 130(1), pp. 50-58. ISSN 0733-9364

Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations. PhD thesis, University of Texas at Austin, USA.

Choi, K and Lee, H W (2016) Deconstructing the construction industry: A spatiotemporal clustering approach to profitability modeling. Journal of Construction Engineering and Management, 142(10): 04016051, ISSN 0733-9364

Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364

Chong, D; Wang, Y; Chen, L and Yu, B (2016) Modeling and validation of energy consumption in asphalt mixture production. Journal of Construction Engineering and Management, 142(12): 04016069, ISSN 0733-9364

Choudhari, S and Tindwani, A (2017) Logistics optimisation in road construction project. Construction Innovation, 17(2), pp. 158-179. ISSN 1471-4175

Chow, V; Loosemore, M and McDonnell, G (2012) Modelling the impact of extreme weather events on hospital facilities management using a system dynamics approach. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Chowdhury, S; Ren, Z; Rouhana, F; Wang, J and Zhu, J (2024) Exploring sustainability in resource management: Implementation of a water-energy-human nexus framework at a university campus. Journal of Construction Engineering and Management, 150(10): 04024140, ISSN 0733-9364

Christiansen, T R (1994) Modeling efficiency and effectiveness of coordination in engineering design teams. PhD thesis, Stanford University, USA.

Christodoulou, S E (1998) Optimum bid markup calculation in competitive bidding environments using fuzzy artificial neural networks. PhD thesis, Columbia University, USA.

Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175

Chritamara, S; Ogunlana, S O and Luong Bach, N (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(5-6), pp. 381-392. ISSN 0969-9988

Chua, D K H and Goh, Y M (2005) Poisson model of construction incident occurrence. Journal of Construction Engineering and Management, 131(6), pp. 715-722. ISSN 0733-9364

Chua, D K H and Li, G M (2002) RISim: Resource-interacted simulation modeling in construction. Journal of Construction Engineering and Management, 128(3), pp. 195-202. ISSN 0733-9364

Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364

Chua, D K H and Yeoh, K W (2011) PDM++: Planning framework from a construction requirements perspective. Journal of Construction Engineering and Management, 137(4), pp. 266-274. ISSN 0733-9364

Chua, D K H; Yeoh, K W and Song, Y (2010) Quantification of spatial temporal congestion in four-dimensional computer-aided design. Journal of Construction Engineering and Management, 136(6), pp. 641-649. ISSN 0733-9364

Chuing, L S (2015) Modelling capability-based risk assessment for international construction project ventures. PhD thesis, University of Malaya, Malaysia.

Chun, C K; Li, H and Skitmore, M (2012) The use of virtual prototyping for hazard identification in the early design stage. Construction Innovation, 12(1), pp. 29-42. ISSN 1471-4175

Chung, H C P and Adeyeye, K (2018) Structural flood damage and the efficacy of property-level flood protection. International Journal of Building Pathology and Adaptation, 36(5), pp. 471-499. ISSN 23984708

Chung, S (2024) Potential issue identification for country risks in international construction projects from news articles. PhD thesis, Seoul National University, Republic of Korea.

Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.

Cidik, M S; Boyd, D and Thurairajah, N (2014) Leveraging collaboration through the use of building information models. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Cirrincione, Laura (2021) Simulation and experimental methods for improving energy efficiency, environmental performance and resilience of single and clustered groups of buildings. PhD thesis, Università degli Studi di Palermo, Italy.

Clarkson, Luke (2021) Comprehensive monitoring strategy for tailings dams. PhD thesis, University of Queensland, Australia.

Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.

Clossick, J and Khonsari, T (2025) Living labs: Epistemic modelling, temporariness and land value. Buildings & Cities, 6(1), pp. 841-861. ISSN 2632-6655

Coffey, B; Borgeson, S; Selkowitz, S; Apte, J; Mathew, P and Haves, P (2009) Towards a very low-energy building stock: Modelling the US commercial building sector to support policy and innovation planning. Building Research & Information, 37(5-6), pp. 610-624. ISSN 0961-3218

Conzatti, A; Fosas De Pando, D; Chater, B and Coley, D (2025) Are simple models for natural ventilation suitable for shelter design? Buildings & Cities, 6(1), pp. 158-181. ISSN 2632-6655

Cooke, T; Lingard, H and Blismas, N (2007) On-line oh&s risk assessment for construction designers: The 'toolshed' prototype. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Cooke, T; Lingard, H; Blismas, N and Stranieri, A (2008) ToolSHeD™: The development and evaluation of a decision support tool for health and safety in construction design. Engineering, Construction and Architectural Management, 15(4), pp. 336-351. ISSN 0969-9988

Cooper, J (2015) Sustainable building maintenance within social housing. PhD thesis, University of Greenwich, UK.

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.

Cosar-Jorda, P; Buswell, R A and Mitchell, V A (2019) Quantifying energy demand reduction considering householder willingness to apply measures. Building Research & Information, 47(7), pp. 850-864. ISSN 0961-3218

Costa, L; Barbosa, M B A; Baldam, R D L and Coelho, T D P (2019) Challenges of process modeling in architecture and engineering to execute projects and public works. Journal of Construction Engineering and Management, 145(1): 05018015, ISSN 0733-9364

Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.

Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364

Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.

Crippa, J; Boeing, L C; Caparelli, A P A; da Costa, M R M M; Scheer, S; Araujo, A M F and Bem, D (2018) A BIM–LCA integration technique to embodied carbon estimation applied on wall systems in Brazil. Built Environment Project and Asset Management, 8(5), pp. 491-503. ISSN 2044-124X

Crowley, A J (1998) The development & implementation of a product model for constructional steelwork. PhD thesis, University of Leeds, UK.

Cuciniello, G; Inzerillo, G; Corazziari, L; Ciampini, A; Degni, R; Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(9): 04023080, ISSN 0733-9364

Cui, L Z; Liu, J; Luo, H; Wang, J; Zhang, X; Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(6): 04024049, ISSN 0733-9364

Cui, X (2002) Delay time modelling and software development. PhD thesis, University of Salford, UK.

Cusack, M M (1984) The use and limitations of mathematical models in the planning and control of construction projects. Construction Management and Economics, 2(3), pp. 219-224. ISSN 01446193

Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(2), pp. 91-104. ISSN 01446193

Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(3), pp. 183-198. ISSN 01446193

D'Amato, M and Kauko, T (2012) Sustainability and risk premium estimation in property valuation and assessment of worth. Building Research & Information, 40(2), pp. 174-185. ISSN 0961-3218

Dabbas, M A A (1981) Computerized decision making in construction. PhD thesis, Georgia Institute of Technology, USA.

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Dai, F and Lu, M (2013) Three-dimensional modeling of site elements by analytically processing image data contained in site photos. Journal of Construction Engineering and Management, 139(7), pp. 881-894. ISSN 0733-9364

Dakhil, A J (2017) Building information modelling (BIM) maturity-benefits assessment relationship framework for UK construction clients. PhD thesis, University of Salford, UK.

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.

Daneshfar, M (2024) Integration of geospatial and environmental data to support building renovation. PhD thesis, Technische Universitaet Berlin, Germany.

Dangerfield, B; Green, S and Austin, S (2010) Understanding construction competitiveness: The contribution of system dynamics. Construction Innovation, 10(4), pp. 408-420. ISSN 1471-4175

Das, D. K. and Emuze, F. (2021) Design delays in building projects in india: Effects and remedies. Construction Economics and Building, 21(1), pp. 22-44. ISSN 2204-9029

Das, D K and Emuze, F (2017) A dynamic model of contractor-induced delays in India. Journal of Construction in Developing Countries, 22(1), pp. 21-39. ISSN 1823-6499

Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.

Davies, M; Jackaway, A; Hardy, R; Dewey, E and Littler, J (2000) A translucent louvre system: Design concepts, modelling work and monitored data. Building Research & Information, 28(1), pp. 42-50. ISSN 0961-3218

Davila Delgado, J M and Oyedele, L O (2020) BIM data model requirements for asset monitoring and the circular economy. Journal of Engineering, Design and Technology, 18(5), pp. 1269-1285. ISSN 1726-0531

Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193

Dayan, V; Chileshe, N and Hassanli, R (2022) A scoping review of information-modeling development in bridge management systems. Journal of Construction Engineering and Management, 148(9): 03122006, ISSN 0733-9364

De Dear, R (2011) Revisiting an old hypothesis of human thermal perception: Alliesthesia. Building Research & Information, 39(2), pp. 108-117. ISSN 0961-3218

De Wilde, P J C J (2004) Computational support for the selection of energy saving building components. PhD thesis, Delft University of Technology, Netherlands.

Deal, B (2001) Ecological urban dynamics: The convergence of spatial modelling and sustainability. Building Research & Information, 29(5), pp. 381-393. ISSN 0961-3218

Deep, S; Gajendran, T; Jefferies, M; Uggina, V S and Patil, S (2024) Influence of subcontractors' "strategic capabilities" on "power", "dependence" and "collaboration": An empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(2), pp. 571-592. ISSN 0969-9988

Defoe, P S (2018) The consideration of trees in rights of light cases part 2. International Journal of Building Pathology and Adaptation, 36(3), pp. 318-332. ISSN 23984708

Delatte, G (2014) The effects of three dimensional modeling on labor productivity through enhancing visualization of craft workers in the industrial construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Delgado, J M D; Oyedele, L; Bilal, M; Ajayi, A; Akanbi, L and Akinade, O (2020) Big data analytics system for costing power transmission projects. Journal of Construction Engineering and Management, 146(1): 05019017, ISSN 0733-9364

Delgado-Arvelo, Y (2012) An investigation into the data collection process for the development of cost models. PhD thesis, De Montfort University, UK.

Deng, Y (2015) Mapping of BIM and GIS for interoperable geospatial data management and analysis for the built environment. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.

Dethridge, L and Quinn, B (2016) Realtime emergency communication in virtual worlds. International Journal of Disaster Resilience in the Built Environment, 7(1), pp. 26-39. ISSN 1759-5916

Devaney, S and Roberts, D (2012) Who gets the jobs? Factors influencing the employability of property and construction graduates in the UK. Construction Management and Economics, 30(3), pp. 233-246. ISSN 1466433X

Devkar, G A and Kalidindi, S N (2013) Modeling and assessment of competencies in urban local bodies for implementing PPP projects. Built Environment Project and Asset Management, 3(1), pp. 42-57. ISSN 2044-124X

Dhakal, S; Zhang, L and Lv, X (2022) Ontology-based semantic modelling to support knowledge-based document classification on disaster-resilient construction practices. International Journal of Construction Management, 22(11), pp. 2059-2078. ISSN 1562-3599

Dhawan, K; Tookey, J; Fredriksson, A and Tetik, M (2026) Decarbonising construction logistics: The role of supplier-led distribution and integrated warehousing. Construction Innovation, 26(9), pp. 21-48. ISSN 1471-4175

Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.

Diab, M F; Varma, A and Panthi, K (2017) Modeling the construction risk ratings to estimate the contingency in highway projects. Journal of Construction Engineering and Management, 143(8): 04017041, ISSN 0733-9364

Dikmen, I; Birgonul, M T and Kiziltas, S (2005) Prediction of organizational effectiveness in construction companies. Journal of Construction Engineering and Management, 131(2), pp. 252-261. ISSN 0733-9364

Dikmen, I; Birgonul, M T; Tah, J H M and Ozer, A H (2012) Web-based risk assessment tool using integrated duration-cost influence network model. Journal of Construction Engineering and Management, 138(9), pp. 1023-1034. ISSN 0733-9364

Ding, Grace K C (2004) The development of a multi-criteria approach for the measurement of sustainable performance for built projects and facilities. PhD thesis, University of Technology Sydney, Australia.

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis. PhD thesis, University of Alberta, Canada.

Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599

Do, Q; Le, T and Le, C (2024) Uncovering critical causes of highway work zone accidents using unsupervised machine learning and social network analysis. Journal of Construction Engineering and Management, 150(3): 04023168, ISSN 0733-9364

Doan, D T (2019) Enhancing green star certification by improving bim uptake through system dynamics modelling. PhD thesis, Auckland University of Technology, New Zealand.

Doan, D T and Chinda, T (2016) Modeling construction and demolition waste recycling program in Bangkok: Benefit and cost analysis. Journal of Construction Engineering and Management, 142(12): 05016015, ISSN 0733-9364

Doan, D T; GhaffarianHoseini, A; Naismith, N; Ghaffarianhoseini, A; Zhang, T and Tookey, J (2023) An empirical examination of green star certification uptake and its relationship with BIM adoption in New Zealand. Smart and Sustainable Built Environment, 12(1), pp. 84-104. ISSN 2046-6099

Dobrovnik, M.; Herold, D. M. and Kummer, S. (2026) Perception differences in dynamic capabilities for digital supply chain transformation across managerial hierarchies: A DEMATEL-based analysis in the construction industry. Construction Innovation, 26(9), pp. 204-232. ISSN 1471-4175

Doe, Robert (2017) Integration of computational design tools in the design and production of prefabricated homes. PhD thesis, University of Sydney, Australia.

Dong, S (2012) A single element based modeling approach for simulating construction operations. PhD thesis, University of Nebraska - Lincoln, USA.

Dossick, C; Osburn, L and Neff, G (2025) Innovation through practice: The messy work of making technology useful for architecture, engineering and construction teams. Engineering, Construction and Architectural Management, 32(7), pp. 4887-4899. ISSN 0969-9988

Dosumu, O S and Uwayo, S M (2023) Modelling the adoption of internet of things (IoT) for sustainable construction in a developing economy. Built Environment Project and Asset Management, 13(3), pp. 394-411. ISSN 2044-124X

Drew, D S (1994) The effect of contract type and size on competitiveness in construction contract bidding. PhD thesis, University of Salford, UK.

Du, H (2012) Modelling of building performance under the UK climate change projections and the prediction of future heating and cooling design loads in building spaces. PhD thesis, University of Northumbria at Newcastle, UK.

Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.

Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.

Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(1), pp. 19-33. ISSN 1726-0531

Dunlop, P and Smith, S (2000) Stochastic modelling of concrete operations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

Dunne, J (2007) Design knowledge extraction: A community-based approach to public open space design in Mexico city. Architectural Engineering and Design Management, 3(3), pp. 160-168. ISSN 1745-2007

Dursun, O and Stoy, C (2011) Time-cost relationship of building projects: Statistical adequacy of categorization with respect to project location. Construction Management and Economics, 29(1), pp. 97-106. ISSN 1466433X

Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(4), pp. 444-468. ISSN 0969-9988

Duyshart, B; Walker, D; Mohamed, S and Hampson, K (2003) An example of developing a business model for information and communication technologies (ICT) adoption on construction projects: the national museum of Australia project. Engineering, Construction and Architectural Management, 10(3), pp. 179-192. ISSN 0969-9988

Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.

Ebekozien, E. O.; Ebekozien, A.; Hafez, M.; Aigbavboa, C.; Nwaole, A. N. C.; Samsurijan, M. S.; Aliu, J. O.; Ayo-Odirifi, S. O.; Adekunle, S. A. and Akinradewo, O. (2026) Modelling of government flood-related policy in Sustainable Development Goal 11: Evidence from Nigeria using "system theory". International Journal of Building Pathology and Adaptation, 44(4), pp. 995-1012. ISSN 2398-4708

Ebrahimigharehbaghi, S (2022) Understanding the decision-making process in homeowner energy retrofits: From behavioural and transaction cost perspectives. PhD thesis, Delft University of Technology, Netherlands.

Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988

Eccles, S; O'Reilly, M and Stovin, V (1997) Numerical modelling of contract strategy evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Ecem Yildiz, A; Dikmen, I and Talat Birgonul, M (2020) Using system dynamics for strategic performance management in construction. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364

Ech Charqy, Y; Radouani, R and Essahli, M (2023) Fe modeling of the effect of conductivity in galvanic corrosion between different types of stainless steel and carbon steel in a structure bolted joint. International Journal of Building Pathology and Adaptation, 41(3), pp. 574-587. ISSN 23984708

Edwards, D; Parn, E A; Sing, M C P and Thwala, W D (2019) Risk of excavators overturning: Determining horizontal centrifugal force when slewing freely suspended loads. Engineering, Construction and Architectural Management, 26(3), pp. 479-498. ISSN 0969-9988

Edwards, D J (1999) A methodology for predicting the total average hourly maintenance cost of tracked hydraulic excavators operating in the UK opencast mining industry. PhD thesis, University of Wolverhampton, UK.

Edwards, D J and Holt, G D (2008) Construction workers' health and safety knowledge: Initial observations on some test-result data. Journal of Engineering, Design and Technology, 6(1), pp. 65-80. ISSN 1726-0531

Edwards, D J; Nicholas, J and Sharp, R (2001) Forecasting UK construction plant sales. Engineering, Construction and Architectural Management, 8(3), pp. 171-176. ISSN 0969-9988

Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: A tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(3), pp. 225-232. ISSN 0969-9988

Egbelakin, T; Omotayo, T; Ogunmakinde, O E and Ekundayo, D (2025) Eliciting social themes of flood mitigation and community engagement studies through text mining. International Journal of Building Pathology and Adaptation, 43(1), pp. 29-49. ISSN 2398-4708

Egger, C S (2015) Sewer rehabilitation planning under uncertainty. PhD thesis, ETH Zürich, Switzerland.

Ehwi, R J; Oti-Sarpong, K; Shojaei, R and Burgess, G (2022) Offsite manufacturing research: A systematic review of methodologies used. Construction Management and Economics, 40(1), pp. 1-24. ISSN 01446193

Eid, M S (2017) Sustainable infrastructure development: A holistic system based decision making framework integrating vulnerability indicators and stakeholders objectives. PhD thesis, University of Tennessee, USA.

Eisazadeh, N; De Troyer, F and Allacker, K (2025) Environmental performance of patient rooms using an integrated approach considering operational energy, daylight and comfort analysis. Smart and Sustainable Built Environment, 14(4), pp. 1117-1142. ISSN 2046-6099

Ejohwomu, O A (2007) Modelling the supply and demand for construction and building services skills in the Black Country. PhD thesis, University of Wolverhampton, UK.

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2005) A conceptual demand led model founded on theories of labour market mismatch for the construction and building services industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ekanayake, E M A C; Shen, G Q P; Kumaraswamy, M M; Owusu, E K and Saka, A B (2021) Modeling supply chain resilience in industrialized construction: A Hong Kong case. Journal of Construction Engineering and Management, 147(11): 05021009, ISSN 0733-9364

Ekanayake, E M A C; Xue, J; Shen, G Q and Kumaraswamy, M M (2021) Dynamic supply chain vulnerability analysis of Hong Kong-Zhuhai-Macao Bridge construction: A topic modelling approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Eker, S; Zimmermann, N; Carnohan, S and Davies, M (2018) Participatory system dynamics modelling for housing, energy and wellbeing interactions. Building Research & Information, 46(7), pp. 738-754. ISSN 0961-3218

Ekyalimpa, Ronald (2015) A distributed simulation approach for contractor company performance management in the construction industry. PhD thesis, University of Alberta, Canada.

El Asmar, L (2019) Assessing experiential learning in construction education by modeling student performance. PhD thesis, Arizona State University, USA.

El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system. PhD thesis, University of Wisconsin - Madison, USA.

El Hawary, M and Marzouk, M (2023) Predicting buildings life cycle sustainability behaviour using system dynamics. Architectural Engineering and Design Management, 19(4), pp. 323-339. ISSN 1745-2007

El Said, S F (2022) A modeling approach to indexing the cost of highway construction and maintenance projects to a responsive highway user fee using bid items data. PhD thesis, Vanderbilt University, USA.

El-Adaway, I H and Kandil, A A (2009) Contractors' claims insurance: A risk retention approach. Journal of Construction Engineering and Management, 135(9), pp. 819-825. ISSN 0733-9364

El-Bibany, H E-D (1992) Architecture for human-computer design, management and coordination in a collaborative AEC environment. PhD thesis, Stanford University, USA.

El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.

El-Diraby, T E (2012) Epistemology of construction informatics. Journal of Construction Engineering and Management, 138(1), pp. 53-65. ISSN 0733-9364

El-Gafy, M; Abdelhamid, T and Abdelrazig, Y (2010) Environmental impact analysis using hybrid decision support framework: A transportation project case study. International Journal of Construction Education and Research, 6(3), pp. 219-237. ISSN 1557-8771

El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364

El-Gohary, N (2008) Semantic process modelling and integration for collaborative construction and infrastructure development. PhD thesis, University of Toronto, Canada.

El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Kholy, A M; Tahwia, A M and Elsayed, M M (2022) Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models. International Journal of Construction Management, 22(9), pp. 1675-1689. ISSN 1562-3599

El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.

El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework. PhD thesis, University of Alberta, Canada.

Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988

Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets. PhD thesis, University of Maryland, College Park, USA.

Eleyan, D (2006) Project review solution-directed model using system dynamics modelling. PhD thesis, University of Manchester, UK.

Elf, M L (2007) Modelling of care processes: The use of simulation models for the design of health care environments. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.

Elhag, T M S and Boussabaine, A H (2001) Tender price estimation using artificial neural networks. Journal of Financial Management of Property and Construction, 6(3), pp. 193-208. ISSN 1366-4387

Elhag, T M S and Boussabaine, A H (2002) Tender price estimation using artificial neural networks II: Modelling. Journal of Financial Management of Property and Construction, 7(1), pp. 49-64. ISSN 1366-4387

Elijah, O O and Oluwasuji, D J (2019) An evaluation of training needs of the Nigerian construction professionals in adopting building information modelling. Journal of Construction in Developing Countries, 24(2), pp. 63-81. ISSN 1823-6499

Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988

Elmasry, M; Zayed, T and Hawari, A (2019) Multi-objective optimization model for inspection scheduling of sewer pipelines. Journal of Construction Engineering and Management, 145(2): 04018129, ISSN 0733-9364

Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364

Elrod, M T (2017) A novel approach to determining real-time risk probabilities in critical infrastructure industrial control systems. PhD thesis, Nova Southeastern University, USA.

Elsayegh, A (2021) Collaborative planning in the construction industry: A holistic framework for assessing collaborative planning practices and predicting project performance. PhD thesis, Missouri University of Science and Technology, USA.

Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193

Enegbuma, W I; Aliagha, G U; Ali, K N and Badiru, Y Y (2016) Confirmatory strategic information technology implementation for building information modelling adoption model. Journal of Construction in Developing Countries, 21(2), pp. 113-129. ISSN 1823-6499

Engida Woldemichael, D. and Mohd Hashim, F. (2011) A framework for functionbased conceptual design support system. Journal of Engineering, Design and Technology, 9(3), pp. 250-272. ISSN 1726-0531

Engida Woldemichael, D and Mohd Hashim, F (2011) A framework for function-based conceptual design support system. Journal of Engineering, Design and Technology, 9(3), pp. 250-272. ISSN 1726-0531

Erfani, A (2023) Data-driven risk modeling for infrastructure projects using artificial intelligence techniques. PhD thesis, University of Maryland, College Park, USA.

Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X

Erpen, Mauro Luiz (2020) Analysis of the perception of relative importance of critical success factors in the civil construction industry using artificial neural networks. PhD thesis, Universidade de Brasília, Brazil.

Ershadi, Mahmoud (2021) Analysing and modelling the critical success factors of project management offices in the construction industry. PhD thesis, University of Newcastle, Australia.

Esa, Mohd Reza (2018) Moving towards sustainable construction in Malaysia: A holistic model for construction and demolition (c&d) waste management. PhD thesis, University of Queensland, Australia.

Esders, M C (2017) Consideration of uncertain future demand and decision flexibility in the determination of intervention programs for buildings. DSc thesis, ETH Zürich, Switzerland.

Esguicero, Fabio Jose (2020) Framework applied to process modeling in municipal management of construction waste. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.

Eslamirad, N; Malekpour Kolbadinejad, S; Mahdavinejad, M and Mehranrad, M (2020) Thermal comfort prediction by applying supervised machine learning in green sidewalks of Tehran. Smart and Sustainable Built Environment, 9(4), pp. 361-374. ISSN 2046-6099

Esmaeili, B (2012) Identifying and quantifying construction safety risks at the attribute level. PhD thesis, University of Colorado at Boulder, USA.

Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. II: Predicting safety outcomes using generalized linear models. Journal of Construction Engineering and Management, 141(8): 04015022, ISSN 0733-9364

Esmalian, A (2022) Understanding social equity in infrastructure systems resilience. PhD thesis, Texas A&M University, USA.

Espada, R; Apan, A and McDougall, K (2017) Vulnerability assessment of urban community and critical infrastructures for integrated flood risk management and climate adaptation strategies. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 375-411. ISSN 1759-5916

Espada, R J; Apan, A and McDougall, K (2015) Vulnerability assessment and interdependency analysis of critical infrastructures for climate adaptation and flood mitigation. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 313-346. ISSN 1759-5916

Essah, E A; Sanders, C H; Baker, P and Kalagasidis, A S (2009) Condensation and moisture transport in cold roofs: Effects of roof underlay. Building Research & Information, 37(2), pp. 117-128. ISSN 0961-3218

Essien, I O (2021) Modelling project complexity for leadership decision making and success in the building construction industry in Lagos, Nigeria. PhD thesis, Oxford Brookes University, UK.

Evans, S; Liddiard, R and Steadman, P (2019) Modelling a whole building stock: Domestic, non-domestic and mixed use. Building Research & Information, 47(2), pp. 156-172. ISSN 0961-3218

Faccio, M; Gamberi, M; Nedaei, M and Pilati, F (2018) Technical and economic modelling and evaluation of a water distribution system equipped with an autoclave for industrial production applications. Journal of Engineering, Design and Technology, 16(3), pp. 342-359. ISSN 1726-0531

Fadoul, A (2020) A BIM-based model for constructability assessment of buildings design. PhD thesis, University of Nottingham, UK.

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.

Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364

Fan, R Y C; Ng, S T and Wong, J M W (2010) Reliability of the Box-Jenkins model for forecasting construction demand covering times of economic austerity. Construction Management and Economics, 28(3), pp. 241-254. ISSN 1466433X

Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364

Fang, D; Wang, Y; Lim, H W; Ma, L; Gu, B and Huang, Y (2023) Construction of a Bayesian network based on leadership-culture-behavior model to improve owner safety management behavior. Journal of Construction Engineering and Management, 149(3): 04022177, ISSN 0733-9364

Faraj, I (2001) Verification and spatial clearance of features in a product modelling environment. Construction Innovation, 1(1), pp. 55-74. ISSN 1471-4175

Faraj, I (2003) Geometric verification of design. Engineering, Construction and Architectural Management, 10(1), pp. 56-70. ISSN 0969-9988

Faraji, A (2021) Neuro-fuzzy system based model for prediction of project performance in downstream sector of petroleum industry in Iran. Journal of Engineering, Design and Technology, 19(6), pp. 1268-1290. ISSN 1726-0531

Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives. PhD thesis, University of Washington, USA.

Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364

Farghaly, K; Collinge, W; Mosleh, M H; Manu, P and Cheung, C M (2022) Digital information technologies for prevention through design (ptd): A literature review and directions for future research. Construction Innovation, 22(4), pp. 1036-1058. ISSN 1471-4175

Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364

Farnsworth, C B; Beveridge, S; Miller, K R and Christofferson, J P (2015) Application, advantages, and methods associated with using BIM in commercial construction. International Journal of Construction Education and Research, 11(3), pp. 218-236. ISSN 1557-8771

Farokhnia, K (2013) Nonstructural vulnerability functions for building categories. PhD thesis, University of Colorado at Boulder, USA.

Farouk Kineber, A; Othman, I B; Oke, A E and Chileshe, N (2022) Modelling the relationship between value management's activities and critical success factors for sustainable buildings. Journal of Engineering, Design and Technology, 20(2), pp. 414-435. ISSN 1726-0531

Farzaneh, A (2019) Development of BIM-BEM framework to support the design process. DEng thesis, Ecole de Technologie Superieure, Canada.

Farzin, A; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Economic optimization of heat exchanger networks based on geometric parameters using hybrid genetic-particle swarm algorithm technique. Journal of Engineering, Design and Technology, 19(4), pp. 989-1015. ISSN 1726-0531

Fasakin, J O and Ogunsemi, D R (2003) Modelling the selling prices of residential buildings in Nigeria. Journal of Financial Management of Property and Construction, 8(2), pp. 111-114. ISSN 1366-4387

Fateminia, Seyed Hamed (2023) Determining and managing contingency reserve throughout the lifecycle of construction projects. PhD thesis, University of Alberta, Canada.

Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099

Fawcett, W and Song, J Y (2009) Modelling the use of space and time in the knowledge economy. Building Research & Information, 37(3), pp. 312-324. ISSN 0961-3218

Fayek, A R (2020) Fuzzy logic and fuzzy hybrid techniques for construction engineering and management. Journal of Construction Engineering and Management, 146(7): 04020064, ISSN 0733-9364

Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364

Fayek, Aminah (1996) A competitive estimating and tendering strategy model for use in the civil engineering construction industry. PhD thesis, University of Melbourne, Australia.

Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.

Fellows, R and Liu, A M M (2000) Human dimensions in modelling prices of building projects. Engineering, Construction and Architectural Management, 7(4), pp. 362-372. ISSN 0969-9988

Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.

Fente, J; Schexnayder, C and Knutson, K (2000) Defining a probability distribution function for construction simulation. Journal of Construction Engineering and Management, 126(3), pp. 234-241. ISSN 0733-9364

Feofilovs, M; Romagnoli, F; Gotangco, C K; Josol, J C; Jardeleza, J M P; Litam, J E; Campos, J I and Abenojar, K (2020) Assessing resilience against floods with a system dynamics approach: A comparative study of two models. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 615-629. ISSN 1759-5916

Ferreira, J (2024) Analysis of urban parameters via geoprocessing as a basis for city's master plans: The case of Ribeirão das Neves city, MG Brazil. International Journal of Building Pathology and Adaptation, 42(2), pp. 257-277. ISSN 23984708

Ferreira, Tiago de Vasconcelos Gonçalves (2025) High-resolution dynamic model integrated with BIM for performance evaluation in building water distribution systems. PhD thesis, Universidade de São Paulo, Brazil.

Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387

Fettermann, D C; Borriello, A; Pellegrini, A; Cavalcante, C G; Rose, J M and Burke, P F (2021) Getting smarter about household energy: The who and what of demand for smart meters. Building Research & Information, 49(1), pp. 100-112. ISSN 0961-3218

Fiorineschi, L; Bacci, T; Frillici, F S S; Cubeda, S; Volpe, Y; Rotini, F; Carfagni, M and Facchini, B (2023) Non-reactive test rig for combustor-turbine interaction studies in industrial gas turbines. Journal of Engineering, Design and Technology, 21(3), pp. 758-777. ISSN 1726-0531

Fiorineschi, L; Conti, L; Rossi, G and Rotini, F (2024) Conceptual design of a small production plant for eco-friendly packaging. Journal of Engineering, Design and Technology, 22(4), pp. 1257-1281. ISSN 1726-0531

Firouzi, A; Yang, W and Li, C Q (2016) Prediction of total cost of construction project with dependent cost items. Journal of Construction Engineering and Management, 142(12): 04016072, ISSN 0733-9364

Fisher, D J (1989) Piping erection constructability issues in a semiautomated environment. PhD thesis, University of Texas at Austin, USA.

Fisher, D J and O’Connor, J T (1991) Constructability for piping automation: Field operations. Journal of Construction Engineering and Management, 117(3), pp. 468-485. ISSN 0733-9364

Fisher, N (1987) The use of structured data analysis as a construction management research tool. PhD thesis, University of Reading, UK.

Flanagan, R and Marsh, L (2000) Measuring the costs and benefits of information technology in construction. Engineering, Construction and Architectural Management, 7(4), pp. 423-435. ISSN 0969-9988

Flood, I and Issa, R R A (2010) Empirical modeling methodologies for construction. Journal of Construction Engineering and Management, 136(1), pp. 36-48. ISSN 0733-9364

Flores Salas, A (2016) Evaluation of the use of lightweight concrete panels for post disaster house reconstruction using Building Information Modelling. PhD thesis, University of Manchester, UK.

Foliente, G and Seo, S (2012) Modelling building stock energy use and carbon emission scenarios. Smart and Sustainable Built Environment, 1(2), pp. 118-138. ISSN 2046-6099

Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Forcael, E (2010) Buffering strategies for managing transportation construction projects. PhD thesis, University of Florida, USA.

