Items with Index Term: matrix analysis

Number of items: 10.

Amarkhil, Q and Elwakil, E (2021) Constraints and opportunities facing construction organization in post-conflict condition in Afghanistan. Journal of Financial Management of Property and Construction, 26(3), pp. 301-318. ISSN 1366-4387

Austin, S; Baldwin, A; Baizhan, L I and Waskett, P (2000) Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(2), pp. 173-182. ISSN 01446193

Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193

Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Beadle, K; Gibb, A; Austin, S; Fuster, A and Madden, P (2008) Adaptable futures: Sustainable aspects of adaptable buildings. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Garg, R; Chhikara, R; Singh, R; Agrawal, G; Talwar, V and Mehra, V (2021) A qualitative study to understand the factors affecting the adoption of glass fiber-reinforced gypsum (gfrg) as a sustainable building technology: Insights from Indian construction industry. Construction Innovation, 21(2), pp. 321-344. ISSN 1471-4175

Jadidoleslami, S. and Saghatforoush, E. (2026) Interdependencies unveiled: MICMAC analysis of BIM-AI synergies in construction. Journal of Construction Engineering and Management, 152(7): 04026086, ISSN 0733-9364

Jadidoleslami, S. and Saghatforoush, E. (2026) Unveiling interdependencies across phases: MICMAC analysis of BIM and AI integration challenges in construction. Architectural Engineering and Design Management, 22(4), pp. 1188-1210. ISSN 1745-2007

Le, A T H and Sutrisna, M (2024) Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis. Engineering, Construction and Architectural Management, 31(6), pp. 2513-2535. ISSN 0969-9988

Newton, A J (1995) The planning and management of detailed building design. PhD thesis, Loughborough University, UK.

This list was generated on Sat Aug 22 02:15:55 2026 UTC.