Items with Index Term: model development
Abas, N H; Blismas, N and Lingard, H (2021) Development of risk assessment tool using damaging energy and argumentation theory for evaluating construction occupational safety and health risks. Engineering, Construction and Architectural Management, 28(10), pp. 2967-2993. ISSN 0969-9988
Abbasianjahromi, H and Aghakarimi, M (2023) Safety performance prediction and modification strategies for construction projects via machine learning techniques. Engineering, Construction and Architectural Management, 30(3), pp. 1146-1164. ISSN 0969-9988
Abdel Aziz, A M (2023) Statistical analysis and representation models of working-days liquidated damages. Journal of Construction Engineering and Management, 149(7): 04023054, ISSN 0733-9364
Abu Dabous, S; Alzghoul, A and Ibrahim, F (2025) Intelligent condition prediction model for bridge infrastructure based on evaluating machine learning algorithms. Smart and Sustainable Built Environment, 14(2), pp. 557-576. ISSN 2046-6099
Acheamfour, V K; Adjei-Kumi, T and Kissi, E (2023) Contractor selection: A review of qualification and pre-qualification systems. International Journal of Construction Management, 23(2), pp. 338-348. ISSN 1562-3599
Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 0969-9988
Adrian, J J (1974) Modeling construction method productivity. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387
Akinade, O O (2017) BIM-based software for construction waste analytics using artificial intelligence hybrid models. PhD thesis, University of the West of England, Bristol, UK.
Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599
Al-Sakkaf, A; Bagchi, A; Zayed, T and Mahmoud, S (2023) Sustainability assessment model for heritage buildings. Smart and Sustainable Built Environment, 12(1), pp. 105-127. ISSN 2046-6099
Alani, A M; Petersen, A K; Chapman, K G and Khosrowshahi, F (2004) A proposed quantitative model for building repair and maintenance: Theory, model development and application. Journal of Construction Research, 5(2), pp. 193-210. ISSN 1609-9451
Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364
Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process. PhD thesis, University of Alberta, Canada.
Aoieong, R T; Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: Model development. Construction Management and Economics, 20(2), pp. 179-192. ISSN 01446193
Appleton, B J A; Niaz, M A; Abourizk, S M; Al-Hussein, M and Mohamed, Y (2006) Priority rating logic simulation model for tower crane operations management. Journal of Construction Research, 7(1), pp. 133-147. ISSN 1609-9451
Asiedu, R O; Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(1), pp. 21-39. ISSN 0969-9988
Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387
Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387
Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.
Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364
Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.
Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.
Chang, M (2016) Investigating and improving bridge management system methodologies under uncertainty. PhD thesis, Utah State University, USA.
Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364
Charoenngam, C (1993) A knowledge-base representation for a construction measurement control information system (CMCIS). PhD thesis, University of Texas at Austin, USA.
Chen, H L (2009) Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), pp. 1190-1200. ISSN 0733-9364
Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.
Chiu, W Y B and Lai, J H K (2020) Building information modelling for building services engineering: Benefits, barriers and conducive measures. Engineering, Construction and Architectural Management, 27(9), pp. 2221-2252. ISSN 0969-9988
Chua, D K H and Li, G M (2002) RISim: Resource-interacted simulation modeling in construction. Journal of Construction Engineering and Management, 128(3), pp. 195-202. ISSN 0733-9364
Cirilovic, J; Vajdic, N; Mladenovic, G and Queiroz, C (2014) Developing cost estimation models for road rehabilitation and reconstruction: Case study of projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(3): 4013065, ISSN 0733-9364
Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.
Dada, M O (2012) Predictors of procurement selection: An investigation of traditional and integrated methods in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 71-85. ISSN 1823-6499
Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.
Dao, B P (2016) Exploring and measuring project complexity. PhD thesis, Texas A&M University, USA.
Delgado-Arvelo, Y (2012) An investigation into the data collection process for the development of cost models. PhD thesis, De Montfort University, UK.
Ecem Yildiz, A; Dikmen, I and Talat Birgonul, M (2020) Using system dynamics for strategic performance management in construction. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364
Edwards, D J; Holt, G D and Harris, F C (1999) Predicting maintenance expenditure on construction plant: Model development and performance analysis. Journal of Financial Management of Property and Construction, 4(1), pp. 31-46. ISSN 1366-4387
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.
Fan, R Y C; Ng, S T and Wong, J M W (2010) Reliability of the Box-Jenkins model for forecasting construction demand covering times of economic austerity. Construction Management and Economics, 28(3), pp. 241-254. ISSN 1466433X
Flood, I and Issa, R R A (2010) Empirical modeling methodologies for construction. Journal of Construction Engineering and Management, 136(1), pp. 36-48. ISSN 0733-9364
Gambo, N; Musonda, I and Zadawa, A N (2023) Effects of social media learning environments on AEC learning process among university students in Nigeria. International Journal of Construction Education and Research, 19(1), pp. 99-127. ISSN 1557-8771
Gao, X and Pishdad-Bozorgi, P (2020) A framework of developing machine learning models for facility life-cycle cost analysis. Building Research & Information, 48(5), pp. 501-525. ISSN 0961-3218
García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.