Ford, D N and Bhargav, S (2006) Project management quality and the value of flexible strategies. Engineering, Construction and Architectural Management, 13(3), pp. 275-289. ISSN 0969-9988

Forsythe, P (2008) Modelling customer perceived service quality in housing construction. Engineering, Construction and Architectural Management, 15(5), pp. 485-496. ISSN 0969-9988

Fortune, C and Hinks, J (1999) Quality issues in building project price forecasting: factors affecting model selection. Journal of Construction Procurement, 5(2), pp. 129-140. ISSN 1358-9180

Fortune, C and Lees, M (2001) Systematic errors of judgement and the formulation of strategic cost advice for construction clients. Journal of Financial Management of Property and Construction, 6(2), pp. 81-93. ISSN 1366-4387

Fortune, C and Skitmore, M (1994) Quantification skills in the construction industry. Construction Management and Economics, 12(1), pp. 79-88. ISSN 01446193

Foster, P; Abdelal, G; Lim, J B P; Hajsadeghi, M and McCrum, D (2016) Finite element modelling of cyclic behaviour of cold-formed steel bolted moment-resisting connections. Journal of Construction in Developing Countries, 21(1), pp. 167-180. ISSN 1823-6499

Foster, S R (2020) Management strategies for improving construction industry ethics. PhD thesis, Walden University, USA.

Fouchal, F; Hassan, T M and Loveday, D L (2014) Design methodology for integrating multipath systems (building services). Journal of Engineering, Design and Technology, 12(4), pp. 491-506.

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector. PhD thesis, KTH Royal Institute of Technology, Sweden.

Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988

Francis, A (2013) The chronographical approach for construction project modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 188-204. ISSN 17514312

Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304

Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364

Francis, A and Thomas, A (2023) System dynamics modelling coupled with multi-criteria decision-making (MCDM) for sustainability-related policy analysis and decision-making in the built environment. Smart and Sustainable Built Environment, 12(3), pp. 534-564. ISSN 2046-6099

Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.

Fu, H; Fu, Y; Tan, Y and Guo, X (2025) Deciphering mechanisms of anxiety influences on hazard identification in construction situations. Journal of Construction Engineering and Management, 151(11): 04025174, ISSN 0733-9364

Fu, J; Tian, H; Song, L; Li, M; Bai, S and Ren, Q (2021) Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Engineering, Construction and Architectural Management, 28(7), pp. 2023-2041. ISSN 0969-9988

Fu, X (2010) Refinancing and restructuring projects utilising project finance in developing countries. PhD thesis, University of Manchester, UK.

Fuerst, F; Van De Wetering, J and Wyatt, P (2013) Is intrinsic energy efficiency reflected in the pricing of office leases? Building Research & Information, 41(4), pp. 373-383. ISSN 0961-3218

Fuller, R J and Luther, M B (2002) Thermal simulation of an Australian university building. Building Research & Information, 30(4), pp. 255-263. ISSN 0961-3218

Fung, I W H; Tam, V W Y; Chu, J O C and Le, K N (2022) A stress-strain model for resilience engineering for construction safety and risk management. International Journal of Construction Management, 22(12), pp. 2308-2324. ISSN 1562-3599

Galanis, P (2014) Probabilistic methods to identify seismically hazardous older-type concrete frame buildings. PhD thesis, University of California, Berkeley, USA.

Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364

Ganapathy, G P and Haupt, T C (2024) Engineering properties of SBS and crumb-rubber modified bitumen: a design of experiment approach. Journal of Engineering, Design and Technology, 22(6), pp. 1742-1754. ISSN 1726-0531

Gane, V (2011) Design scenarios methodology: enabling requirements-driven design spaces. PhD thesis, Stanford University, USA.

Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.

Ganguly, I (2008) Modeling alternatives and visualization of product adoption and usage in the residential construction industry. PhD thesis, University of Washington, USA.

Gao, Z; Walters, R C; Jaselskis, E J and Wipf, T J (2006) Approaches to improving the quality of construction drawings from owner's perspective. Journal of Construction Engineering and Management, 132(11), pp. 1187-1192. ISSN 0733-9364

Garcia, G; Golparvar-Fard, M; De La Garza, J M and Fischer, M (2021) Measuring progress and productivity in model-driven engineering for capital project delivery. Journal of Construction Engineering and Management, 147(4): 04021009, ISSN 0733-9364

García de Soto, D B; Streule, T; Klippel, M; Bartlomé, O and Adey, B T (2020) Improving the planning and design phases of construction projects by using a case-based digital building system. International Journal of Construction Management, 20(8), pp. 900-911. ISSN 1562-3599

Garg, Arun (2022) Quantifying resilient safety culture using complex network theory. PhD thesis, Griffith University, Australia.

Garg, H C (2012) Theoretical modeling of orifice compensated symmetric hole-entry hybrid journal bearings. Journal of Engineering, Design and Technology, 10(3), pp. 421-435. ISSN 1726-0531

Gashaw, T and Jilcha, K (2023) Design risk modeling and analysis for railway construction projects. International Journal of Construction Management, 23(14), pp. 2488-2498. ISSN 1562-3599

Gaspari, J; Fabbri, K and Marchi, L (2025) Investigating the influence of perforated façade skins on indoor illuminance level: A case study. Architectural Engineering and Design Management, 21(2), pp. 211-230. ISSN 1745-2007

Gbadegesin, A O; Sun, Y and Nwulu, N I (2021) Stacked value streams of hybrid energy storage systems in prosumer microgrids. Journal of Engineering, Design and Technology, 19(5), pp. 1063-1079. ISSN 1726-0531

Gebretekle, Y T and Fayek, A R (2023) Fuzzy agent-based modeling of competency and performance measures in construction. Journal of Construction Engineering and Management, 149(12): 04023133, ISSN 0733-9364

Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X

Geekiyanage, D; Ramachandra, T and Thurairajah, N (2018) A model for early stage estimation of operational expenses (opex) in commercial buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Gehrig, G B (2002) A decision support system framework to improve design-construction integration and project performance on public sector underground utility projects. PhD thesis, Colorado State University, USA.

Gerami Seresht, N and Fayek, A R (2018) Dynamic modeling of multifactor construction productivity for equipment-intensive activities. Journal of Construction Engineering and Management, 144(9): 04018091, ISSN 0733-9364

Gerrish, T (2017) Exploring the effectiveness of BIM for energy performance management of non-domestic buildings. EngD thesis, Loughborough University, UK.

Gerstenberger, A J (2021) Modeling the likelihood of construction incidents using public data. EdD thesis, Teachers College, Columbia University, USA.

Getuli, V; Capone, P; Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(3), pp. 504-530. ISSN 1471-4175

Getvoldsen, K S; Chandragiri, A K; Khalafallah, A M; Belizaire, M; Weirs, J; Raheem, H M J; Gerges, M and Butt, T E (2024) Sustainability’s three principal dimensions versus Climate Change Act 2008: A retrospective numerical modelling. Construction Economics and Building, 24(3), pp. 5-22. ISSN 2204-9029

Ghafoori, M and Abdallah, M (2022) Simulation-based optimization model to minimize equivalent annual cost of existing buildings. Journal of Construction Engineering and Management, 148(2): 04021202, ISSN 0733-9364

Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.

Ghannoum, M; Assaad, J; Daaboul, M and El-Mir, A (2025) Deterministic and stochastic finite element modeling of reinforced concrete beams without stirrups containing plastic wastes. International Journal of Building Pathology and Adaptation, 43(4), pp. 614-632. ISSN 2398-4708

Ghansah, F A and Lu, W (2024) Major opportunities of digital twins for smart buildings: A scientometric and content analysis. Smart and Sustainable Built Environment, 13(1), pp. 63-84. ISSN 2046-6099

Ghansah, F A; Lu, W and Ababio, B K (2024) Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 31(5), pp. 2128-2150. ISSN 0969-9988

Ghansah, F A (2025) Digital twins for smart building at the facility management stage: A systematic review of enablers, applications and challenges. Smart and Sustainable Built Environment, 14(4), pp. 1194-1229. ISSN 2046-6099

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Ghavidel, A (2025) AI-informed multi-threat decision-support methodology for long-term bridge asset management. PhD thesis, University of Texas at San Antonio, USA.

Ghodoosi, F; Abu-Samra, S; Zeynalian, M and Zayed, T (2018) Maintenance cost optimization for bridge structures using system reliability analysis and genetic algorithms. Journal of Construction Engineering and Management, 144(2): 04017116, ISSN 0733-9364

Gholami, E (2017) Exploiting BIM in energy efficient domestic retrofit: evaluation of benefits and barriers. PhD thesis, University of Liverpool, UK.

Gholami, M; Mofidi Shemirani, M and Fayaz, R (2018) A modelling methodology for a solar energy-efficient neighbourhood. Smart and Sustainable Built Environment, 7(1), pp. 117-132. ISSN 2046-6099

Gholizadeh, P (2022) Analyzing accidents among specialty contractors: A data mining approach. PhD thesis, George Mason University, USA.

Ghosh, S; Krishna, S R; Billton, J V; Srikanth, S A; Mohandas, S; Ashwin Ganesh, M and Shiv Kulin, C (2021) Countering tropical cyclonic storm impacts on low-rise houses. Smart and Sustainable Built Environment, 10(4), pp. 631-652. ISSN 2046-6099

Gibbs, D-J (2017) Development of building information models (BIM) to support innovative time management and delay analysis. EngD thesis, Loughborough University, UK.

Giesekam, J J (2016) The contribution to UK climate mitigation targets from reducing embodied carbon in the construction sector. PhD thesis, University of Leeds, UK.

Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364

Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193

Gkiourka, P (2011) Managing innovation in the construction industry. PhD thesis, University of Leeds, UK.

Glass, A (2011) Analysis of building-integrated renewable energy systems in modern UK homes. EngD thesis, University of Manchester, UK.

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Goedert, J D and Meadati, P (2008) Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management, 134(7), pp. 509-516. ISSN 0733-9364

Goh, B H (1997) Construction demand modelling: a systematic approach to using economic indicators and a comparative study of alternative forecasting approaches. PhD thesis, University College London, UK.

Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364

Goncalves, V L; Costanzo, V; Fabbri, K and Rakha, T (2022) Overheating assessment in Passivhaus dwellings: The influence of prediction tools. Buildings & Cities, 3(1), pp. 153-167. ISSN 2632-6655

Gonzalez, Alvaro Eduardo (2016) Organisational design & mirroring in construction. MPhil thesis, University of Sydney, Australia.

Gonzalez-Quevedo, A A; Abourizk, S M; Iseley, D T and Halpin, D W (1993) Comparison of two simulation methodologies in construction. Journal of Construction Engineering and Management, 119(3), pp. 573-589. ISSN 0733-9364

Goodess, C; Berk, S; Ratna, S B; Brousse, O; Davies, M; Heaviside, C; Moore, G and Pineo, H (2021) Climate change projections for sustainable and healthy cities. Buildings & Cities, 2(1), pp. 812-836. ISSN 2632-6655

Gormley, M and Campbell, D P (2006) Modelling water reduction effects: Method and implications for horizontal drainage. Building Research & Information, 34(2), pp. 131-144. ISSN 0961-3218

Gormley, M and Kelly, D A (2019) Pressure transient suppression in drainage systems of tall buildings. Building Research & Information, 47(4), pp. 421-436. ISSN 0961-3218

Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.

Gouda Mohamed, A; Helmy Ammar, M and Nabawy, M (2023) Risks assessment using structural equation modeling: Mega housing projects construction in Egypt. International Journal of Construction Management, 23(16), pp. 2717-2728. ISSN 1562-3599

Govender, R; Saba, G; Ham, N; Hou, L; Moon, S and Kim, J J (2022) Appraisal of building information modeling (BIM) curriculum for early-career construction-industry professionals: Case study at c educational institute in Korea. International Journal of Construction Management, 22(5), pp. 891-899. ISSN 1562-3599

Gowda, R K; Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(4), pp. 417-432. ISSN 01446193

Graham, D; Smith, S D and Crapper, M (2006) Refining the case-based reasoning model of construction processes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364

Graham, S (2005) Sustainable building design: A systematic approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, T E (2002) Infrastructure engineering evaluation and assessment using geographic information system and the analytic hierarchy process: A cross-discipline approach. DEng thesis, Morgan State University, USA.

Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects. PhD thesis, University of Colorado at Boulder, USA.

Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.

Grant, A and Ries, R (2013) Impact of building service life models on life cycle assessment. Building Research & Information, 41(2), pp. 168-186. ISSN 0961-3218

Grassie, D; Schwartz, Y; Symonds, P; Korolija, I; Mavrogianni, A and Mumovic, D (2022) Energy retrofit and passive cooling: Overheating and air quality in primary schools. Buildings & Cities, 3(1), pp. 204-225. ISSN 2632-6655

Gray, C and Al-Bizri, S (2007) Modelling trade contractor information production. Architectural Engineering and Design Management, 3(1), pp. 39-48. ISSN 1745-2007

Green, S D and Simister, S J (1999) Modelling client business processes as an aid to strategic briefing. Construction Management and Economics, 17(1), pp. 63-76. ISSN 01446193

Greenhalgh, S (2016) The effects of 3D printing in design thinking and design education. Journal of Engineering, Design and Technology, 14(4), pp. 752-769.

Greenwood, D and Wu, S (2012) Establishing the association between collaborative working and construction project performance based on client and contractor perceptions. Construction Management and Economics, 30(4), pp. 299-308. ISSN 1466433X

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.

Griffiths, P W; Norton, B; Eames, P C and Lo, S N G (1996) Detailed simulation of heat transfer across planar evacuated glazing. Building Research & Information, 24(3), pp. 141-147. ISSN 0961-3218

Grimm, Alec G (2023) Modeling and monitoring construction site sediment control measures to improve design, performance, and longevity. PhD thesis, Ohio State University, USA.

Grimsey, D and Graham, R (1997) PFI in the NHS (Private finance initiative in the UK national health service). Engineering, Construction and Architectural Management, 4(3), pp. 215-231. ISSN 0969-9988

Gruen, A; Behnisch, M and Kohler, N (2009) Perspectives in the reality-based generation, nD modelling, and operation of buildings and building stocks. Building Research & Information, 37(5-6), pp. 503-519. ISSN 0961-3218

Gruneberg, S (2008) Modelling the UK built infrastructure market using gross fixed capital formation. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(4), pp. 359-368. ISSN 1466433X

Guan, Z; Samarasinghe, D A S; Yiu, T W; Reddy, R and Laird, I (2026) Examining the risk factors influencing safety outcomes for Chinese migrant construction workers in New Zealand. Engineering, Construction and Architectural Management, 33(15), pp. 182-202. ISSN 0969-9988

Guan, Li (2022) An integrated decision support system for project risk assessment and treatment decision making considering risk interdependencies. PhD thesis, University of New South Wales, Australia.

Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits. PhD thesis, Pennsylvania State University, USA.

Gultekin-Bicer, P; Anumba, C J and Leicht, R M (2018) Advanced energy retrofit projects: Cross-case analysis of integrated system design. International Journal of Construction Management, 18(6), pp. 453-466. ISSN 1562-3599

Gunning, J G and Moss, J (2002) Public private partnership procurement of educational facilities in the UK. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Guribie, F L; Owusu-Manu, D G; Badu, E and Edwards, D J (2023) Fuzzy synthetic evaluation of the systemic obstacles to personalizing knowledge flows within and across projects. Construction Innovation, 23(3), pp. 546-566. ISSN 1471-4175

Gurmu, A.; Galluzzo, A. and Kite, J. (2021) Modelling customers' perception of the quality of services provided by builders: A case of Victoria, Australia. Construction Economics and Building, 21(1), pp. 100-124. ISSN 2204-9029

Gyadu-Asiedu, W (2009) Assessing construction project performance in Ghana: modelling practitioners' and clients perspectives. PhD thesis, Eindhoven University of Technology, Netherlands.

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Habermann, N and Hedel, R (2018) Damage functions for transport infrastructure. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 420-434. ISSN 1759-5916

Habibi, S (2022) Role of BIM and energy simulation tools in designing zero-net energy homes. Construction Innovation, 22(1), pp. 101-119. ISSN 1471-4175

Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.

Hadzaman, N A H; Takim, R and Nawawi, A H (2015) BIM roadmap strategic implementation plan: Lesson learnt from Australia, Singapore and Hong Kong. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Haga, Heitor Cesar Riogi (2008) Production and sales sectors of materials in the house construction production chain: Diagnosis for the development of technological foresight studies. PhD thesis, Universidade de São Paulo, Brazil.

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects. PhD thesis, University of Alberta, Canada.

Hajjar, D and AbouRizk, S M (2002) Unified modeling methodology for construction simulation. Journal of Construction Engineering and Management, 128(2), pp. 174-185. ISSN 0733-9364

Hajjar, D and Abourizk, S M (1998) Modeling and analysis of aggregate production operations. Journal of Construction Engineering and Management, 124(5), pp. 390-401. ISSN 0733-9364

Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099

Hakkarainen, T E (2002) Studies on fire safety assessment of construction products. DSc(Tech) thesis, Tampereen Teknillinen Korkeakoulu, Finland.

Halder, A. (2026) Modeling critical driving factors of stakeholder integration and their influences on construction megaproject performance: A regression-based analysis. Journal of Engineering, Design and Technology, 24(1), pp. 213-241. ISSN 1726-0531

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.

Haller, M and Stehn, L (2011) Evaluation of efficiency in housing construction design. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hamayat, F.; Ahmad, R. F.; Ghaban, W.; Saeed, F.; Ahmad, J.; Anwar, S. M. and Zubair, S. (2026) Data-driven stnet and stprophet models for secure edge-based indoor air temperature prediction in smart buildings. Building Research & Information, 54(4), pp. 492-509. ISSN 0961-3218

Hamida, A; Alsudairi, A; Alshaibani, K and Alshamrani, O (2022) Parametric study of the impact of building envelope systems on embodied and operational carbon of residential buildings. International Journal of Building Pathology and Adaptation, 40(5), pp. 753-774. ISSN 23984708

Hamida, M B and Hassanain, M A (2022) A framework model for AEC/FM knowledge in adaptive reuse projects. Journal of Engineering, Design and Technology, 20(3), pp. 624-648. ISSN 1726-0531

Hamidane, H; Ababneh, A; Messabhia, A and Xi, Y (2020) Modeling of chloride penetration in concrete structures under freeze-thaw cycles. International Journal of Building Pathology and Adaptation, 38(1), pp. 127-147. ISSN 23984708

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193

Hammad, M M (2001) CPDICenter: Web-based virtual construction project document information center in support of claims preparation. PhD thesis, Concordia University, Canada.

Hamoda, M F (2008) Modeling of construction noise for environmental impact assessment. Journal of Construction in Developing Countries, 13(1), pp. 79-89. ISSN 1823-6499

Hampshire, P (2015) The development of an approach and decision support tool to inform sustainable roof selection. EngD thesis, University of Bath, UK.

Hampson, K; Peters, R; Walker, D and Tucker, S (2000) Project alliancing and information technology in building construction: The national museum of Australia. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hamurcu, A; Timur, Ş and Rızvanoğlu, K (2020) An overview of virtual reality within industrial design education. Journal of Engineering, Design and Technology, 18(6), pp. 1889-1905. ISSN 1726-0531

Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.

Han, S (2024) Understanding of AI-aided reality capture data for the development of BIM modeling for building façade inspections. PhD thesis, Marquette University, USA.

Han, Y; Li, J; Cao, X and Jin, R (2020) Structural equation modeling approach to studying the relationships among safety investment, construction employees' safety cognition, and behavioral performance. Journal of Construction Engineering and Management, 146(7): 04020065, ISSN 0733-9364

Han, Y; Shen, J; Zhu, X; An, B and Bao, X (2024) Interaction mechanisms of interface management risks in complex systems of high-speed rail construction projects: An association rule mining-based modeling framework. Engineering, Construction and Architectural Management, 31(5), pp. 2101-2127. ISSN 0969-9988

Hanna, A S; Ibrahim, M W; Lotfallah, W; Iskandar, K A and Russell, J S (2016) Modeling project manager competency: An integrated mathematical approach. Journal of Construction Engineering and Management, 142(8): 4016029, ISSN 0733-9364

Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364

Hanna, S (2012) Addressing complex design problems through inductive learning. PhD thesis, University College London, UK.

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hao, J L J; Tam, V W Y; Yuan, H P; Wang, J Y and Li, J R (2010) Dynamic modeling of construction and demolition waste management processes: An empirical study in Shenzhen, China. Engineering, Construction and Architectural Management, 17(5), pp. 476-492. ISSN 0969-9988

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Haron, A T (2013) Organisational readiness to implement building information modelling: a framework for design consultants in Malysia. PhD thesis, University of Salford, UK.

Harrington, S and Mulville, M (2021) A risk framework for the delivery of long-term performance through the large-scale energy focused retrofit of housing. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Harty, J (2012) The impact of digitalisation on the management role of architectural technology. PhD thesis, Robert Gordon University, UK.

Hasanzade, M P; van Oel, C J and Pazhouhanfar, M (2023) Passengers' preferences for architectural design characteristics in the design of airport terminals. Architectural Engineering and Design Management, 19(6), pp. 586-601. ISSN 1745-2007

Hasheminasab, S and Kashi, E (2021) Finite element analysis of ports pavement under container loading. Journal of Engineering, Design and Technology, 19(2), pp. 497-508. ISSN 1726-0531

Hassan, M E M (2017) Modeling the macroeconomic impact of construction spending as a public policy tool - the case of employment. PhD thesis, Purdue University, USA.

Hassane Assaad, R (2021) Innovative modeling and management of infrastructure systems, engineering and construction operations, and offsite construction technology using computational data analytics. PhD thesis, Missouri University of Science and Technology, USA.

Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988

Hastie, J; Sutrisna, M and Egbu, C (2017) Modelling knowledge integration process in early contractor involvement procurement at tender stage: A Western Australian case study. Construction Innovation, 17(4), pp. 429-456. ISSN 1471-4175

Hawas, F and Cifuentes, A (2014) Valuation of projects with stochastic cash flows and intertemporal correlations: Practical modeling guidelines. Journal of Construction Engineering and Management, 140(6): 6014003, ISSN 0733-9364

Haymaker, J (2004) The perspective approach: Enabling engineers to construct and integrate views and generate an evolving project model. PhD thesis, Stanford University, USA.

He, J.; Chen, H.; Yang, H.; Li, P. and Zheng, Z. (2026) Text2Onto-Agent: An llm agent-based end-to-end automated ontology construction method anda case study of green building domain modeling. Journal of Construction Engineering and Management, 152(9): 04026153, ISSN 0733-9364

He, S; Li, J; Li, M and Antwi-Afari, M F (2026) Modeling and analyzing workers' hazard perception in construction equipment operations: A hierarchical Bayesian cognitive modeling approach integrating multisource data. Journal of Construction Engineering and Management, 152(5): 04026054, ISSN 0733-9364

He, N (2016) Conceptual cost modeling of innovative industrial estates using sysml and case-based reasoning. PhD thesis, National University of Singapore, Singapore.

He, R (2023) Modeling of sustainable materials management systems: Hybrid science-based, data-driven approaches. PhD thesis, Carnegie Mellon University, USA.

He, X; Liu, R and Anumba, C J (2021) Data-driven insights on the knowledge gaps of conceptual cost estimation modeling. Journal of Construction Engineering and Management, 147(2): 04020165, ISSN 0733-9364

He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation. PhD thesis, Columbia University, USA.

Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364

Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364

Helen, C L; Francis, V and Turner, M (2010) The rhythms of project life: A longitudinal analysis of work hours and work-life experiences in construction. Construction Management and Economics, 28(10), pp. 1085-1098. ISSN 1466433X

Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), pp. 903-917. ISSN 2044-124X

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.

Heravi, G and Eslamdoost, E (2015) Applying artificial neural networks for measuring and predicting construction-labor productivity. Journal of Construction Engineering and Management, 141(10): 04015032, ISSN 0733-9364

Herzog, Florian (2005) Strategic portfolio management for long-term investments: An optimal control approach. PhD thesis, ETH Zürich, Switzerland.

Hessami, A R; Faghihi, V; Kim, A and Ford, D N (2020) Evaluating planning strategies for prioritizing projects in sustainability improvement programs. Construction Management and Economics, 38(8), pp. 726-738. ISSN 01446193

Heydari Torkamani, M; Shahbazi, Y and Belali Oskoyi, A (2024) Explaining resilience model of historical bazaars using artificial neural network. Smart and Sustainable Built Environment, 13(6), pp. 1538-1559. ISSN 2046-6099

Hickey, P J (2023) A study of gender diversity in u.S. Architecture, engineering, and construction (AEC) industry leadership. PhD thesis, University of Maryland, College Park, USA.

Hijazi, A M (1989) Simulation analysis of linear construction processes. PhD thesis, Purdue University, USA.

Hijazi, A M; Abourizk, S M and Halpin, D W (1992) Modeling and simulating learning development in construction. Journal of Construction Engineering and Management, 118(4), pp. 685-700. ISSN 0733-9364

Hoff, R M (2023) A proposal for infrastructure adaptation and cascading failures for black swans. PhD thesis, Arizona State University, USA.

Hogan, D B (1998) Modeling construction cost performance: A comprehensive approach using statistical, artificial neural network and simulation methods. PhD thesis, Columbia University, USA.

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Holmes, S H; Phillips, T and Wilson, A (2016) Overheating and passive habitability: Indoor health and heat indices. Building Research & Information, 44(1), pp. 1-19. ISSN 0961-3218

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.

Holt, G D (2010) Contractor selection innovation: Examination of two decades' published research. Construction Innovation, 10(3), pp. 304-328. ISSN 1471-4175

Holt, G D and Edwards, D J (2013) Analysis of United Kingdom off-highway construction machinery market and its consumers using new-sales data. Journal of Construction Engineering and Management, 139(5), pp. 529-537. ISSN 0733-9364

Hong, Y; Hammad, A; Zhong, X; Wang, B and Akbarnezhad, A (2020) Comparative modeling approach to capture the differences in BIM adoption decision-making process in Australia and China. Journal of Construction Engineering and Management, 146(2): 04019099, ISSN 0733-9364

Hong, Y; Hammad, A W A and Akbarnezhad, A (2019) Impact of organization size and project type on BIM adoption in the Chinese construction market. Construction Management and Economics, 37(11), pp. 675-691. ISSN 01446193

Hong, Ying Civil (2018) Modelling and evaluating the adoption of building information modelling in Australian and Chinese small and medium-sized construction organisations. PhD thesis, University of New South Wales, Australia.

Hopkin, C and Lay, S (2024) Conceptual arguments on the use of unlatched reverse swing "flappy" door smoke control systems in residential buildings. International Journal of Building Pathology and Adaptation, 42(4), pp. 618-636. ISSN 23984708

Hopkin, D J (2011) The fire performance of engineered timber products and systems. EngD thesis, Loughborough University, UK.

Hopkins, O S (2004) Planning rural water supply systems in developing countries: The case of Rwanda. PhD thesis, University of North Carolina at Chapel Hill, USA.

Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193

Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708

Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.

Hosseini, M R; Jupp, J; Papadonikolaki, E; Mumford, T; Joske, W and Nikmehr, B (2021) Position paper: Digital engineering and building information modelling in Australia. Smart and Sustainable Built Environment, 10(3), pp. 331-344. ISSN 2046-6099

Hosseinian, S M and Jaberi, A (2024) Optimal sharing of construction project outcomes with downstream contracting parties: Principal-agent analysis. Journal of Construction Engineering and Management, 150(2): 04023156, ISSN 0733-9364

Hosseinian, S M; Younesi, S; Razini, S and Carmichael, D G (2022) Intelligent stochastic agent-based model for predicting truck production in construction sites by considering learning effect. Journal of Construction Engineering and Management, 148(5): 04022018, ISSN 0733-9364

Hou, H (2023) Understanding building and urban environment interactions: an integrated framework for building occupancy modelling. PhD thesis, Imperial College London, UK.

Hou, H; Lai, J H K; Wu, H and Wang, T (2024) Digital twin application in heritage facilities management: Systematic literature review and future development directions. Engineering, Construction and Architectural Management, 31(8), pp. 3193-3221. ISSN 0969-9988

Hou, J-H (2006) Object modeling and proper abstractions: The case of stair design. DDes thesis, Harvard University, USA.

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases. PhD thesis, Brunel University, UK.

Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hu, D and Mohamed, Y (2014) Simulation-model-structuring methodology for industrial construction fabrication shops. Journal of Construction Engineering and Management, 140(5): 04014002, ISSN 0733-9364

Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193

Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.

Hu, K (2011) Three essays on modeling complex dynamic problems in health and safety. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Hu, W; Dong, J; Hwang, B G; Ren, R and Chen, Z (2020) Network planning of urban underground logistics system with hub-and-spoke layout: Two phase cluster-based approach. Engineering, Construction and Architectural Management, 27(8), pp. 2079-2105. ISSN 0969-9988

Hu, X and Liu, C (2016) Profitability performance assessment in the Australian construction industry: A global relational two-stage DEA method. Construction Management and Economics, 34(3), pp. 147-159. ISSN 01446193

Hu, Xiancun (2015) Construction industry performance measurement with carbon reduction. PhD thesis, Deakin University, Australia.

Hua, G B (1996) Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression. Construction Management and Economics, 14(1), pp. 25-34. ISSN 01446193

Hua, G B (2012) Modeling sectoral construction demand and its relationship with economic indicators. International Journal of Construction Education and Research, 8(3), pp. 223-240. ISSN 1557-8771

Hua, G B and Pin, T H O (2000) Forecasting construction industry demand, price and productivity in Singapore: The Box-Jenkins approach. Construction Management and Economics, 18(5), pp. 607-618. ISSN 01446193

Huang, C; Wang, Z K; Li, B; Wang, C; Xu, L S; Jiang, K; Liu, M; Guo, C X; Zhao, X F and Yang, H (2023) Discretized cell modeling for optimal layout of multiple tower cranes. Journal of Construction Engineering and Management, 149(8): 04023068, ISSN 0733-9364

Huang, C and Wong, C K (2017) Discretized cell modeling for optimal facility layout plans of unequal and irregular facilities. Journal of Construction Engineering and Management, 143(1): 04016082, ISSN 0733-9364

Huang, J (2025) Structure-aware 3D building reconstruction. PhD thesis, Delft University of Technology, Netherlands.

Huang, J; Abadi, M and Yeow, J (2023) Policies for the transition to circular construction: A systematic literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Huang, Mengqi (2022) BIM for underground stations: Supporting decision making on lifecycle stages. PhD thesis, Monash University, Australia.

Huang, R Y and Halpin, D W (1995) Graphical-based method for transient evaluation of construction operations. Journal of Construction Engineering and Management, 121(2), pp. 222-229. ISSN 0733-9364

Huang, R Y and Halpin, D W (2000) Graphically based lp modelling for linear scheduling analysis: The polo system. Engineering, Construction and Architectural Management, 7(1), pp. 41-51. ISSN 0969-9988

Huang, R-Y (1994) A graphical-based method for transient evaluation of construction operations. PhD thesis, Purdue University, USA.

Huang, S (2016) Model based technologies for enhancing building operation. PhD thesis, University of Miami, USA.

Huang, Y (2010) Sustainable infrastructure system modeling under uncertainties and dynamics. PhD thesis, University of California, Davis, USA.

Hughes, W P (1989) Organizational analysis of building projects. PhD thesis, Liverpool Polytechnic, UK.

Hunt, B J P (1980) Development of a research program for scaffolding standards. DEng thesis, University of Kansas, USA.

Hussein, D (2020) A user preference modelling method for the assessment of visual complexity in building façade. Smart and Sustainable Built Environment, 9(4), pp. 483-501. ISSN 2046-6099

Huuhka, S; Moisio, M and Arnould, M (2024) Evaluating past and future building operational emissions: Improved method. Buildings & Cities, 5(1), pp. 150-161. ISSN 2632-6655

Hwang, S; Ahn, S and Lee, S H (2021) Agent-embedded system dynamics (AESD) modeling approach for analyzing worker policies: A research case on construction worker absenteeism. Construction Innovation, 21(3), pp. 379-397. ISSN 1471-4175

Hwang, S and Liu, L Y (2010) Contemporaneous time series and forecasting methodologies for predicting short-term productivity. Journal of Construction Engineering and Management, 136(9), pp. 1047-1055. ISSN 0733-9364

Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hübner, D.; Moghayedi, A. and Michell, K. (2026) Affordable net-zero carbon housing in the Global South: Pathways towards a resilient built environment. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Ibañez-Guzmán, J (1995) Modelling of on-site work cells for the simulation of automated and semi-automated construction. Construction Management and Economics, 13(5), pp. 427-434. ISSN 01446193

Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531

Ibrahim, A.; Badawy, M. and Hamdy, K. (2026) Modeling interdependent constraints on modular construction: A constraint theory and fuzzy-PLS-SEM approach for developing countries. Journal of Engineering, Design and Technology, 24(3), pp. 734-754. ISSN 1726-0531

Ibrahim, Y M (2010) On the measurement of work in progress using computer vision: A computerised reporting model. Journal of Engineering, Design and Technology, 8(1), pp. 45-63. ISSN 1726-0531

Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.

