Items with Index Term: mediator

Number of items: 130.

Abolghasemi, M.; Al-Mhdawi, M. K. S.; Rahimian, F. and Qazi, A. (2026) Exploring the nexus of stakeholder management, project performance and stakeholder satisfaction in Malaysian residential building projects: A PLS-SEM approach. Engineering, Construction and Architectural Management, 33(3), pp. 2089-2117. ISSN 0969-9988

Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.

Agapiou, A (2015) The factors influencing mediation referral practices and barriers to its adoption: A survey of construction lawyers in England and Wales. International Journal of Law in the Built Environment, 7(3), pp. 231-247. ISSN 1756-1450

Agyemang, E.; Deku, C. S.; Owusu-Mante, S.; Forkuor, J. B.; Dwumah, P. and Ofori-Dua, K. (2026) Housing adaptations for climate resilience: Predictors of climate-responsive housing in coastal and savannah zones. Smart and Sustainable Built Environment, pp. 1-25. ISSN 2046-6099

Ajibike, W A; Adeleke, A Q; Mohamad, F; Bamgbade, J A and Moshood, T D (2023) The impacts of social responsibility on the environmental sustainability performance of the Malaysian construction industry. International Journal of Construction Management, 23(5), pp. 780-789. ISSN 1562-3599

Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities. PhD thesis, Brunel University, UK.

Anbar, D R; Chang, T; Ullah, S; Alqershy, M T; Mousa, K and Deng, X (2026) The role of interpersonal distrust as a mediator of the relationship between ethnic minorities and knowledge hiding in international construction projects. Engineering, Construction and Architectural Management, 33(1), pp. 832-855. ISSN 0969-9988

Anbar, D. R.; Deng, X.; Taha Alqershy, M. and Ullah, S. (2026) Unveiling interpersonal distrust as a mediator between contingent employees and knowledge hiding in international construction projects in the gulf region. International Journal of Construction Management, 26(7), pp. 1390-1405. ISSN 1562-3599

Antaki, N; Petrescu, D; Schalk, M; Brandao, E; Calciu, D and Marin, V (2026) Mediation roles and ecologies within resilience-focused urban living labs. Buildings & Cities, 7(1), pp. 20-38. ISSN 2632-6655

Asiedu, R and Iddris, F (2022) Value co-creation approach to management of construction project stakeholders. Journal of Construction in Developing Countries, 27(1), pp. 1-23. ISSN 1823-6499

Besaiso, H; Fenn, P and Emsley, M (2016) Alternative dispute resolution in Palestine: The myth and dilemma of construction mediation. International Journal of Law in the Built Environment, 8(3), pp. 269-286. ISSN 1756-1450

Brooker, P (2009) Criteria for the appropriate use of mediation in construction disputes: Judicial statements in the English technology and construction court. International Journal of Law in the Built Environment, 1(1), pp. 82-97. ISSN 1756-1450

Brooker, P (2011) Towards a code of professional conduct for construction mediators. International Journal of Law in the Built Environment, 3(1), pp. 24-47. ISSN 1756-1450

Cao, N and Cheung, S O (2025) The value of voluntary participation in construction dispute mediation. Engineering, Construction and Architectural Management, 32(2), pp. 1229-1253. ISSN 0969-9988

Chalkey, K and Green, M (2016) In the context of mediation, is safeguarding mediator neutrality and party autonomy more important than ensuring a fair settlement? International Journal of Law in the Built Environment, 8(2), pp. 161-175. ISSN 1756-1450

Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364

Chandra, Venny (2007) An investigation of cultural learning during the hospital process from a facilities management perspective. PhD thesis, University of New South Wales, Australia.

Chen, K and Lu, W (2019) Bridging BIM and building (BBB) for information management in construction: The underlying mechanism and implementation. Engineering, Construction and Architectural Management, 26(7), pp. 1518-1532. ISSN 0969-9988

Chen, Y; Yang, Z; Liu, B; Wang, D; Xiao, Y and Wang, A (2024) How cultural intelligence affects expatriate effectiveness in international construction projects. Engineering, Construction and Architectural Management, 31(4), pp. 1696-1714. ISSN 0969-9988

Cheung, C M; Bowen, P; Cattell, K and Davis, J (2020) Construction professionals' commitment to the organisation, work-life balance, and well-being. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Cheung, S O; Yiu, T W and Lam, M C (2013) Interweaving trust and communication with project performance. Journal of Construction Engineering and Management, 139(8), pp. 941-950. ISSN 0733-9364

