Items with Index Term: maximization

Number of items: 89.

AbdelMagid, M H (2024) Navigating the anticipation-adaptation paradigms: Evaluating the decision-making pathways of critical infrastructure resilience planning. PhD thesis, Florida State University, USA.

Ahmad, A H (2008) Private housing development: refining rational choice. PhD thesis, University College London, UK.

Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.

Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988

Alim, S and Polak, J (2016) Public-private partnerships for future urban infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 150-158. ISSN 17514304

Ambekar, S.; Dhaigude, A. S.; Chatterjee, D. and Tapar, A. V. (2025) Identifying and ranking critical success factors for contractor value addition in the construction sector using the ISM-IRP technique. Construction Innovation, 26(5), pp. 1582-1613. ISSN 1471-4175

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(1), pp. 62-76. ISSN 0969-9988

Arif, F (2013) A decision support framework for infrastructure maintenance investment decision-making. PhD thesis, Florida International University, USA.

Avetisyan, H G (2013) Sustainable infrastructure modeling and policy analyses: Construction, energy and transportation industries. PhD thesis, University of Maryland, College Park, USA.

Beard, J L (2011) Theoretical framework for determinants of A/E/C firm value, strategy and continuity: An analysis incorporating corporeal, volitional and knowledge assets. PhD thesis, Georgia Institute of Technology, USA.

Berryman, C W; Jensen, W G and Zhu, J (2006) Maximization of fly ash in the manufacture of reinforced concrete pipe. International Journal of Construction Education and Research, 2(3), pp. 209-216. ISSN 1557-8771

Birgonul, Z (2021) A receptive-responsive tool for customizing occupant's thermal comfort and maximizing energy efficiency by blending BIM data with real-time information. Smart and Sustainable Built Environment, 10(3), pp. 504-535. ISSN 2046-6099

Bowen, P; Allen, Y; Edwards, P; Cattell, K and Simbayi, L (2014) Guidelines for effective workplace HIV/AIDS intervention management by construction firms. Construction Management and Economics, 32(4), pp. 362-381. ISSN 01446193

Boyd, N J P (2016) From bicycles to buildings: a SCOT analysis of project level adoption of BIPV. PhD thesis, University of Reading, UK.

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X

Chan, K-W (2010) The transaction costs and the choice of contractual arrangements in the construction industry in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: A case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 368-380. ISSN 0969-9988

Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193

Chen, Y; Zhuang, T and Liu, G (2023) A hybrid approach to supporting physical-change-based renewal projects selection decisions in high-density city: A case study of Chongqing. Engineering, Construction and Architectural Management, 30(7), pp. 2879-2903. ISSN 0969-9988

Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364

Cole, R J and Fedoruk, L (2015) Shifting from net-zero to net-positive energy buildings. Building Research & Information, 43(1), pp. 111-120. ISSN 0961-3218

Cummins, A; Graham, B; Thomas, K and Lucey, T (2016) The effectiveness of managing through trust the middle management layer of a construction company: Proposed ethnographic research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dalgliesh, C D; Bowen, P A and Hill, R C (1997) Environmental sustainability in the delivery of affordable housing in South Africa. Engineering, Construction and Architectural Management, 4(1), pp. 23-39. ISSN 0969-9988

Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.

Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988

El-Aroud, A S (1980) Road network investment model for developing countries. PhD thesis, Pennsylvania State University, USA.

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Fredslund, L; Søder, P H; Hansen, E J d P and Koch, C (2022) An institutional analysis of how the construction industry's complexity affects waste: An alternative response to future market demands for sustainability. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Ganesan, S (1994) Employment maximization in construction in developing countries. Construction Management and Economics, 12(4), pp. 323-335. ISSN 01446193

Griffith, A and Sidwell, A C (1997) Development of constructability concepts, principles and practices. Engineering, Construction and Architectural Management, 4(4), pp. 295-310. ISSN 0969-9988

Guo, S; Wang, J and Xiong, H (2023) The influence of effort level on profit distribution strategies in ipd projects. Engineering, Construction and Architectural Management, 30(9), pp. 4099-4119. ISSN 0969-9988

Hartwell, J C; Upadhyay, Y and Sourani, A (2019) Influential factors of life cycle management in education PFI projects. Built Environment Project and Asset Management, 9(2), pp. 302-314. ISSN 2044-124X

Higham, A and Fortune, C J (2012) Investment appraisal tools and sustainability evaluation in social housing. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.