Ijaola, I A and Idoro, G I (2020) Modelling the relationship between task characteristics and training of site supervisors in Nigerian construction firms. African Journal of Built Environment Research, 4(1), pp. 59-80. ISSN 2414-0236

Ikediashi, D and Mbamali, I (2014) Modelling the impact of outsourcing decisions on facilities management service-level performance: A case of Nigeria's public hospitals. Construction Management and Economics, 32(11), pp. 1130-1147. ISSN 01446193

Ikediashi, D I and Ogwueleka, A C (2016) Assessing the use of ICT systems and their impact on construction project performance in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(2), pp. 252-276.

Imoudu, E W; Godwin, A U and Nita, A K (2014) Preliminary building information modelling adoption model in Malaysia: A strategic information technology perspective. Construction Innovation, 14(4), pp. 408-432. ISSN 1471-4175

Imran, S A; Commuri, S; Barman, M; Zaman, M and Beainy, F (2017) Modeling the dynamics of asphalt-roller interaction during compaction. Journal of Construction Engineering and Management, 143(7): 04017015, ISSN 0733-9364

Indrastuti (2014) Unit cost modelling of public building project in Kepulauan Riau, Indonesia. PhD thesis, University of Malaya, Malaysia.

Ingle, A; Moezzi, M; Lutzenhiser, L and Diamond, R (2014) Better home energy audit modelling: Incorporating inhabitant behaviours. Building Research & Information, 42(4), pp. 409-421. ISSN 0961-3218

Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.

Ioannou, P G and Yang, I T (2016) Repetitive scheduling method: Requirements, modeling, and implementation. Journal of Construction Engineering and Management, 142(5): 04016002, ISSN 0733-9364

Irumba, R (2015) Modelling of construction safety performance and housing markets in Kampala, Uganda. PhD thesis, KTH Royal Institute of Technology, Sweden.

Isa, M F M (2013) Quality modeling and improvement of university facilities services using six-sigma: A case study on wayne state university FPM services. PhD thesis, Wayne State University, USA.

Isa, R; Emuze, F; Das, D and Awuzie, B O (2018) Modeling a transformational route to infrastructure sustainability in South Africa. Built Environment Project and Asset Management, 8(2), pp. 147-159. ISSN 2044-124X

Isaacs, J; Falconer, R; Gilmour, D and Blackwood, D (2010) Modelling and visualizing sustainability assessment in urbanenvironments. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Isied, M M (2023) Critical assessment of asphalt mixture design procedures and asphalt mixture classification systems. PhD thesis, North Carolina State University, USA.

Isikdag, U (2006) Towards the implementation of building information models in geospatial context. PhD thesis, University of Salford, UK.

Iskandar, K A; Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 2023-2039. ISSN 0969-9988

Islam, M D M and Faniran, O O (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23(2), pp. 215-223. ISSN 01446193

Islam, M S; Nepal, M and Skitmore, M (2025) Structuring risks for a comprehensive understanding of cost overruns in power plant projects. Construction Innovation, 25(3), pp. 1014-1032. ISSN 1471-4175

Islam, Muhammad Saiful (2019) Modelling cost overrun risks in power plant projects. PhD thesis, Queensland University of Technology, Australia.

Ismaeel, W S E (2019) Systems thinking and modeling for buildings' sustainable site selection. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ismaeel, W S E (2020) An integrated model for energy-efficient building opening design. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.

Jacob, J and Varghese, K (2018) A framework for ad hoc information management for the building design process. Engineering, Construction and Architectural Management, 25(8), pp. 1034-1052. ISSN 0969-9988

Jafar Ramaji, I (2016) An integrated building information modeling (BIM) framework for multi-story modular buildings. PhD thesis, Pennsylvania State University, USA.

Jafari, A (2018) A decision-making framework for the selection of sustainable alternatives for energy-retrofits. PhD thesis, University of New Mexico, USA.

Jafarzadeh, R; Ingham, J M; Wilkinson, S; González, V and Aghakouchak, A A (2014) Application of artificial neural network methodology for predicting seismic retrofit construction costs. Journal of Construction Engineering and Management, 140(2): 04013044, ISSN 0733-9364

Jafarzadeh, R; Wilkinson, S; González, V; Ingham, J M and Amiri, G G (2014) Predicting seismic retrofit construction cost for buildings with framed structures using multilinear regression analysis. Journal of Construction Engineering and Management, 140(3): 4013062, ISSN 0733-9364

Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.

Jalali, Farhang (2020) Quantifying pavement preservation performance using probabilistic deterioration modeling. PhD thesis, Auburn University, USA.

Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.

Jaly Zada, A J (2016) Versioning of IFC-based information models for collaborative design. PhD thesis, University of Nottingham, UK.

James, Ian E (2005) A study of ethical responses to contemporary cultural influences in the workplace: In particular the construction industry in Queensland with implications for vocational education and training. PhD thesis, Griffith University, Australia.

Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.

Jaramillo, L V (2019) Implementations of resilience engineering for natural system disturbances: A panarchical perspective. PhD thesis, University of New Mexico, USA.

Javed, A (2024) Optimizing infrastructure resilience through utility maturity. PhD thesis, University of Florida, USA.

Jawad, S and Ledwith, A (2022) A measurement model of project control systems success for engineering and construction projects case study: Contractor companies in saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 29(3), pp. 1218-1240. ISSN 0969-9988

Jayaram, S (2010) Design of template to fabricate magnetic torquer coils for nano and picosatellite missions. Journal of Engineering, Design and Technology, 8(2), pp. 158-167. ISSN 1726-0531

Jayasinghe, R S; Rameezdeen, R and Chileshe, N (2023) Modelling the cause and effect relationship risks in reverse logistics supply chains for demolition waste. Engineering, Construction and Architectural Management, 30(9), pp. 4018-4044. ISSN 0969-9988

Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.

Jeong, J G; Hastak, M and Syal, M (2009) Framework of manufacturer-retailer relationship in the manufactured housing construction. Construction Innovation, 9(1), pp. 22-41. ISSN 1471-4175

Jeong, W S (2014) Integrating building information modeling with object-oriented physical modeling for building thermal simulation. PhD thesis, Texas A&M University, USA.

Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364

Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9): 04025134, ISSN 0733-9364

Jha, K N and Devaya, M N (2008) Modelling the risks faced by Indian construction companies assessing international projects. Construction Management and Economics, 26(4), pp. 337-348. ISSN 1466433X

Ji, Y; Lee, A and Swan, W (2019) Retrofit modelling of existing dwellings in the UK: The Salford energy house case study. International Journal of Building Pathology and Adaptation, 37(3), pp. 344-360. ISSN 23984708

Ji, Y; Qi, K; Qi, Y; Li, Y; Li, H X; Lei, Z and Liu, Y (2020) BIM-based life-cycle environmental assessment of prefabricated buildings. Engineering, Construction and Architectural Management, 27(8), pp. 1703-1725. ISSN 0969-9988

Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X

Jiang, H and Liu, C (2014) A panel vector error correction approach to forecasting demand in regional construction markets. Construction Management and Economics, 32(12), pp. 1205-1221. ISSN 01446193

Jiang, H; Xu, Y and Liu, C (2013) Construction price prediction using vector error correction models. Journal of Construction Engineering and Management, 139(11): 4013022, ISSN 0733-9364

Jiang, H; Xu, Y and Liu, C (2014) Market effects on forecasting construction prices using vector error correction models. International Journal of Construction Management, 14(2), pp. 101-112. ISSN 1562-3599

Jiang, Heng (2013) Econometric techniques for estimating construction demand in Australia. PhD thesis, Deakin University, Australia.

Jiang, L (2016) A constructability review ontology to support automated rule checking leveraging building information models. PhD thesis, Pennsylvania State University, USA.

Jiang, W; Ding, L and Zhou, C (2021) Cyber physical system for safety management in smart construction site. Engineering, Construction and Architectural Management, 28(3), pp. 788-808. ISSN 0969-9988

Jiang, Y; Yang, G; Li, H; Zhang, T and Khudhair, A (2024) Physics-informed knowledge-driven decision-making framework for holistic bridge maintenance. Journal of Construction Engineering and Management, 150(9): 04024105, ISSN 0733-9364

Jiang, Ziang (2025) Advancing scan-vs-BIM in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.

Jiang, Ziang (2025) Advancing scan-vs-bim in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.

Jin, B and Xu, X (2025) Contemporaneous causal orderings among prices of retail properties: Evidence from Chinese cities through vector error-correction modeling and directed acyclic graphs. Journal of Financial Management of Property and Construction, 30(3), pp. 398-415. ISSN 1366-4387

Jin, S. (2026) Dynamics and influences analysis of public concerns in mega construction projects: An integrated topic and sentiment modeling approach. Journal of Construction Engineering and Management, 152(8): 04026104, ISSN 0733-9364

Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions. PhD thesis, Clemson University, USA.

Jordan, M R C (2005) The design, use and implementation of maintenance management systems and pavement management systems for whole life costing. Unpublished PhD thesis, Curtin University of Technology, Australia.

Juan, C and Olmos, F (2019) Public-private equity joint ventures and risk transfers in motorways of the sea. Built Environment Project and Asset Management, 9(5), pp. 669-682. ISSN 2044-124X

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jungclaus, M A (2024) Embodied carbon emissions benchmarks of residential and commercial reference buildings in the United States. PhD thesis, University of Colorado at Boulder, USA.

Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599

Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Kader, A S A (1997) Cost modelling for inland waterway transport systems. PhD thesis, Liverpool John Moores University, UK.

Kagan, Paula Brumer Franceschini (2024) Occupant behaviour modelling for building performance simulation of naturally ventilated school classrooms. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kajewski, S L (2005) Multilevel formwork load distribution with posttensioned slabs. Journal of Construction Engineering and Management, 131(2), pp. 203-210. ISSN 0733-9364

Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193

Kaka, A P and Fortune, C (2002) Net cash flow models: Towards the black box approach. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kaka, A P and Price, A D F (1993) Modelling standard cost commitment curves for contractors' cash flow forecasting. Construction Management and Economics, 11(4), pp. 271-283. ISSN 01446193

Kaka, A P F (1990) Corporate financial model for construction contractors. PhD thesis, Loughborough University, UK.

Kalampakorn, S (2000) Stages of construction workers' use of hearing protection. PhD thesis, University of Michigan, USA.

Kale, S and Arditi, D (2010) Innovation diffusion modeling in the construction industry. Journal of Construction Engineering and Management, 136(3), pp. 329-340. ISSN 0733-9364

Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.

Kamardeen, I (2010) 8d BIM modelling tool for accident prevention through design. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kamel Hedayat Abad, M E (2017) Integration and interoperability of building envelope information and energy modeling. PhD thesis, Pennsylvania State University, USA.

Kammouh, O; Nogal, M; Binnekamp, R and Wolfert, A R M (2021) Mitigation controller: Adaptive simulation approach for planning control measures in large construction projects. Journal of Construction Engineering and Management, 147(8): 04021093, ISSN 0733-9364

Kang, K (2018) Enhancing critical capacity of infrastructure supply chain to improve resilience of associated communities and infrastructure to disaster. PhD thesis, Purdue University, USA.

Kang, S-C (2006) Computer planning and simulation of construction erection processes using single or multiple cranes. PhD thesis, Stanford University, USA.

Kang, Y-J (2000) Minimum life-cycle cost structural design against natural hazards. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364

Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988

Kant Jain, K and Bhattacharjee, B (2012) Application of fuzzy concepts to the visual assessment of deteriorating reinforced concrete structures. Journal of Construction Engineering and Management, 138(3), pp. 399-408. ISSN 0733-9364

Kapoor, P (2022) Exploratory study of the SMES of manufacturers of construction products in Uttar Pradesh. PhD thesis, Amity University, Noida, India.

Karaiskos, P; Munian, Y; Martinez-Molina, A and Alamaniotis, M (2026) Indoor air quality prediction modeling for a naturally ventilated fitness building using rnn-LSTM artificial neural networks. Smart and Sustainable Built Environment, 15(1), pp. 384-406. ISSN 2046-6099

Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.

Karamujic, H (2012) Modelling seasonality in Australian building approvals. Construction Economics and Building, 12(1), pp. 26-36. ISSN 2204-9029

Karan, E P; Sivakumar, R; Irizarry, J and Guhathakurta, S (2014) Digital modeling of construction site terrain using remotely sensed data and geographic information systems analyses. Journal of Construction Engineering and Management, 140(3): 4013067, ISSN 0733-9364

Karatas, A and El-Rayes, K (2014) Optimal trade-offs between social quality of life and life-cycle cost in housing units. Journal of Construction Engineering and Management, 140(12): 04014058, ISSN 0733-9364

Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988

Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.

Karimi, H; Taylor, T R B; Dadi, G B; Goodrum, P M and Srinivasan, C (2018) Impact of skilled labor availability on construction project cost performance. Journal of Construction Engineering and Management, 144(7): 04018057, ISSN 0733-9364

Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988

Karki, T K (2020) Flood resilience in Malaysian cities: A case study of two towns in Johor state. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 329-342. ISSN 1759-5916

Kartarn, S; Ballard, G and Ibbs, C W (1997) Introducing a new concept and approach to modeling construction. Journal of Construction Engineering and Management, 123(1), pp. 89-97. ISSN 0733-9364

Kartman, S A (1995) Reengineering construction planning systems. PhD thesis, University of California, Berkeley, USA.

Karunaratne, Banneka Mudiyanselage (1994) A new method of analysis for cyclic construction operations using systems engineering approach. PhD thesis, University of New South Wales, Australia.

Karunaratne, Roshan (2022) Optimisation of prefabricated modular-integrated residential construction using hybrid customisation methods. PhD thesis, University of Melbourne, Australia.

Kasai, S; Li, N and Fang, D (2015) A system-of-systems approach to understanding urbanization: state of the art and prospect. Smart and Sustainable Built Environment, 4(2), pp. 154-171. ISSN 2046-6099

Kashiwagi, D T; Slater, C and Kashiwagi, M (2002) 'Just in time' information for performance based systems. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.

Kasozi, P and Tutesigensi, A (2007) A framework for appraising construction projects using carbon footprint. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364

Kassem, M; Kelly, G; Dawood, N; Serginson, M and Lockley, S (2015) BIM in facilities management applications: A case study of a large university complex. Built Environment Project and Asset Management, 5(3), pp. 261-277. ISSN 2044-124X

Kassim, Y; Underwood, J and Raphael, B (2009) Data envelopment analysis of it-enabled strategy for construction organisations. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Katsuragawa, C M; Lucko, G; Isaac, S and Su, Y (2021) Fuzzy linear and repetitive scheduling for construction projects. Journal of Construction Engineering and Management, 147(3): 04021002, ISSN 0733-9364

Kaur, P; Ritu, R K and Kaur, A (2024) Unraveling consumer behavioral intentions to adopt solar water heaters in India using utaut model. Built Environment Project and Asset Management, 14(2), pp. 312-328. ISSN 2044-124X

Kavishe, N and An, M (2016) Challenges for implementing public private partnership in housing projects in dar es salaam city, Tanzania. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kaya, H D and Dikmen, I (2024) Using system dynamics to support strategic digitalization decisions. Journal of Construction Engineering and Management, 150(4): 04024009, ISSN 0733-9364

Kayan, B A; Forster, A M and Banfill, P F G (2016) Green maintenance for historic masonry buildings: An option appraisal approach. Smart and Sustainable Built Environment, 5(2), pp. 143-164. ISSN 2046-6099

Kazemi, Hamidreza (2014) Evaluating the effectiveness and hydrological performance of green infrastructure stormwater control measures. PhD thesis, University of Louisville, USA.

Kaçel, S and Lau, B (2018) Louis I. Kahn and Richard Kelly: Collaborative design in creation of the luminous environment. Architectural Engineering and Design Management, 14(4), pp. 306-316. ISSN 1745-2007

Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.

Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors. PhD thesis, University of Salford, UK.

Keirouz, W T (1988) Domain modeling of constructed facilities for robotic applications. PhD thesis, Carnegie Mellon University, USA.

Kelso M, R (2003) Automated commissioning of HVAC systems using first principle models. PhD thesis, Loughborough University, UK.

Kenley, R (1999) Cash farming in building and construction: A stochastic analysis. Construction Management and Economics, 17(3), pp. 393-401. ISSN 01446193

Kenley, R (2001) The predictive ability of bromilow's time-cost model: A comment. Construction Management and Economics, 19(8), pp. 759-764. ISSN 01446193

Kenley, R (2001) In-project end-date forecasting: An idiographic, deterministic approach, using cash-flow modelling. Journal of Financial Management of Property and Construction, 6(3), pp. 209-216. ISSN 1366-4387

Kenley, Russell (1986) Construction project cash flow modelling. PhD thesis, University of Melbourne, Australia.

Kennington, J (1993) Development of an integrated HVAC design environment. PhD thesis, University College, Galway, Ireland.

Keskin, B (2021) A building information modeling (BIM)-centric digital ecosystem for smart airport life cycle management. PhD thesis, Syracuse University, USA.

Keskin, B; Salman, B and Koseoglu, O (2022) Architecting a BIM-based digital twin platform for airport asset management: A model-based system engineering with sysml approach. Journal of Construction Engineering and Management, 148(5): 04022020, ISSN 0733-9364

Kestle, L and Potangaroa, R (2012) Identifying the added-value of various roles in the post-disaster response and recovery of christchurch. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ketabi, A B and Heravi, G (2022) Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(2), pp. 643-668. ISSN 0969-9988

Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.

Khamaksorn, A; Nimmolrat, A; Mahat, N and Thinnukool, O (2023) An IDEF0 functional planning model for the development of an asset management framework: A case study of chiang mai university. Journal of Construction in Developing Countries, 28(1), pp. 133-150. ISSN 1823-6499

Khan, K I A (2016) Management of information complexity using system dynamics for small and medium-sized enterprises (SMEs) on construction projects. PhD thesis, University of Reading, UK.

Khan, K I A; Flanagan, R and Lu, S L (2015) Managing the complexity of information flow for construction small and medium-sized enterprises (csmes) using system dynamics and collaborative technologies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Khan, K I A; Flanagan, R and Lu, S-L (2016) Managing information complexity using system dynamics on construction projects. Construction Management and Economics, 34(3), pp. 192-204. ISSN 0144-6193

Khan, M I; Khan, S; Khan, U and Haleem, A (2023) Modeling the big data challenges in context of smart cities: an integrated fuzzy ISM-DEMATEL approach. International Journal of Building Pathology and Adaptation, 41(2), pp. 422-453. ISSN 23984708

Khan, M W and Ali, Y (2020) Sustainable construction: Lessons learned from life cycle assessment (LCA) and life cycle cost analysis (LCCA). Construction Innovation, 20(2), pp. 191-207. ISSN 1471-4175

Khan, Mona (2025) System of systems framework for structured risk analysis in complex engineering projects involving alliance. PhD thesis, RMIT University, Australia.

Khanh, H D; Kim, S Y; Khoa, N V and Tu, N T (2023) The relationship between workers' experience and productivity: A case study of brick masonry construction. International Journal of Construction Management, 23(4), pp. 596-605. ISSN 1562-3599

Khanh, H D; Kim, S Y and Linh, L Q (2023) Construction productivity prediction through Bayesian networks for building projects: Case from Vietnam. Engineering, Construction and Architectural Management, 30(5), pp. 2075-2100. ISSN 0969-9988

Khanzadi, M; Nasirzadeh, F and Dashti, M S (2018) Fuzzy cognitive map approach to analyze causes of change orders in construction projects. Journal of Construction Engineering and Management, 144(2): 04017111, ISSN 0733-9364

Khanzadi, M; Nasirzadeh, F; Mir, M and Nojedehi, P (2018) Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach. Construction Innovation, 18(1), pp. 2-19. ISSN 1471-4175

Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531

Khoa, V. D.; Chinda, T. and Nguyen, N. H. (2026) Knowledge management process to enhance construction competitiveness in the long term: System dynamics modelling approach. International Journal of Construction Management, 26(9), pp. 1960-1977. ISSN 1562-3599

Khodakarami, V (2009) Applying Bayesian networks to model uncertainty in project scheduling. PhD thesis, Queen Mary University of London, UK.

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988

Kiet, T T (2024) Problematic issues emerging during BIM implementation process in construction organizations. Built Environment Project and Asset Management, 14(6), pp. 892-913. ISSN 2044-124X

Kiliccote, H (1997) A standards processing framework. PhD thesis, Carnegie Mellon University, USA.

Kim, C (2004) Spatial information acquisition and its use for infrastructure operation and maintenance. PhD thesis, University of Texas at Austin, USA.

Kim, C S and Liu, L Y (2007) Cost information model for managing multiple projects. Journal of Construction Engineering and Management, 133(12), pp. 966-974. ISSN 0733-9364

Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364

Kim, H S (1998) Evaluation of quality during early design: A prerequisite to defining value for money for the client. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Kim, H-s (1998) Value for money in building design: Modelling the cost-quality relationships. PhD thesis, University of Reading, UK.

Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.

Kim, J J and William Ibbs, C (1995) Work-package-process model for piping construction. Journal of Construction Engineering and Management, 121(4), pp. 381-387. ISSN 0733-9364

Kim, K J (1997) Simplified discrete event simulation for heavy construction operations. PhD thesis, University of Texas at Austin, USA.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, Y and Ham, Y (2024) Revealing the impact of heat radiation on construction: A microclimate simulation using meteorological data and geometric modeling. Journal of Construction Engineering and Management, 150(4): 04024016, ISSN 0733-9364

Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.

Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Zayed, T (2024) Modeling the relationship between value management implementation phases, critical success factors and overall project success. Construction Innovation, 24(5), pp. 1380-1400. ISSN 1471-4175

Kirby, A M; Dietz, J E; Matson, E T; Pekny, J F and Wojtalewicz, C (2015) Major city evacuation planning using simulation modeling. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 397-408. ISSN 1759-5916

Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.

Kirkham, R J (2005) Re-engineering the whole life cycle costing process. Construction Management and Economics, 23(1), pp. 9-14. ISSN 01446193

Kirkham, R J; Alisa, M; Silva, A P d; Grindley, T and Brøndsted, J (2004) Rethinking whole life cycle cost based design decision-making. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kirkham, R J and Boussabaine, A H (2001) Modelling probability distributions of facilities management costs for an NHS acute care hospital building. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kirkham, R J; Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care nhs hospital buildings. Construction Management and Economics, 20(3), pp. 251-261. ISSN 01446193

Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988

Kishk, M (2005) On the mathematical modelling of whole-life costs. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kishk, M and Al-Hajj, A (2000) Fuzzy modelling of life cycle costs of alternatives with different lives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kishk, M; Pollock, R; Atta, J and Power, L (2005) A structured model for performance assessment in property management. Journal of Financial Management of Property and Construction, 10(3), pp. 159-170. ISSN 1366-4387

Kissi, E; Adjei-Kumi, T; Amoah, P and Gyimah, J (2018) Forecasting construction tender price index in Ghana using autoregressive integrated moving average with exogenous variables model. Construction Economics and Building, 18(1), pp. 70-82. ISSN 2204-9029

Kissi, J (2012) Improving innovation and project performance in construction professional services firms: the leadership role of middle managers. PhD thesis, Loughborough University, UK.

Kittinaraporn, W; Tuprakay, S and Prasittisopin, L (2022) Effective modeling for construction activities of recycled aggregate concrete using artificial neural network. Journal of Construction Engineering and Management, 148(3): 04021206, ISSN 0733-9364

Klapa, P. and Mitka, B. (2026) UAV data for BIM-based building assessment across construction stages: Sensor utility evaluation. Building Research & Information, 54(5), pp. 552-572. ISSN 0961-3218

Kleps, S M (2013) Impact of workflow disruptions, project characteristics and foremen characteristics on improvisational decisions and actions on construction sites. PhD thesis, Illinois Institute of Technology, USA.

Kléos, M L C J (2007) An assessment of the potential of the IFC for RC interoperability. PhD thesis, University of Leeds, UK.

Kobeyev, S; Tokbolat, S; Nazipov, F and Satyanaga, A (2023) Design and modeling of an on-site greywater treatment system for a hotel building. International Journal of Building Pathology and Adaptation, 41(1), pp. 201-224. ISSN 23984708

Koch, C and Beemsterboer, S (2017) Making an engine: Performativities of building information standards. Building Research & Information, 45(6), pp. 596-609. ISSN 0961-3218

Kohler, N and Hassler, U (2002) The building stock as a research object. Building Research & Information, 30(4), pp. 226-236. ISSN 0961-3218

Kohler, N and Yang, W (2007) Long-term management of building stocks. Building Research & Information, 35(4), pp. 351-362. ISSN 0961-3218

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.

Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X

Kolokotroni, M; Robinson-Gayle, S; Tanno, S and Cripps, A (2004) Environmental impact analysis for typical office facades. Building Research & Information, 32(1), pp. 2-16. ISSN 0961-3218

Koo, D H (2007) Development of sustainability assessment model for underground infrastructure. PhD thesis, Arizona State University, USA.

Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988

Koskela, L and Ballard, G (2012) Is production outside management? Building Research & Information, 40(6), pp. 724-737. ISSN 0961-3218

Kostourou, F (2021) Housing growth: Impacts on density, space consumption and urban morphology. Buildings & Cities, 2(1), pp. 55-78. ISSN 2632-6655

Kotey, S and T, S (2026) Exploring apprentice selection by skilled trade artisans in the Ghanaian construction industry. Construction Innovation, 26(2), pp. 579-606. ISSN 1471-4175

Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.

Krzywoszynska, A; Buckley, A; Birch, H; Watson, M; Chiles, P; Mawyin, J; Holmes, H and Gregson, N (2016) Co-producing energy futures: Impacts of participatory modelling. Building Research & Information, 44(7), pp. 804-815. ISSN 0961-3218

Kulkarni, S S; Chapman, C; Shah, H and Edwards, D J (2018) A computational design method for bio-mimicked horizontal axis tidal turbines. International Journal of Building Pathology and Adaptation, 36(2), pp. 188-209. ISSN 23984708

Kululanga, G K (1999) A framework to facilitate construction contractors' learning. PhD thesis, Loughborough University, UK.

Kumar, S (2013) Experience-based design review of healthcare facilities using interactive virtual prototypes. PhD thesis, Pennsylvania State University, USA.

Kumar, S and Bansal, V K (2021) GIS-based locational evaluation of infrastructure facilities in hilly regions: A case study of an institute campus. International Journal of Construction Management, 21(11), pp. 1165-1184. ISSN 1562-3599

Kumar, S V (2019) Identification and modelling of risk factors, mitigation measures, and entry strategies for Indian construction firms in international markets. PhD thesis, Indian Institute of Technology Delhi, India.

Kumar, V; Kaushik, A K and Singh, G (2022) Modeling the Indian households' intention to adopt the solar net metering system. Built Environment Project and Asset Management, 12(6), pp. 956-972. ISSN 2044-124X

Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988

Kuntz, K A (1994) A construction crew evaluation model to improve craft productivity. PhD thesis, Pennsylvania State University, USA.

Kuo, Vincent (2019) Latent semantic analysis for knowledge management in construction. DSc(Tech) thesis, Aalto University, Finland.

Kurvinen, A; Huovari, J; Lahtinen, M; Sen, T and Saari, A (2024) A dynamic model for estimating the long-term need for repairs and renovations in residential buildings. Building Research & Information, 52(5), pp. 533-550. ISSN 0961-3218

Kwofie, T E; Adinyira, E and Fugar, F (2016) Modelling the effect of housing design unit contract packaging on mass housing project team communication performance. Journal of Construction in Developing Countries, 21(1), pp. 35-50. ISSN 1823-6499

Kwon, S-W (2003) Human-assisted fitting and matching of objects to sparse point clouds for rapid workspace modeling in construction automation. PhD thesis, University of Texas at Austin, USA.

Kyaw Oo D’Amore, G and Mauro, F (2023) Numerical study on modelling perforated elements using porous baffle interface and porous region. Journal of Engineering, Design and Technology, 21(6), pp. 1827-1840. ISSN 1726-0531

Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.

Kübler, O (2006) Applied decision-making in civil engineering. DSc thesis, ETH Zürich, Switzerland.

Laganakou, G (2020) What feasible macro-scale interventions could stimulate a sustainable growth in the UK housing retrofit industry? An examination of the potential impact from supply-chain innovations on low energy retrofit of pre-1919 housing. PhD thesis, University of Northampton, UK.

Lahdenperä, P (2017) Towards a coherent theory of project alliancing: Discovering the system's complex mechanisms yielding value for money. Construction Economics and Building, 17(2), pp. 41-61. ISSN 2204-9029

Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.

Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.

Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193

Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988

Lam, K C; Hu, T; Ng, S T; Skitmore, M and Cheoung, S O (2001) A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19(2), pp. 175-188. ISSN 01446193

Lam, K C and Oshodi, O S (2016) Forecasting construction output: A comparison of artificial neural network and Box-Jenkins model. Engineering, Construction and Architectural Management, 23(3), pp. 302-322. ISSN 0969-9988

Lam, K C; Runeson, G; Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(4), pp. 359-375. ISSN 0969-9988

Lam, K C; So, A T P; Hu, T; Ng, T; Yuen, R K K; Lo, S M; Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(1), pp. 63-76. ISSN 01446193

Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988

Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.

Lam, Ka-Chi (1997) The optimisation of financial decisions in a contracting firm. PhD thesis, University of New South Wales, Australia.

Langston, C and Ghanbaripour, A N (2016) A management maturity model (MMM) for project-based organisational performance assessment. Construction Economics and Building, 16(4), pp. 68-85. ISSN 2204-9029

Langston, Y L and Langston, C (2009) The inherent building energy-cost relationship: An analysis of thirty Melbourne case studies. Construction Economics and Building, 9(1), pp. 9-18. ISSN 2204-9029

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X

Lansley, P R (1986) Modelling construction organizations. Construction Management and Economics, 4(1), pp. 19-36. ISSN 01446193

Laovisutthichai, V; Lu, W and Bao, Z (2022) Design for construction waste minimization: Guidelines and practice. Architectural Engineering and Design Management, 18(3), pp. 279-298. ISSN 1745-2007

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Laryea, S and Watermeyer, R (2020) Managing uncertainty in fast-track construction projects: Case study from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(2), pp. 49-63. ISSN 17514304

Lashford, C (2016) Modelling the role of SuDS management trains to minimise the flood risk of new-build housing developments in the UK. PhD thesis, Coventry University, UK.

Lataniotis, C (2019) Data-driven uncertainty quantification for high-dimensional engineering problems. DSc thesis, ETH Zürich, Switzerland.

Lather, J I (2019) A hybrid modeling approach using discrete event simulation and layout optimization for healthcare layout planning problems. PhD thesis, Pennsylvania State University, USA.

Lau, S C; Lu, M and Poon, C S (2014) Formalized approach to discretize a continuous plant in construction simulations. Journal of Construction Engineering and Management, 140(8): 04014032, ISSN 0733-9364

Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387

Lawther, P M (2000) Predictive cost modelling: Investigation utilising a qualitatively biased research methodology. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Le, T. T. and Nguyen, L. H. (2026) Modeling the external drivers of green building investment: A PLS-SEM analysis of subjective norms. International Journal of Building Pathology and Adaptation, pp. 1-20. ISSN 2398-4708

Le, P L; Dao, T M and Chaabane, A (2019) BIM-based framework for temporary facility layout planning in construction site: A hybrid approach. Construction Innovation, 19(3), pp. 424-464. ISSN 1471-4175

Le Masurier, J W (2001) Developing the observational method as a systematic approach to uncertainty management. PhD thesis, University of Bristol, UK.

Lee, Y. J. (2026) Exploring peer leadership and organizational culture in R&D: A social network and machine learning approach in South korea's construction industry. Construction Innovation, 26(6), ISSN 1471-4175

Lee, A and Sexton, M G (2007) ND modelling: Industry uptake considerations. Construction Innovation, 7(3), pp. 288-302. ISSN 1471-4175

Lee, C K; Yiu, T W and Cheung, S O (2021) Predicting intention to use alternative dispute resolution (ADR): An empirical test of theory of planned behaviour (TPB) model. International Journal of Construction Management, 21(1), pp. 27-40. ISSN 1562-3599

Lee, C Y-H (2010) A probabilistic approach to the life-cycle cost assessment of preventive maintenance strategies on flexible pavements. PhD thesis, University of California, Davis, USA.

Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364

Lee, D E and Shi, J J (2006) Construction business automation system. Journal of Construction Engineering and Management, 132(1), pp. 88-96. ISSN 0733-9364

Lee, D-E (2004) Construction business automation system (CBAS). PhD thesis, Illinois Institute of Technology, USA.

Lee, G (2004) A new formal and analytical process to product modeling (PPM) method and its application to the precast concrete industry. PhD thesis, Georgia Institute of Technology, USA.

