Items with Index Term: mathematical model

Number of items: 248.

Abadou, Y; Ghrieb, A; Bustamante, R and Faid, H (2020) Optimization by mixture design approach: Impact of marble and ceramic recycle on properties of mortar based on air lime. Journal of Engineering, Design and Technology, 18(6), pp. 1731-1747. ISSN 1726-0531

Abbasnejad, B; Nasirian, A; Duan, S; Diro, A; Prasad Nepal, M and Song, Y (2024) Measuring BIM implementation: A mathematical modeling and artificial neural network approach. Journal of Construction Engineering and Management, 150(5): 04024032, ISSN 0733-9364

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.

Adekunle, T O (2019) Summer performance, comfort, and heat stress in structural timber buildings under moderate weather conditions. Smart and Sustainable Built Environment, 8(3), pp. 220-242. ISSN 2046-6099

Agarwal, S; Kant, R and Shankar, R (2022) Humanitarian supply chain management: Modeling the pre and post-disaster relief operations. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 421-439. ISSN 1759-5916

Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364

Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175

Akinade, O O (2017) BIM-based software for construction waste analytics using artificial intelligence hybrid models. PhD thesis, University of the West of England, Bristol, UK.

Al-Kaabi, N S (2006) A fuzzy-based construction safety advisor (CSA) for construction safety in the United Arab Emirates. PhD thesis, Ohio State University, USA.

Al-Lahham, Yazan (2019) Risk management approaches in SMEs: A study of owner-managers in Jordan. PhD thesis, University of Liverpool, UK.

Al-Shaeer, H A Y; Irwan, J M; Alshalif, A; Amran, M; Alanazi, H; Tang, W C; Tang, L; Alhokabi, A and Alluqmani, A E (2026) Enhancing carbonation resistance of foamed concrete via microbial incorporation: A response surface methodology approach with aspergillus iizukae ean605 fungi. International Journal of Building Pathology and Adaptation, 44(1), pp. 266-294. ISSN 2398-4708

Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.

Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.

Alarc N, L F and Bastias, A (2000) A computer environment to support the strategic decision-making process in construction firms. Engineering, Construction and Architectural Management, 7(1), pp. 63-75. ISSN 0969-9988

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.

Alarćon, L F and Ashley, D B (1996) Modeling project performance for decision making. Journal of Construction Engineering and Management, 122(3), pp. 265-273. ISSN 0733-9364

Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.

Almahmoud, Essam (2014) Social sustainability health check: A model for evaluating and optimising social value creation in construction projects. PhD thesis, University of Melbourne, Australia.

Alshamsi, O S (2019) Multiple criteria decision making for supplier selection and cross-cultural considerations: Case study of the United Kingdom / United Arab Emirates construction industry. PhD thesis, University of Exeter, UK.

Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.

Amiri, R; Majrouhi Sardroud, J and Momenaei Kermani, V (2023) Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model. Engineering, Construction and Architectural Management, 30(4), pp. 1444-1462. ISSN 0969-9988

Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599

Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599

Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599

Aouad, R and Amara, I (2018) Influence of the cutting condition on the wear and the surface roughness in the steel aisi 4140 with mixed ceramic and diamond tool. Journal of Engineering, Design and Technology, 16(6), pp. 828-836. ISSN 1726-0531

Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(8), pp. 721-732. ISSN 1466433X

Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.

Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.

Asjad, M; Kulkarni, M S and Gandhi, O P (2016) Supportability issues of mechanical systems for their useful life. Journal of Engineering, Design and Technology, 14(1), pp. 33-53.

Aydin, Y C and Mirzaei, P A (2022) A novel mathematical model to measure individuals' perception of the symmetry level of building facades. Architectural Engineering and Design Management, 18(3), pp. 261-278. ISSN 1745-2007

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.

Ballesteros-Pérez, P; Skitmore, M; Sanz-Ablanedo, E and Verhoeven, P (2019) Forecasting the number and distribution of new bidders for an upcoming construction auction. Journal of Construction Engineering and Management, 145(10): 040190561, ISSN 0733-9364

Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.