Huang, H (2003) The effects of building regulations control on the design of private residential buildings. PhD thesis, University of Hong Kong, Hong Kong.

Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364

Jain, K and Devkar, G (2025) Development and testing of lean simulation game on set-based design. Construction Innovation, 25(4), pp. 1035-1057. ISSN 1471-4175

Kang, L; Liu, S; Zhang, H and Gong, D (2021) Person anomaly detection-based videos surveillance system in urban integrated pipe gallery. Building Research & Information, 49(1), pp. 55-68. ISSN 0961-3218

Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, Jong Jin (2005) A study of the externalities of reconstruction projects in neighbourhood residential markets. PhD thesis, University of New South Wales, Australia.

Kuoribo, E; Yomoah, R; Owusu-Manu, D G; Acheampong, A; John Edwards, D and Debrah, C (2023) Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 30(10), pp. 5233-5252. ISSN 0969-9988

Laefer, D F and Manke, J P (2008) Building reuse assessment for sustainable urban reconstruction. Journal of Construction Engineering and Management, 134(3), pp. 217-227. ISSN 0733-9364

Langevine, R (2006) A decision support system for the maintenance management of buildings. PhD thesis, University of Alberta, Canada.

Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364

Leon, M; Ahiaga-Dagbui, D; Fleming, C and Laing, R (2017) Exploring visual asset management collaboration: Learning from the oil and gas sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Leung, M Y; Wei, X and Ojo, L D (2024) Developing a value-risk management model for construction projects. Journal of Construction Engineering and Management, 150(1): 04023148, ISSN 0733-9364

Liguori, D; Sommerville, J and Manase, D (2012) Probabilistic pre-requisites contributing to successful housing association partnering. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Lim, J N (2007) Stimulating construction innovation in Singapore by developing the national system of innovation. PhD thesis, National University of Singapore, Singapore.

Lim, J N and Ofori, G (2007) Classification of innovation for strategic decision making in construction businesses. Construction Management and Economics, 25(9), pp. 963-978. ISSN 1466433X

Liou, F M; Yang, C H; Chen, B and Chen, W (2011) Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm. Construction Management and Economics, 29(5), pp. 535-548. ISSN 1466433X

Liu, C; AbouRizk, S; Morley, D and Lei, Z (2020) Data-driven simulation-based analytics for heavy equipment life-cycle cost. Journal of Construction Engineering and Management, 146(5): 04020038, ISSN 0733-9364

Liu, Chang (2020) Data-driven strategies to improve the construction equipment management. PhD thesis, University of Alberta, Canada.

Loosemore, M and Reid, S (2019) The social procurement practices of tier-one construction contractors in Australia. Construction Management and Economics, 37(4), pp. 183-200. ISSN 01446193

Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.

Mahdi, H S and Carmichael, D G (2014) Optimal sharing arrangement for multiple project outcomes. Journal of Financial Management of Property and Construction, 19(3), pp. 264-280. ISSN 1366-4387

Mahdi, H S and Carmichael, D G (2014) An optimal target cost contract with a risk neutral owner. Engineering, Construction and Architectural Management, 21(5), pp. 586-604. ISSN 0969-9988

Mak, Wae Hoa Jonathan (2019) The design of resilient engineering infrastructure systems. PhD thesis, University of Cambridge, UK.