Lee, J; Blumenstein, M; Guan, H and Loo, Y C (2013) Minimising uncertainty in long-term prediction of bridge element. Engineering, Construction and Architectural Management, 20(2), pp. 127-142. ISSN 0969-9988

Lee, J and Ham, Y (2021) Physiological sensing-driven personal thermal comfort modelling in consideration of human activity variations. Building Research & Information, 49(5), pp. 512-524. ISSN 0961-3218

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Lee, J M (2010) Automated checking of building requirements on circulation over a range of design phases. PhD thesis, Georgia Institute of Technology, USA.

Lee, J M; Anumba, C J; Gibb, A G and Agbasi, E (2002) The current status of the cladding sector and its opportunities for computer-integrated manufacture (CIM). In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Lee, J-R (1997) The object-oriented project system for pavement construction management and visualization. PhD thesis, Ohio State University, USA.

Lee, K (1994) Software options for support of three-dimensional CAD in the architectural design process: A critical evaluation by practitioners and educators. PhD thesis, Texas A&M University, USA.

Lee, K J (2013) A formal and ontological approach to embed commissioning test protocol into building information model. PhD thesis, Carnegie Mellon University, USA.

Lee, W V and Steemers, K (2017) Exposure duration in overheating assessments: A retrofit modelling study. Building Research & Information, 45(1-2), pp. 60-82. ISSN 0961-3218

Lehtonen, J L and Kiiras, J M (2010) Cost modelling in underpinning projects. Construction Management and Economics, 28(9), pp. 985-995. ISSN 1466433X

Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.

Leo-Olagbaye, F and Odeyinka, H A (2020) An assessment of risk impact on road projects in Osun State, Nigeria. Built Environment Project and Asset Management, 10(5), pp. 673-691. ISSN 2044-124X

Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.

Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364

Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.

Leviäkangas, P; Wigan, M and Haapasalo, H (2013) Financial anatomy of E4 Helsinki-Lahti shadow toll PPP project. Built Environment Project and Asset Management, 3(2), pp. 165-180. ISSN 2044-124X

Levy, R (1975) The concept of system identification and its application to the built environment. PhD thesis, University of Manchester, UK.

Lewis, N S (2023) Development of an open-source methodology for simulation of civil engineering structures subject to multi-hazards. PhD thesis, University of Washington, USA.

Li, T.; Ling, F. Y. Y.; Li, Z.; Dou, Y. and Guo, Z. (2026) Portfolio optimization of prefabricated interior building component systems: A multistakeholder perspective. Journal of Construction Engineering and Management, 152(9): 04026154, ISSN 0733-9364

Li, X.; Lin, M.; Chen, J. and Jim, C. Y. (2026) A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models. Engineering, Construction and Architectural Management, 33(7), pp. 5645-5674. ISSN 0969-9988

Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.

Li, Guokai (2024) A research on construction and demolition waste management. PhD thesis, Università degli Studi di Padova, Italy.

Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(1-2), pp. 69-81. ISSN 0969-9988

Li, H; Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), pp. 211-220. ISSN 0969-9988

Li, H T (2013) Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and constructionprojects. PhD thesis, University of Hong Kong, Hong Kong.

Li, J; Chen, Y and Wang, H (2025) Human-machine system modeling and safety risk assessment in construction operations incorporating workers' performance variability. Journal of Construction Engineering and Management, 151(3): 04024209, ISSN 0733-9364

Li, J; Yu, M and Wang, H (2018) A taxonomy of performance shaping factors for shield tunnel construction. Engineering, Construction and Architectural Management, 25(4), pp. 574-596. ISSN 0969-9988

Li, J; Zhu, J and Guan, C (2024) Mitigating fatigue in tunnel construction through illumination: Evidence from virtual reality. Journal of Construction Engineering and Management, 150(11): 04024165, ISSN 0733-9364

Li, P; Tang, Y; Zheng, Z; Wang, Z and Zhuang, Y (2024) Semiautomated railway line information modeling based on asset management data. Journal of Construction Engineering and Management, 150(10): 04024130, ISSN 0733-9364

Li, P; Wang, Q; Guo, Z; Mei, T; Li, Q; Qiao, S and Zuo, W (2022) Identifying falling-from-height hazards in building information models: A voxelization-based method. Journal of Construction Engineering and Management, 148(2): 04021203, ISSN 0733-9364

Li, R Y M (2012) Econometric modelling of risk adverse behaviours of entrepreneurs in the provision of house fittings in China. Construction Economics and Building, 12(1), pp. 72-82. ISSN 2204-9029

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Li, T H Y; Thomas Ng, S and Skitmore, M (2016) Modeling multi-stakeholder multi-objective decisions during public participation in major infrastructure and construction projects: A decision rule approach. Journal of Construction Engineering and Management, 142(3): 04015087, ISSN 0733-9364

Li, X; Han, S; Gül, M; Al-Hussein, M and El-Rich, M (2018) 3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task. Journal of Construction Engineering and Management, 144(1): 04017093, ISSN 0733-9364

Li, X; Li, H; Skitmore, M and Wang, F (2022) Understanding the influence of safety climate and productivity pressure on non-helmet use behavior at construction sites: A case study. Engineering, Construction and Architectural Management, 29(1), pp. 72-90. ISSN 0969-9988

Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X

Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364

Li, Z and Tong, X (2017) Applications of the discrete element method and Fibonacci sequence on a banana screen. Journal of Engineering, Design and Technology, 15(1), pp. 2-12.

Li Hao, J; Hill, M J and Yin Shen, L (2008) Managing construction waste on-site through system dynamics modelling: The case of Hong Kong. Engineering, Construction and Architectural Management, 15(2), pp. 103-113. ISSN 0969-9988

Liang, D (2001) Improved reliability and economic modeling for new and retrofitted low-rise structures subjected to extreme wind hazards. PhD thesis, State University of New York at Buffalo, USA.

Liang, J S (2023) A knowledge with ontology representation for product life cycle to support eco-design activities. Journal of Engineering, Design and Technology, 21(4), pp. 991-1026. ISSN 1726-0531

Lim, B T C (1987) Causal modelling construction project performance. PhD thesis, Heriot-Watt University, UK.

Lin, Y H; Dai, J; Li, J and Tao, X (2026) Efficient classification and disposal management of construction waste using blockchain technology and system dynamics. Journal of Construction Engineering and Management, 152(2): 04025242, ISSN 0733-9364

Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364

Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.

Lin, K-Y (2013) Investigating reducing building energy use at urban scale in Taipei. PhD thesis, Cardiff University, UK.

Lin, L Y (2015) Modelling of organizational capabilities, innovation activities and performance of small and medium sized construction firms. PhD thesis, University of Malaya, Malaysia.

Lin, M-C (2000) Contract design of private infrastructure concessions. PhD thesis, University of California, Berkeley, USA.

Lin, S (2022) Risk analysis and management for excavation engineering via multi-criteria decision making modeling. PhD thesis, National University of Singapore, Singapore.

Ling, F Y Y (2003) Managing the implementation of construction innovations. Construction Management and Economics, 21(6), pp. 635-649. ISSN 01446193

Lingard, H (1995) Safety in Hong Kong's construction industry: changing worker behaviour. PhD thesis, University of Hong Kong, Hong Kong.

Lingard, H; Warmerdam, A and Shooshtarian, S (2019) Getting the balance right: Regulating occupational health and safety planning and coordination in the Australian construction industry. Engineering, Construction and Architectural Management, 26(4), pp. 599-617. ISSN 0969-9988

Lishner, I and Shtub, A (2023) The compounding effect of multiple disruptions on construction projects. International Journal of Construction Management, 23(6), pp. 1061-1068. ISSN 1562-3599

Littlefair, P; Ortiz, J and Bhaumik, C D (2010) A simulation of solar shading control on UK office energy use. Building Research & Information, 38(6), pp. 638-646. ISSN 0961-3218

Liu, L. and Liu, Y. (2026) From engagement to endurance: Modeling the long-term sustainability of VR training in construction through an ecological systems perspective. Journal of Construction Engineering and Management, 152(8): 04026130, ISSN 0733-9364

Liu, A M M and Fang, Z (2006) A power-based leadership approach to project management. Construction Management and Economics, 24(5), pp. 497-507. ISSN 1466433X

Liu, A M M; Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: Towards a conceptual model and a research agenda. Construction Management and Economics, 29(2), pp. 173-183. ISSN 1466433X

Liu, C; AbouRizk, S; Morley, D and Lei, Z (2020) Data-driven simulation-based analytics for heavy equipment life-cycle cost. Journal of Construction Engineering and Management, 146(5): 04020038, ISSN 0733-9364

Liu, C; Itoh, Y and Dawood, N N (2001) Financial analysis on the influence of infrastructure construction on regional economic development. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Liu, Chang (2020) Data-driven strategies to improve the construction equipment management. PhD thesis, University of Alberta, Canada.

Liu, D (2009) Multi-phase empirical investigation and path modeling of construction workers' use of personal fall arrest systems. PhD thesis, Ohio State University, USA.

Liu, G; Nzige, J H and Li, K (2019) Trending topics and themes in offsite construction(OSC) research: The application of topic modelling. Construction Innovation, 19(3), pp. 343-366. ISSN 1471-4175

Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liu, H; Yu, Y; Sun, Y and Yan, X (2021) A system dynamic approach for simulation of a knowledge transfer model of heterogeneous senders in mega project innovation. Engineering, Construction and Architectural Management, 28(3), pp. 681-705. ISSN 0969-9988

Liu, J; Love, P E D; Sing, M C P; Carey, B and Matthews, J (2015) Modeling Australia's construction workforce demand: Empirical study with a global economic perspective. Journal of Construction Engineering and Management, 141(4): 05014019, ISSN 0733-9364

Liu, J; Xu, X and Liu, J (2025) An analysis of BIM-related job requirements based on text mining in China. Journal of Engineering, Design and Technology, 23(1), pp. 126-142. ISSN 1726-0531

Liu, K and El-Gohary, N (2022) Bridge deterioration knowledge ontology for supporting bridge document analytics. Journal of Construction Engineering and Management, 148(6): 04022030, ISSN 0733-9364

Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: Preliminary evidence from Australian projects. Construction Management and Economics, 28(1), pp. 89-100. ISSN 1466433X

Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.

Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364

Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988

Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.

Liu, R; Du, J; Issa, R R A and Giel, B (2017) BIM cloud score: Building information model and modeling performance benchmarking. Journal of Construction Engineering and Management, 143(4): 04016109, ISSN 0733-9364

Liu, W (2008) Systems theory based method for construction project planning. PhD thesis, University of Florida, USA.

Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(4), pp. 406-427. ISSN 0969-9988

Liu, Y; Wang, X; Zhang, J and Guo, S (2025) How risk factors lead to the early termination of public–private partnership projects in China: A multi-case study based on social network analysis and interpretive-structure modeling. Engineering, Construction and Architectural Management, 32(2), pp. 824-846. ISSN 0969-9988

Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.

Lockwood, T A (2008) A new market risk model for cogeneration project financing—combined heat and power development without a power purchase agreement. PhD thesis, Walden University, USA.

Loganathan, Santhosh (2023) A framework for analysing the influence of teamwork processes of onsite construction trade crews on productivity. PhD thesis, University of Technology Sydney, Australia.

Lomas, K J (2009) Decarbonizing national housing stocks: Strategies, barriers and measurement. Building Research & Information, 37(2), pp. 187-191. ISSN 0961-3218

London, K; Kenley, R and Agapiou, A (1998) Theoretical supply chain network modelling in the building industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

London, Kerry (2004) Construction supply chain procurement modelling. PhD thesis, University of Melbourne, Australia.

Long, G (2010) A detailed investigation of the applicability and utility of simulation and gaming in the teaching of civil engineering students. PhD thesis, University of Nottingham, UK.

Long, J (2004) Computer-integrated information modelling for design of building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Loosemore, M; Chow, V W and McGeorge, D (2012) Modelling the risks of extreme weather events for Australasian hospital infrastructure using rich picture diagrams. Construction Management and Economics, 30(12), pp. 1071-1086. ISSN 1466433X

Lopes, Carmen Silvia Gonçalves (2016) Active learning in training engineer: The influence of the use of learning strategies for skills based on a systemic view. PhD thesis, Universidade de São Paulo, Brazil.

Lopes, M A R; Antunes, C H; Reis, A and Martins, N (2017) Estimating energy savings from behaviours using building performance simulations. Building Research & Information, 45(3), pp. 303-319. ISSN 0961-3218

Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.

Love, N E (2009) Leading indicators of failure: a study of SMEs in the construction sector in Wales and Scotland. PhD thesis, University of the West of England, Bristol, UK.

Love, P E D; Davis, P; Kerry London, K and Jasper, T (2008) Causal modelling of construction disputes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Love, P E D; Davis, P R; Lopez, R and Jasper, T (2008) It’s not just about bricks and mortar: Procedural failures in construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Love, P E D; Edwards, D J; Irani, Z and Goh, Y M (2011) Dynamics of rework in complex offshore hydrocarbon projects. Journal of Construction Engineering and Management, 137(12), pp. 1060-1070. ISSN 0733-9364

Love, P E D; Mandal, P; Smith, J and Heng, L I (2000) Modelling the dynamics of design error induced rework in construction. Construction Management and Economics, 18(5), pp. 567-574. ISSN 01446193

Lowe, D J and Parvar, J (2004) A logistic regression approach to modelling the contractor's decision to bid. Construction Management and Economics, 22(6), pp. 643-653. ISSN 01446193

Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364

Lu, M (2003) Simplified discrete-event simulation approach for construction simulation. Journal of Construction Engineering and Management, 129(5), pp. 537-546. ISSN 0733-9364

Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), pp. 219-226. ISSN 0733-9364

Lu, M; Anson, M; Tang, S L and Ying, Y C (2003) Hkconsim: A practical simulation solution to planning concrete plant operations in Hong Kong. Journal of Construction Engineering and Management, 129(5), pp. 547-554. ISSN 0733-9364

Lu, M; Lau, S C and Poon, C S (2009) Simulation approach to evaluating cost efficiency of selective demolition practices: Case of Hong Kong's Kai Tak Airport demolition. Journal of Construction Engineering and Management, 135(6), pp. 448-457. ISSN 0733-9364

Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364

Lu, Y; Girling, C; Martino, N; Kim, J; Kellett, R and Salter, J (2023) Climate action at the neighbourhood scale: Comparing municipal future scenarios. Buildings & Cities, 4(1), pp. 83-102. ISSN 2632-6655

Lucko, G (2011) Modeling the residual market value of construction equipment under changed economic conditions. Journal of Construction Engineering and Management, 137, pp. 806-816. ISSN 0733-9364

Lucko, G and Gattei, G (2016) Line-of-balance against linear scheduling: Critical comparison. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 26-44. ISSN 17514304

Lucko, G and Rojas, E M (2010) Research validation: Challenges and opportunities in the construction domain. Journal of Construction Engineering and Management, 136(1), pp. 127-135. ISSN 0733-9364

Luiten, G T and Tolman, F P (1997) Automating communication in civil engineering. Journal of Construction Engineering and Management, 123(2), pp. 113-120. ISSN 0733-9364

Lummen, N; Nakajo, S and Yamada, F (2014) Flooding due to torrential rainfall in Kumamoto, 2012. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 260-276. ISSN 1759-5916

Luo, J; Zadeh, P and Staub-French, S (2024) Ontology-based design features for representing constructability in architectural design: Toward BIM in off-site construction. Journal of Construction Engineering and Management, 150(10): 05024010, ISSN 0733-9364

Luo, L; Zhang, L and He, Q (2020) Linking project complexity to project success: A hybrid SEM-FCM method. Engineering, Construction and Architectural Management, 27(9), pp. 2591-2614. ISSN 0969-9988

Luo, M; Fan, H Q and Liu, G (2020) Measuring regional differences of construction productive efficiency in China: A distance friction minimization approach. Engineering, Construction and Architectural Management, 27(4), pp. 952-974. ISSN 0969-9988

Luo, X; Li, H; Dai, F; Cao, D; Yang, X and Guo, H (2017) Hierarchical Bayesian model of worker response to proximity warnings of construction safety hazards: Toward constant review of safety risk control measures. Journal of Construction Engineering and Management, 143(6): 04017006, ISSN 0733-9364

Luong Hai, N and Tuan, N A (2023) Modeling of planning function management in Vietnam's public construction works. Built Environment Project and Asset Management, 13(2), pp. 201-216. ISSN 2044-124X

Lutz, J D; Halpin, D W and Wilson, J R (1994) Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773. ISSN 0733-9364

Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193

Ma, G.; Chen, Y. and Du, C. (2026) Intelligent optimization framework for tunnel construction organization driven by multi-source data and process-level simulation. International Journal of Construction Management, 26(7), pp. 1299-1319. ISSN 1562-3599

Ma, C (2015) Stakeholder risk attitudes in safety risk management : exploring the relationship between risk attitude and safety risk management performance. PhD thesis, University of Hong Kong, Hong Kong.

Ma, J; Zhao, Y; Zheng, D; Liao, X and Lu, J (2025) CSADnet: Attention-based semantic segmentation method for spraying scene images of building gables. Journal of Construction Engineering and Management, 151(8): 04025109, ISSN 0733-9364

Ma, K; Wu, R; Xiao, Y and Wang, H (2024) Spherical dome: Design, digital twin manufacturing, and testing of a glubam structure. Architectural Engineering and Design Management, 20(6), pp. 1471-1488. ISSN 1745-2007

Ma, L; Liu, C and Mills, A (2016) Construction labor productivity convergence: A conditional frontier approach. Engineering, Construction and Architectural Management, 23(3), pp. 283-301. ISSN 0969-9988

Macit, S (2014) Computer representation of building codes for automated compliance checking. PhD thesis, Izmir Institute of Technology, Turkey.

Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.

Maghrebi, M; Sammut, C and Waller, S T (2015) Feasibility study of automatically performing the concrete delivery dispatching through machine learning techniques. Engineering, Construction and Architectural Management, 22(5), pp. 573-590. ISSN 0969-9988

Mahamadu, A M; Mahdjoubi, L; Booth, C; Manu, P and Manu, E (2019) Building information modelling (BIM) capability and delivery success on construction projects. Construction Innovation, 19(2), pp. 170-192. ISSN 1471-4175

Mahamadu, A-M (2017) Development of a decision support framework to aid selection of construction supply chain organisations for BIM-enabled projects. PhD thesis, University of the West of England, Bristol, UK.

Mahato, B K and Ogunlana, S O (2011) Conflict dynamics in a dam construction project: A case study. Built Environment Project and Asset Management, 1(2), pp. 176-194. ISSN 2044-124X

Mahazir, M.; Zainudin, N. M. and Rahman, R. A. (2026) Modeling causes and strategies in BIM execution plan development: A PLS-SEM approach. Construction Innovation, pp. 1-31. ISSN 1471-4175

Mahdavi, A (2016) A system-of-systems approach to ex-ante analysis of profit potential of a project portfolio. PhD thesis, Purdue University, USA.

Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364

Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mahjoubpour, B; Nasirzadeh, F; Mohammad Hosein Zadeh Golabchi, M; Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project. Engineering, Construction and Architectural Management, 25(4), pp. 559-573. ISSN 0969-9988

Mahmud, A; Ogunlana, S O; Hong, W T; Yahaya, I W and Akoh, S R (2023) Adopting qualitative data in conceptual system dynamic modelling. Construction Economics and Building, 23(3-4), pp. 71-86. ISSN 2204-9029

Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.

Mahmud, A T; Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: A systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(1), pp. 29-56. ISSN 1366-4387

Maina, J J (2024) Modelling business performance from marketing practices of architecture firms in Nigeria. Journal of Financial Management of Property and Construction, 29(3), pp. 425-443. ISSN 1366-4387

Mak, S and Raftery, J (1992) Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), pp. 303-320. ISSN 01446193

Mak, S W (1995) Risk analysis in construction: A paradigm shift from a hard to soft approach. Construction Management and Economics, 13(5), pp. 385-392. ISSN 01446193

Mak, S W K (1992) Risk management in construction: A study of subjective judgments. PhD thesis, London, External, UK.

Mak, S W K; Choy, L H T and ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(2), pp. 92-105. ISSN 1471-4175

Mak, Wae Hoa Jonathan (2019) The design of resilient engineering infrastructure systems. PhD thesis, University of Cambridge, UK.

Makrigeorgis, C N (1991) Development of an optimal durability-based highway cost allocation model. PhD thesis, Texas A&M University, USA.

Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599

Malhotra, M; Sahu, V; Srivastava, A and Misra, A K (2020) Experimental and numerical investigation of the effect of pre-existing utility tunnel on the bearing capacity of shallow footing in sandy soils. Journal of Engineering, Design and Technology, 18(3), pp. 513-529. ISSN 1726-0531

Mallasi, Z (2019) Designing with pixels: Parametric thinking for patterning dynamic building facades. Engineering, Construction and Architectural Management, 26(4), pp. 668-688. ISSN 0969-9988

Malsane, S M (2015) The application of automated rule checking to existing UK building regulations using BIM technologies. PhD thesis, University of Northumbria at Newcastle, UK.

Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction. PhD thesis, University of Alberta, Canada.

Manavazhi, M R (2000) Hybrid modelling framework for synthesizing virtual structures. Construction Management and Economics, 18(4), pp. 415-426. ISSN 01446193

Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.

Mane, K M; Kulkarni, D K and Prakash, K B (2021) Prediction of shear strength of concrete produced by using pozzolanic materials and partly replacing nfa by MS using ann. Journal of Engineering, Design and Technology, 19(2), pp. 578-587. ISSN 1726-0531

Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.

Manjia, M; Pettang, C and Abanda, F H (2011) Urban self-building labour cost modelling in Cameroon. Journal of Construction in Developing Countries, 16(2), pp. 69-90. ISSN 1823-6499

Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Constructing a complex precast tilt-up-panel structure utilizing an optimization model, 3D CAD, and animation. Journal of Construction Engineering and Management, 133(3), pp. 199-207. ISSN 0733-9364

Mansuri, L; Udeaja, C; Trillo, C; Kwasi, G; Patel, D; Jha, K; Makore, C B and Gupta, S (2019) Scientometric analysis and mapping of digital technologies used in cultural heritage field. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Mansuri, L E; Patel, D A; Udeaja, C; Makore, B C N; Trillo, C; Awuah, K G B and Jha, K N (2022) A systematic mapping of BIM and digital technologies for architectural heritage. Smart and Sustainable Built Environment, 11(4), pp. 1060-1080. ISSN 2046-6099

Mantle, E J (2007) An evaluation of 3d building modelling and visualisation packages for enhancing public participation within the planning process. PhD thesis, University of Glamorgan, UK.

Manu, P; Asiedu, R O; Mahamadu, A M; Olomolaiye, P O; Booth, C; Manu, E; Ajayi, S and Agyekum, K (2021) Contribution of procurement capacity of public agencies to attainment of procurement objectives in infrastructure procurement. Engineering, Construction and Architectural Management, 28(10), pp. 3322-3345. ISSN 0969-9988

Mao, X and Zhang, X (2008) Construction process reengineering by integrating lean principles and computer simulation techniques. Journal of Construction Engineering and Management, 134(5), pp. 371-381. ISSN 0733-9364

Mao, Z (2003) Forecasting total factor productivity growth in the construction industry using neural network modelling. PhD thesis, National University of Singapore, Singapore.

Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.

Marasini, R; Dawood, N S and Hobbs, B (2001) Stockyard layout planning in precast concrete products industry: A case study and proposed framework. Construction Management and Economics, 19(4), pp. 365-377. ISSN 01446193

Marcos, Micheline Helen Cot (2015) Method of obtaining environmental impact data, during the design development process through use of BIM tool. PhD thesis, Universidade de São Paulo, Brazil.

Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.

Marinelli, M and Lambropoulos, S (2013) Algorithmic method for scraper load-time optimization. Journal of Construction Engineering and Management, 139(5), pp. 459-465. ISSN 0733-9364

Marocco, M; Cacciaguerra, E and Garofolo, I (2024) An operational framework for implementing digital systems in public administrations' processes in the design phase. Architectural Engineering and Design Management, 20(3), pp. 411-430. ISSN 1745-2007

Marsh, D; Bryde, D and Graham, A (2014) Perceptions of the value and viability of implementing lean construction with business information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304

Martin, H and Ramjarrie, K (2021) Cloud contractor selection model for design-build open tender. Journal of Construction Engineering and Management, 147(4): 04021020, ISSN 0733-9364

Martinez, J C and Ioannou, P G (1999) General-purpose systems for effective construction simulation. Journal of Construction Engineering and Management, 125(4), pp. 265-276. ISSN 0733-9364

Martinez Lagunas, A J and Nik-Bakht, M (2024) Process mining, modeling, and management in construction: A critical review of three decades of research coupled with a current industry perspective. Journal of Construction Engineering and Management, 150(11): 04024158, ISSN 0733-9364

Martinez-Soto, A and Jentsch, M F (2020) A transferable energy model for determining the future energy demand and its uncertainty in a country's residential sector. Building Research & Information, 48(6), pp. 587-612. ISSN 0961-3218

Martínez-Rocamora, A; García-Alvarado, R; Casanova-Medina, E; González-Böhme, L F and Auat-Cheein, F (2020) Parametric programming of 3D printed curved walls for cost-efficient building design. Journal of Construction Engineering and Management, 146(5): 04020039, ISSN 0733-9364

Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.

Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364

Marzouk, M and Hassouna, M (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation, 19(4), pp. 614-628. ISSN 1471-4175

Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175

Marzouk, M and Moselhi, O (2003) Object-oriented simulation model for earthmoving operations. Journal of Construction Engineering and Management, 129(2), pp. 173-181. ISSN 0733-9364

Marzouk, M and Moselhi, O (2004) Multiobjective optimization of earthmoving operations. Journal of Construction Engineering and Management, 130(1), pp. 105-113. ISSN 0733-9364

Marzouk, M and Zaher, M (2025) Integrated approach for facility management of existing buildings using point cloud segmentation. International Journal of Building Pathology and Adaptation, 43(6), pp. 1439-1465. ISSN 2398-4708

Mashamba, T (2024) A system dynamics model to enhance on-time delivery of infrastructure projects within a power utility in South Africa. PhD thesis, University of South Africa, South Africa.

Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.

Masood, R; Roy, K; Gonzalez, V A; Lim, J B P and Nasir, A R (2025) Modeling relational performance of the supply chains for prefabricated housebuilding in New Zealand. Smart and Sustainable Built Environment, 14(1), pp. 276-302. ISSN 2046-6099

Matar, M; Osman, H; Georgy, M; Abou-Zeid, A and Elsaid, M (2020) Evaluating the environmental performance of pipeline construction using systems modelling. Construction Management and Economics, 38(8), pp. 689-714. ISSN 01446193

Mathews, J D (2000) Optimisation and decision support during the conceptual stage of building design: New techniques based on the genetic algorithm. PhD thesis, University of Plymouth, UK.

Matipa, W M (2008) Total cost management at the design stage using a building product model. PhD thesis, University College Cork, Ireland.

Matipa, W M; Kelliher, D and Keane, M (2004) Contending with the challenges of deploying building product models in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175

Maull, W M (1998) An investigation into the development of engineering students' conceptual understanding of mathematics. PhD thesis, University of Plymouth, UK.

Maver, T W (2020) The architectural and engineering design of buildings aided by computer: A personal memoir with selected publications. DSc thesis, University of Glasgow, UK.

Mavrogianni, A; Pathan, A; Oikonomou, E; Biddulph, P; Symonds, P and Davies, M (2017) Inhabitant actions and summer overheating risk in London dwellings. Building Research & Information, 45(1-2), pp. 119-142. ISSN 0961-3218

Mbiti, Titus (2008) System dynamics model of construction output in Kenya. PhD thesis, RMIT University, Australia.

McCabe, B Y (1997) An automated modeling approach for construction performance improvement using simulation and belief networks. PhD thesis, University of Alberta, Canada.

McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.

McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364

McCauley, Kathleen H (2020) Modeling construction management dynamics: A proxy estimation of percent planned complete. PhD thesis, Indiana State University, USA.

McClements, S (2013) Modelling construction consultant selection based on attributes of trust. PhD thesis, University of Ulster, UK.

McCluskey, W; Davis, P; Haran, M; McCord, M and McIlhatton, D (2012) The potential of artificial neural networks in mass appraisal: The case revisited. Journal of Financial Management of Property and Construction, 17(3), pp. 274-292. ISSN 1366-4387

McCluskey, W J; Zulkarnain, D D and Kamarudin, N (2014) Boosted regression trees: An application for the mass appraisal of residential property in Malaysia. Journal of Financial Management of Property and Construction, 19(2), pp. 152-167. ISSN 1366-4387

McCord, M; Davis, P; McCord, J; Haran, M and Davison, K (2020) An exploratory investigation into the relationship between energy performance certificates and sales price: A polytomous universal model approach. Journal of Financial Management of Property and Construction, 25(2), pp. 247-271. ISSN 1366-4387

McCord, M; Davis, P T; Haran, M; McGreal, S and McIlhatton, D (2012) Spatial variation as a determinant of house price: Incorporating a geographically weighted regression approach within the Belfast housing market. Journal of Financial Management of Property and Construction, 17(1), pp. 49-72. ISSN 1366-4387

McCormack, M; Treloar, G J; Palmowski, L and Crawford, R (2007) Modelling direct and indirect water requirements of construction. Building Research & Information, 35(2), pp. 156-162. ISSN 0961-3218

McCowan, A and Mohamed, S (2002) A classification of decision support systems (DSSs) for the Analysis and evaluation of concession project investments (CPIs). Journal of Financial Management of Property and Construction, 7(2), pp. 127-137. ISSN 1366-4387

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

McEntire, D; Crocker, C G and Peters, E (2010) Addressing vulnerability through an integrated approach. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 50-64. ISSN 1759-5916

McErlane, A; Haran, M; McClements, S and McCord, J (2018) Modelling the drivers for public-private partnerships (PPP) provision of United Kingdom (UK) social infrastructure. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

McGeorge, D; Chow, V W; Carthey, J and Loosemore, M (2011) Modelling the impact of extreme weather events on healthcare infrastructure using rich picture diagrams. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mehmood, U.; Ujang, U. and Azri, S. (2026) Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: A Malaysian case study. Built Environment Project and Asset Management, 16(2), pp. 321-337. ISSN 2044-124X

Meins, E; Wallbaum, H; Hardziewski, R and Feige, A (2010) Sustainability and property valuation: A risk-based approach. Building Research & Information, 38(3), pp. 280-300. ISSN 0961-3218

Mekid, S and Bashmal, S (2019) Engineering manipulation at nanoscale: Further functional specifications. Journal of Engineering, Design and Technology, 17(3), pp. 572-590. ISSN 1726-0531

Mekid, S and Shang, M (2015) Concept of dependent joints in functional reconfigurable robots. Journal of Engineering, Design and Technology, 13(3), pp. 400-418.

Melia, K (2005) Exploring and modelling the process of change management in construction organisations. PhD thesis, University of Dundee, UK.

Mellado, F; Wong, P F; Amano, K; Johnson, C and Lou, E C W (2020) Digitisation of existing buildings to support building assessment schemes: Viability of automated sustainability-led design scan-to-BIM process. Architectural Engineering and Design Management, 16(2), pp. 84-99. ISSN 1745-2007

Mellal, L and Djebabra, M (2015) Contribution of cost-benefit analysis to optimization of eco-design plants. Journal of Engineering, Design and Technology, 13(2), pp. 334-346.

Meng, J; Yan, J; Xue, B; Fu, J and He, N (2018) Reducing construction material cost by optimizing buy-in decision that accounts the flexibility of non-critical activities. Engineering, Construction and Architectural Management, 25(8), pp. 1092-1108. ISSN 0969-9988

Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock. PhD thesis, University of California, Los Angeles, USA.

Mesa, H A (2016) Modeling performance of integrated project delivery systems in design and construction. PhD thesis, University of Colorado at Boulder, USA.

Meyer, H W G (1991) Conceptual model for integrating business activity and data systems in the AEC industry. PhD thesis, University of Wisconsin - Madison, USA.

Miceli, A; Bevill, G and Simsiriwong, J (2025) Effect of additively manufactured polymeric inserts on impact response of construction safety helmets. Journal of Engineering, Design and Technology, 23(5), pp. 1653-1665. ISSN 1726-0531

Michell, K; Bowen, P and Cattell, K (2007) Modeling the design team as a temporary management structure: Reality versus theory. Construction Economics and Building, 7(1), pp. 19-28. ISSN 2204-9029

Michieka, N M; Razek, N H A and Gearhart, R S (2023) Modelling the impact of oil price changes and investment decisions on construction wages in the U.S. Construction Management and Economics, 41(6), pp. 500-518. ISSN 01446193

Milberg, C T (2006) Application of tolerance management to civil systems. PhD thesis, University of California, Berkeley, USA.

Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Mirzaei, Z (2015) An investigation of methodologies to determine the most sustainable bridge work programs. DSc thesis, ETH Zürich, Switzerland.

Moaveni, B (2007) System and damage identification of civil structures. PhD thesis, University of California, San Diego, USA.