Bao, Qi (2003) Effective energy management during a building's life cycle. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Barari, A; Ganjavi, B; Jeloudar, M G and Domairry, G (2010) Assessment of two analytical methods in solving the linear and nonlinear elastic beam deformation problems. Journal of Engineering, Design and Technology, 8(2), pp. 127-145. ISSN 1726-0531

Basurto, C; Kämpf, J H and Scartezzini, J-L (2017) Multi-criteria analysis for the integrated performance assessment of complex fenestration systems. Building Research & Information, 45(8), pp. 926-942. ISSN 0961-3218

Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193

Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.

Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.

Bogenberger, C; Dell'Amico, M; Fuellerer, G; Hoefinger, G; Iori, M; Novellani, S and Panicucci, B (2015) Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6): 05015003, ISSN 0733-9364

Borges, Maria Luiza Abath Escorel (2025) Decision-making optimization method for construction site layout planning based on slp and BIM. PhD thesis, Universidade Estadual de Campinas, Brazil.

Brattebø, H; Bergsdal, H; Sandberg, N H; Hammervold, J and Müller, D B (2009) Exploring built environment stock metabolism and sustainability by systems analysis approaches. Building Research & Information, 37(5-6), pp. 569-582. ISSN 0961-3218

Cakan, H; Kazan, E and Usmen, M (2014) Investigation of factors contributing to fatal and non-fatal roofer fall accidents. International Journal of Construction Education and Research, 10(4), pp. 300-317. ISSN 1557-8771

Camargo Júnior, Alceu Salles (2003) Simultaneous engineering: A comparison between "point-based" and "set-based" approaches. PhD thesis, Universidade de São Paulo, Brazil.

Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364

Cattell, D W; Bowen, P A and Kaka, A P (2007) Review of unbalanced bidding models in construction. Journal of Construction Engineering and Management, 133(8), pp. 562-573. ISSN 0733-9364

Cheetham, D W and Banfill, P F G (1980) An unusual case of delayed sulphate attack to concrete floor slabs. Construction Papers, 1(1), pp. 7-16. ISSN 0144-8587

Chen, H-Y; Chang, Y-M and Chang, H-C (2016) A numerical definition-based systematic design approach for coupling consumers' image perception with product form. Journal of Engineering, Design and Technology, 14(1), pp. 134-159.

Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X

Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.

Cui, X (2002) Delay time modelling and software development. PhD thesis, University of Salford, UK.

Cusack, M M (1984) The use and limitations of mathematical models in the planning and control of construction projects. Construction Management and Economics, 2(3), pp. 219-224. ISSN 01446193

Davis, M M; Vallejo Espinosa, A L and Ramirez, F R (2019) Beyond green façades: Active air-cooling vertical gardens. Smart and Sustainable Built Environment, 8(3), pp. 243-252. ISSN 2046-6099

De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364

Delgado-Hernández, D J and Palacios-Navarro, U J (2024) A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: Case study of Mexico. Engineering, Construction and Architectural Management, 31(7), pp. 2900-2915. ISSN 0969-9988

Deng, F (2004) Expert and decision-support system approaches for construction project financing and cash flow management for large infrastructure projects. PhD thesis, State University of New York at Buffalo, USA.

Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.

Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218

Direitinho, Romao Manuel Leitao Carrapato (2020) Civil construction waste (RCC) management model supported by the analytic hierarchy process (AHP) method. PhD thesis, Universidade Federal de São Carlos, Brazil.

Dixit, M K (2017) Embodied energy and cost of building materials: Correlation analysis. Building Research & Information, 45(5), pp. 508-523. ISSN 0961-3218

Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988

Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175

Duff, A R (1980) A stochastic analysis of activity duration. Construction Papers, 1(1), pp. 63-69. ISSN 0144-8587

Ekanayake, E M A C; Shen, G; Kumaraswamy, M and Owusu, E K (2022) A fuzzy synthetic evaluation of vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 29(6), pp. 2358-2381. ISSN 0969-9988

El Asmar, M; Lotfallah, W; Whited, G and Hanna, A S (2010) Quantitative methods for design-build team selection. Journal of Construction Engineering and Management, 136(8), pp. 904-912. ISSN 0733-9364

El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364

Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988

Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988

Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.

Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.

Erkoreka, A; Flores-Abascal, I; Escudero, C; Martin, K; Millan, J A and Sala, J M (2020) Flat roof hygrothermal performance testing and evaluation. International Journal of Building Pathology and Adaptation, 38(1), pp. 148-175. ISSN 23984708

Eslamirad, N; Malekpour Kolbadinejad, S; Mahdavinejad, M and Mehranrad, M (2020) Thermal comfort prediction by applying supervised machine learning in green sidewalks of Tehran. Smart and Sustainable Built Environment, 9(4), pp. 361-374. ISSN 2046-6099

Etemadinia, H and Tavakolan, M (2021) Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects. International Journal of Construction Management, 21(1), pp. 93-112. ISSN 1562-3599

Everett, J G and Farghal, S (1994) Learning curve predictors for construction field operations. Journal of Construction Engineering and Management, 120(3), pp. 603-616. ISSN 0733-9364

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Feng, Y (2015) Mathematical models for determining the minimum level of voluntary safety investments for building projects. Journal of Construction Engineering and Management, 141(7): 4015015, ISSN 0733-9364

Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387

Fini, A A F; Akbarnezhad, A; Rashidi, T H and Travis Waller, S (2017) Job assignment based on brain demands and human resource strategies. Journal of Construction Engineering and Management, 143(5): 04016123, ISSN 0733-9364

Friedrich, D R; Daly, J P and Dick, W G (1987) Revisions, repairs, and rework on large projects. Journal of Construction Engineering and Management, 113(3), pp. 488-500. ISSN 0733-9364

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.

Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.

Ghanbari, M; Olaikhan, A A J and Skitmore, M (2025) Enhancing project portfolio selection for construction holding firms: A multi-objective optimization framework with risk analysis. Engineering, Construction and Architectural Management, 32(8), pp. 5534-5557. ISSN 0969-9988

Ghasemi, M; Chakrabortty, R K; Shahabi-Shahmiri, R and Mirnezami, S A (2024) A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem. International Journal of Construction Management, 24(10), pp. 1090-1106. ISSN 1562-3599

Ghoddousi, P; Nasirzadeh, F and Hashemi, H (2018) Evaluating highway construction projects' sustainability using a multicriteria group decision-making model based on bootstrap simulation. Journal of Construction Engineering and Management, 144(9): 04018092, ISSN 0733-9364

Godby, C J (2002) A computational study of lexicalized noun phrases in English. PhD thesis, Ohio State University, USA.

Gunawardena, N D (1990) A methodology for optimising maintenance and replacement of construction equipment. PhD thesis, Loughborough University, UK.

Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hammad, M W; Abbasi, A and Ryan, M J (2018) Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method. Journal of Construction Engineering and Management, 144(4): 04018011, ISSN 0733-9364

Hanna, A S; Ibrahim, M W; Lotfallah, W; Iskandar, K A and Russell, J S (2016) Modeling project manager competency: An integrated mathematical approach. Journal of Construction Engineering and Management, 142(8): 4016029, ISSN 0733-9364

Hebiba, A M; Bouferguene, A; Moon, S and Han, S (2022) Wind-wise automated stability analysis for selection of tower crane and location. Journal of Construction Engineering and Management, 148(11): 04022127, ISSN 0733-9364

Hermann, U H; Hasan, S; Al-Hussein, M and Bouferguene, A (2011) Innovative system for off-the-ground rotation of long objects using mobile cranes. Journal of Construction Engineering and Management, 137(7), pp. 478-485. ISSN 0733-9364

Herzog, Florian (2005) Strategic portfolio management for long-term investments: An optimal control approach. PhD thesis, ETH Zürich, Switzerland.

Hijazi, A M; Abourizk, S M and Halpin, D W (1992) Modeling and simulating learning development in construction. Journal of Construction Engineering and Management, 118(4), pp. 685-700. ISSN 0733-9364

Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.