Cheung, S O; Zhu, L and Yu, K I (2022) The value of apology in construction dispute negotiation. International Journal of Construction Management, 22(10), pp. 1910-1923. ISSN 1562-3599

Cho, W M and Hadikusumo, B H W (2024) Psychological contract between contractors and owners in construction projects: The mediating role of inter-organisational teamwork. Engineering, Construction and Architectural Management, 31(10), pp. 4001-4015. ISSN 0969-9988

Cong, W; Goh, Y M; Zhang, S; Liang, H; Zhou, Z and Guo, N (2023) Linking leader-member exchange and informal safety communication of construction workers in China: A cognitive psychology perspective. Journal of Construction Engineering and Management, 149(10): 04023092, ISSN 0733-9364

Costa, A C B (2014) The effects of organizational justice and exercise on the relationship between job stressors and employee health. PhD thesis, Portland State University, USA.

Ding, Z; Ng, F F and Wang, J (2013) The mediation role of trust in knowledge sharing a cognitive perspective in Chinese architectural design teams. Engineering, Construction and Architectural Management, 20(6), pp. 604-619. ISSN 0969-9988

Dodanwala, T C; Santoso, D S and Yukongdi, V (2023) Examining work role stressors, job satisfaction, job stress, and turnover intention of sri lanka's construction industry. International Journal of Construction Management, 23(15), pp. 2583-2592. ISSN 1562-3599

Duodu, B.; Nduro, E. and Rowlinson, S. (2026) Enhancing construction contracting firm performance through external knowledge sourcing: Is innovation the "black box"? Journal of Engineering, Design and Technology, 24(1), pp. 193-212. ISSN 1726-0531

Elazhary, M. and El-Adaway, I. H. (2026) Managing risks under nuclear power plant projects: A latent similarity-guided contract customization. Journal of Construction Engineering and Management, 152(7): 04026089, ISSN 0733-9364

Fehan, H and Aigbogun, O (2021) Influence of internal organizational factors and institutional pressures on construction firms' performance. Construction Economics and Building, 21(2), pp. 81-99. ISSN 2204-9029

Frances, Z and Stevenson, F (2018) Domestic photovoltaic systems: The governance of occupant use. Building Research & Information, 46(1), pp. 23-41. ISSN 0961-3218

Gambo, N; Said, I and Ismail, R (2016) Influences of cost factors affecting technical performance of local government projects in Nigeria: A partial least square-structural equation modeling approach. Journal of Construction in Developing Countries, 21(1), pp. 85-111. ISSN 1823-6499

Georg, S and Tryggestad, K (2009) On the emergence of roles in construction: The qualculative role of project management. Construction Management and Economics, 27(10), pp. 969-981. ISSN 1466433X

Gluch, P and Räisänen, C (2009) Interactional perspective on environmental communication in construction projects. Building Research & Information, 37(2), pp. 164-175. ISSN 0961-3218

Gu, T; Hao, E; Dirks, K; Kieu, M and Zhang, R (2026) Enhancing residents' satisfaction in old community renewal: Application and validation of an extended expectation-disconfirmation theory model. Journal of Construction Engineering and Management, 152(4): 04026023, ISSN 0733-9364

Guan, L (2023) An extended TOE model for digital procurement adoption of Chinese construction industry: A case study of H group. PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.

Haji Abdullah, M A b (2015) An investigation of the development of mediation in the UK construction industry. PhD thesis, University of Manchester, UK.

Han, Y; Li, J; Cao, X and Jin, R (2020) Structural equation modeling approach to studying the relationships among safety investment, construction employees' safety cognition, and behavioral performance. Journal of Construction Engineering and Management, 146(7): 04020065, ISSN 0733-9364

Harty, C (2008) Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), pp. 1029-1041. ISSN 1466433X

Hosseini, M R; Martek, I; Chileshe, N; Zavadskas, E K and Arashpour, M (2018) Assessing the influence of virtuality on the effectiveness of engineering project networks: "Big five theory" perspective. Journal of Construction Engineering and Management, 144(7): 04018059, ISSN 0733-9364

Hu, Z.; Li, S.; He, C.; Shen, Y. and Xu, Z. (2026) Effect of management commitment on construction project safety resilience: Safety competence and working conditions as the mediators. Journal of Construction Engineering and Management, 152(8): 04026123, ISSN 0733-9364