Mock, B and O'Connor, J T (2019) High-value, low-effort industrial plant commissioning solution strategies. Construction Innovation, 19(4), pp. 653-671. ISSN 1471-4175

Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation, 19(2), pp. 256-279. ISSN 1471-4175

Moeti, M; Jacques, E; Feng, W and North, C (2021) Modelling the effect of computation sampling on insight error in computational fluid dynamics scientific simulation. Journal of Engineering, Design and Technology, 19(1), pp. 263-290. ISSN 1726-0531

Moffatt, S and Kohler, N (2008) Conceptualizing the built environment as a social-ecological system. Building Research & Information, 36(3), pp. 248-268. ISSN 0961-3218

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.

Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization. PhD thesis, University of Alberta, Canada.

Mohamad, M and Tran, D Q (2021) Risk-based prioritization approach to construction inspections for transportation projects. Journal of Construction Engineering and Management, 147(1): 04020150, ISSN 0733-9364

Mohamed, S.; Trinh, M. T.; Mostafa, S. and Ojuola, J. (2025) Application of complexity science principles to safety leadership for improving safety participation. Journal of Engineering, Design and Technology, 24(1), pp. 64-84. ISSN 1726-0531

Mohamed, E; Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(6), pp. 2328-2357. ISSN 0969-9988

Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.

Mohamed, S (2003) Performance in international construction joint ventures: Modeling perspective. Journal of Construction Engineering and Management, 129(6), pp. 619-626. ISSN 0733-9364

Mohamed, S and Chinda, T (2011) System dynamics modelling of construction safety culture. Engineering, Construction and Architectural Management, 18(3), pp. 266-281. ISSN 0969-9988

Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.

Mohamed, T (2023) Modelling interaction between schedule performance and schedule determinants of construction projects. PhD thesis, Loughborough University, UK.

Mohamed, Y (2002) A framework for systematic improvement of construction systems. PhD thesis, University of Alberta, Canada.

Mohammadpour, A (2014) Retrofitting healthcare facilities to enhance patient safety and energy efficiency. PhD thesis, Pennsylvania State University, USA.

Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(2), pp. 229-244. ISSN 1471-4175

Mohammed, A W (2016) Agent-based modeling of abc methods for decisionmaking in highway bridge projects including uncertainty and several stakeholders. PhD thesis, Western Michigan University, USA.

Mohammed, O D (2024) An analytical approach for the determination of helical gear tooth geometry. Journal of Engineering, Design and Technology, 22(6), pp. 2020-2042. ISSN 1726-0531

Mohammed, R E (2007) An exploratory system dynamics model to investigate the relationships between errors that occur in construction documents in Saudi Arabia and their possible causes. PhD thesis, Heriot-Watt University, UK.

Mohammed Abdelkader, E; Zayed, T; Elshaboury, N and Taiwo, R (2025) A hybrid Bayesian optimization-based deep learning model for modeling the condition of saltwater pipes in Hong Kong. International Journal of Construction Management, 25(1), pp. 46-62. ISSN 1562-3599

Mohammed Alashwal, A M (2012) Developing a project learning model considering fragmentation in construction. PhD thesis, University of Malaya, Malaysia.

Moharrami, S; Bayat, A and Abourizk, S (2022) Modeling microtunnel boring machine penetration rate using a mechanistic approach. Journal of Construction Engineering and Management, 148(11): 04022128, ISSN 0733-9364

Moharrami, S; Taghaddos, M; RazaviAlavi, S R and AbouRizk, S (2021) A hybrid simulation approach for microtunneling construction planning. Construction Innovation, 21(3), pp. 363-378. ISSN 1471-4175

Mohseni, H; Setunge, S; Zhang, G and Wakefield, R (2017) Markov process for deterioration modeling and asset management of community buildings. Journal of Construction Engineering and Management, 143(6): 04017003, ISSN 0733-9364

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Moir, S and Carter, K (2012) Diagrammatic representations of sustainability: A review and synthesis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Molenaar, K; Washington, S and Diekmann, J (2000) Structural equation model of construction contract dispute potential. Journal of Construction Engineering and Management, 126(4), pp. 268-276. ISSN 0733-9364

Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.

Molwus, J J (2014) Stakeholder management in construction projects: a life cycle based framework. PhD thesis, Heriot-Watt University, UK.

Molwus, J J; Erdogan, B and Ogunlana, S (2017) Using structural equation modelling to understand the relationships among critical success factors for stakeholder management in construction. Engineering, Construction and Architectural Management, 24(3), pp. 426-450. ISSN 0969-9988

Momade, M H; Durdyev, S; Dixit, S; Shahid, S and Alkali, A K (2024) Modeling labor costs using artificial intelligence tools. International Journal of Building Pathology and Adaptation, 42(6), pp. 1263-1281. ISSN 2398-4708

Momade, M H; Shahid, S; Hainin, M R B; Nashwan, M S and Tahir Umar, A (2022) Modelling labour productivity using SVM and rf: A comparative study on classifiers performance. International Journal of Construction Management, 22(10), pp. 1924-1934. ISSN 1562-3599

Moore, B C (1993) Modeling risk of lunar construction activities: A technology assessment approach. PhD thesis, Georgia Institute of Technology, USA.

Moore, D R (1996) Task difficulty assessment: a contribution towards improved buildability through simplification. PhD thesis, De Montfort University, UK.

Moore, H (2013) Exploring information generation and propagation from the point of installation on construction jobsites: An sna/abm hybrid approach. PhD thesis, Michigan State University, USA.

Moore, J E; Kuprenas, J; Lee, J J; Gordon, P; Richardson, H and Pan, Q (2004) Cost analysis methodology for advanced treatment of stormwater: The Los Angeles case. Journal of Construction Research, 5(2), pp. 149-170. ISSN 1609-9451

Moore, S A; Gelfand, S and Whitsett, D (2015) Epistemological conflict: Modern and non-modern frameworks for sustainability. Building Research & Information, 43(6), pp. 659-674. ISSN 0961-3218

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities. PhD thesis, University of Maryland, College Park, USA.

Mootanah, D P (2000) Theory meets practice: Proposal for a dynamic value and risk methodology for project management. Journal of Construction Research, 1(2), pp. 131-138. ISSN 1609-9451

Moradi, S; Nasirzadeh, F and Golkhoo, F (2015) A hybrid SD-DES simulation approach to model construction projects. Construction Innovation, 15(1), pp. 66-83. ISSN 1471-4175

Morcous, G S L (2000) Case -based reasoning for modeling bridge deterioration. PhD thesis, Concordia University, Canada.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364

Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364

Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Morsi, D M A; Ismaeel, W S E; El Hamed, A E A and Othman, A A E (2020) Applying LCA-BIM integration for a sustainable management process. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(1), pp. 45-52. ISSN 01446193

Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175

Moshtaghian, F and Noorzai, E (2023) Integration of risk management within the building information modeling (BIM) framework. Engineering, Construction and Architectural Management, 30(5), pp. 1951-1977. ISSN 0969-9988

Mostafa, S and Chileshe, N (2015) Discrete-event simulation model for offsite manufacturing in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mostafa, S and Chileshe, N (2018) Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia. Architectural Engineering and Design Management, 14(1-2), pp. 139-157. ISSN 1745-2007

Mostafa, S; Chileshe, N and Abdelhamid, T S (2016) Lean and agile integration within offsite construction using discrete event simulation: A systematic literature review. Construction Innovation, 16(4), pp. 483-525. ISSN 1471-4175

Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.

Motawa, I and Almarshad, A (2015) Case-based reasoning and BIM systems for asset management. Built Environment Project and Asset Management, 5(3), pp. 233-247. ISSN 2044-124X

Motawa, I and Kaka, A (2009) Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(4), pp. 325-336. ISSN 0969-9988

Motawa, I A (2005) A systematic approach to modelling change processes in construction projects. Construction Economics and Building, 5(1), pp. 23-31. ISSN 2204-9029

Motlagh, K C (1992) Algorithms for computerised surface modelling and highway alignment design. PhD thesis, University of Strathclyde, UK.

Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.

Moussa, M; Ruwanpura, J and Jergeas, G (2006) Decision tree modeling using integrated multilevel stochastic networks. Journal of Construction Engineering and Management, 132(12), pp. 1254-1266. ISSN 0733-9364

Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364

Moussa, M A E-F M (2013) Unified simulation methodology and project risk assessment framework. PhD thesis, University of Calgary, Canada.

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.

Mujalli, R O; Marie, I and Al-Kasasbeh, M (2024) Consequences of COVID-19 on jordan's construction sector using data mining techniques. International Journal of Construction Management, 24(12), pp. 1339-1348. ISSN 1562-3599

Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.

Mulholland, S M; Boffy-Ramirez, E and Clevenger, C M (2026) Incentives and effort elicitation in construction contracting: Modeling strategic behavior under DBB and CMR/GMP contracts. Construction Management and Economics, 44(2), pp. 143-158. ISSN 0144-6193

Mungodla, S G; Linganiso, L Z; Mlambo, S and Motaung, T (2019) Economic and technical feasibility studies: Technologies for second generation biofuels. Journal of Engineering, Design and Technology, 17(4), pp. 670-704. ISSN 1726-0531

Munns, A K and Al-Haimus, K M (2000) Estimating using cost significant global cost models. Construction Management and Economics, 18(5), pp. 575-585. ISSN 01446193

Murguia, D; Demian, P and Soetanto, R (2021) Systemic BIM adoption: A multilevel perspective. Journal of Construction Engineering and Management, 147(4): 04021014, ISSN 0733-9364

Murnane, R; Simpson, A and Jongman, B (2016) Understanding risk: What makes a risk assessment successful? International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 186-200. ISSN 1759-5916

Murtagh, N; Owen, A M and Simpson, K (2023) Engaging UK repair–maintain–improve practitioners in improved building performance. International Journal of Building Pathology and Adaptation, 41(1), pp. 11-24. ISSN 23984708

Musil, T A (2011) Evaluating development and community benefits of shopping malls: A case study using input/output analysis. Journal of Financial Management of Property and Construction, 16(2), pp. 111-125. ISSN 1366-4387

Muslimin, R. and Brasier, N. (2026) An analysis of outdoor thermal comfort impact on pedestrian walking patterns at sub-hour timescales with agent-based modelling. Smart and Sustainable Built Environment, 15(3), pp. 1149-1176. ISSN 2046-6099

Mustapha, K; Alhiyafi, J; Shafi, A and Olatunji, S O (2023) Support vector machines for predicting the compressive response of defected 3D printed polymeric sandwich structures. Journal of Engineering, Design and Technology, 21(3), pp. 819-839. ISSN 1726-0531

Müller, P (2010) Procedural modeling of buildings. DSc thesis, ETH Zürich, Switzerland.

Nabi, M A; El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(5): 04024024, ISSN 0733-9364

Nabil, A (2016) P.A.L.M. - physical asset lifecycle modelling in the healthcare sector. PhD thesis, University College London, UK.

Naderpajouh, N; Mahdavi, A; Hastak, M and Aldrich, D P (2014) Modeling social opposition to infrastructure development. Journal of Construction Engineering and Management, 140(8): 04014029, ISSN 0733-9364

Naji, K K (1997) The development of a virtual environment for simulating equipment-based construction operations in real-time object-oriented systems. PhD thesis, University of Florida, USA.

Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats. PhD thesis, Purdue University, USA.

Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation. PhD thesis, University of Strathclyde, UK.

Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364

Nasirian, A; Arashpour, M; Abbasi, B and Akbarnezhad, A (2019) Optimal work assignment to multiskilled resources in prefabricated construction. Journal of Construction Engineering and Management, 145(4): 1627, ISSN 0733-9364

Nasirzadeh, F; Afshar, A; Khanzadi, M and Howick, S (2008) Integrating system dynamics and fuzzy logic modelling for construction risk management. Construction Management and Economics, 26(11), pp. 1197-1212. ISSN 1466433X

Nasirzadeh, F; Carmichael, D G; Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(7), pp. 1261-1276. ISSN 0969-9988

Nasirzadeh, F; Ghayoumian, M; Khanzadi, M and Rostamnezhad Cherati, M (2020) Modelling the social dimension of sustainable development using fuzzy cognitive maps. International Journal of Construction Management, 20(3), pp. 223-236. ISSN 1562-3599

Nasirzadeh, F; Khanzadi, M and Mir, M (2018) A hybrid simulation framework for modelling construction projects using agent-based modelling and system dynamics: An application to model construction workers' safety behavior. International Journal of Construction Management, 18(2), pp. 132-143. ISSN 1562-3599

Nasrazadani, H; Mahsuli, M; Talebiyan, H and Kashani, H (2017) Probabilistic modeling framework for prediction of seismic retrofit cost of buildings. Journal of Construction Engineering and Management, 143(8): 04017055, ISSN 0733-9364

Navon, R; Shapira, A and Shechori, Y (2000) Automated rebar constructability diagnosis. Journal of Construction Engineering and Management, 126(5), pp. 389-397. ISSN 0733-9364

Nayak, B; Bhattacharyya, S S S; Kulkarni, O and Mehdi, S N (2023) Adoption of online pharmacy applications during COVID-19 pandemic; empirical investigation in the Indian context from push-pull and mooring framework. Journal of Engineering, Design and Technology, 21(4), pp. 1173-1196. ISSN 1726-0531

Nepal, Jaya (2015) Reliability-based performance assessment and optimum maintenance of corroded reinforced concrete structures. PhD thesis, University of Greenwich, UK.

Neshat, N; Hadian, H and Rahimi Alangi, S (2020) Technological learning modelling towards sustainable energy planning. Journal of Engineering, Design and Technology, 18(1), pp. 84-101. ISSN 1726-0531

Newton, K L and Chileshe, N (2012) Awareness, usage and benefits of building information modelling (BIM) adoption-the case of South Australian construction organizations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Newton, P W and Tucker, S N (2011) Pathways to decarbonizing the housing sector: A scenario analysis. Building Research & Information, 39(1), pp. 34-50. ISSN 0961-3218

Newton, S (1991) An agenda for cost modelling research. Construction Management and Economics, 9(2), pp. 97-112. ISSN 01446193

Ng, F F (1990) A knowledge analysis model for knowledge engineering in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193

Ng, S T; Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(5), pp. 519-534. ISSN 1466433X

Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364

Ng, S-t T (1996) Case-based reasoning decision support for contractor prequalification. PhD thesis, University of Manchester, UK.

Ngowtanasuwan, G and Hadikusumo, B H W (2017) System dynamics modelling for BIM adoption in Thai architectural and engineering design industry. Construction Innovation, 17(4), pp. 457-474. ISSN 1471-4175

Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.

Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Nguyen, T T (2017) Modeling of CLT creep behavior and real-time hybrid simulation of a CLT-LiFS building. PhD thesis, University of Alabama, USA.

Nguyen, T-H (1999) Automated deduction of topological information in a computer-based building design system. PhD thesis, Pennsylvania State University, USA.

Nguyen, V T; Do, S T; Tran, C N N and Vo, M D (2024) Assessing the impact of the traits of payment delay causes on subcontractor's business performance in construction projects: A case study in Vietnam. International Journal of Construction Management, 24(11), pp. 1259-1269. ISSN 1562-3599

Nguyen, V U (1985) Tender evaluation by fuzzy sets. Journal of Construction Engineering and Management, 111(3), pp. 231-243. ISSN 0733-9364

Nicholls, C (2014) Energy use in non-domestic buildings: The UK government's new evidence base. Building Research & Information, 42(1), pp. 109-117. ISSN 0961-3218

Nielsen, Y and Sayar, T (2001) Web-based information flow modelling in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Nimbarte, A D (2009) Modeling the risk factors associated with the neck disorders during manual material handling tasks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Nkado, R N and Mbachu, J I (2001) Modelling client needs and satisfaction in the built environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Nolla, Ieda Maria (2023) HBIM in the management of cultural assets. PhD thesis, Universidade de São Paulo, Brazil.

Noorzai, E; Bakmohammadi, P and Garmaroudi, M A (2023) Optimizing daylight, energy and occupant comfort performance of classrooms with photovoltaic integrated vertical shading devices. Architectural Engineering and Design Management, 19(4), pp. 394-418. ISSN 1745-2007

Nordin, A (2013) Constructing component-based systems directly from requirements using incremental composition. PhD thesis, University of Manchester, UK.

Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt. PhD thesis, University of Manchester, UK.

Nour, H A (2003) An information approach for enhancing the health and safety file. PhD thesis, University of Manchester, UK.

Nourian, P; Rezvani, S; Valeckaite, K and Sariyildiz, S (2018) Modelling walking and cycling accessibility and mobility: The effect of network configuration and occupancy on spatial dynamics of active mobility. Smart and Sustainable Built Environment, 7(1), pp. 101-116. ISSN 2046-6099

Novak, V M (2012) Managing sustainability value in design: A systems approach. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadigo, O; Naismith, N N; Ghaffarianhoseini, A; Ghaffarian Hoseini, A and Tookey, J (2021) Dynamic Bayesian network modelling for predicting adaptability of time performance during time influencing factors disruptions in construction enterprise. Engineering, Construction and Architectural Management, 28(10), pp. 2994-3013. ISSN 0969-9988

Nwadigo, O B K; Naismith, N; GhaffarianHoseini, A; GhaffarianHoseini, A and Tookey, J (2022) Construction project planning and scheduling as a dynamic system: A content analysis of the current status, technologies and forward action. Smart and Sustainable Built Environment, 11(4), pp. 972-995. ISSN 2046-6099

Nwagwu, C C; Akin, S and Hertwich, E G (2024) Modelling Nigerian residential dwellings: bottom-up approach and scenario analysis. Buildings & Cities, 5(1), pp. 521-539. ISSN 2632-6655

Nwaogu, J M; Chan, A P C and Akinyemi, T A (2023) Conceptualizing the dynamics of mental health among construction supervisors. International Journal of Construction Management, 23(15), pp. 2593-2613. ISSN 1562-3599

Nwaogu, O (2017) A systems approach to the development of an energy benchmarking process model for commercial buildings. DEng thesis, Morgan State University, USA.

Nyqvist, R; Peltokorpi, A and Seppänen, O (2024) Uncertainty network modeling method for construction risk management. Construction Management and Economics, 42(4), pp. 346-365. ISSN 01446193

O'Grady, W (2013) A knowledge management system to optimise comfort throughout the building life-cycle. PhD thesis, University College Cork, Ireland.

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obonyo, E A (2011) An agent-based intelligent virtual learning environment for construction management. Construction Innovation, 11(2), pp. 142-160. ISSN 1471-4175

Ock, J-H (1998) Integrated decision process model (idepm) for the development of the build-operate-transfer (bot) highway project proposals. PhD thesis, University of Colorado at Boulder, USA.

Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387

Odeyinka, H A (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Odeyinka, H A and Lowe, J G (2001) An evaluation of methodological issues for assessing risk impacts on construction cash flow forecast. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Odeyinka, H A; Lowe, J G and Kaka, A P (2002) A construction cost flow risk assessment model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Oduyemi, O; Okoroh, M and Dean, A (2015) Developing an artificial neural network model for life cycle costing in buildings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Oduyemi, O I (2015) Life cycle costing methodology for sustainable commerical office buildings. PhD thesis, University of Derby, UK.

Ogden, R G; Kendrick, C C and Walliman, N S R (2004) Modelling of enhanced passive and conventional cooling systems. Building Research & Information, 32(1), pp. 17-26. ISSN 0961-3218

Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193

Ogunyanda, K; Fritz, W and van Zyl, R (2015) PSIM simulations of a DC squid magnetometer. Journal of Engineering, Design and Technology, 13(2), pp. 298-314.

Oguz Erkal, E D; Hallowell, M R; Ghriss, A and Bhandari, S (2024) Predicting serious injury and fatality exposure using machine learning in construction projects. Journal of Construction Engineering and Management, 150(3): 04023169, ISSN 0733-9364

Ogwueleka, A C and Maritz, M J (2016) Modeling for incentive payoffs in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(3), pp. 543-562.

Oke, A E; Kineber, A F; Albukhari, I and Dada, A J (2024) Modeling the robotics implementation barriers for construction projects in developing countries. International Journal of Building Pathology and Adaptation, 42(3), pp. 386-409. ISSN 23984708

Oke, A E; Ogunsami, D R and Ogunlana, S (2012) Establishing a common ground for the use of structural equation modelling for construction related research studies. Construction Economics and Building, 12(3), pp. 89-94. ISSN 2204-9029

Olanrewaju, O I; Chileshe, N; Adekunle, E O and Salihu, C (2024) Modelling the environmental, economic and social impacts of coronavirus pandemic on the construction industry. International Journal of Construction Management, 24(14), pp. 1485-1498. ISSN 1562-3599

Olatunji, O. A.; Lee, J. J. S.; Chong, H. Y. and Akanmu, A. A. (2021) Building information modelling (BIM) penetration in quantity surveying (qs) practice. Built Environment Project and Asset Management, 11(5), pp. 888-902. ISSN 2044-124X

Olatunji, O A (2019) Promoting student commitment to BIM in construction education. Engineering, Construction and Architectural Management, 26(7), pp. 1240-1260. ISSN 0969-9988

Olatunji, O A and Sher, W (2014) Perspectives on modelling BIM-enabled estimating practices. Construction Economics and Building, 14(4), pp. 32-53. ISSN 2204-9029

Oloke, D A; Edwards, D J and Thorpe, T A (2003) Predicting construction plant breakdown time using time series modelling. Journal of Engineering, Design and Technology, 1(2), pp. 202-221. ISSN 1726-0531

Olugboyega, O and Windapo, A (2023) Modelling the indicators of a reduction in BIM adoption barriers in a developing country. International Journal of Construction Management, 23(9), pp. 1581-1591. ISSN 1562-3599

Olukolajo, M A; Ogungbenro, M T and Adewusi, A O (2018) Tenants' characteristics and rent default tendencies in Akure residential property market. African Journal of Built Environment Research, 2(1), pp. 41-54. ISSN 2414-0236

Oluwayemi, O (2021) Retrofitting Sustainable Drainage Systems (SUDS) in public buildings in the UK: a cost benefit analysis model. PhD thesis, Birmingham City University, UK.

Oluwole, A O; Jane Jia Suen, L; Heap-Yih, C and Akanmu, A A (2021) Building information modelling penetration in quantity surveying practice. Built Environment Project and Asset Management, 11(5), pp. 888-902. ISSN 2044-124X

Ono, Eikichi (2025) Occupant-centric design for functional and thermal zoning at activity-based workspaces. PhD thesis, National University of Singapore, Singapore.

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Oo, B L; Drew, D and Lo, H (2007) Modelling contractors' mark-up behaviour in different construction markets. Engineering, Construction and Architectural Management, 14(5), pp. 447-462. ISSN 0969-9988

Oo, B L; Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(4), pp. 387-398. ISSN 1466433X

Oo, B L; Drew, D S and Lo, H P (2008) Heterogeneous approach to modeling contractors' decision-to-bid strategies. Journal of Construction Engineering and Management, 134(10), pp. 766-775. ISSN 0733-9364

Oo, B L; Drew, D S and Lo, H P (2010) Modeling the heterogeneity in contractors' mark-up behavior. Journal of Construction Engineering and Management, 136(7), pp. 720-729. ISSN 0733-9364

Oo, B L; Ling, F Y Y and Soo, A (2015) Construction procurement: Modelling bidders' learning in recurrent bidding. Construction Economics and Building, 15(4), pp. 16-29. ISSN 2204-9029

Oo, B L; Nguyen, A T; Ahn, Y and Lim, B T H (2025) Predicting the number of bidders in construction competitive bidding using explainable machine learning models. Construction Innovation, 25(7), pp. 158-188. ISSN 1471-4175

Op den Bosch, A (1994) Design/construction processes simulation in real-time object-oriented environments. PhD thesis, Georgia Institute of Technology, USA.

Orooji, F (2015) Risk-based wind loss and mitigation for residential wood framed construction. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Orozco, F A; Serpell, A F; Molenaar, K R and Forcael, E (2014) Modeling competitiveness factors and indexes for construction companies: Findings of Chile. Journal of Construction Engineering and Management, 140(4): B4013002, ISSN 0733-9364

Oshodi, O; Edwards, D J; lam, K C; Olanipekun, A O and Aigbavboa, C O (2020) Construction output modelling: a systematic review. Engineering, Construction and Architectural Management, 27(10), pp. 2959-2991. ISSN 0969-9988

Osman, H and Nikbakht, M (2014) A game-theoretic model for roadway performance management: A socio-technical approach. Built Environment Project and Asset Management, 4(1), pp. 40-54. ISSN 2044-124X

Osman, H M and El-Diraby, T E (2011) Knowledge-enabled decision support system for routing urban utilities. Journal of Construction Engineering and Management, 137(3), pp. 198-213. ISSN 0733-9364

Osorio-Sandoval, C A (2021) BIM-based construction simulation modelling. PhD thesis, University of Nottingham, UK.

Osunsanmi, T O; Aigbavboa, C O; Thwala, W D D and Molusiwa, R (2022) Modelling construction 4.0 as a vaccine for ensuring construction supply chain resilience amid COVID-19 pandemic. Journal of Engineering, Design and Technology, 20(1), pp. 132-158. ISSN 1726-0531

Otasowie, O K; Clinton, C; Oke, A E and Adekunle, P (2025) Mapping out focus for circular economy business models (cebms) research in construction sector studies: A bibliometric approach. Journal of Engineering, Design and Technology, 23(5), pp. 1404-1422. ISSN 1726-0531

Othman, A A; Rahman, S A; Sundram, V P K and Bhatti, M A (2015) Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 644-668. ISSN 0969-9988

Oti, A H (2014) Building information modelling for sustainability appraisal of conceptual design of steel-framed buildings. PhD thesis, University of Nottingham, UK.

Oti, A H; Farrell, P; Abanda, F H; McMahon, P; Mahamadu, A M; Mzyece, D; Akintola, A A and Prinja, N (2022) A BIM-driven framework for integrating rules and regulations in the decommissioning of nuclear power plants. Construction Innovation, 22(4), pp. 809-830. ISSN 1471-4175

Oti, A H; Tah, J H M and Abanda, F H (2018) Integration of lessons learned knowledge in building information modeling. Journal of Construction Engineering and Management, 144(9): 04018081, ISSN 0733-9364

Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499

Owolabi, A A; Anumba, C J and El-Hamalawi, A (2003) Towards implementing integrated building product libraries. Construction Innovation, 3(3), pp. 175-194. ISSN 1471-4175

Owusu-Manu, D G; Adjei, T K; Sackey, D M; Edwards, D J and Hosseini, R M (2021) Mainstreaming sustainable development goals in Ghana’s energy sector within the framework of public–private partnerships: Challenges, opportunities and strategies. Journal of Engineering, Design and Technology, 19(3), pp. 605-624. ISSN 1726-0531

Owusu-Manu, D G; Edwards, D J; Donkor-Hyiaman, K A; Asiedu, R O; Hosseini, M R and Obiri-Yeboah, E (2019) Housing attributes and relative house prices in Ghana. International Journal of Building Pathology and Adaptation, 37(5), pp. 733-746. ISSN 23984708

Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2025) Smart housing adaptations register with user matching functionalities for different mobility categories for the social housing sector. International Journal of Building Pathology and Adaptation, 43(2), pp. 177-196. ISSN 2398-4708

Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(3), pp. 399-411. ISSN 2044-124X

O’Connell, S; Reynders, G; Seri, F; Sterling, R and Keane, M M (2020) A standardised flexibility assessment methodology for demand response. International Journal of Building Pathology and Adaptation, 38(1), pp. 20-37. ISSN 23984708

Padala, S P S (2025) A BIM-integrated multi objective optimization model for sustainable building construction management. Construction Innovation, 25(6), pp. 1727-1751. ISSN 1471-4175

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Padala, S P S and Maheswari, J U (2023) Modeling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), pp. 2369-2390. ISSN 1562-3599

Paiva, A G C (1996) A framework for the evaluation of quality of dwellings. PhD thesis, University of Bristol, UK.

Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218

Pan, X.; Ma, G.; Zhang, Y. and Ke, J. (2026) How voluntary sustainable effort influences task performance of construction project members: Insights from agent-based simulation. Engineering, Construction and Architectural Management, pp. 1-29. ISSN 0969-9988

Pan, Q (2007) System identification of constructed civil engineering structures and uncertainty. PhD thesis, Drexel University, USA.

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Pandimani, M R; Ponnada, M R and Geddada, Y (2024) Finite-element modeling of partially prestressed concrete beams with unbonded tendon under monotonic loadings. Journal of Engineering, Design and Technology, 22(1), pp. 235-256. ISSN 1726-0531

Panthi, K (2009) A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts. PhD thesis, Florida International University, USA.

Panuwatwanich, Kriengsak (2008) Modelling the innovation diffusion process in Australian architectural and engineering design organisations. PhD thesis, Griffith University, Australia.

Panwar, A and Jha, K N (2019) A many-objective optimization model for construction scheduling. Construction Management and Economics, 37(12), pp. 727-739. ISSN 01446193

Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges. PhD thesis, Purdue University, USA.

Papachristos, G; Jain, N; Burman, E; Zimmermann, N; Wu, X; Liu, P; Mumovic, D; Lin, B; Davies, M and Edkins, A (2020) Low carbon building performance in the construction industry: A multi-method approach of system dynamics and building performance modelling. Construction Management and Economics, 38(9), pp. 856-876. ISSN 01446193

Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction. PhD thesis, Arizona State University, USA.

Park, M; Ji, S H; Lee, H S and Kim, W (2009) Strategies for design-build in Korea using system dynamics modeling. Journal of Construction Engineering and Management, 135(11), pp. 1125-1137. ISSN 0733-9364

Parker, D; MacFarlane, J; Peng, V and Murray, J (2003) Forecasting property market cycles: An application of the RICS model to the Sydney CBD office market. Journal of Financial Management of Property and Construction, 8(3), pp. 178-192. ISSN 1366-4387

Parvar, J (2003) Neural networks decision support system (decision to bid). PhD thesis, University of Manchester, UK.

Passe, U; Dorneich, M; Krejci, C; Koupaei, D M; Marmur, B; Shenk, L; Stonewall, J; Thompson, J and Zhou, Y (2020) An urban modelling framework for climate resilience in low-resource neighbourhoods. Buildings & Cities, 1(1), pp. 453-474. ISSN 2632-6655

Patel, P. and Sturgill, R. (2026) An interpretive structure modeling approach to assess the value of underground utility as-builts. Journal of Construction Engineering and Management, 152(10): 04026164, ISSN 0733-9364

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Payne, B (1998) Project risk analysis. PhD thesis, Nottingham Trent University, UK.

Pekkonen, M; Turunen, M and Haverinen-Shaughnessy, U (2018) Housing quality perceptions in Finland: The elderly population. Building Research & Information, 46(4), pp. 417-429. ISSN 0961-3218

Pendlebury, M C (2000) Techniques and strategies to improve conceptual and schematic design. PhD thesis, Loughborough University, UK.

Perng, Y-H (1988) An intelligent system approach for construction risk identification. PhD thesis, University of Texas at Austin, USA.

Perrucci, D V (2021) Methods for scenario modeling of post-disaster temporary housing. PhD thesis, Vanderbilt University, USA.

Petkov, I (2022) Optimal decarbonization conditions for buildings & districts: A model-based techno-economic perspective. DSc thesis, ETH Zürich, Switzerland.

Petrova, E (2019) AI for BIM-based sustainable building design: Integrating knowledge discovery and semantic data modelling for evidence-based design decision support. PhD thesis, Aalborg University, Denmark.

Peña-Mora, F and Li, M (2001) Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management, 127(1), pp. 1-17. ISSN 0733-9364

Pham, V H S and Phan, K A (2023) Elaboration of willingness to pay and compensation demanded for costly bid preparation. International Journal of Construction Management, 23(7), pp. 1131-1137. ISSN 1562-3599

Phan, D H D (1993) The primitive-composite (p-c) approach: A methodology for developing sharable object-oriented data representations for facility engineering integration. PhD thesis, Stanford University, USA.

Philip, B and AlJassmi, H (2024) Time-series forecasting of road distress parameters using dynamic Bayesian belief networks. Construction Innovation, 24(1), pp. 317-340. ISSN 1471-4175

Phua, F T T (2004) Modelling the determinants of multi-firm project success: A grounded exploration of differing participant perspectives. Construction Management and Economics, 22(5), pp. 451-459. ISSN 01446193

Phua, F T T (2005) Determining the relationship between fee structure and project performance between firms: An empirical study based on institutional and task environment perspectives. Construction Management and Economics, 23(1), pp. 45-56. ISSN 01446193

Phythian, G J (1991) Applications of knowledge-based expert systems in recurrent competitive bidding. PhD thesis, Loughborough University, UK.

Pickhaver, J A (2006) Numerical modelling of building response to tunnelling. PhD thesis, University of Oxford, UK.