Hu, X; Nor, E and Hooy, C W (2023) Do political connections cause over-indebtedness? Empirical evidence from China's listed construction firms. Journal of Financial Management of Property and Construction, 28(3), pp. 477-497. ISSN 1366-4387

Huang, N; Du, Q; Bai, L and Chen, Q (2025) Optimizing collaborative decision-making of multi-agent resources for large-scale projects: From a matching perspective. Engineering, Construction and Architectural Management, 32(1), pp. 16-37. ISSN 0969-9988

Imran, S A; Commuri, S; Barman, M; Zaman, M and Beainy, F (2017) Modeling the dynamics of asphalt-roller interaction during compaction. Journal of Construction Engineering and Management, 143(7): 04017015, ISSN 0733-9364

Iskandar, K A; Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 2023-2039. ISSN 0969-9988

Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364

Jelodar, M B; Wilkinson, S; Kalatehjari, R and Zou, Y (2022) Designing for construction procurement: An integrated decision support system for building information modelling. Built Environment Project and Asset Management, 12(1), pp. 111-127. ISSN 2044-124X

Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions. PhD thesis, Clemson University, USA.

Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988

Kale, S and Arditi, D (2005) Diffusion of computer aided design technology in architectural design practice. Journal of Construction Engineering and Management, 131(10), pp. 1135-1141. ISSN 0733-9364

Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(5), pp. 485-495. ISSN 1466433X

Kamanda-Kabague, B M (1981) Application of mathematical model techniques to the planning and control of overhead costs in the construction industry. PhD thesis, City, University of London, UK.

Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364

Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988

Khalilzadeh, M; Balafshan, R and Hafezalkotob, A (2020) Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects. Journal of Engineering, Design and Technology, 18(6), pp. 1997-2016. ISSN 1726-0531

Khosrowshahi, F (1989) A new mathematically based model for forecasting construction project expenditure pattern. PhD thesis, South Bank Polytechnic, UK.

Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(2), pp. 113-132. ISSN 01446193

Khosrowshahi, F (2001) Project cash flow forecasting: A mathematical approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Khosrowshahi, F (2002) Project cost-time optimal solutions. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Khuncumchoo, N (2007) Roof maintenance record analysis toward proactive maintenance policies. PhD thesis, Georgia Institute of Technology, USA.

Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.

Kibwami, N and Tutesigensi, A (2014) Mathematical modelling of embodied carbon emissions of building projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.

Labib, Y N; Lotfallah, W B; Hanna, A S and Boulos, N W (2021) Development and application of performance index for comparative assessment of public capital projects. Journal of Construction Engineering and Management, 147(2): 04020175, ISSN 0733-9364

Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193

Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(2), pp. 84-95. ISSN 0961-3218

Lam, K C; So, A T P; Hu, T; Ng, T; Yuen, R K K; Lo, S M; Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(1), pp. 63-76. ISSN 01446193

Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.

Lertpaitoonpan, W (2000) Bridge damage detection using a system identification method. PhD thesis, University of Florida, USA.

Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193

Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(1-2), pp. 69-81. ISSN 0969-9988

Li, Y; Wang, J; Cao, L; Wei, D and Wang, Y (2022) Three-step mathematical model for optimizing rebar cutting-stock with practical application. Journal of Construction Engineering and Management, 148(7): 04022043, ISSN 0733-9364

Lim, B T H; Ling, F Y Y; Ibbs, C W; Raphael, B and Ofori, G (2012) Mathematical models for predicting organizational flexibility of construction firms in Singapore. Journal of Construction Engineering and Management, 138(3), pp. 361-375. ISSN 0733-9364

Ling, F Y Y; Tan, P C; Ning, Y; Teo, A and Gunawansa, A (2015) Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. Engineering, Construction and Architectural Management, 22(2), pp. 169-189. ISSN 0969-9988

Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988

Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364

Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364

Lv, Y; Feng, J; Wang, G and Li, H (2024) Stability characteristics and experiment of hydraulic drive four-wheel chassis. Journal of Engineering, Design and Technology, 22(2), pp. 598-612. ISSN 1726-0531