Huang, C F and Lien, H C (2012) An empirical analysis of the influences of corporate social responsibility on organizational performance of Taiwan's construction industry: Using corporate image as a mediator. Construction Management and Economics, 30(4), pp. 263-275. ISSN 1466433X

Huang, W; Zhong, D and Chen, Y (2024) The relationship between construction workers' emotional intelligence and safety performance. Engineering, Construction and Architectural Management, 31(5), pp. 2176-2201. ISSN 0969-9988

Ilter, D; Cakmak, P I; Ustuner, Y A and Tas, E (2016) Toward a research roadmap for construction mediation. International Journal of Law in the Built Environment, 8(2), pp. 176-190. ISSN 1756-1450

Janda, K B and Parag, Y (2013) A middle-out approach for improving energy performance in buildings. Building Research & Information, 41(1), pp. 39-50. ISSN 0961-3218

Jayakody, R R J C and Amaratunga, D (2021) Guiding factors for planning public open spaces to enhance coastal cities' disaster resilience to tsunamis. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 471-483. ISSN 1759-5916

Jia, J and Wu, M (2025) Examining the effectiveness of knowledge governance mechanisms in mobile messaging groups within construction project teams. Engineering, Construction and Architectural Management, 32(8), pp. 5019-5039. ISSN 0969-9988

Ju, L; Ji, Y P; Wu, C; Ning, X and He, Y (2024) Relationship between abusive supervision and workers' well-being in construction projects: Effects of guanxi closeness and trust in managers. Engineering, Construction and Architectural Management, 31(8), pp. 3429-3451. ISSN 0969-9988

Kang, F; Shi, Y; Li, J and Zhang, H (2025) Impacts of leader anger expressions on newcomer proactive career behavior and work alienation in the construction industry. Engineering, Construction and Architectural Management, 32(6), pp. 3659-3678. ISSN 0969-9988

Karnasuta, P (2004) An examination of the effects of web-based virtual working environments on team effectiveness within construction projects. PhD thesis, University of Reading, UK.

Ke, Y (2020) Impact of trust on the performance of construction enterprises: analysis of the cooperative process mechanism in the context of Chaoshan culture. DProf thesis, Fordham University, USA.

Khan, N A; Hui, Z; Khan, A N and Soomro, M A (2022) Impact of women authentic leadership on their own mental wellbeing through ego depletion: Moderating role of leader's sense of belongingness. Engineering, Construction and Architectural Management, 29(10), pp. 4191-4214. ISSN 0969-9988

Kim, J (2022) A multimodal approach to improve fire safety on construction sites. PhD thesis, Oklahoma State University, USA.

Kim, J; Shan, Y; Kim, S; Song, D; Park, H and Bang, C (2021) Factors influencing fire safety on building construction sites: A fire officer's perspective. Journal of Construction Engineering and Management, 147(10): 04021118, ISSN 0733-9364

Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Zayed, T (2024) Modeling the relationship between value management implementation phases, critical success factors and overall project success. Construction Innovation, 24(5), pp. 1380-1400. ISSN 1471-4175

Konanahalli, Ashwini Prakash (2013) Critical factors influencing British expatriates' success on international architectural, engineering and construction assignments in Sub-Saharan Africa, China, middle East and Indian sub-continent. PhD thesis, Queen's University Belfast, UK.

Kpamma, Z E; Adjei-Kumi, T; Ayarkwa, J and Adinyira, E (2018) Choosing by advantages incorporated framework for a user-involved design process. Architectural Engineering and Design Management, 14(3), pp. 194-217. ISSN 1745-2007

Lau, J L and Hashim, A H (2020) Mediation analysis of the relationship between environmental concern and intention to adopt green concepts. Smart and Sustainable Built Environment, 9(4), pp. 539-556. ISSN 2046-6099

Leung, R H M and Hui, B T F (2020) Success in construction mediation in Hong Kong, China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 114-119. ISSN 17514304

Li, K and Cheung, S O (2019) Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145(11): 04019070, ISSN 0733-9364

Li, X; Li, H; Zhang, R; Yin, Y; Sun, S; Bai, J and Liu, R (2024) Impact of asymmetric trust on construction project management performance: The mediating role of knowledge sharing. Engineering, Construction and Architectural Management, 31(11), pp. 4538-4561. ISSN 0969-9988

Lin, S and Cheung, S O (2022) Exploring the concept of psychological distance and its impact on intention to settle in construction dispute negotiation. Journal of Construction Engineering and Management, 148(12): 04022133, ISSN 0733-9364