Pieterse, E I (2024) A cost model to improve short-term underinsurance of residential buildings in South Africa. PhD thesis, University of Pretoria, South Africa.

Piper, B E B (2014) Optimization methods for improving the resilience of civil infrastructure systems subject to natural hazards. PhD thesis, North Carolina State University, USA.

Pitt, T J and Griffith, G T T (1996) Space modelling in healthcare properties. Journal of Financial Management of Property and Construction, 1(1), pp. 77-88. ISSN 1366-4387

Plantinga, H; Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager's choice of procurement instruments. Engineering, Construction and Architectural Management, 26(2), pp. 303-320. ISSN 0969-9988

Platt, L S; Chen, X; Sabo-Attwood, T; Iovine, N; Brown, S and Pollitt, B (2024) Improving infection prevention briefing through predictive predesign: A computational approach to architectural programming by evaluating socioecological risk factors. Architectural Engineering and Design Management, 20(4), pp. 776-788. ISSN 1745-2007

Plumblee II, J M (2013) Incorporating natural hazard resistance into the life cycle assessment framework. PhD thesis, Clemson University, USA.

Pocobelli, D P (2021) Heritage building information model (BIM) for scientific data. PhD thesis, University College London, UK.

Podevyn, M (2013) Developing an organisational framework for sustaining virtual city models. PhD thesis, University of Northumbria at Newcastle, UK.

Pogorelskiy, S (2024) BIM-based methods for optimizing the design and maintenance of telecommunications infrastructure in data centres. PhD thesis, Debreceni Egyetem, Hungary.

Poh, P S H and Malcolm W. Horner, R (1995) Cost-significant modelling: Its potential for use in south-east Asia. Engineering, Construction and Architectural Management, 2(2), pp. 121-139. ISSN 0969-9988

Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(8), pp. 861-868. ISSN 1466433X

Polat, G (2009) Simulation-based efficiency assessment approach for rebar supply chains in Turkey. Construction Innovation, 9(1), pp. 101-121. ISSN 1471-4175

Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(4), pp. 445-462. ISSN 1471-4175

Ponnada, M R and Geddada, Y (2023) Nonlinear modelling and finite element analysis on the load-bearing capacity of RC beams with considering the bond–slip effect. Journal of Engineering, Design and Technology, 21(4), pp. 945-972. ISSN 1726-0531

Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(1), pp. 125-138. ISSN 1609-9451

Porritt, S M; Cropper, P C; Shao, L and Goodier, C I (2013) Heat wave adaptations for UK dwellings and development of a retrofit toolkit. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 269-286. ISSN 1759-5916

Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364

Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364

Powell, R (2012) Evaluating cognitive screening as a possible solution to reducing accidents and improving workplace productivity through early preventive detection of fatigue-impairment in the construction industry. PhD thesis, University of Bath, UK.

Prasertrungruang, T and Hadikusumo, B H W (2008) System dynamics modelling of machine downtime for small to medium highway contractors. Engineering, Construction and Architectural Management, 15(6), pp. 540-561. ISSN 0969-9988

Prasertrungruang, T and Hadikusumo, B H W (2009) Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors. Journal of Construction Engineering and Management, 135(10), pp. 939-947. ISSN 0733-9364

Praticò, F G; Casciano, A and Tramontana, D (2011) Pavement life-cycle cost and asphalt binder quality: Theoretical and experimental investigation. Journal of Construction Engineering and Management, 137(2), pp. 99-107. ISSN 0733-9364

Prozzi, J A (2001) Modeling pavement performance by combining field and experimental data. PhD thesis, University of California, Berkeley, USA.

Pudney, Steven Grant (2010) Asset renewal decision modelling with application to the water utility industry. PhD thesis, Queensland University of Technology, Australia.

Pun, S K; Liu, C and Langston, C (2006) Case study of demolition costs of residential buildings. Construction Management and Economics, 24(9), pp. 967-976. ISSN 1466433X

Puri, V (2012) Incorporation of continuous activities into activity cycle diagram based discrete event simulation for construction operations. PhD thesis, Purdue University, USA.

Puri, V and Martinez, J C (2013) Modeling of simultaneously continuous and stochastic construction activities for simulation. Journal of Construction Engineering and Management, 139(8), pp. 1037-1045. ISSN 0733-9364

Qi, L; Zhai, H and Shuang, Q (2026) Attention-driven multiobject tracking for proactive fall safety management in construction. Journal of Construction Engineering and Management, 152(5): 04026052, ISSN 0733-9364

Quaigrain, R A; Winter, J and Issa, M H (2014) A critical review of the literature on disability management in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Qui, N T (2013) Automated schedule generation and analysis from a construction requirement perspective. PhD thesis, National University of Singapore, Singapore.

Rabie, M and El-Sayegh, S (2017) Modelling of tri-parameter bidding integrating cost, time and risk: A stochastic approach. Journal of Financial Management of Property and Construction, 22(2), pp. 117-134. ISSN 1366-4387

Rachmawati, F; Mudjahidin, M and Dewi Widowati, E (2024) Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance. International Journal of Construction Management, 24(2), pp. 213-225. ISSN 1562-3599

Radzi, A R; Azmi, N F; Kamaruzzaman, S N and Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6): 04025063, ISSN 0733-9364

Radzi, A R; K.S, A; Alias, A R; Algahtany, M and Rahman, R A (2025) Modeling the factors affecting workplace well-being at construction sites: a cross-regional multigroup analysis. Journal of Engineering, Design and Technology, 23(4), pp. 1087-1110. ISSN 1726-0531

Raftery, J (1998) From Ptolemy to Heisenberg: Quantitative models and reality. Construction Management and Economics, 16(3), pp. 295-302. ISSN 01446193

Raftery, J J (1984) An investigation of the suitability of cost models for use in building design. PhD thesis, Liverpool Polytechnic, UK.

Rahman, S (2010) Knowledge-based decision support system for multi criteria roofing material selection and cost modelling. PhD thesis, University of Ulster, UK.

Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2009) A knowledge-based decision support system for roofing materials selection and cost estimating: A conceptual framework and data modelling. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Rahmani Asl, M (2015) A building information model (BIM) based framework for performance optimization. PhD thesis, Texas A&M University, USA.

Rai, Sanish (2016) Building occupancy simulation and data assimilation using a graph based agent oriented model. PhD thesis, Georgia State University, USA.

Raja, P (2025) A building centric urban digital twin for resiliency planning. PhD thesis, Rutgers The State University of New Jersey, USA.

Rajagopalan, N (2011) Residential life cycle assessment modeling for green buildings and building products. PhD thesis, University of Pittsburgh, USA.

Ramalingam Rethnam, O. and Thomas, A. (2026) A physics-informed deep learning-based urban building thermal comfort modeling and prediction framework for identifying thermally vulnerable building stock. Smart and Sustainable Built Environment, 15(2), pp. 622-648. ISSN 2046-6099

Ramalingam Rethnam, O and Thomas, A (2024) Urban building energy modelling-based framework to analyze the effectiveness of the community-wide implementation of national energy conservation codes. Smart and Sustainable Built Environment, 13(5), pp. 1213-1239. ISSN 2046-6099

Rana Abdollahi, R; Bagherzadeh, F; Schnabel, M A and Bakshi, N (2024) A design methodology to consider occupants' spatial adjustment and manage view content in adaptive façade design for improving visual comfort. Architectural Engineering and Design Management, 20(1), pp. 168-190. ISSN 1745-2007

Ranasinghe, M and Russell, A D (1992) Analytical approach for economic risk quantification of large engineering projects : Validation. Construction Management and Economics, 10(1), pp. 45-68. ISSN 01446193

Ranasinghe, Rajeshkumar (2023) Identifying factors that influence adoption, deployment and optimisation of project management methodologies within the Australian local government sector. PhD thesis, RMIT University, Australia.

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599

Raoufi, M and Fayek, A R (2021) Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction. Construction Innovation, 21(3), pp. 398-416. ISSN 1471-4175

Rapheal, O; Afolabi, A; Oyeyipo, O and Olugbenro, O (2024) Modelling client and construction firm barriers hindering social client relationship management system implementation in the built environment. Architectural Engineering and Design Management, 20(1), pp. 102-119. ISSN 1745-2007

Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory. PhD thesis, Illinois Institute of Technology, USA.

Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364

Raslan, R M S (2010) Performance based regulations: the viability of the modelling approach as a methodology for building energy compliance demonstration. PhD thesis, University College London, UK.

Rasmussen, F. N.; Birkved, M. and Birgisdóttir, H. (2020) Low-carbon design strategies for new residential buildings: Lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007

Rasmussen, F N; Birkved, M and Birgisdóttir, H (2020) Low- carbon design strategies for new residential buildings: lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007

Rasoulimanesh, M.; Rahai, A. and Shahhosseini, V. (2025) An integrated decision support system for strategic budget/resource allocation in bridge infrastructure management based on digital technologies. Smart and Sustainable Built Environment, 15(5), pp. 1939-1966. ISSN 2046-6099

Raval, P; Sarkar, D and Solanki, A (2026) A comparative analysis of the application of fuzzy ANP and fuzzy TOPSIS methods for integrated building information modelling (BIM) and blockchain adoption in the construction sector. International Journal of Construction Management, 26(4), pp. 694-717. ISSN 1562-3599

Ravirala, V (1995) Multi-criteria optimization methodologies for highway program development. PhD thesis, Rensselaer Polytechnic Institute, USA.

RazaviAlavi, S and AbouRizk, S (2022) A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects. Journal of Engineering, Design and Technology, 20(4), pp. 866-886. ISSN 1726-0531

Ready to deleteÓ Broin, E (2016) Modelling drivers of energy demand in the European union building sector. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Recsei, Richard Anthony (1998) A generalised decision support system for contaminated site management. PhD thesis, University of New South Wales, Australia.

Reda, R M (1990) RPM: Repetitive project modeling. Journal of Construction Engineering and Management, 116(2), pp. 316-330. ISSN 0733-9364

Reddrick, L A (2023) Leadership strategies for modeling ethical behavior in the real estate industry. DBA thesis, Walden University, USA.

Rempelos, G (2023) A whole life carbon model for railway track system interventions. PhD thesis, University of Southampton, UK.

Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099

Resalati, S; Kendrick, C C and Hill, C (2020) Embodied energy data implications for optimal specification of building envelopes. Building Research & Information, 48(4), pp. 429-445. ISSN 0961-3218

Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599

Rezakhani, P (2022) Project scheduling and performance prediction: A fuzzy-Bayesian network approach. Engineering, Construction and Architectural Management, 29(6), pp. 2233-2244. ISSN 0969-9988

Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599

Richter, S M and Bixler, R P (2022) Complexifying urban expansion: An exploratory, gradient-based approach. Buildings & Cities, 3(1), pp. 792-807. ISSN 2632-6655

Riley, D R (1994) Modeling the space behavior of construction activities. PhD thesis, Pennsylvania State University, USA.

Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193

Rodionova, A (2022) Robust and reliable building renovation strategies for environmental and economic performance. DSc thesis, ETH Zürich, Switzerland.

Rodrigues, F; Antunes, F and Matos, R (2021) Safety plugins for risks prevention through design resourcing BIM. Construction Innovation, 21(2), pp. 244-258. ISSN 1471-4175

Rogerson, J H; Morris, J P and Jared, G E M (2000) Development of a generic design-decision planner. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Rooke, J; Molloy, E M; Sinclair, M; Koskela, L; Siriwardena, M; Kagioglou, M and Siemieniuch, C (2008) Models and metaphors: Complexity theory and through-life management in the built environment. Architectural Engineering and Design Management, 4(1), pp. 47-57. ISSN 1745-2007

Rosado, Lais Peixoto (2019) Life cycle assessment of construction and demolition waste management in a Brazilian watershed. PhD thesis, Universidade Estadual de Campinas, Brazil.

Rosas Sanchez, L (2008) Application of game modeling to good tunneling practice. PhD thesis, University of Colorado at Boulder, USA.

Rostamnezhad, M; Nasirzadeh, F; Khanzadi, M; Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: A case study of highway project. Engineering, Construction and Architectural Management, 27(7), pp. 1595-1618. ISSN 0969-9988

Roupé, M (2013) Development and implementations of virtual reality for decision-making in urban planning and building design. PhD thesis, Chalmers University of Technology, Sweden.

Rowlinson, S and Cheung, Y K F (2008) Stakeholder management through empowerment: Modelling project success. Construction Management and Economics, 26(6), pp. 611-623. ISSN 1466433X

Rungjang, K (2013) Public investment for developing port facilities within competitive market. PhD thesis, University of Wisconsin - Madison, USA.

Rupp, S H and Plagmann, M (2019) Characterisation of air permeability of common ceiling linings and penetrations. International Journal of Building Pathology and Adaptation, 37(4), pp. 448-460. ISSN 23984708

Russell, A D; Tran, N and Staub-French, S (2014) Searching for value: Construction strategy exploration and linear planning. Construction Management and Economics, 32(6), pp. 520-547. ISSN 01446193

Russell, A D and Wong, W C M (1993) New generation of planning structures. Journal of Construction Engineering and Management, 119(2), pp. 196-214. ISSN 0733-9364

Russell, J S (1992) Decision models for analysis and evaluation of construction contractors. Construction Management and Economics, 10(3), pp. 185-202. ISSN 01446193

Russell, J S and Jaselskis, E J (1992) Predicting construction contractor failure prior to contract award. Journal of Construction Engineering and Management, 118(4), pp. 791-811. ISSN 0733-9364

Rustom, R N (2006) Formulation of generic simulation models for analyzing construction claims. Construction Economics and Building, 6(2), pp. 11-19. ISSN 2204-9029

Rustom, R N and Amer, M I (2006) Modeling the factors affecting quality in building construction projects in Gaza Strip. Journal of Construction Research, 7(1), pp. 33-47. ISSN 1609-9451

Saade, M R M; da Silva, M G; Gomes, V; Franco, H G; Schwamback, D and Lavor, B (2014) Material eco-efficiency indicators for Brazilian buildings. Smart and Sustainable Built Environment, 3(1), pp. 54-71. ISSN 2046-6099

Saba, F (2012) A semantic-driven framework for facilitating reusability and interoperability of construction simulation modeling. PhD thesis, University of Alberta, Canada.

Sachs, T and Tiong, R L K (2009) Quantifying qualitative information on risks: Development of the QQIR method. Journal of Construction Engineering and Management, 135(1), pp. 56-71. ISSN 0733-9364

Sacks, R; Eastman, C M and Lee, G (2004) Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. Journal of Construction Engineering and Management, 130(2), pp. 206-215. ISSN 0733-9364

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Sadick, A M; Hasan, A and Ahiaga-Dagbui, D D (2026) Modeling sustainability discourse in the construction industry: A deep-learning approach. Journal of Construction Engineering and Management, 152(4): 04026026, ISSN 0733-9364

Sadooghi, P and Kherani, N P (2022) Influence of metallo-dielectric optical properties on thermal resistance and solar heat gain coefficient of multi-pane glazing systems in hot and cold climates. Architectural Engineering and Design Management, 18(6), pp. 894-910. ISSN 1745-2007

Sadoun, B I (1992) A modeling methodology for energy-conserving site design. PhD thesis, Ohio State University, USA.

Saha, S; Hazra, S and Ghosh, T (2022) How embankment influences coastal livelihood in the context of climate adaptation: a case study of Indian sundarban delta. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 327-350. ISSN 1759-5916

Sahin, O; Miller, D and Mohamed, S (2018) Value-based modelling: An Australian case of off-site manufactured buildings. International Journal of Construction Management, 18(1), pp. 34-52. ISSN 1562-3599

Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364

Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175

Sailer, K; Utley, M; Pachilova, R; Fouad, A T Z; Li, X; Jayaram, H and Foster, P J (2025) Lanes, clusters, sightlines: Modelling patient flow in medical clinics. Buildings & Cities, 6(1), pp. 201-218. ISSN 2632-6655

Sakhakarmi, S (2022) Automated approach for the enhancement of scaffolding structure monitoring with strain sensor data. PhD thesis, University of Nevada, Las Vegas, USA.

Salah, A and Moselhi, O (2015) Contingency modelling for construction projects using fuzzy-set theory. Engineering, Construction and Architectural Management, 22(2), pp. 214-241. ISSN 0969-9988

Salah, M; Elbeltagi, E and Elsheikh, A (2024) Optimization of construction site layout using BIM generative design. International Journal of Construction Management, 24(3), pp. 314-322. ISSN 1562-3599

Salama, M; Al-Sharif, F; Kaka, A P and Leishman, C (2006) Cost modelling for standardised design projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Salama, M A (2011) The relationship between the performance of the economy and the costing of building projects: a case study of school buildings in Egypt. PhD thesis, Heriot-Watt University, UK.

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Salem, D and Elwakil, E (2023) Asset condition assessment model for healthcare facilities. International Journal of Construction Management, 23(1), pp. 182-203. ISSN 1562-3599

Salman, B and Gursoy, B (2022) Markov chain pavement deterioration prediction models for local street networks. Built Environment Project and Asset Management, 12(6), pp. 853-870. ISSN 2044-124X

Salter, J; Lu, Y; Kim, J C; Kellett, R; Girling, C; Inomata, F and Krahn, A (2020) Iterative 'what-if' neighborhood simulation: Energy and emissions impacts. Buildings & Cities, 1(1), pp. 293-307. ISSN 2632-6655

Sambasivan, M; Deepak, T J; Salim, A N and Ponniah, V (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics and structural equation modeling approach. Engineering, Construction and Architectural Management, 24(2), pp. 308-325. ISSN 0969-9988

Sami Kashkooli, A M (2013) A critical building lifecycle assessment framework for building designers and decision makers. PhD thesis, University of Sheffield, UK.

Sampaio, A Z; Henriques, P G and Ferreira, P S (2004) Virtual reality technology applied in civil engineering education: Visual simulation of construction processes. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364

Sanhudo, L; Poças Martins, J; Ramos, N M M; Almeida, R M S F; Rocha, A; Pinto, D; Barreira, E and Simões, M L (2021) BIM framework for the specification of information requirements in energy-related projects. Engineering, Construction and Architectural Management, 28(10), pp. 3123-3143. ISSN 0969-9988

Sanhudo, L P N (2021) Artificial intelligence for an enhanced as-is BIM energy analysis: Enabling an efficient energy retrofit through the automation of the scan-to-BIM process. PhD thesis, Universidade do Porto, Portugal.

Sankaran, B and O'Brien, W J (2018) Impact of CIM technologies and agency policies on performance for highway infrastructure projects. Journal of Construction Engineering and Management, 144(7): 04018052, ISSN 0733-9364

Sanoubar, S (2022) Temporal and spatial considerations in maintenance planning. PhD thesis, University of Pittsburgh, USA.

Sanseverino, Anna (2023) Application of BIM methodology for structural inspection and maintenance eco-systems: Semi-automated monitoring procedures to implement different kinds of data into enriched cooperative systems. PhD thesis, Università degli Studi di Salerno, Italy.

Santero, N J (2009) Pavements and the environment: A life-cycle assessment approach. PhD thesis, University of California, Berkeley, USA.

Sanvido, V E (1984) Designing productivity management and control systems for construction projects. PhD thesis, Stanford University, USA.

Sanvido, V E and Medeiros, D J (1990) Applying computer-integrated manufacturing concepts to construction. Journal of Construction Engineering and Management, 116(2), pp. 365-379. ISSN 0733-9364

Sarah Slaughter, E (1999) Assessment of construction processes and innovations through simulation. Construction Management and Economics, 17(3), pp. 341-350. ISSN 01446193

Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599

Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364

Sartori, I; Bergsdal, H; Muller, D B and Brattebø, H (2008) Towards modelling of construction, renovation and demolition activities: Norway's dwelling stock, 1900-2100. Building Research & Information, 36(5), pp. 412-425. ISSN 0961-3218

Sarvari, H; Parsa, A; Olawumi, T O; Chan, D W M; Rashidi, A and Beer, M (2024) Perceived barriers to implementing building information modeling in Iranian small and medium-sized enterprises (SMEs): A Delphi survey of construction experts. Architectural Engineering and Design Management, 20(3), pp. 673-693. ISSN 1745-2007

Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 0969-9988

Savaşkan, M O and Özener, O Ö (2023) H-BIM applications for vernacular architecture: A historic rural house case study in bursa, Turkey. Engineering, Construction and Architectural Management, 30(9), pp. 3997-4017. ISSN 0969-9988

Sawhney, A and AbouRizk, S M (1995) HSM-simulation-based planning method for construction projects. Journal of Construction Engineering and Management, 121(3), pp. 297-303. ISSN 0733-9364

Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364

Sayed Zayed, N.; Badawy Abu-Sena, A. B.; Attia, T. M. and Ahmed, A. (2026) Integrating recycled materials in road construction: A cost-effective and sustainable approach. International Journal of Construction Management, 26(7), pp. 1222-1238. ISSN 1562-3599

Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.

Schafer, D W (2014) A conceptual framework for resilience engineering in construction safety. PhD thesis, Michigan State University, USA.

Schamne, Annelise Nairne (2022) Building information modeling in construction waste management: Proposal of a conceptual model in the IFC standard. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364

Schiavi, B; Havard, V; Beddiar, K and Baudry, D (2023) A VR training scenario editor for operation in construction based on bim 4D and domain expert authoring. Smart and Sustainable Built Environment, 12(5), pp. 1074-1089. ISSN 2046-6099

Schiller, G (2007) Urban infrastructure: Challenges for resource efficiency in the building stock. Building Research & Information, 35(4), pp. 399-411. ISSN 0961-3218

Schmidt, J R (1997) Quantifying the impact of construction accidents using predictive models. PhD thesis, State University of New York at Buffalo, USA.

Schünemann, C; Dshemuchadse, M and Scherbaum, S (2025) A systemic decision-making model for energy retrofits. Buildings & Cities, 6(1), pp. 511-526. ISSN 2632-6655

Scott, J R (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value. PhD thesis, Robert Gordon University, UK.

Scott, J R; Edge, M; Laing, R and Martin, P (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988

Seboni, L (2016) Improving the existing project manager-to-project practice of a specific organization (organization A) in Botswana. PhD thesis, University of Leeds, UK.

Seboni, L and Tutesigensi, A (2015) A mathematical model for allocating project managers to projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Seki, Y; Sutrisna, M and Olanipekun, A O (2021) Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. Engineering, Construction and Architectural Management, 28(7), pp. 1929-1951. ISSN 0969-9988

Selberherr, J (2015) Sustainable life cycle offers through cooperation. Smart and Sustainable Built Environment, 4(1), pp. 4-24. ISSN 2046-6099

Selinger, S (1983) Economic service life of building construction equipment. Journal of Construction Engineering and Management, 109(4), pp. 398-405. ISSN 0733-9364

Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.

Sepasgozar, S M E (2023) Construction digital technology assimilation and absorption capability using measurement invariance of composite modeling. Journal of Construction Engineering and Management, 149(7): 04023041, ISSN 0733-9364

Sepasgozar, S M E; Forsythe, P and Shirowzhan, S (2018) Evaluation of terrestrial and mobile scanner technologies for part-built information modeling. Journal of Construction Engineering and Management, 144(12): 04018110, ISSN 0733-9364

Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.

Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.

Serugga, J; Kagioglou, M; Edwards, D; Talebi, S and Johns, N (2024) Key influences to cost modelling and analysis in off-site construction: Research trends and gap analysis. Architectural Engineering and Design Management, 20(6), pp. 1335-1356. ISSN 1745-2007

Serugga, J; Kagioglou, M and Tzortzopoulos, P (2021) Benefits realization: Novel conceptual model for front end-design decision-making using dempster-shafer theory and quality function deployment. Journal of Construction Engineering and Management, 147(7): 04021062, ISSN 0733-9364

Severson, G D; Russell, J S and Jaselskis, E J (1994) Predicting contract surety bond claims using contractor financial data. Journal of Construction Engineering and Management, 120(2), pp. 405-420. ISSN 0733-9364

Shafabakhsh, G; Kashi, E and Tahani, M (2018) Analysis of runway pavement response under aircraft moving load by FEM. Journal of Engineering, Design and Technology, 16(2), pp. 233-243. ISSN 1726-0531

Shafabakhsh, G A; Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by led and fe method. Journal of Engineering, Design and Technology, 14(2), pp. 362-372.

Shafiq, M T and Lockley, S R (2022) Application of signature-based matching for IFC model comparison. International Journal of Construction Management, 22(9), pp. 1765-1774. ISSN 1562-3599

Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shahbazi, B; Akbarnezhad, A; Rey, D; Ahmadian Fard Fini, A and Loosemore, M (2019) Optimization of job allocation in construction organizations to maximize workers' career development opportunities. Journal of Construction Engineering and Management, 145(6): 04019036, ISSN 0733-9364

Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering. PhD thesis, University of Alberta, Canada.

Shahin, A; Abourizk, S M and Mohamed, Y (2011) Modeling weather-sensitive construction activity using simulation. Journal of Construction Engineering and Management, 137(3), pp. 238-246. ISSN 0733-9364

Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.

Shakantu, W; Muya, M; Tookey, J and Bowen, P (2008) Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa. Engineering, Construction and Architectural Management, 15(5), pp. 423-439. ISSN 0969-9988

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(7), pp. 2810-2835. ISSN 0969-9988

Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.

Sharaborova, Gulnara (2015) Towards best practices in project management: Profiling professional excellence in identifying and acting on early warning signs in complex projects within a Russian context. PhD thesis, RMIT University, Australia.

Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context. PhD thesis, Nottingham Trent University, UK.

Sharma, H; Sohani, N and Yadav, A (2023) Structural modeling of lean supply chain enablers: A hybrid AHP and ISM-MICMAC based approach. Journal of Engineering, Design and Technology, 21(6), pp. 1658-1689. ISSN 1726-0531

Sharma, V K; Sharma, S K and Singh, A P (2022) Risk enablers modelling for infrastructure projects using Bayesian belief network. International Journal of Construction Management, 22(6), pp. 993-1010. ISSN 1562-3599

Sharp, M; Jones, K and Clarke, R (2005) An investigation into inefficiency in the condition based maintenance process. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sharrard, A L (2007) Greening construction processes using an input-output-based hybrid life cycle assessment method. PhD thesis, Carnegie Mellon University, USA.

Shashwat, S; Zingre, K and Thurairajah, N (2022) Enhancing building energy efficiency estimation by integrating microclimate conditions. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X

Sherafat, Behnam (2022) Acoustical modeling of construction jobsites with multiple operational machines for activity recognition and productivity analysis. PhD thesis, University of Utah, USA.

Sherrin, C; McAllister, P and Nanda, A (2015) The persistence of distance: A macro-level perspective on European cross-border real estate development flows. Journal of Financial Management of Property and Construction, 20(2), pp. 147-169. ISSN 1366-4387

Shi, Q; Yu, J; Zhang, L; Wang, J and Cheng, G (2026) Quantitative evaluation of smart construction pilot cities policies in China based on the pmc-index model. Engineering, Construction and Architectural Management, 33(1), pp. 690-712. ISSN 0969-9988

Shi, X; Qiao, Y; Zhao, X; Liu, Y; Liu, C; Huang, R and Cui, Y (2025) Improving emergency evacuation capacity for subway stations based on agent-based modelling. Construction Innovation, 25(6), pp. 1865-1881. ISSN 1471-4175

Shi, J and AbouRizk, S M (1997) Resource-based modeling for construction simulation. Journal of Construction Engineering and Management, 123(1), pp. 26-33. ISSN 0733-9364

Shi, J and Abourizk, S (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(4), pp. 489-498. ISSN 01446193

Shi, J J (1999) Activity-based construction (ABC) modeling and simulation method. Journal of Construction Engineering and Management, 125(5), pp. 354-360. ISSN 0733-9364

Shi, J J (1999) Mathematical models for maximizing aggregate plant production. Journal of Construction Engineering and Management, 125(1), pp. 53-60. ISSN 0733-9364

Shi, J J and Halpin, D W (2003) Enterprise resource planning for construction business management. Journal of Construction Engineering and Management, 129(2), pp. 214-221. ISSN 0733-9364

Shibeika, A; Davies, R and Gray, C (2009) Care pathways and the built environment: Conceptual framework for understanding. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shiha, A and El-Adaway, I H (2026) From ports to projects: Estimating the impact of supply chain volatility and trade policy changes on construction material prices. Journal of Construction Engineering and Management, 152(6): 04026064, ISSN 0733-9364

Shim, E (2008) The decision-making modeling for concurrent planning of construction projects. PhD thesis, Texas A&M University, USA.

Shipworth, D (2002) A stochastic framework for embodied greenhouse gas emissions modelling of construction materials. Building Research & Information, 30(1), pp. 16-24. ISSN 0961-3218

Shipworth, D (2006) Qualitative modelling of sustainable energy scenarios: An extension of the bon qualitative input-output model. Construction Management and Economics, 24(7), pp. 695-703. ISSN 1466433X

Shoaib Khan, M; Kim, J; Park, S; Lee, S and Seo, J (2021) Methodology for voxel-based earthwork modeling. Journal of Construction Engineering and Management, 147(10): 04021111, ISSN 0733-9364

Shoar, S; Yiu, T W; Payan, S and Parchamijalal, M (2023) Modeling cost overrun in building construction projects using the interpretive structural modeling approach: A developing country perspective. Engineering, Construction and Architectural Management, 30(2), pp. 365-392. ISSN 0969-9988

Short, C A; Song, J; Mottet, L; Chen, S; Wu, J and Ge, J (2018) Challenges in the low-carbon adaptation of China's apartment towers. Building Research & Information, 46(8), pp. 899-930. ISSN 0961-3218

Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218

Short, C A; Woods, A W; Drumright, L; Zia, R and Mingotti, N (2022) An alternative approach to delivering safe, sustainable surgical theatre environments. Buildings & Cities, 3(1), pp. 316-333. ISSN 2632-6655

Shrivastava, R (2020) Development of risk management model for construction of railway project in India. PhD thesis, University of Petroleum and Energy Studies, India.

Siddiquei, A N; Ahmad, S; Badar, K and Asmi, F (2024) How and when creativity thrives in construction projects: A study of leader's humor. Engineering, Construction and Architectural Management, 31(8), pp. 3377-3397. ISSN 0969-9988

Siddiquei, A N; Imam, H and Asmi, F (2024) How and when temporal leadership facilitates the success of sustainable construction projects. Engineering, Construction and Architectural Management, 31(12), pp. 4852-4871. ISSN 0969-9988

Siddiqui, A A (2019) An investigation into data sharing between building information modelling and fire safety engineering, with potential applications to smart buildings. PhD thesis, University of Greenwich, UK.

Siham, E Y (2024) Towards a 3D property valuation model: Conceptualization and BIM-CIM based data integrability. PhD thesis, Universite de Liege, Belgium.

Sillars, D N (1998) Pre-operational attributes as predictors of organizational success within a joint venture: Modeling joint venture formation in the architecture/engineering/construction industry. PhD thesis, Georgia Institute of Technology, USA.

Silva da Purificação, N R; Henrique, V B; Amorim, A; Carneiro, A and Souza, G H B (2024) Reconstruction and storage of a low-cost three-dimensional model for a cadastre of historical and artistic heritage. International Journal of Building Pathology and Adaptation, 42(2), pp. 237-256. ISSN 23984708

Simon, S and O’brien, W (2023) Pilot study to measure the energy and carbon impacts of teleworking. Buildings & Cities, 4(1), pp. 174-192. ISSN 2632-6655

Simukonda, W T (2024) Modelling offsite construction to control hazards and direct cost of accidents. PhD thesis, Nelson Mandela University, South Africa.

Sinesilassie, E G; Tripathi, K K; Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: Engineer's perspective. Engineering, Construction and Architectural Management, 26(10), pp. 2410-2431. ISSN 0969-9988

Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364

Singh, N; Dixit, A and Ashish, D K (2025) Modelling of critical success factors to improve the supply chain resilience for sustainable construction sector. Smart and Sustainable Built Environment, 14(6), pp. 1846-1878. ISSN 2046-6099

Singh, M M; Sawhney, A and Borrmann, A (2019) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(1), pp. 15-31. ISSN 1562-3599

Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029

Singh, S (1987) Cost models for approximate cost estimation of structural systems in commercial high rise buildings. PhD thesis, National University of Singapore, Singapore.

Singh, S and Ramiya, A M (2025) Assessing avalanche susceptibility using the analytic hierarchical process and multi-criteria weighted overlay: A case study of the leh-parthapur road axis. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 437-455. ISSN 1759-5908

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193

Skitmore, R M (1986) A model of the construction project selection and bidding decision. PhD thesis, University of Salford, UK.

