Items with Index Term: mathematical modelling

Number of items: 56.

Abbasnejad, B; Nasirian, A; Duan, S; Diro, A; Prasad Nepal, M and Song, Y (2024) Measuring BIM implementation: A mathematical modeling and artificial neural network approach. Journal of Construction Engineering and Management, 150(5): 04024032, ISSN 0733-9364

Abdul Nabi, M (2023) Promoting enhanced decision-making and proactive management for modularization in the construction industry using risk-based approach, analytical hierarchy process, and graph theory. PhD thesis, Missouri University of Science and Technology, USA.

Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988

Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.

Aghimien, E I; Aghimien, L M; Petinrin, O O and Aghimien, D O (2021) High-performance computing for computational modelling in built environment-related studies: A scientometric review. Journal of Engineering, Design and Technology, 19(5), pp. 1138-1157. ISSN 1726-0531

Alidadi Shamsabadi, A; Jahangiri, M; Rezaei, T; Yadollahi Farsani, R; Seryani, A and Hakim, S (2022) The design of a seasonal heat storage system with a geothermal heat pump for a residential building in Tehran. Journal of Engineering, Design and Technology, 20(6), pp. 1606-1626. ISSN 1726-0531

Almeraikhi, A M (2010) An integrated framework for multi-project planning and control. PhD thesis, Sheffield Hallam University, UK.

Amewornu, E M and Nwulu, N I (2021) A framework for the techno-economic and reliability analysis of grid connected microgrids. Journal of Engineering, Design and Technology, 19(3), pp. 659-685. ISSN 1726-0531

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364

Bishop, E A (1997) Talking shop: Egyptian engineers and Soviet specialists at the Aswan High Dam. PhD thesis, University of Chicago, USA.

Bunemer, Ricardo (2020) Construction 4.0 proposal for digital technological innovations for the civil construction sector: Case study of a smart house. PhD thesis, Universidade Estadual de Campinas, Brazil.

Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process. PhD thesis, Aston University, UK.

Chen, H L (2009) Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), pp. 1190-1200. ISSN 0733-9364

Chen, J H; Hayati, D W; Su, Y M; Wijatmiko, I and Purnamasari, R (2019) Improving preliminary cost estimation in Indonesia using support vector regression. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 25-33. ISSN 17514304

Crawley, J; Biddulph, P; Wingfield, J; Ashdown, M; Lowe, R and Elwell, C (2020) Inferring the as-built air permeability of new UK dwellings. International Journal of Building Pathology and Adaptation, 38(1), pp. 3-19. ISSN 23984708

Cui, X (2002) Delay time modelling and software development. PhD thesis, University of Salford, UK.

Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218

Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: A tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(3), pp. 225-232. ISSN 0969-9988

Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.

Esders, M C (2017) Consideration of uncertain future demand and decision flexibility in the determination of intervention programs for buildings. DSc thesis, ETH Zürich, Switzerland.

Francis, A; Bibai, J and Miresco, E (2013) Simulation of scheduling logic using dynamic functions. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 145-158. ISSN 17514312

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.

Gharehbaghi, K; Farnes, K and Hurst, N (2025) A novel method of refining the performance of rail systems: An evaluation of system dynamics using discrete event simulation. Smart and Sustainable Built Environment, 14(2), pp. 536-556. ISSN 2046-6099

Gormley, M and Campbell, D P (2006) Modelling water reduction effects: Method and implications for horizontal drainage. Building Research & Information, 34(2), pp. 131-144. ISSN 0961-3218

Hairstans, R (2007) Optimisation of timber platform frame construction. PhD thesis, Edinburgh Napier University, UK.

Hashemi, R and Shahbandarzadeh, H (2024) A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development. International Journal of Construction Management, 24(3), pp. 323-330. ISSN 1562-3599

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases. PhD thesis, Brunel University, UK.

Khalaf, A B; Hamam, Y; Alayli, Y and Djouani, K (2013) The effect of maintenance on the survival of medical equipment. Journal of Engineering, Design and Technology, 11(2), pp. 142-157. ISSN 1726-0531

Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(2), pp. 113-132. ISSN 01446193

Khosrowshahi, F (2002) Project cost-time optimal solutions. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.

Kibwami, N and Tutesigensi, A (2014) Mathematical modelling of embodied carbon emissions of building projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Kim, J; Ham, Y; Chung, Y and Chi, S (2019) Systematic camera placement framework for operation-level visual monitoring on construction jobsites. Journal of Construction Engineering and Management, 145(4): 04019019, ISSN 0733-9364

Kishk, M (2005) On the mathematical modelling of whole-life costs. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.

Le, P L; Dao, T M and Chaabane, A (2019) BIM-based framework for temporary facility layout planning in construction site: A hybrid approach. Construction Innovation, 19(3), pp. 424-464. ISSN 1471-4175

Liu, Chang (2020) Data-driven strategies to improve the construction equipment management. PhD thesis, University of Alberta, Canada.

Magoda, C M; Gryzagoridis, J and Kanyarusoke, K (2021) Effective heat conductivity of Honeycomb (porous) composite panel. Journal of Engineering, Design and Technology, 19(4), pp. 876-887. ISSN 1726-0531

Maull, W M (1998) An investigation into the development of engineering students' conceptual understanding of mathematics. PhD thesis, University of Plymouth, UK.

Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.

Nishiyama, D and Radosavljevic, M (2009) Mathematical modelling of decision making processes in construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Oladapo, A A (2011) Multi-criteria contractor selection: a practical application of analytic hierarchy process. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(2), pp. 79-88. ISSN 17514312

Oo, B L; Drew, D and Lo, H (2007) Modelling contractors' mark-up behaviour in different construction markets. Engineering, Construction and Architectural Management, 14(5), pp. 447-462. ISSN 0969-9988

Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.

Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.

Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364

Seboni, L and Tutesigensi, A (2015) A mathematical model for allocating project managers to projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.

Shahbazi, Babak (2020) A mathematical optimization approach to account for career development, job security, and job satisfaction in human resource planning in construction organizations. PhD thesis, University of New South Wales, Australia.

Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364

Sun, H; Fan, Z; Zhou, Y and Shi, Y (2010) Empirical research on competitiveness factors: Analysis of real estate industry of Beijing and Tianjin. Engineering, Construction and Architectural Management, 17(3), pp. 240-251. ISSN 0969-9988

Tokede O, S B B A (2013) Preserving continuity in whole-life cost models for net-zero carbon buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.

Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988

Zhang, M (2011) Uncertainty and imprecision in safety assessment of offshore structures. PhD thesis, National University of Singapore, Singapore.

This list was generated on Sat Aug 22 02:19:27 2026 UTC.