García de Soto, B; Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(3), pp. 165-196. ISSN 1562-3599
Gholizadeh, P (2022) Analyzing accidents among specialty contractors: A data mining approach. PhD thesis, George Mason University, USA.
Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193
Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364
Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364
Hildreth, J C (2020) Effect of period length on forecasting maintenance and repair costs for heavy equipment by the period cost based methodology. International Journal of Construction Education and Research, 16(3), pp. 167-179. ISSN 1557-8771
Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.
Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364
Hon, C K H; Sun, C; Xia, B; Jimmieson, N L; Way, K A and Wu, P P Y (2022) Applications of Bayesian approaches in construction management research: A systematic review. Engineering, Construction and Architectural Management, 29(5), pp. 2153-2182. ISSN 0969-9988
Hu, D and Mohamed, Y (2014) Simulation-model-structuring methodology for industrial construction fabrication shops. Journal of Construction Engineering and Management, 140(5): 04014002, ISSN 0733-9364
Isa, R; Emuze, F; Das, D and Awuzie, B O (2018) Modeling a transformational route to infrastructure sustainability in South Africa. Built Environment Project and Asset Management, 8(2), pp. 147-159. ISSN 2044-124X
Isied, M M (2023) Critical assessment of asphalt mixture design procedures and asphalt mixture classification systems. PhD thesis, North Carolina State University, USA.
Jackson, M (2007) Model development for the adoption of technology: electronic commerce in the construction industry. PhD thesis, University of Wolverhampton, UK.
Jain, P; Tambuskar, D P and Narwane, V (2024) Identification of critical factors for big data analytics implementation in sustainable supply chain in emerging economies. Journal of Engineering, Design and Technology, 22(3), pp. 926-968. ISSN 1726-0531
Kaya, H D and Dikmen, I (2024) Using system dynamics to support strategic digitalization decisions. Journal of Construction Engineering and Management, 150(4): 04024009, ISSN 0733-9364
Kere, K J (2023) Probabilistic model development and risk management strategies for pipelines with anomalies. PhD thesis, Marquette University, USA.
Kestle, L; Potangaroa, R and Storey, B (2011) Integration of lean design and design management and its influence on the development of a multidisciplinary design management model for remote site projects. Architectural Engineering and Design Management, 7(2), pp. 139-153. ISSN 1745-2007
Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(2), pp. 113-132. ISSN 01446193
Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364
Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.
Koo, B and Fischer, M (2000) Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management, 126(4), pp. 251-260. ISSN 0733-9364
Kusi, E; Boateng, I and Danso, H (2025) Energy consumption and carbon emission of conventional and green buildings using building information modelling (BIM). International Journal of Building Pathology and Adaptation, 43(4), pp. 826-854. ISSN 2398-4708
Lee, C Y-H (2010) A probabilistic approach to the life-cycle cost assessment of preventive maintenance strategies on flexible pavements. PhD thesis, University of California, Davis, USA.
Li, X; Li, H; Skitmore, M and Wang, F (2022) Understanding the influence of safety climate and productivity pressure on non-helmet use behavior at construction sites: A case study. Engineering, Construction and Architectural Management, 29(1), pp. 72-90. ISSN 0969-9988
Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X
Li, Y; Nie, X and Chen, S (2007) Fuzzy approach to prequalifying construction contractors. Journal of Construction Engineering and Management, 133(1), pp. 40-49. ISSN 0733-9364
Liao, L; Teo Ai Lin, E and Low, S P (2020) Assessing building information modeling implementation readiness in building projects in Singapore: A fuzzy synthetic evaluation approach. Engineering, Construction and Architectural Management, 27(3), pp. 700-724. ISSN 0969-9988
Lim, B T H; Ling, F Y Y; Ibbs, C W; Raphael, B and Ofori, G (2012) Mathematical models for predicting organizational flexibility of construction firms in Singapore. Journal of Construction Engineering and Management, 138(3), pp. 361-375. ISSN 0733-9364
Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364
Marasini, R and Dawood, N (2000) A simulation model to manage and optimise stockyard layout: A case study in precast concrete products industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Moon, S; Lee, G; Chi, S and Oh, H (2021) Automated construction specification review with named entity recognition using natural language processing. Journal of Construction Engineering and Management, 147(1): 04020147, ISSN 0733-9364
Moyo, T.; Raliile, M.; Edwards, D. J. and Chigara, B. (2026) Construct validation for technical sustainability as the fourth pillar for achieving sustainable construction: A case for Zimbabwe. Construction Innovation, 26(9), pp. 233-263. ISSN 1471-4175
Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364
Nawarathna, A.; Alwan, Z.; Gledson, B. and Fernando, N. G. (2026) An early-stage embodied carbon assessment method for the Global South: Sri Lankan case study. Built Environment Project and Asset Management, pp. 1-16. ISSN 2044-124X
Nouh, A; Elkasaby, E and Hussein, K (2023) Establishment of prediction system for cost of defect liability phase in construction project. Construction Innovation, 23(2), pp. 467-486. ISSN 1471-4175
Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.
