Items with Index Term: mathematical programming
Abdessalem, J; Fakhreddine, D; Said, A and Mohamed, H (2014) Shape optimization for a hyperelastic axisymmetric structure. Journal of Engineering, Design and Technology, 12(2), pp. 177-194. ISSN 1726-0531
Afshar, A; Ziaraty, A K; Kaveh, A and Sharifi, F (2009) Nondominated archiving multicolony ant algorithm in time: cost trade-off optimization. Journal of Construction Engineering and Management, 135(7), pp. 668-674. ISSN 0733-9364
Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599
Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599
Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193
Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.
Banihashemi, S A and Khalilzadeh, M (2021) Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. Engineering, Construction and Architectural Management, 28(7), pp. 1979-2004. ISSN 0969-9988
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Bowles, Graeme (1995) Annual sinking fund modelling for housing association major repairs provision. PhD thesis, Abertay University, UK.
De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364
Elbehairy, H (2007) Bridge management system with integrated life cycle cost optimization. PhD thesis, University of Waterloo, Canada.
Khalilzadeh, M; Balafshan, R and Hafezalkotob, A (2020) Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects. Journal of Engineering, Design and Technology, 18(6), pp. 1997-2016. ISSN 1726-0531
Khalilzadeh, M; Kebriyaii, O and Rezaei, R (2023) Identification and selection of stakeholder engagement strategies: Case study of an Iranian oil and gas construction project. International Journal of Construction Management, 23(3), pp. 484-494. ISSN 1562-3599
Kong, J S (2001) Lifetime maintenance strategies for deteriorating structures. PhD thesis, University of Colorado at Boulder, USA.
Le, P L; Dao, T M and Chaabane, A (2019) BIM-based framework for temporary facility layout planning in construction site: A hybrid approach. Construction Innovation, 19(3), pp. 424-464. ISSN 1471-4175
Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.
Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.
Mahmoodi, A. and Easa, S. M. (2026) A multi-objective matheuristic framework for sustainable truck-UAV last-mile delivery in smart urban built environments. Smart and Sustainable Built Environment, pp. 1-48. ISSN 2046-6099
Patsiatzis, Dimitrios I (2003) Optimal process plant layout using mathematical programming. PhD thesis, University College London, UK.
Pinheiro Santos Fernandes, P G; Elias Arantes, A and Ferreira Nobre Júnior, E (2024) Optimization model for earthwork allocations considering the construction of multiple haul roads: GIS-based integrated approach. Journal of Construction Engineering and Management, 150(4): 05024001, ISSN 0733-9364
Piper, B E B (2014) Optimization methods for improving the resilience of civil infrastructure systems subject to natural hazards. PhD thesis, North Carolina State University, USA.
Sangiorgio, V; Uva, G and Fatiguso, F (2018) Optimized AHP to overcome limits in weight calculation: Building performance application. Journal of Construction Engineering and Management, 144(2): 04017101, ISSN 0733-9364
Sangiorgio, Valentino (2019) Development of a decision support system for the structural degradation analysis of RC buildings supported by user-reported data and modern information technologies. PhD thesis, Politecnico di Bari, Italy.
Sedaghati, R (2000) Investigations in structural optimization of nonlinear problems using the finite element method. PhD thesis, University of Victoria, Canada.
Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364
Silva-Jauregui, D (1982) The economics of capacity expansion in the mexican cement industry. PhD thesis, Northwestern University, USA.
Singh, G; Kiangi, G E; Sabah, A N A and Greenslade, O C (1986) Application of a micro computer in investment decisions using dynamic programming. Construction Management and Economics, 4(3), pp. 188-199. ISSN 01446193
Sohani, H; Seyed Hossein Hosseini, N and Saghatforoush, E (2024) The optimized form of building made from the reused elements. Architectural Engineering and Design Management, 20(2), pp. 191-213. ISSN 1745-2007
Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988
Wang, H; Yi, W; Zhen, L and Chan, A P C (2024) Cost-optimized transport planning for prefabricated modules with the implementation of the just-in-time strategy. Journal of Construction Engineering and Management, 150(8): 04024093, ISSN 0733-9364
Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.
Wang, Y S and Chau, K W (1997) An evaluation of the efficiency of construction industry in Hong Kong using the DEA approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.
Yi, W; Wang, H; Zhen, L and Liu, Y (2023) Automated generation of horizontal precast slab stacking plans. Journal of Construction Engineering and Management, 149(12): 04023121, ISSN 0733-9364
Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988