Liu, B; Xue, B; Meng, J; Chen, X and Sun, T (2020) How project management practices lead to infrastructure sustainable success: An empirical study based on goal-setting theory. Engineering, Construction and Architectural Management, 27(10), pp. 2797-2833. ISSN 0969-9988

Liu, K; Liu, Y and Kou, Y (2025) External drivers of inter-organizational collaboration in megaproject: A perspective based on project governance. Engineering, Construction and Architectural Management, 32(5), pp. 2920-2941. ISSN 0969-9988

Liu, M; Zhu, Y; Wei, J; Le, Y and Zhang, X (2022) Impact of institutional pressures on external program manager involvement: Evidence from large projects in China. Journal of Construction Engineering and Management, 148(9): 04022079, ISSN 0733-9364

Liu, Q; Feng, Y and London, K (2020) Conceptual model for managing mental health in the culturally diverse construction workforce. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Loganathan, S and Forsythe, P (2020) Unravelling the influence of teamwork on trade crew productivity: A review and a proposed framework. Construction Management and Economics, 38(11), pp. 1040-1060. ISSN 01446193

Luong Hai, N and Tuan, N A (2023) Modeling of planning function management in Vietnam's public construction works. Built Environment Project and Asset Management, 13(2), pp. 201-216. ISSN 2044-124X

Lynch, Peter (2003) Growth-survival tradeoffs of Queensland licensed homebuilders 1986-1996: An event history study. PhD thesis, University of Queensland, Australia.

Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects. PhD thesis, Stanford University, USA.

Mahalingam, A; Yadav, A K and Varaprasad, J (2015) Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases. Journal of Construction Engineering and Management, 141(7): 5015006, ISSN 0733-9364

Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364

Musenero, Leah (2023) Development of an integrated framework for constructive dispute resolution in infrastructure public-private partnership projects. PhD thesis, University of Adelaide, Australia.

Nawaz, A; Jiang, W and Akhtar, S (2025) Exploring the role of servant leadership, teamwork, and organizational learning in the success of construction projects: A focus on project nature as a moderator. Journal of Construction Engineering and Management, 151(10): 04025154, ISSN 0733-9364

Nawaz Khan, A; Khan, N A and Soomro, M A (2020) Influence of ethical leadership in managing human resources in construction companies. Journal of Construction Engineering and Management, 146(11): 04020125, ISSN 0733-9364

Newaz, M T; Davis, P; Jefferies, M and Pillay, M (2020) Examining the psychological contract as mediator between the safety behavior of supervisors and workers on construction sites. Journal of Construction Engineering and Management, 146(1): 04019094, ISSN 0733-9364

Ng, P (2011) The use of mediation in preventing homelessness in England. International Journal of Law in the Built Environment, 3(2), pp. 146-158. ISSN 1756-1450

Nguyen, M. V.; Khanh, H. D.; Nguyen, K. V. and Nguyen, T. T. H. (2026) Investigation of the impacts of perceived greenwashing on employee loyalty: The mediating role of guilt and frustration. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Nguyen, T H D; Chileshe, N; Rameezdeen, R and Wood, A (2019) Stakeholder influence pathways in construction projects: Multicase study. Journal of Construction Engineering and Management, 145(9): 05019011, ISSN 0733-9364

Novieto, D T (2023) Safety climate and occupational safety behaviours: The mediating role of psychological ownership among construction professionals. Engineering, Construction and Architectural Management, 30(2), pp. 853-868. ISSN 0969-9988

Olopade, J O (2020) Qualitative comparative analysis of causal pathways to successful construction cross-functional teams. PhD thesis, University of Florida, USA.

Peh, L C (2010) Relationship between flight-time and organization design of internationalizing architectural and engineering (a&e) consultancy firms. PhD thesis, National University of Singapore, Singapore.

Raliile, M.; Haupt, T. C. and Kajimo-Shakantu, K. (2026) The mediating and moderating role of coping on occupational stress and psychological well-being among the construction workforce in South Africa: The psychological stress theory approach. Journal of Engineering, Design and Technology, 24(2), pp. 427-447. ISSN 1726-0531

Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.

Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.

Sang, L; Yu, M; Lin, H; Zhang, Z and Jin, R (2021) Big data, technology capability and construction project quality: A cross-level investigation. Engineering, Construction and Architectural Management, 28(3), pp. 706-727. ISSN 0969-9988

Siddiquei, A N; Imam, H and Asmi, F (2024) How and when temporal leadership facilitates the success of sustainable construction projects. Engineering, Construction and Architectural Management, 31(12), pp. 4852-4871. ISSN 0969-9988

Sommerville, J; Craig, N and McCarney, M (2004) Knowledge management as a stress mediator. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Steenhausen, P D (2003) Negotiating among mediators: Multiparty mediation in international politics. PhD thesis, University of Southern California, USA.