Ofori-Boadu, A N; Owusu-Manu, D G; Edwards, D J and Asiseh, F (2021) A conceptual model of subcontractor development practices for LEED projects. Engineering, Construction and Architectural Management, 28(4), pp. 1196-1213. ISSN 0969-9988
Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods. PhD thesis, University of Alabama, USA.
Oo, B L; Lim, B T H and Runeson, G (2023) Mark-up on construction projects: what have we learnt in the last 20 years? Engineering, Construction and Architectural Management, 30(9), pp. 4319-4338. ISSN 0969-9988
Padala, S P S (2025) A BIM-integrated multi objective optimization model for sustainable building construction management. Construction Innovation, 25(6), pp. 1727-1751. ISSN 1471-4175
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.
Radzi, A R; Azmi, N F; Kamaruzzaman, S N and Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6): 04025063, ISSN 0733-9364
Rajeh, M (2014) Comparative analysis of construction procurement systems based on transaction costs. PhD thesis, Auckland University of Technology, New Zealand.
Rajeh, M; Tookey, J E; Olabode, J and Rotimi, B (2015) Estimating transaction costs in the New Zealand construction procurement a structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(2), pp. 242-267. ISSN 0969-9988
Rankin, J H (2000) Computer-assisted construction planning. PhD thesis, University of British Columbia, Canada.
Russell, J S and Jaselskis, E J (1992) Predicting construction contractor failure prior to contract award. Journal of Construction Engineering and Management, 118(4), pp. 791-811. ISSN 0733-9364
Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364
Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.
Shrivastava, R (2020) Development of risk management model for construction of railway project in India. PhD thesis, University of Petroleum and Energy Studies, India.
Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.
Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599
Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599
Tokede, O and Globa, A (2025) Life cycle sustainability tracker: A dynamic approach. Engineering, Construction and Architectural Management, 32(5), pp. 2971-3006. ISSN 0969-9988
Tsehayae, A A and Fayek, A R (2016) Developing and optimizing context-specific fuzzy inference system-based construction labor productivity models. Journal of Construction Engineering and Management, 142(7): 4016017, ISSN 0733-9364
Veselka, J (2023) BIM data structure in the building optimization: Methodology for model development. PhD thesis, Czech Technical University, Czech Republic.
Vitharana, V H P and Chinda, T (2021) Development of a lower back pain prevention index for heavy equipment operators in the construction industry: System dynamics modelling. International Journal of Construction Management, 21(7), pp. 677-693. ISSN 1562-3599
Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.
Waroonkun, T and Stewart, R A (2008) Pathways to enhanced value creation from the international technology transfer process in Thai construction projects. Construction Innovation, 8(4), pp. 299-317. ISSN 1471-4175
White, T; Ariaratnam, S T and Michael, J (2012) Subterranean infrastructure reconnaissance for manmade and natural hazards and disasters. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 66-86. ISSN 1759-5916
Xie, L L; Luo, Y; Hou, L and Yu, J (2025) Determinants for megaproject knowledge innovation management: A Bayesian network analysis. Engineering, Construction and Architectural Management, 32(9), pp. 5885-5912. ISSN 0969-9988
Xiong, Yunjie (2020) A BIM-based interoperability platform in support of building operation and energy management. PhD thesis, Virginia Tech, USA.
Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708
Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364
Zhang, Q W; Liao, P C; Liang, M and Chan, A P C (2024) Critical factors influencing learning from quality failures in the construction of grid infrastructure. Engineering, Construction and Architectural Management, 31(4), pp. 1730-1750. ISSN 0969-9988
Zhang, Y; Minchin, R E; Flood, I and Ries, R J (2023) Preliminary cost estimation of highway projects using statistical learning methods. Journal of Construction Engineering and Management, 149(5): 04023026, ISSN 0733-9364
Zolghadr, Ali (2023) Innovative offsite construction uptake in the housebuilding sector: A systemic approach to economic justifiability for volume builders. PhD thesis, RMIT University, Australia.
Up a level