Skrzypczak, I; Oleniacz, G; Leśniak, A; Zima, K; Mrówczyńska, M and Kazak, J K (2022) Scan-to-BIM method in construction: Assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information, 50(8), pp. 859-880. ISSN 0961-3218

Slater, K R; Ventura, J; Robinson, J B; Fernandez, C; Dutfield, S and King, L (2022) Assessing climate action progress of the city of Toronto. Buildings & Cities, 3(1), pp. 1059-1074. ISSN 2632-6655

Slattery, D K and Sumner, M R (2011) Leadership characteristics of rising stars in construction project management. International Journal of Construction Education and Research, 7(3), pp. 159-174. ISSN 1557-8771

Slattery, K T and Slattery, D K (2013) Modeling earth surfaces for highway earthwork computation using terrestrial laser scanning. International Journal of Construction Education and Research, 9(2), pp. 132-146. ISSN 1557-8771

Smith, G R and Bohn, C M (1999) Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), pp. 101-108. ISSN 0733-9364

So, K L (2021) Integrated life-cycle management of highway bridges. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Soares, Bruno Cesarino (2021) Use of building information modeling to support built environment management. PhD thesis, Universidade Federal de Minas Gerais, Brazil.

Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: The case of saudi Arabia. Engineering, Construction and Architectural Management, 30(6), pp. 2545-2563. ISSN 0969-9988

Sodangi, M and Salman, A (2023) AHP-DEMATEL modelling of consultant related delay factors affecting sustainable housing construction in Saudi Arabia. International Journal of Construction Management, 23(16), pp. 2859-2868. ISSN 1562-3599

Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. PhD thesis, University of Wolverhampton, UK.

Soetanto, R and Proverbs, D G (2001) Modelling client satisfaction levels: A comparison of multiple regression and artificial neural network techniques. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029

Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: The impact of client performance. Engineering, Construction and Architectural Management, 9(5-6), pp. 453-465. ISSN 0969-9988

Soewin, E and Chinda, T (2022) Development of a construction performance index in the construction industry: System dynamics modelling approach. International Journal of Construction Management, 22(10), pp. 1806-1817. ISSN 1562-3599

Solla, M; González-Jorge, H; Varela, M and Lorenzo, H (2013) Ground-penetrating radar for inspection of in-road structures and data interpretation by numerical modeling. Journal of Construction Engineering and Management, 139(6), pp. 749-753. ISSN 0733-9364

Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling. PhD thesis, Pennsylvania State University, USA.

Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Motamedisedeh, O. and Rahimian, F. (2026) Modelling risk factors in earthmoving equipment operations on Australian construction sites: A fuzzy DEMATEL approach. Engineering, Construction and Architectural Management, 33(3), pp. 2118-2153. ISSN 0969-9988

Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364

Song, T.; Feng, Y. and Xu, L. (2026) A study of balcony design characteristics promoting perceived restorativeness: A stated preference method. Engineering, Construction and Architectural Management, pp. 1-25. ISSN 0969-9988

Song, J; Fan, S; Lin, W; Mottet, L; Woodward, H; Davies Wykes, M; Arcucci, R; Xiao, D; Debay, J E; ApSimon, H; Aristodemou, E; Birch, D; Carpentieri, M; Fang, F; Herzog, M; Hunt, G R; Jones, R L; Pain, C; Pavlidis, D; Robins, A G; Short, C A and Linden, P F (2018) Natural ventilation in cities: The implications of fluid mechanics. Building Research & Information, 46(8), pp. 809-828. ISSN 0961-3218

Song, J; Song, D and Zhang, D (2015) Modeling the concession period and subsidy for BOT waste-to-energy incineration projects. Journal of Construction Engineering and Management, 141(10): 04015033, ISSN 0733-9364

Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.

Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364

Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364

Song, Y (2007) Intermediate function analysis for improving constructability. PhD thesis, National University of Singapore, Singapore.

Song, Y and Chua, D K H (2006) Modeling of functional construction requirements for constructability analysis. Journal of Construction Engineering and Management, 132(12), pp. 1314-1326. ISSN 0733-9364

Songer, A D (1992) Toward an improved understanding of public sector design-build planning. PhD thesis, University of California, Berkeley, USA.

Sonkor, Muammer Semih (2026) A cybersecurity decision-support framework for technology integration in the built environment. PhD thesis, New York University Tandon School of Engineering, USA.

Sonkor, M S and García De Soto, B (2021) Operational technology on construction sites: A review from the cybersecurity perspective. Journal of Construction Engineering and Management, 147(12): 04021172, ISSN 0733-9364

Sonmez, R (2004) Selection of a probability distribution function for construction cost estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sonmez, R and Rowings, J E (1998) Construction labor productivity modeling with neural networks. Journal of Construction Engineering and Management, 124(6), pp. 498-504. ISSN 0733-9364

Sorooshnia, E; Rashidi, M; Rahnamayiezekavat, P; Rezaei, F and Samali, B (2023) Optimum external shading system for counterbalancing glare probability and daylight illuminance in sydney's residential buildings. Engineering, Construction and Architectural Management, 30(1), pp. 296-320. ISSN 0969-9988

Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.

Souza, Flávia Rodrigues de (2015) The design management process into real estate developers companies. PhD thesis, Universidade de São Paulo, Brazil.

Srivastava, A; Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology, 17(6), pp. 1129-1145. ISSN 1726-0531

Stals, A; Elsen, C and Jancart, S (2022) Integration of parametric modeling tools in small architectural offices–between constraints and organizational strategies. Architectural Engineering and Design Management, 18(5), pp. 759-773. ISSN 1745-2007

Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.

Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029

Steadman, P; Evans, S; Liddiard, R; Godoy-Shimizu, D; Ruyssevelt, P and Humphrey, D (2020) Building stock energy modelling in the UK: The 3DStock method and the London building stock model. Buildings & Cities, 1(1), pp. 100-119. ISSN 2632-6655

Steele, J (2000) The interdisciplinary conceptual design of buildings. PhD thesis, Loughborough University, UK.

Steemers, K; Baker, N; Crowther, D; Dubiel, J and Nikolopoulou, M (1998) Radiation absorption and urban texture. Building Research & Information, 26(2), pp. 103-112. ISSN 0961-3218

Stellacci, S; Domingos, L and Resende, R (2024) Integrated computational approaches for energy retrofit of historical buildings in extreme climate environments. International Journal of Building Pathology and Adaptation, 42(1), pp. 114-132. ISSN 23984708

Stewart, M G (1993) Modeling human performance in reinforced concrete beam construction. Journal of Construction Engineering and Management, 119(1), pp. 6-22. ISSN 0733-9364

Stickley, A; Christensen, S; Duncan, W D and Buchbach, J (2016) Predictive technology and natural hazards: Risk for Australian planning authorities? International Journal of Law in the Built Environment, 8(1), pp. 42-55. ISSN 1756-1450

Stojanovic, V; Falconer, R; Blackwood, D; Paterson, G; Fleming, M and Bell, S (2014) Interactive visualisation of heat loss and gain for early-stage energy appraisal of the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Stone, A; Shipworth, D; Biddulph, P and Oreszczyn, T (2014) Key factors determining the energy rating of existing English houses. Building Research & Information, 42(6), pp. 725-738. ISSN 0961-3218

Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.

Stundon, D; Spillane, J; Lim, J P B; Tansey, P and Tracey, M (2015) Building information modelling energy performance assessment on domestic dwellings: A comparative study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Sturk, R (1998) Engineering geological information: Its value and impact on tunnelling. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.

Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.

Su, X and Cai, H (2014) Life cycle approach to construction workspace modeling and planning. Journal of Construction Engineering and Management, 140(7): 04014019, ISSN 0733-9364

Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.

Su, Y; Isaac, S and Lucko, G (2018) Integrated temporal-spatial model for construction plans with boolean logic operators. Journal of Construction Engineering and Management, 144(4): 04018009, ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. I: Theory for periodic phenomena and time value of money. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. II: Feasible prompt payment discount scenarios. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.

Subprasom, K and Chen, A (2007) Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. Journal of Construction Engineering and Management, 133(1), pp. 64-71. ISSN 0733-9364

Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway. PhD thesis, University of Michigan, USA.

Sun, Chenjunyan (2023) Improving mental health in the construction industry. PhD thesis, Queensland University of Technology, Australia.

Sun, L (2001) Stochastic performance modeling considering maintenance effects for highway pavement management. PhD thesis, University of Texas at Austin, USA.

Sun, Q; He, L; Ding, F; Chen, X; Ding, L and Tu, Y (2021) Modeling and analysis of structure parameters on the lifting force for power catwalk. Journal of Engineering, Design and Technology, 19(1), pp. 187-202. ISSN 1726-0531

Sun, W (2000) Designing an object-oriented geographic information system application for integration of building construction project information. PhD thesis, University of Florida, USA.

Sun, Z (2020) Predictive control of interpersonal communication processes in civil infrastructure systems operations. PhD thesis, Arizona State University, USA.

Sunarharum, T M; Sloan, M and Susilawati, C (2014) Re-framing planning decision-making: Increasing flood resilience in Jakarta. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 230-242. ISSN 1759-5916

Suo, W.; Li, J.; Zhang, J. and Wang, L. (2026) A feature-driven risk allocation modeling methodology for transport infrastructure public-private partnership projects. Journal of Construction Engineering and Management, 152(10): 04026174, ISSN 0733-9364

Suprun, E; Sahin, O; Anthony Stewart, R and Panuwatwanich, K (2022) Examining transition pathways to construction innovation in Russia: A system dynamics approach. International Journal of Construction Management, 22(4), pp. 556-578. ISSN 1562-3599

Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.

Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(2), pp. 164-179. ISSN 0969-9988

Swaffield, J A and Jack, L B (2004) Simulation and analysis of airborne cross-contamination routes due to the operation of building drainage and vent systems. Building Research & Information, 32(6), pp. 451-467. ISSN 0961-3218

Syachrani, S (2010) Advanced sewer asset management using dynamic deterioration models. PhD thesis, Oklahoma State University, USA.

Symonds, P; Taylor, J; Mavrogianni, A; Davies, M; Shrubsole, C; Hamilton, I and Chalabi, Z (2017) Overheating in English dwellings: Comparing modelled and monitored large-scale datasets. Building Research & Information, 45(1-2), pp. 195-208. ISSN 0961-3218

Synovec, T M (2020) A strategy to reduce total cost of ownership of the U.S. Air Force's airfield pavements. PhD thesis, Mississippi State University, USA.

Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(6), pp. 557-567. ISSN 0961-3218

Tabarroki, S; Nazari, A and Banihashemi, S (2024) Risk stages and factors in architectural design- a structural equation modelling. Architectural Engineering and Design Management, 20(1), pp. 79-101. ISSN 1745-2007

Tabassi, A A; Ramli, M; Roufechaei, K M and Tabasi, A A (2014) Team development and performance in construction design teams: An assessment of a hierarchical model with mediating effect of compensation. Construction Management and Economics, 32(9), pp. 932-949. ISSN 01446193

Taggart, M; Koskela, L K and Rooke, J A (2014) An improvement strategy for the defects and rework management process within an SME: An action research approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation. PhD thesis, University of Alberta, Canada.

Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364

Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175

Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.

Tah, J H M; Aouad, G; Lee, A and Wu, S (2004) Conceptual information modelling for risk analysis and management in an nD-modelling environment. Journal of Construction Procurement, 10(1),

Tah, J H M and Carr, V (2000) Information modelling for a construction project risk management system. Engineering, Construction and Architectural Management, 7(2), pp. 107-119. ISSN 0969-9988

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Tahmasebinia, F; M.E. Sepasgozar, S; Shirowzhan, S; Niemela, M; Tripp, A; Nagabhyrava, S; Mansuri, K Z and Alonso-Marroquin, F (2020) Criteria development for sustainable construction manufacturing in Construction Industry 4.0: Theoretical and laboratory investigations. Construction Innovation, 20(3), pp. 379-400. ISSN 1471-4175

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988

Tam, C M; Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(8), pp. 839-849. ISSN 01446193

Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531

Tam, V W Y; Liu, L and Le, K N (2023) Modelling and quantitation of embodied, operational and mobile energies of buildings: A holistic review from 2012 to 2021. Engineering, Construction and Architectural Management, 30(9), pp. 4045-4079. ISSN 0969-9988

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.

Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.

Tan, C Y M; Rahman, R A and Lee, Y S (2025) Modelling the well building concepts for office environments: PLS-SEM approach. Journal of Engineering, Design and Technology, 23(2), pp. 618-639. ISSN 1726-0531

Tan, Y; Smith, N J and Bower, D A (2003) Improving risk identification by utilizing hybrid intelligent reasoning. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Tang, W; Cui, Q; Zhang, F and Chen, Y (2019) Urban rail-transit project investment benefits based on compound real options and trapezoid fuzzy numbers. Journal of Construction Engineering and Management, 145(1): 05018016, ISSN 0733-9364

Tang, Y; Lim, P G and Gan, S W (2012) Forecasting capability of a construction organization model: 10 years later. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tang, Y H and Ogunlana, S O (2003) Modelling the dynamic perfomance of a construction organization. Construction Management and Economics, 21(2), pp. 127-136. ISSN 01446193

Tangkitsiri, W (2016) Modelling user satisfaction with transportation public-private partnership projects. PhD thesis, Heriot-Watt University, UK.

Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531

Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.

Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. DTech thesis, KTH Royal Institute of Technology, Sweden.

Taroun, A (2012) Decision support system (DSS) for construction project risk analysis and evaluation via evidential reasoning (ER). PhD thesis, University of Manchester, UK.

Tartibu, L K; Sun, B and Kaunda, M A E (2015) Optimal design study of thermoacoustic regenerator with lexicographic optimization method. Journal of Engineering, Design and Technology, 13(3), pp. 499-519.

Tasselli, Nicola (2023) BIM digital integration for existing buildings: Processes and tools to foster technological innovation of added-value building systems applied to the 20th century built asset in emilia-romagna. PhD thesis, Università degli Studi di Ferrara, Italy.

Tatum, C B (2011) Core elements of construction engineering knowledge for project and career success. Journal of Construction Engineering and Management, 137, pp. 745-750. ISSN 0733-9364

Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364

Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599

Taylor, S; Fan, D and Rylatt, M (2014) Enabling urban-scale energymodelling: A new spatial approach. Building Research & Information, 42(1), pp. 4-16. ISSN 0961-3218

Taylor, T (2014) Assessing the thermal performance of buildings at the construction stage using thermography: development and evaluation of a testing approach in the context of new housing in Wales. PhD thesis, Cardiff Metropolitan University, UK.

Teixeira Brasil, Jose Artur (2025) A digital twin framework for monitoring, modeling, and forecasting the performance of permeable pavement systems. PhD thesis, The University of Texas at San Antonio, USA.

Teizer, J (2006) Real-time spatial modeling to detect and track resources on construction sites. PhD thesis, University of Texas at Austin, USA.

Teizer, J; Caldas, C H and Haas, C T (2007) Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. Journal of Construction Engineering and Management, 133(11), pp. 880-888. ISSN 0733-9364

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa, J J and Samaraweera, A (2025) Modelling the effect of transaction cost determinants and governance on Australian offsite construction supply chain resilience. Engineering, Construction and Architectural Management, 32(13), pp. 104-132. ISSN 0969-9988

Teo, S I E; Zhou, Y and Yeoh, J K W (2025) Indoor wifi path loss model to estimate indoor network coverage considering residential design. Smart and Sustainable Built Environment, 14(5), pp. 1407-1433. ISSN 2046-6099

Tepeli, E; Taillandier, F and Breysse, D (2021) Multidimensional modelling of complex and strategic construction projects for a more effective risk management. International Journal of Construction Management, 21(12), pp. 1218-1239. ISSN 1562-3599

Terouhid, S A (2013) A dynamic decision support system for organizational sustainability excellence of construction firms. PhD thesis, University of Florida, USA.

Tesfamariam, S (2008) Seismic risk assessment of reinforced concrete buildings using fuzzy based techniques. PhD thesis, University of Ottawa, Canada.

Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364

Thevenin, M K and Elliott, J W (2018) The role of supportive others in academic decisions; differences in construction management students by gender. International Journal of Construction Education and Research, 14(4), pp. 257-276. ISSN 1557-8771

Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.

Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation. PhD thesis, University of Michigan, USA.

Thomas, A V; Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(4), pp. 407-424. ISSN 01446193

Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Thomas, H R; Maloney, W F; Horner, R M W; Smith, G R; Handa, V K and Sanders, S R (1990) Modeling construction labor productivity. Journal of Construction Engineering and Management, 116(4), pp. 705-726. ISSN 0733-9364

Thompson, B P (2009) Investigation of system dynamics applied to building simulation for anti-terrorism resource allocation. PhD thesis, University of Wisconsin - Madison, USA.

Thompson, E T (1997) A rational approach to computer integration in construction. PhD thesis, London South Bank University, UK.

Thompson, O (2020) Towards a comprehensive understanding of human behaviour in dwelling fires. PhD thesis, University of Greenwich, UK.

Thompson, R F (2002) Management of architects within architectural businesses. PhD thesis, University of Salford, UK.

Thomson, C P H (2016) From point cloud to building information model: capturing and processing survey data towards automation for high quality 3D models to aid a BIM process. PhD thesis, University College London, UK.

Thomson, D; Kaka, A; Pronk, L and Alalouch, C (2012) The use of freelisting to elicit stakeholder understanding of the benefits sought from healthcare buildings. Construction Management and Economics, 30(4), pp. 309-323. ISSN 1466433X

Thomson, D S; Austin, S A; Mills, G R and Devine-Wright, H (2013) Practitioner understanding of value in the UK building sector. Engineering, Construction and Architectural Management, 20(3), pp. 214-231. ISSN 0969-9988

Thorpe, D (2012) Evaluating factors in sustainable road construction and management: A life cycle approach. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175

Thunberg, M and Fredriksson, A (2023) A model for visualizing cost shifts when introducing construction logistics setups. Construction Innovation, 23(4), pp. 757-774. ISSN 1471-4175

Thuvander, L (2002) Towards environmental informatics for building stocks. A conceptual model for an environmental building stock information system for sustainable development – EBSIS. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Thuvander, L (2003) Towards environmental informatics for building stocks: A conceptual model for an environmental building stock information system for sustainable development - EBSIS(SD). PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Tiellemans, N; Kemperman, A; Maussen, S and Arentze, T (2022) The influence of group decision-making on residents' preferences for sustainable energy measures of dwellings. Building Research & Information, 50(4), pp. 410-423. ISSN 0961-3218

Tien, I (2014) Bayesian network methods for modeling and reliability assessment of infrastructure systems. PhD thesis, University of California, Berkeley, USA.

Tino Balestra, C E; Alessi Reichert, T; Savaris, G; Pansera, W A and Medeiros-Junior, R A (2020) Nondestructive method for estimation of chloride profiles: Correlation between electrical resistivity and holliday-empirical equation. Journal of Construction Engineering and Management, 146(10): 04020119, ISSN 0733-9364

Tiruneh, G G and Fayek, A R (2022) Hybrid GA-manfis model for organizational competencies and performance in construction. Journal of Construction Engineering and Management, 148(4): 04022002, ISSN 0733-9364

Tiruneh, Getaneh Gezahegne (2021) Hybrid neuro-fuzzy model for construction organizational competencies and performance. PhD thesis, University of Alberta, Canada.

Titus, K M; Blismas, N; Wakefield, R and Lombardo, R (2011) System archetypes underlying the problematic behaviourof construction activity in Kenya. Construction Management and Economics, 29(1), pp. 3-13. ISSN 1466433X

Tokede, O and Wamuziri, S (2012) Perceptions of fuzzy set theory in construction risk analysis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tokede, O O (2016) Developing whole-life cost models for retrofit options in office buildings. PhD thesis, Edinburgh Napier University, UK.

Toma, H M; Abdeen, A H and Ibrahim, A (2025) Predicting construction equipment resale price: Machine learning model. Engineering, Construction and Architectural Management, 32(5), pp. 3453-3464. ISSN 0969-9988

Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.

Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. PhD thesis, Stanford University, USA.

Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Site-layout modeling: How can artificial intelligence help? Journal of Construction Engineering and Management, 118(3), pp. 594-611. ISSN 0733-9364

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364

Torriti, J (2012) Multiple-project discount rates for cost-benefit analysis in construction projects: A formal risk model for microgeneration renewable energy technologies. Construction Management and Economics, 30(9), pp. 739-747. ISSN 1466433X

Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193

Touran, A (1991) Modeling uncertainty in operations with nonstationary cycle times. Journal of Construction Engineering and Management, 117(4), pp. 728-735. ISSN 0733-9364

Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(4), pp. 295-306. ISSN 01446193

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Tran, H and Carmichael, D G (2012) The likelihood of subcontractor payment: Downstream progression via the owner and contractor. Journal of Financial Management of Property and Construction, 17(2), pp. 135-152. ISSN 1366-4387

Tran, H; Robert, D; Gunarathna, P and Setunge, S (2023) Stochastic prediction of road network degradation based on field monitoring data. Journal of Construction Engineering and Management, 149(10): 04023096, ISSN 0733-9364

Tran, V D (2017) Evaluating the economics of construction and demolition waste minimisation and zero waste in the New Zealand construction industry. PhD thesis, Auckland University of Technology, New Zealand.

Trinh, Hoang T (2021) Optimisation framework for sustainable design of concrete buildings. PhD thesis, Griffith University, Australia.

Tsang, Y T; Fung, I W H; Tam, V W Y; Sing, C P and Lu, C T (2017) Development of an accident modelling in the Hong Kong construction industry. International Journal of Construction Management, 17(2), pp. 124-131. ISSN 1562-3599

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175

Tsehayae, A A and Fayek, A R (2016) Developing and optimizing context-specific fuzzy inference system-based construction labor productivity models. Journal of Construction Engineering and Management, 142(7): 4016017, ISSN 0733-9364

Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X

Tsolas, I E (2011) Modelling profitability and effectiveness of Greek-listed construction firms: An integrated DEA and ratio analysis. Construction Management and Economics, 29(8), pp. 795-807. ISSN 1466433X

Tsolas, I E (2013) Modeling profitability and stock market performance of listed construction firms on the athens exchange: Two-stage DEA approach. Journal of Construction Engineering and Management, 139(1), pp. 111-119. ISSN 0733-9364

Tucker, G C; Windapo, A and Cattell, K S (2015) Exploring the use of financial capacity as a predictor of construction company corporate performance: Evidence from South Africa. Journal of Engineering, Design and Technology, 13(4), pp. 596-611.

Tudor, L G (1987) Modeling OSHA's inspection decision and the compliance decision of the firm. PhD thesis, George Washington University, USA.

Turk, Ž and Klinc, R (2020) A social-product-process framework for construction. Building Research & Information, 48(7), pp. 747-762. ISSN 0961-3218

Tuuli, M and Acquah, S (2012) Do you feel what i feel? Empowerment contagion in project teams. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences. PhD thesis, University of Hong Kong, Hong Kong.

Tuuli, M M and Rowlinson, S (2009) Performance consequences of psychological empowerment. Journal of Construction Engineering and Management, 135(12), pp. 1334-1347. ISSN 0733-9364

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: A multilevel examination of the job performance implications. Construction Management and Economics, 27(5), pp. 473-498. ISSN 1466433X

Uddin, S M J (2023) Leveraging social media platforms and generative AI technologies for construction industry applications. PhD thesis, North Carolina State University, USA.

Uddin, S M J; Albert, A; Tamanna, M and Alsharef, A (2023) Youtube as a source of information: Early coverage of the COVID-19 pandemic in the context of the construction industry. Construction Management and Economics, 41(5), pp. 402-427. ISSN 01446193

Udeaja, Chika Emmanuel (2002) A decision support framework for construction material supply chain management using multi-agent systems. PhD thesis, London South Bank University, UK.

Uggla, G (2021) Model and reality: Connecting BIM and the built environment. PhD thesis, KTH Royal Institute of Technology, Sweden.

Umar, M; Ofem, M I; Anwar, A S and Salisu, A G (2021) Modelling of mechanical properties of Pa6 based reinforced graphite and graphite nano platelets composites using different aspect ratio. Journal of Engineering, Design and Technology, 19(4), pp. 809-827. ISSN 1726-0531

Underwood, J and Isikdag, U (2011) Emerging technologies for BIM 2.0. Construction Innovation, 11(3), pp. 252-258. ISSN 1471-4175

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.

Unsal, H I and Taylor, J E (2011) Modeling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks. Journal of Construction Engineering and Management, 137(4), pp. 284-293. ISSN 0733-9364

Urquhart, S and Whyte, A (2018) Contractor tendering research: Going beyond bid/no-bid and markup models. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 255-262. ISSN 17514304

Urquhart, S; Whyte, A and Lloyd, N (2017) The development of a more efficient internal tender procedure framework for Australian construction contractors. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Usman, Z S (2023) Using Semantic Web technologies to recommend sustainable building technology products. PhD thesis, Oxford Brookes University, UK.

Uthai, T; Zhou, T; Ye, Y; You, H and Du, J (2025) Haptics-based robot teleoperation for soft object manipulation. Journal of Construction Engineering and Management, 151(5): 04025028, ISSN 0733-9364

Utkucu, D and Sözer, H (2025) Modeling a mixed-mode cooling system with correlation to operable building facade openings: Mathematical logic integration of computational fluid dynamics and energy models. Journal of Construction Engineering and Management, 151(6): 04025054, ISSN 0733-9364

Vahdat, K and Smith, N J (2010) A DSS framework for selecting projects in seismic areas. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Van Hove, M Y C; Deurinck, M; Lameire, W; Laverge, J; Janssens, A and Delghust, M (2023) Large-scale statistical analysis and modelling of real and regulatory total energy use in existing single-family houses in flanders. Building Research & Information, 51(2), pp. 203-222. ISSN 0961-3218

Van Tam, N. (2026) Evaluating risk distribution: A stakeholder-driven causal analysis of genai adoption risks in construction project management. Journal of Construction Engineering and Management, 152(7): 04026098, ISSN 0733-9364

Van de Ruitenbeek, H K M (2012) Evolutionary, unconscious design support for the architectural, engineering and construction industry. PhD thesis, Delft University of Technology, Netherlands.

Vander Schaaf, R E (2008) A system-of-system (sos) approach for improved decision-making in infrastructure project selection problems. PhD thesis, Purdue University, USA.

Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.

Verheij, J M (2005) Process-mediated planning of AEC projects through structured dialogues. PhD thesis, Georgia Institute of Technology, USA.

Vesali Mahmoud, N (2016) A comprehensive decision support framework in the front-end phase of major transportation projects. PhD thesis, Florida International University, USA.

Vidalakis, C; Tookey, J E and Sommerville, J (2011) Logistics simulation modelling across construction supply chains. Construction Innovation, 11(2), pp. 212-228. ISSN 1471-4175

Viljoen, P S (1981) Incentive management techniques for pavement rehabilitation construction. PhD thesis, University of California, Berkeley, USA.

Vinodh, S and Aravindraj, S (2012) Axiomatic modeling of lean manufacturing system. Journal of Engineering, Design and Technology, 10(2), pp. 199-216. ISSN 1726-0531

Viswanathan, S K and Jha, K N (2020) Risk mitigation modelling of international construction projects executed by Indian firms: A structural equation modelling approach. Engineering, Construction and Architectural Management, 27(9), pp. 2687-2713. ISSN 0969-9988

Vitharana, V H P and Chinda, T (2021) Development of a lower back pain prevention index for heavy equipment operators in the construction industry: System dynamics modelling. International Journal of Construction Management, 21(7), pp. 677-693. ISSN 1562-3599

Vojinovic, Z and Kecman, V (2001) Modelling empirical data to support project cost estimating: Neural networks versus traditional methods. Construction Innovation, 1(4), pp. 227-243. ISSN 1471-4175

Von Kluge, P. N.; Doumia, B. and Sengha, G. G. (2026) Nonlinear soil-structure interaction effects on eccentric seismic pounding and torsional response of adjacent buildings: Experimental validation and reduced-order modelling. Architectural Engineering and Design Management, 22(3), pp. 809-843. ISSN 1745-2007

Wakefield, R R and Sears, G A (1997) Petri nets for simulation and modeling of construction systems. Journal of Construction Engineering and Management, 123(2), pp. 105-112. ISSN 0733-9364

Walker, G (1999) A critical analysis into the factors that determine project management success: The case in railway engineering projects. PhD thesis, London South Bank University, UK.

Walker, L (2022) Scenario-based robustness assessment for low-emission building retrofit. DSc thesis, ETH Zürich, Switzerland.

Walliah, Jerry Jimmy (2021) Understanding the behaviour of the Australian retirement village industry: A system dynamics modelling approach. PhD thesis, Queensland University of Technology, Australia.

Walters, J P (2015) A systems approach to sustainable rural water infrastructure in developing countries. PhD thesis, University of Colorado at Boulder, USA.

Wan, M.; Li, L.; Yuan, M. and Yin, X. (2026) Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(7), pp. 5469-5494. ISSN 0969-9988

Wang, L.; Yuan, J.; Chen, Y.; Wan, X. and Huang, G. (2026) Intelligent construction benefits the public: Evidence from the opinion analysis on social media. Engineering, Construction and Architectural Management, 33(3), pp. 2176-2199. ISSN 0969-9988

Wang, L.; Yuan, J.; Su, S.; Weng, S. and Hu, F. (2026) Vision-based progress compliance and worker health monitoring in concrete pouring and vibration. Journal of Construction Engineering and Management, 152(10): 04026162, ISSN 0733-9364

Wang, M.; Dang, X. and Deng, X. (2026) Green Silk Road: How stakeholders shape the ESG footprint of Chinese international contractors. Engineering, Construction and Architectural Management, pp. 1-31. ISSN 0969-9988

Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364

Wang, Y. and Zou, P. X. W. (2026) Uncovering key construction injury causal factors using topic modeling and word co-occurrence network analysis methods. Journal of Construction Engineering and Management, 152(10): 04026168, ISSN 0733-9364

Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193

Wang, G; Locatelli, G; Zhang, H; Wan, J and Chen, Y (2023) Playing the cards right: Exploring the way leadership influences organizational citizenship behavior for the environment in megaprojects. Engineering, Construction and Architectural Management, 30(2), pp. 623-646. ISSN 0969-9988

Wang, H (2021) BIM-based knowledge management for the use of construction and facilities management knowledge in construction projects. PhD thesis, Queen's University Belfast, UK.

Wang, H; Meng, X and McGetrick, P J (2018) Incorporating knowledge of construction and facility management into the design in the BIM environment. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Wang, H-H (2010) A context-based representation and reasoning formalism to support construction safety planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Wang, J; Han, C and Li, X (2023) Modified streamlined optimization algorithm for time-cost tradeoff problems of complex large-scale construction projects. Journal of Construction Engineering and Management, 149(5): 04023022, ISSN 0733-9364

Wang, K (2017) Real options models for better investment decisions in road infrastructure under demand uncertainty. PhD thesis, University of California, Irvine, USA.

Wang, L-H (2005) Vertical process integration in design and manufacturing of hardwood products. PhD thesis, University of Missouri - Columbia, USA.

Wang, M; Altaf, M S; Al-Hussein, M and Ma, Y (2020) Framework for an IoT-based shop floor material management system for panelized homebuilding. International Journal of Construction Management, 20(2), pp. 130-145. ISSN 1562-3599

Wang, N and Horner, M (2007) CSI model for estimating road maintenance projects. Construction Management and Economics, 25(12), pp. 1269-1281. ISSN 1466433X

Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.

Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364

Wang, Q; Guo, Z; Mei, T; Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies' installation: A 4D-BIM-based approach. Engineering, Construction and Architectural Management, 25(3), pp. 374-411. ISSN 0969-9988

Wang, S (2019) An exact architectural practice: Strategies for post-digital architectural design in China’s construction context. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.

Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management. DES thesis, Columbia University, USA.

Wang, X; Liu, R; Ye, K and Tekka, R S (2020) Modelling the cost of collusion in the construction industry: A case of China. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Wang, Y (2015) Structured versus direct-mapping approaches to empirical modeling of civil engineering problems. PhD thesis, University of Florida, USA.

Wang, Y (2022) Monitoring, modelling and analysis of occupants' operation of windows, use of air purifiers and smart air quality control in low-energy residential buildings. PhD thesis, University College London, UK.

Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364

Wang, Z; Hu, H and Gong, J (2018) Modeling worker competence to advance precast production scheduling optimization. Journal of Construction Engineering and Management, 144(11): 04018098, ISSN 0733-9364

Wang, Z; Jia, L; Lv, J and Huang, J (2024) Minimization of rebar cutting waste using BIM and cutting pattern-oriented multiobjective optimization. Journal of Construction Engineering and Management, 150(11): 04024166, ISSN 0733-9364

Wang, Ze (2025) Advancing circular construction in sydney: Integrating system dynamics, evolutionary game theory, and robust optimization for construction and demolition waste management. PhD thesis, University of Sydney, Australia.

Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.