Styhre, A (2008) The role of social capital in knowledge sharing: The case of a specialist rock construction company. Construction Management and Economics, 26(9), pp. 941-951. ISSN 1466433X

Sunindijo, Riza (2012) Skills for developing safety climate in construction projects. PhD thesis, University of New South Wales, Australia.

Talaq, J (2004) Antecedents and consequences of motivation: an examination of motivation as mediator to human and organisational performance. PhD thesis, University of Wolverhampton, UK.

Tian, B; Fu, J; Xu, Y and Sun, L (2024) How does contract flexibility affect the sustainability performance of public–private partnership projects? A serial multiple mediator model. Engineering, Construction and Architectural Management, 31(1), pp. 28-47. ISSN 0969-9988

Trushell, I; Clark, B and Agapiou, A (2014) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Trushell, I; Clark, B and Agapiou, A (2016) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. International Journal of Law in the Built Environment, 8(2), pp. 101-122. ISSN 1756-1450

Tuuli, M M and Rowlinson, S (2009) Performance consequences of psychological empowerment. Journal of Construction Engineering and Management, 135(12), pp. 1334-1347. ISSN 0733-9364

Unwin, S (2007) Analysing architecture through drawing. Building Research & Information, 35(1), pp. 101-110. ISSN 0961-3218

Vadithe, R. N.; Sreenu, N.; Kesari, B.; Chiranjeevi, V.; Mudavath, C. B. N. and Rajput, R. C. (2026) The role of HR analytics in driving organizational agility and operational performance: Evidence from the construction sector. Engineering, Construction and Architectural Management, 33(7), pp. 5318-5339. ISSN 0969-9988

Van Tam, N (2025) Impact of self-efficacy on construction labor productivity: The mediating role of work motivation. Engineering, Construction and Architectural Management, 32(5), pp. 3407-3431. ISSN 0969-9988

Verma, M. and Yadav, P. (2025) Gig economy: Workplace incivility's impact through culture, digital skills, and well-being. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 116-123. ISSN 1751-4304

Wall, R; Ankrah, N and Charlson, J (2016) An investigation into the different styles of the lawyer and construction specialist when mediating construction disputes. International Journal of Law in the Built Environment, 8(2), pp. 137-160. ISSN 1756-1450

Wan, X; Zhang, Y; Mao, P; Li, H; Wang, R; Yi, X and Zhao, X (2022) How perceived corporate social responsibility and public knowledge affect public participation intention: Evidence from Chinese waste incineration power projects. Engineering, Construction and Architectural Management, 29(10), pp. 4107-4131. ISSN 0969-9988

Wang, Y. and Zou, P. X. W. (2026) Uncovering key construction injury causal factors using topic modeling and word co-occurrence network analysis methods. Journal of Construction Engineering and Management, 152(10): 04026168, ISSN 0733-9364

Wang, D; Fang, S and Li, K (2019) Dynamic changes of governance mechanisms in mega construction projects in China: The mediating role of opportunism. Engineering, Construction and Architectural Management, 26(4), pp. 723-735. ISSN 0969-9988

Wang, D; Huang, R; Qiao, Y; Sheng, Z; Li, K and Zhao, L (2023) How perceived leader-member exchange differentiation affects construction workers' safety citizenship behavior: Organizational identity and felt safety responsibility as mediators. Journal of Construction Engineering and Management, 149(11): 04023110, ISSN 0733-9364

Wang, H; Hamilton, A; Song, Y and Tah, J (2007) Implementation of a data integration service for building and urban planning. Architectural Engineering and Design Management, 3(3), pp. 195-208. ISSN 1745-2007

Wang, X; Qiao, Y; Wang, D; Sheng, Z and Newaz, M T (2021) Psychological contract of safety and construction worker behavior: Felt safety responsibility and safety-specific trust as mediators. Journal of Construction Engineering and Management, 147(11): 04021152, ISSN 0733-9364

Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988

Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X

Wu, G; Hu, Z; Zheng, J; Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(1), pp. 101-124. ISSN 0969-9988

Xu, L and Zhang, Z (2025) Influence of residential physical environments on occupant experience: Considering the moderating effects of indoor plants and climate zones. Engineering, Construction and Architectural Management, 32(9), pp. 5814-5838. ISSN 0969-9988