Marantzidis, I and Gidado, K (2011) The maximisation of the use of reclaimed asphalt pavement (RAP) in the Greek construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

McCauley, Kathleen H (2020) Modeling construction management dynamics: A proxy estimation of percent planned complete. PhD thesis, Indiana State University, USA.

Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.

Na, L J; Ofori, G and Park, M (2006) Stimulating construction innovation in Singapore through the national system of innovation. Journal of Construction Engineering and Management, 132(10), pp. 1069-1082. ISSN 0733-9364

Narayana, N S S (1976) Engineering production function and choice of technique. PhD thesis, Indian Statistical Institute - Kolkata, India.

Ofori, G; Zhang, Z and Ling, F Y Y (2021) Initiatives that enable Singapore contractors to improve construction productivity. Built Environment Project and Asset Management, 11(5), pp. 785-803. ISSN 2044-124X

Ogunbayo, O T (2019) Respondents' perception of risk factors on residential property development in Abuja, Nigeria. Journal of Construction Business and Management, 3(1), pp. 18-26. ISSN 2521-0165

Ogunbiyi, O; Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88-107. ISSN 1471-4175

Pardalis, G. and Sula, M. (2026) One-stop shops as leverage points for renovation sufficiency. Buildings & Cities, 7(1), pp. 614-632. ISSN 2632-6655

Parker, P E (1992) Efficiency and the response to reform in Chinese urban construction enterprises: A production theory approach. PhD thesis, University of Washington, USA.

Patel, D J and Patel, D A (2025) Development of demolition project hazard index using the possibility approach. International Journal of Construction Management, 25(3), pp. 301-311. ISSN 1562-3599

Peng, J and Zhang, Q (2025) Construction group conflict under resource overlap: A game theory approach. Engineering, Construction and Architectural Management, 32(1), pp. 156-171. ISSN 0969-9988

Pritchard, C R (1999) Access to construction work and resources in Zimbabwe: An institutional analysis of the development of the construction industry. PhD thesis, London South Bank University, UK.

Rosso, S (2007) Environmental life-cycle of domestic kitchen refurbishment. PhD thesis, University of Brighton, UK.

Sajjad, M; Jayasinghe, C and Perera, P (2024) Damage assessment automation for single storey detached masonry houses: a probabilistic approach. Building Research & Information, 52(5), pp. 551-563. ISSN 0961-3218

Seydel, J (2003) Evaluating and comparing bidding optimization effectiveness. Journal of Construction Engineering and Management, 129(3), pp. 285-292. ISSN 0733-9364

Shohet, I M and Perelstein, E (2004) Decision support model for the allocation of resources in rehabilitation projects. Journal of Construction Engineering and Management, 130(2), pp. 249-257. ISSN 0733-9364

Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model. PhD thesis, University of Edinburgh, UK.

Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar. PhD thesis, University of Birmingham, UK.

Sturts, C S (2001) Value-bidding: An integrative approach utilizing conjoint analysis and classical bidding theory. PhD thesis, Columbia University, USA.

Su, L; Cao, Y; Li, H and Zhang, C (2024) Water environment treatment ppp projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(2), pp. 866-890. ISSN 0969-9988

Sullivan, K T; Kashiwagi, D; Savicky, J; Kashiwagi, M; Egbu, C and Chang, C K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Wang, X and Chong, H-Y (2015) Setting new trends of integrated building information modelling for construction industry. Construction Innovation, 15(1), pp. 2-6. ISSN 1471-4175

Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364

Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387

Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193

Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364

Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988

Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.

Zheng, J (2013) Ownership structure and company performance : the case of listed real estate companies in mainland China. PhD thesis, University of Hong Kong, Hong Kong.

Çepni, M. S.; Kutluca, A. K.; Salihoğlu, T.; Atmaca, A. and Mintemur, S. (2026) Changing land-use metrics in mass housing: Türkiye case study. Buildings & Cities, 7(1), pp. 541-558. ISSN 2632-6655

This list was generated on Sat Aug 22 02:10:25 2026 UTC.