Wanigarathna, N; Henjewele, C; Jones, K G; Pascale, F and Morga, M (2022) Modelling earthquake damage repair costs: Improving accuracy for preparedness decision making. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Wanigarathna, N; Jones, K; Pascale, F; Morga, M and Meslem, A (2023) Cost–benefit analysis to appraise technical mitigation options for earthquake-induced liquefaction disaster events. Journal of Financial Management of Property and Construction, 28(2), pp. 220-241. ISSN 1366-4387

Wanigarathna, N; Xie, Y; Henjewele, C; Morga, M and Jones, K (2025) Machine learning application to disaster damage repair cost modelling of residential buildings. Construction Management and Economics, 43(4), pp. 302-322. ISSN 0144-6193

Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering. PhD thesis, University of Liverpool, UK.

Wanous, M; Boussabaine, H and Lewis, J (2004) A neurofuzzy decision-support model for mark-up estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wanous, M; Boussabaine, H A and Lewis, J (2003) A neural network bid/no bid model: The case for contractors in Syria. Construction Management and Economics, 21(7), pp. 737-744. ISSN 01446193

Waqar, A; Othman, I and Mansoor, M S (2026) Effect of human-centric technology adoption on sustainable construction success: A partial least square modeling. International Journal of Building Pathology and Adaptation, 44(1), pp. 36-54. ISSN 2398-4708

Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.

Ward, M; Poleacovschi, C; Faust, K and Svec, J (2021) Modeling public support for utility expansions in displacement situations. Journal of Construction Engineering and Management, 147(6): 04021039, ISSN 0733-9364

Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.

Warrier, G A and Palaniappan, S (2025) Uncertainty in the embodied energy assessment of buildings: a case of EWS type low-cost house in India. International Journal of Construction Management, 25(8), pp. 911-922. ISSN 1562-3599

Watkins, M; Mukherjee, A; Onder, N and Mattila, K (2009) Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. Journal of Construction Engineering and Management, 135(7), pp. 657-667. ISSN 0733-9364

Watson, R; Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data: Managing electronic project specification information. Engineering, Construction and Architectural Management, 9(3), pp. 272-283. ISSN 0969-9988

Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Weerasinghe, A S; Rasheed, E O and Rotimi, J O B (2021) A dilemma between building indoor environment preferences and occupant energy behaviours. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Wefki, H; Salah, M; Elbeltagi, E; Elsheikh, A and Khallaf, R (2025) A generative design-based optimization model for multi-objective construction site layout planning. Engineering, Construction and Architectural Management, 32(8), pp. 5429-5455. ISSN 0969-9988

Wenninger, S (2022) Data-driven support and risk modeling for a successful heat transition in the building sector. PhD thesis, Universitaet Bayreuth, Germany.

Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.

White III, R J (2014) Application of social impact bonds in built infrastructure sustainability projects. PhD thesis, Texas A&M University, USA.

Whyte, A and Donaldson, J (2015) Digital model data distribution in civil engineering contracts. Built Environment Project and Asset Management, 5(3), pp. 248-260. ISSN 2044-124X

Whyte, J (2000) Virtual reality applications in the house-building industry. PhD thesis, Loughborough University, UK.

Wibowo, A; Permana, A; Kochendörfer, B; Kiong, R T L; Jacob, D and Neunzehn, D (2012) Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. Journal of Construction Engineering and Management, 138(12), pp. 1403-1410. ISSN 0733-9364

Wibowo, M A (2004) Modelling labour intensive construction and its effect on a developing economy. PhD thesis, University of Nottingham, UK.

Wickramaratne, S (2010) Design and analysis of tsunami warning and evacuation systems. PhD thesis, University of Calgary, Canada.

Wickramasinghe, V; Dias, P; Robert, D and Setunge, S (2024) From physical degradation condition ratings of building elements to lost value ratio bands. Built Environment Project and Asset Management, 14(6), pp. 858-873. ISSN 2044-124X

Wijewickrama, M. K. C. S.; Chileshe, N.; Rameezdeen, R. and Ochoa, J. J. (2026) Application of a Bayesian belief network-based information processing model for quality assurance in demolition waste reverse logistics: Insights from two case studies. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988

Wijewickrama, M K C S; Tennakoon, G A; Samaraweera, A and Chileshe, N (2026) Modeling psychosocial hazards affecting professional construction employees: ISM-MICMAC approach. Journal of Construction Engineering and Management, 152(3): 04025264, ISSN 0733-9364

Wijewickrama, M K C S; Chileshe, N; Rameezdeen, R and Ochoa, J J (2025) Information processing model for quality assurance in reverse logistics supply chains of demolition waste. Engineering, Construction and Architectural Management, 32(13), pp. 193-212. ISSN 0969-9988

Williams, D (2019) Preventing harness-induced pathology in U.S. construction companies: A qualitative multiple case study. PhD thesis, University of Phoenix, USA.

Williams, K; Gupta, R; Hopkins, D; Gregg, M; Payne, C; Joynt, J L R; Smith, I and Bates-Brkljac, N (2013) Retrofitting England's suburbs to adapt to climate change. Building Research & Information, 41(5), pp. 517-531. ISSN 0961-3218

Williams, L M (2000) Strategic decision support for project portfolio management in the public sector. PhD thesis, University of California, Los Angeles, USA.

Williams, P (1995) A regulation evaluation system: A decision support system for the building code of Australia. Construction Management and Economics, 13(3), pp. 197-208. ISSN 01446193

Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.

Williamson, T J (2010) Predicting building performance: The ethics of computer simulation. Building Research & Information, 38(4), pp. 401-410. ISSN 0961-3218

Willis, C J (2010) Measuring the performance of the construction industry through the use of project performance benchmarking metrics in conjunction with maturity modeling. PhD thesis, University of New Brunswick, Canada.

Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.

Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364

Wimalasena, B A D S (2011) A planning tool for construction waste management. PhD thesis, University of Calgary, Canada.

Winch, G M (2003) Models of manufacturing and the construction process: The genesis of re-engineering construction. Building Research & Information, 31(2), pp. 107-118. ISSN 0961-3218

Winn, K R (2014) Inter-scalar multivariable decision making framework for the architectural envelope. PhD thesis, Rensselaer Polytechnic Institute, USA.

Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988

Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, C H; Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), pp. 99-116. ISSN 0969-9988

Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364

Wong, J M W; Chan, A P C and Chiang, Y H (2010) Modeling construction occupational demand: Case of Hong Kong. Journal of Construction Engineering and Management, 136(9), pp. 991-1002. ISSN 0733-9364

Wong, J M W; Chan, A P C and Chiang, Y H (2011) Construction manpower demand forecasting: A comparative study of univariate time series, multiple regression and econometric modelling techniques. Engineering, Construction and Architectural Management, 18(1), pp. 7-29. ISSN 0969-9988

Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029

Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Wood, G; Davis, P; Byrne, P; McAllister, P and Wyatt, P (2011) Precisely wrong or roughly right? An evaluation of development viability appraisal modelling. Journal of Financial Management of Property and Construction, 16(3), pp. 249-271. ISSN 1366-4387

Wood, G; Davis, P and Olatunji, O A (2011) Modelling the costs of corporate implementation of building information modelling. Journal of Financial Management of Property and Construction, 16(3), pp. 211-231. ISSN 1366-4387

Wood, H L (2010) Modelling project complexity at the pre construction stage. PhD thesis, University of Brighton, UK.

Wood, H L and Ashton, P (2010) Modelling project complexity. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Woodward, A and Heesom, D (2021) Implementing HBIM on conservation heritage projects: Lessons from renovation case studies. International Journal of Building Pathology and Adaptation, 39(1), pp. 96-114. ISSN 23984708

Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy. PhD thesis, Massachusetts Institute of Technology, USA.

Wu, C.; Luo, J.; Hong, Y.; Tan, Y. and Lan, W. (2026) A DfMA-incorporating parametric design approach for enhancing constructability in BIM-enabled architectural design in off-site construction. Journal of Construction Engineering and Management, 152(10): 05026006, ISSN 0733-9364

Wu, K (2019) Robotic assembly: A generative architectural design strategy through component arrangements in highly-constrained design spaces. PhD thesis, Princeton University, USA.

Wu, Lingzi (2021) Enhancing data-driven applications in construction. PhD thesis, University of Alberta, Canada.

Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry. PhD thesis, National University of Singapore, Singapore.

Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364

Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.

Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.

Wu, Z (2024) Optimized structural health monitoring for inland waterways infrastructure using model-based diagnostics and prognostics. PhD thesis, University of California, San Diego, USA.

Wuni, I. Y. and Eshun, B. T. B. (2026) A state-of-the-art review of the application of interpretive structural modelling in construction management studies. International Journal of Construction Management, 26(10), pp. 2116-2136. ISSN 1562-3599

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2022) Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2108-2120. ISSN 1562-3599

Wuni, I Y; Shen, G Q; Osei-Kyei, R and Agyeman-Yeboah, S (2022) Modelling the critical risk factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2013-2026. ISSN 1562-3599

Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Xi, J (2013) Evaluating the functional performance of small-scale public demountable buildings. PhD thesis, University of Liverpool, UK.

Xia, N; Ding, S; Zhai, F and Xia, M (2025) Sharing psychological safety climate at the group level among construction workers: The roles of group identification and interactional justice. Journal of Construction Engineering and Management, 151(5): 04025038, ISSN 0733-9364

Xiang, Z; Rashidi, A and Ou, G (2021) Automated framework to translate rebar spatial information from GPR into BIM. Journal of Construction Engineering and Management, 147(10): 04021120, ISSN 0733-9364

Xiao, J; Li, X; Zhang, Z and Zhang, J (2018) Ontology-based knowledge model to support construction noise control in China. Journal of Construction Engineering and Management, 144(2): 04017103, ISSN 0733-9364

Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction. PhD thesis, University of Michigan, USA.

Xie, B; Wang, Z; Xu, Y and Cui, L (2025) How does bricolage drive knowledge innovation in engineering project organizations? Engineering, Construction and Architectural Management, 32(12), pp. 8571-8591. ISSN 0969-9988

Xie, L L; Luo, Y; Hou, L and Yu, J (2025) Determinants for megaproject knowledge innovation management: A Bayesian network analysis. Engineering, Construction and Architectural Management, 32(9), pp. 5885-5912. ISSN 0969-9988

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Xie, H (2012) Improving dynamic project control in tunnel construction. PhD thesis, University of Alberta, Canada.

Xin, X (2020) Semantic intelligence for knowledge-based compliance checking of underground utilities. PhD thesis, Purdue University, USA.

Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988

Xiong, W and Zhang, X (2016) The real option value of renegotiation in public-private partnerships. Journal of Construction Engineering and Management, 142(8): 4016021, ISSN 0733-9364

Xu, T.; Song, Z.; Fan, S. and Guo, D. (2026) Improved risk assessment model using the cloud theory of the existing tunnel in foundation pit construction environment. Engineering, Construction and Architectural Management, 33(5), pp. 3737-3760. ISSN 0969-9988

Xu, G (2011) Assessment of risk of disproportionate collapse of steel building structures exposed to multiple hazards. PhD thesis, Georgia Institute of Technology, USA.

Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.

Xu, S; Wang, J; Wang, X; Shou, W and Ngo, T (2025) Defect modelling and correlation mapping for bridge inspection. Engineering, Construction and Architectural Management, 32(6), pp. 4174-4196. ISSN 0969-9988

Xu, X; Chen, K and Cai, H (2020) Automating utility permitting within highway right-of-way via a generic UML/OCL model and natural language processing. Journal of Construction Engineering and Management, 146(12): 1936, ISSN 0733-9364

Xu, Y; Chong, H Y and Chi, M (2023) Modelling the blockchain adoption barriers in the AEC industry. Engineering, Construction and Architectural Management, 30(1), pp. 125-153. ISSN 0969-9988

Xu, Y; Shen, X; Lim, S and Li, X (2021) Three-dimensional object detection with deep neural networks for automatic as-built reconstruction. Journal of Construction Engineering and Management, 147(9): 04021098, ISSN 0733-9364

Xu, Yongzhi (2021) Automated and real-time scan-to-BIM through deep learning-based object detection. PhD thesis, University of New South Wales, Australia.

Xu, Yuqing (2025) Enhancing reliability and efficiency of upfront embodied carbon assessment leveraging openbim, llm, DES, and blockchain. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xu, Z; Liang, Y; Xu, Y; Fang, Z and Stilla, U (2022) Geometric modeling and surface-quality inspection of prefabricated concrete components using sliced point clouds. Journal of Construction Engineering and Management, 148(9): 04022087, ISSN 0733-9364

Xu, Z; Wang, X; Xiao, Y and Yuan, J (2020) Modeling and performance evaluation of PPP projects utilizing IFC extension and enhanced matter-element method. Engineering, Construction and Architectural Management, 27(8), pp. 1763-1794. ISSN 0969-9988

Xue, J; Shen, G Q; Deng, X; Ogungbile, A J and Chu, X (2023) Evolution modeling of stakeholder performance on relationship management in the dynamic and complex environments of megaprojects. Engineering, Construction and Architectural Management, 30(4), pp. 1536-1557. ISSN 0969-9988

Xue, J; Shen, G Q; Li, Y; Han, S and Chu, X (2021) Dynamic analysis on public concerns in Hong Kong-zhuhai-macao bridge: Integrated topic and sentiment modeling approach. Journal of Construction Engineering and Management, 147(6): 04021049, ISSN 0733-9364

Yakovlev, G I; Gordina, A; Drochytka, R; Buryanov, A F and Smirnova, O (2021) Structure and properties of modified gypsum binder. Smart and Sustainable Built Environment, 10(4), pp. 702-710. ISSN 2046-6099

Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(5), pp. 417-426. ISSN 01446193

Yamusa, M. A.; Dandago, A. A.; Lawal, H. S.; Saka, A. B.; Abubakar, M. and Abdullahi, M. (2025) Quantitative evaluation and modelling of uncertainty factors impacting duration of building renovation projects. Engineering, Construction and Architectural Management, 33(5), pp. 4181-4210. ISSN 0969-9988

Yan, D; Zhao, X; Kalutara, P and Jiang, Z (2025) Modeling antecedents of safety compliance of construction workers in Australia: A perspective of trait activation theory. Engineering, Construction and Architectural Management, 32(2), pp. 1141-1162. ISSN 0969-9988

Yan, J (2020) 3D printing optimization algorithm based on back-propagation neural network. Journal of Engineering, Design and Technology, 18(5), pp. 1223-1230. ISSN 1726-0531

Yang, W and Lam, P T I (2026) A framework for foundational and transitional value assessment of non-market benefits of a smart government system. Building Research & Information, 54(2), pp. 237-256. ISSN 0961-3218

Yang, F (2022) Ascending the pagoda: A ground-up exploration of the ancient construction methods of dayanta using virtual reality. PhD thesis, Ohio State University, USA.

Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193

Yang, J (2001) A decision support system for material routing in construction sites. PhD thesis, University of Wolverhampton, UK.

Yang, L; Li, Q and Pan, W (2024) A domain model for geometric modeling in support of the automated BIM modeling. Engineering, Construction and Architectural Management, 31(12), pp. 4897-4919. ISSN 0969-9988

Yang, L; Lou, J; Zhou, J; Zhao, X and Jiang, Z (2023) Complex network-based research on organization collaboration and cooperation governance responding to COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3749-3779. ISSN 0969-9988

Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.

Yang, Y (2004) Modeling a decision support system for buildable designs. PhD thesis, National University of Singapore, Singapore.

Yang, Y; Wei, Z; Zhang, Z and Xie, H (2025) Modeling the enablers for blockchain technology adoption in the construction supply chain. Journal of Construction Engineering and Management, 151(9): 04025113, ISSN 0733-9364

Yang, Z (2004) Assessing cumulative damage in concrete and quantifying its influence on life cycle performance modeling. PhD thesis, Purdue University, USA.

Yao, D (2024) Enhancing cyber risk management in the construction industry. PhD thesis, New York University Tandon School of Engineering, USA.

Yapage, N and Liyanapathirana, S (2018) Behaviour of geosynthetic reinforced column supported embankments. Journal of Engineering, Design and Technology, 16(1), pp. 44-62.

Yau, Y (2012) Eco-labels and willingness-to-pay: A Hong Kong study. Smart and Sustainable Built Environment, 1(3), pp. 277-290. ISSN 2046-6099

Ye, K (2009) Modelling competition intensity in construction market. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.

Yeoh, K-W (2012) Construction requirements driven planning and scheduling. PhD thesis, National University of Singapore, Singapore.

Yevu, S K; Owusu, E K; Chan, A P C; Oti-Sarpong, K; Wuni, I Y and Tetteh, M O (2023) Systematic review on the integration of building information modelling and prefabrication construction for low-carbon building delivery. Building Research & Information, 51(3), pp. 279-300. ISSN 0961-3218

Yevu, S K; Yu, A T W; Darko, A; Nani, G and Edwards, D J (2023) Modeling the influence patterns of barriers to electronic procurement technology usage in construction projects. Engineering, Construction and Architectural Management, 30(10), pp. 5133-5159. ISSN 0969-9988

Yilmaz, N and Donaldson, A B (2005) Consideration of wind barriers for an inner courtyard. Architectural Engineering and Design Management, 1(4), pp. 281-293. ISSN 1745-2007

Yin, X; Bouferguene, A and Al-Hussein, M (2020) Data-driven sewer pipe data random generation and validation. Journal of Construction Engineering and Management, 146(12): 04020131, ISSN 0733-9364

Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364

Yohanis, Y G and Norton, B (1998) Estimating at the earliest stages of design the financial cost and operational energy requirement of buildings. Journal of Financial Management of Property and Construction, 3(2), pp. 41-58. ISSN 1366-4387

Yonat, N; Isaac, S and Shohet, I M (2025) Complex infrastructure systems analysis and management: The theory of faults. Smart and Sustainable Built Environment, 14(3), pp. 599-624. ISSN 2046-6099

Yorucu, V (2013) Construction in an open economy: Autoregressive distributed lag modeling approach and causality analysis: case of North Cyprus. Journal of Construction Engineering and Management, 139(9), pp. 1199-1210. ISSN 0733-9364

Younes, B; Bouferguène, A; Al-Hussein, M and Yu, H (2015) Overdue invoice management: Markov chain approach. Journal of Construction Engineering and Management, 141(1): 04014062, ISSN 0733-9364

Young, D A; Haas, C T; Goodrum, P and Caldas, C (2011) Improving construction supply network visibility by using automated materials locating and tracking technology. Journal of Construction Engineering and Management, 137(11), pp. 976-984. ISSN 0733-9364

Yousefi, Elham (2023) Developing a data-driven design framework for mass customisation of multi-storey residential buildings. PhD thesis, University of Technology Sydney, Australia.

Yu, B (2013) Environmental implications of pavements: A life cycle view. PhD thesis, University of South Florida, USA.

Yu, J; Ma, G and Jiang, X (2017) Impact of the built environment and care services within rural nursing homes in China on quality of life for elderly residents. Engineering, Construction and Architectural Management, 24(6), pp. 1170-1183. ISSN 0969-9988

Yu, T; Liang, X and Wang, Y (2020) Factors affecting the utilization of big data in construction projects. Journal of Construction Engineering and Management, 146(5): 04020032, ISSN 0733-9364

Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(6), pp. 477-491. ISSN 1466433X

Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.

Yusuf, F (1997) Information and process modelling for IT implementation at the briefing stage. PhD thesis, University of Salford, UK.

Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Zafar, M. B. and Mehmood, U. (2026) Understanding maintenance cost drivers in higher education: A multi-model econometric study. Built Environment Project and Asset Management, 16(3), pp. 520-541. ISSN 2044-124X

Zafar, I; Wuni, I Y; Shen, G Q P; Ahmed, S and Yousaf, T (2022) A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: The case of Pakistan. International Journal of Construction Management, 22(4), pp. 732-750. ISSN 1562-3599

Zakeri Afshar, A; Abbasianjahromi, H; Mirhosseini, S M and Ehsanifar, M (2025) Determining the range of negotiable prices for public–private partnership infrastructure projects: A simulation approach. International Journal of Building Pathology and Adaptation, 43(1), pp. 50-74. ISSN 2398-4708

Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.

Zaneldin, E; Hegazy, T and Grierson, D (2001) Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127(4), pp. 330-336. ISSN 0733-9364

Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.

Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.

Zarghami, S A (2026) System dynamic-driven insights for metaverse adoption in the construction sector. Journal of Construction Engineering and Management, 152(4): 04026010, ISSN 0733-9364

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988

Zayed, T M; Halpin, D W and Basha, I M (2005) Productivity and delays assessment for concrete batch plant-truck mixer operations. Construction Management and Economics, 23(8), pp. 839-850. ISSN 01446193

Zeb, J and Froese, T (2014) Infrastructure management transaction formalism protocol specification: A process development model. Construction Innovation, 14(1), pp. 69-87. ISSN 1471-4175

Zekri, M M and Razali, M N (2020) Volatility dynamics of Malaysian listed property companies within the Asian public property markets by using a switching regime approach. Journal of Financial Management of Property and Construction, 25(1), pp. 5-39. ISSN 1366-4387

Zelinka, D L (2019) Systems approaches to transdisciplinary sustainable development issues. PhD thesis, University of Colorado at Boulder, USA.

Zeng, J; An, M; Chan, A H C and Lin, Y (2004) A methodology for assessing risks in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Zeng, R; Shi, J J S; Wang, C and Lu, T (2024) Integrating as-built BIM model from point cloud data in construction projects. Engineering, Construction and Architectural Management, 31(9), pp. 3557-3574. ISSN 0969-9988

Zhai, H and Russell, J S (1999) Stochastic modelling and prediction of contractor default risk. Construction Management and Economics, 17(5), pp. 563-576. ISSN 01446193

Zhang, M.; Cai, M.; Wang, Z. and Jia, L. (2026) Rag-for-cr: A retrieval-augmented generation framework for efficient, accurate, and traceable querying of construction regulations. Journal of Construction Engineering and Management, 152(9): 04026145, ISSN 0733-9364

Zhang, P; Sing, M C P; Chan, A P C and Liu, H J (2026) Utilizing deep learning for the extraction of cost risk factors from project risk registers: Enhancing contingency estimation. Journal of Construction Engineering and Management, 152(5): 04026049, ISSN 0733-9364

Zhang, S.; Zhong, B.; Sepasgozar, S. M. E.; Xia, Z.; Zhong, X. and Guan, Q. (2026) Toward a federated cross-organizational construction safety knowledge recommendation: A dual-incentive mechanism integrating worker satisfaction. Journal of Construction Engineering and Management, 152(10): 04026159, ISSN 0733-9364

Zhang, H; Li, H and Lu, M (2008) Modeling time-constraints in construction operations through simulation. Journal of Construction Engineering and Management, 134(7), pp. 545-554. ISSN 0733-9364

Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988

Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(4), pp. 373-390. ISSN 0969-9988

Zhang, H M; Chong, H Y; Zeng, Y and Zhang, W (2023) The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance. Engineering, Construction and Architectural Management, 30(6), pp. 2503-2522. ISSN 0969-9988

Zhang, J; Ouyang, Y; Li, H; Ballesteros-Pérez, P and Skitmore, M (2020) Simulation analysis of incentives on employees' acceptance of foreign joint venture management practices: A case study. Engineering, Construction and Architectural Management, 27(8), pp. 2047-2078. ISSN 0969-9988

Zhang, J and Yuan, X X (2021) Stochastic modelling of maintenance flexibility in value for money assessment of PPP road projects. Construction Management and Economics, 39(2), pp. 173-191. ISSN 01446193

Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364

Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks. PhD thesis, Purdue University, USA.

Zhang, L and El-Gohary, N M (2017) Human-centered value analysis: Building-value aggregation based on human values and building-system integration. Journal of Construction Engineering and Management, 143(8): 04017040, ISSN 0733-9364

Zhang, L and El-Gohary, N M (2020) Automated IFC-based building information modelling and extraction for supporting value analysis of buildings. International Journal of Construction Management, 20(4), pp. 269-288. ISSN 1562-3599

Zhang, L and El-Gohary, N M (2021) Axiology-based valuation modeling for human-centered decision making in building planning and design. Journal of Construction Engineering and Management, 147(11): 04021138, ISSN 0733-9364

Zhang, L; Pan, C and Zou, X (2013) Criticality comparison between the repetitive scheduling method and the network model. Journal of Construction Engineering and Management, 139(10): 06013004, ISSN 0733-9364

Zhang, M (2011) Uncertainty and imprecision in safety assessment of offshore structures. PhD thesis, National University of Singapore, Singapore.

Zhang, N (2001) A computer-based environment for preliminary structural design, design collaboration and design automation of tall buildings. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, Q; Oo, B L and Lim, B T H (2024) Modeling influence mechanism of factors on corporate social responsibility implementation: Evidence from Chinese construction firms. Engineering, Construction and Architectural Management, 31(1), pp. 324-362. ISSN 0969-9988

Zhang, Q W; Chong, H Y; Liao, P C and Wan, Y L (2020) Logistic regression modeling of implementation of corporate safety policy in international infrastructures. Engineering, Construction and Architectural Management, 27(10), pp. 3031-3050. ISSN 0969-9988

Zhang, S (2017) Pavement surface distress detection, assessment, and modeling using geospatial techniques. PhD thesis, University of New Mexico, USA.

Zhang, X (2018) Sustainable retrofitting of existing residential buildings at community scale in China. PhD thesis, Cardiff University, UK.

Zhang, X; Otto, F and Oeser, M (2021) Modeling pavement surface deflections under accelerated pavement testing using the PCA method. Journal of Construction Engineering and Management, 147(12): 04021169, ISSN 0733-9364

Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007

Zhang, Y; Chang, R; Mao, W; Zuo, J; Liu, L and Han, Y (2024) Challenges of automating interior construction progress monitoring. Journal of Construction Engineering and Management, 150(9): 03124004, ISSN 0733-9364

Zhang, Y; Minchin, R E; Flood, I and Ries, R J (2023) Preliminary cost estimation of highway projects using statistical learning methods. Journal of Construction Engineering and Management, 149(5): 04023026, ISSN 0733-9364

Zhang, Y; Wang, Z; Lin, W; Minchin, R E and Xue, X (2022) Understanding the slow diffusion of alternative delivery systems using interpretive structural modelling. Construction Management and Economics, 40(6), pp. 459-476. ISSN 01446193

Zhang, Y; Wang, W; Mi, L; Sun, G; Qiao, L; Tao, M and Wang, L (2025) Uncovering the organizational vulnerability toward construction project accidents: Bertopic-based text mining analysis. Journal of Construction Engineering and Management, 151(11): 04025179, ISSN 0733-9364

Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.

Zhao, J (2020) Towards a proactive real-time data-driven musculoskeletal disorders prevention approach in construction. PhD thesis, Pennsylvania State University, USA.

Zhao, S; Lu, T F; Statsenko, L; Koch, B and Garcia, C (2022) A framework for near real-time rom stockpile modelling to improve blending efficiency. Journal of Engineering, Design and Technology, 20(2), pp. 497-515. ISSN 1726-0531

Zhao, Z Y; Tang, C; Zhang, X and Skitmore, M (2017) Agglomeration and competitive position of contractors in the international construction sector. Journal of Construction Engineering and Management, 143(6): 04017004, ISSN 0733-9364

Zheng, B; Hussain, M; Yang, Y; Chan, A P C and Chi, H L (2025) Trade-offs between accuracy and efficiency in BIM-LCA integration. Engineering, Construction and Architectural Management, 32(1), pp. 237-258. ISSN 0969-9988

Zheng, J; Zhang, Z; Wu, G; Yang, Y; Xia, N and Liu, B (2021) Daily self-efficacy, work engagement, and deviance behavior among construction professionals and workers: Cross-level moderating role of job control. Journal of Construction Engineering and Management, 147(4): 04021018, ISSN 0733-9364

Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364

Zheng, Y; Debs, L; Besiktepe, D and Oh, H J (2025) Insights for key professional competencies of us entry-level construction positions: A structural topic modeling approach. Journal of Construction Engineering and Management, 151(8): 04025103, ISSN 0733-9364

Zhong, B; Li, H; Luo, H; Zhou, J; Fang, W and Xing, X (2020) Ontology-based semantic modeling of knowledge in construction: Classification and identification of hazards implied in images. Journal of Construction Engineering and Management, 146(4): 04020013, ISSN 0733-9364

Zhong, B; Wu, H; Xiang, R and Guo, J (2022) Automatic information extraction from construction quality inspection regulations: A knowledge pattern-based ontological method. Journal of Construction Engineering and Management, 148(3): 04021207, ISSN 0733-9364

Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.

Zhou, H B and Zhang, H (2011) Risk assessment methodology for a deep foundation pit construction project in Shanghai, China. Journal of Construction Engineering and Management, 137(12), pp. 1185-1194. ISSN 0733-9364

Zhou, Q; Deng, X; Hwang, B G; Mahmoudi, A and Liu, Y (2023) Integrating the factors affecting knowledge transfer within international construction projects: Individual and team perspectives. Journal of Construction Engineering and Management, 149(11): 04023117, ISSN 0733-9364

Zhou, S; Ng, S T; Lee, S H; Xu, F J and Yang, Y (2020) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(2), pp. 458-482. ISSN 0969-9988

Zhou, W; Heesom, D; Georgakis, P and Tah, J H M (2014) User-centred design for collaborative 4D modelling. Construction Innovation, 14(4), pp. 493-517. ISSN 1471-4175

Zhou, Y and Elhag, T (2007) Financial assessment using neural networks. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Zhou, Y; Wang, X; Gosling, J and Naim, M M (2023) The system dynamics of engineer-to-order construction projects: Past, present, and future. Journal of Construction Engineering and Management, 149(5): 03123004, ISSN 0733-9364

Zhu, M; Guo, S; Zeng, L; Zhang, P; Duan, H and Yue, C (2025) BIM-based base position optimization of mobile construction robots for bricklaying task. Architectural Engineering and Design Management, 21(3), pp. 513-532. ISSN 1745-2007

Zhu, Zicheng (2025) Enhancing building information modelling in existing complex built environment through advanced reality capture and point cloud processing techniques. PhD thesis, Bond University, Australia.

Zhuravchak, R; Nord, N and Brattebø, H (2022) The effect of building attributes on the energy performance at a scale: An inferential analysis. Building Research & Information, 50(6), pp. 662-680. ISSN 0961-3218

Zou, W (2012) Relationship management in public private partnership infrastructure projects. PhD thesis, University of Hong Kong, Hong Kong.

Zou R R, F R and Jewell C, T L C M (2013) An exploratory study of information maturity in construction and developing a decision-making model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Zuluaga Mayorga, S (2024) Exploring the value of infrastructure systems and its impacts on decision-making for sustainability. PhD thesis, University of Toronto, Canada.

Zwikael, O; Salmona, M; Meredith, J and Zarghami, S A (2023) Enhancing project stakeholder communication under insufficient knowledge of project management concepts. Engineering, Construction and Architectural Management, 30(10), pp. 5007-5029. ISSN 0969-9988

d'Apolito, L and Hong, H (2020) Forklift truck performance simulation and fuel consumption estimation. Journal of Engineering, Design and Technology, 18(3), pp. 689-703. ISSN 1726-0531

de Souza, M P; Fialho, B C; Ferreira, R C; Fabricio, M M and Codinhoto, R (2023) Modelling and coordination of building design: An experience of BIM learning/upskilling. Architectural Engineering and Design Management, 19(1), pp. 74-91. ISSN 1745-2007

fu, C; Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(1), pp. 85-98. ISSN 1471-4175

ng, S T; Fang, Y and Skitmore, R M (2008) Negotiation of on-site buffer stocks: A fuzzy non-structural fuzzy decision support system approach. Construction Innovation, 8(3), pp. 202-217. ISSN 1471-4175

ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175

olde Scholtenhuis, L L; Dorée, A G and Hartmann, T (2011) Challenges for construction it adoption on project level. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

van den Adel, J F; Al-Jibouri, S H; Karim, U F A and Mawdesley, M (2003) Integrated foundation design of buildings: Case demonstration of a prototype expert system. Journal of Engineering, Design and Technology, 1(1), pp. 55-74. ISSN 1726-0531

van den Boomen, M (2020) Replacement optimisation for public infrastructure assets: Quantitative optimisation modelling taking typical public infrastructure related features into account. PhD thesis, Delft University of Technology, Netherlands.

van den Boomen, M; Spaan, M T J; Shang, Y and Wolfert, A R M (2020) Infrastructure maintenance and replacement optimization under multiple uncertainties and managerial flexibility. Construction Management and Economics, 38(1), pp. 91-107. ISSN 01446193

Çivici, T and Ayalp, G G (2025) Modelling the critical determinants of architects' work-related stress. International Journal of Construction Management, 25(2), pp. 224-237. ISSN 1562-3599

Ökmen, O and Öztas, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(2), pp. 203-212. ISSN 1466433X

Özorhon, B (2007) Modeling the performance of international construction joint ventures. PhD thesis, Middle East Technical University, Turkey.

Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.

This list was generated on Sat Aug 22 01:36:41 2026 UTC.