Xuan, X; Huang, Y and Zhang, Z (2025) Effects of IEQ on inpatients' psychological restoration in hospital wards: The role of environmental perceptions. Building Research & Information, 53(8), pp. 1014-1038. ISSN 0961-3218

Xue, H; Zhang, S; Chen, J; Cong, W; Wu, G and Zhao, X (2024) Effects of organizational elements on emerging information and construction management technology implementation in building professionals: Moderating role of top management support. Journal of Construction Engineering and Management, 150(10): 04024123, ISSN 0733-9364

Yang, J; Liu, Q; Ye, G; Du, Q; Bai, L and Yue, H (2025) Mediating mechanism of construction noise on workers' safety behavior: Evidence from EEG data. Journal of Construction Engineering and Management, 151(10): 04025148, ISSN 0733-9364

Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364

Yiu, T W and Lai, W Y (2009) Efficacy of trust-building tactics in construction mediation. Journal of Construction Engineering and Management, 135(8), pp. 683-689. ISSN 0733-9364

Yousefi, Y; Jahangiri, M; Alidadi Shamsabadi, A and Raeesi Dehkordi, A (2019) Designing a mediator space and the study of its effect on the energy consumption of a residential building using EnergyPlus software in Savadkuh, Iran. Journal of Engineering, Design and Technology, 17(4), pp. 833-846. ISSN 1726-0531

Yu, M.; Zhao, J.; Lin, H. and Yuan, M. (2026) Keep company with the wolf, learn to howl: The impact of self-focused collective moral judgment on the misconduct of creative members in construction projects. Journal of Construction Engineering and Management, 152(7): 04026085, ISSN 0733-9364

Yuan, M; Wang, X; Zhang, Z; Lin, H and Yu, M (2024) How does collective moral judgment focus on the self-induce deviant behavior of construction workers? A multilevel investigation. Engineering, Construction and Architectural Management, 31(12), pp. 4809-4830. ISSN 0969-9988

Zadawa, A N; Hussin, A A and Osmadi, A (2018) Mediating effects of enforcement on public procurement guidelines' compliance barriers and cost performance of construction projects in Nigerian federal universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), pp. 81-102. ISSN 1823-6499

Zaw, T. T. and Santoso, D. S. (2026) Empowered to engage: The mediating role of psychological capital among Myanmar construction engineers. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Zhang, L and Sun, H (2021) The impacts of ethical climate on knowledge contribution loafing among designers in engineering design firms: Mediated effect of knowledge leadership. Engineering, Construction and Architectural Management, 28(6), pp. 1807-1827. ISSN 0969-9988

Zhang, N; Li, X and Yang, F (2025) Dual pathways of mindfulness in construction occupational psychological health: Long- and short-term mechanisms of positive emotions and psychological capital. Journal of Construction Engineering and Management, 151(12): 04025200, ISSN 0733-9364

Zhang, P; Li, N; Fang, D and Wu, H (2017) Supervisor-focused behavior-based safety method for the construction industry: Case study in Hong Kong. Journal of Construction Engineering and Management, 143(7): 05017009, ISSN 0733-9364

Zhang, Q; Liu, Z and Yang, S (2025) Enhancing construction workers' health and safety: Mechanisms for implementing construction 4.0 technologies in construction organizations. Engineering, Construction and Architectural Management, 32(13), pp. 68-103. ISSN 0969-9988

Zhang, S B; Chen, J and Fu, Y (2020) Contract complexity and trust in construction project subcontracting. Engineering, Construction and Architectural Management, 27(9), pp. 2477-2500. ISSN 0969-9988

Zheng, J; Gu, Y; Luo, L; Zhang, Y; Xie, H and Chang, K (2023) Identifying the definition, measurement, research focuses, and prospects of project complexity: A systematic literature review. Engineering, Construction and Architectural Management, 30(7), pp. 3043-3072. ISSN 0969-9988

Zheng, X; Hu, X; Wu, C and Bai, J (2025) Does owners' leadership matter to relational behavior in mega construction projects? A role orientation perspective. Engineering, Construction and Architectural Management, 32(6), pp. 3608-3629. ISSN 0969-9988

Ziadat, W (2018) A meta-analysis study of project and programme management complexity in the oil and gas sector of the Middle East and North Africa region. PhD thesis, University of Manchester, UK.

This list was generated on Sat Aug 22 02:14:20 2026 UTC.