Magoda, C M; Gryzagoridis, J and Kanyarusoke, K (2021) Effective heat conductivity of Honeycomb (porous) composite panel. Journal of Engineering, Design and Technology, 19(4), pp. 876-887. ISSN 1726-0531

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Malone, E K and Issa, R R A (2014) Predictive models for work-life balance and organizational commitment of women in the U.S. Construction industry. Journal of Construction Engineering and Management, 140(3): 4013064, ISSN 0733-9364

Maloney, W F and McFillen, J M (1983) Research needs in construction worker performance. Journal of Construction Engineering and Management, 109(2), pp. 245-254. ISSN 0733-9364

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364

Mhundwa, R and Simon, M (2021) Electrical energy prediction using a surface fitting model for an on-farm direct expansion bulk milk cooler (DXBMC) in South Africa. Journal of Engineering, Design and Technology, 19(3), pp. 778-794. ISSN 1726-0531

Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization. PhD thesis, University of Alberta, Canada.

Mohamed Sultan, A A B (2019) Decision tools for recycling with a focus on fibre reinforced composites. PhD thesis, University of Manchester, UK.

Mokhtari, M and Hosseinian, S M (2025) Optimal outcome sharing among clients, builders, and designers in collaborative construction contracts: Comparing design–bid–build and design–build methods using principal–agent theory. Journal of Construction Engineering and Management, 151(3): 04024212, ISSN 0733-9364

Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Motawa, I and Kaka, A (2009) Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(4), pp. 325-336. ISSN 0969-9988

Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.

Mulholland, B and Christian, J (1999) Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(1), pp. 8-15. ISSN 0733-9364

Naoui, M A; Lejdel, B; Ayad, M; Amamra, A and kazar, O (2021) Using a distributed deep learning algorithm for analyzing big data in smart cities. Smart and Sustainable Built Environment, 10(1), pp. 90-105. ISSN 2046-6099

Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364

Nishiyama, D and Radosavljevic, M (2009) Mathematical modelling of decision making processes in construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Noor, K; Siddiqui, M A and Syed, A I (2025) Optimization of specific energy consumption in cnc turning of a hardened alloy steel roll at low cutting speeds. Journal of Engineering, Design and Technology, 23(2), pp. 368-385. ISSN 1726-0531

Olatunji, O A (2010) The impact of oil price regimes on construction cost in Nigeria. Construction Management and Economics, 28(7), pp. 747-759. ISSN 1466433X

Oloke, D; Edwards, D J; Wright, B and Love, P E D (2006) A web-based information management system for predicting the breakdown of off-highway plant. Journal of Engineering, Design and Technology, 4(1), pp. 29-45. ISSN 1726-0531

Onukwugha, V C (1991) Optimising the constructional and technological aspects of management for mass housing schemes in Nigeria. PhD thesis, University of Lagos, Nigeria.

Ortlepp, R; Gruhler, K and Schiller, G (2018) Materials in Germany's domestic building stock: Calculation model and uncertainties. Building Research & Information, 46(2), pp. 164-178. ISSN 0961-3218

Osman, B and Zhu, H (2020) A virtual educational model on a CNC milling machine including and excluding two methods of fuzzy controllers. Journal of Engineering, Design and Technology, 18(5), pp. 1153-1163. ISSN 1726-0531

Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.

Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988

Panquet, Q; Bourgault, M; Pellerin, R; Danjou, C and Perrier, N (2024) A process-improvement method for implementing earned value-based project management in organizations. Journal of Construction Engineering and Management, 150(12): 04024170, ISSN 0733-9364

Park, B (2002) Development of a virtual reality excavator simulator: A mathematical model of excavator digging and a calculation methodology. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Paterson, Ian (1981) Contractors' risk and insurance in the Australian building industry. PhD thesis, University of New South Wales, Australia.

Paz, Diogo Henrique Fernandes da (2019) Development of a system to support integrated management of construction and demolition waste. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Pieterse, E I (2024) A cost model to improve short-term underinsurance of residential buildings in South Africa. PhD thesis, University of Pretoria, South Africa.

Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364

Preston, M E (1980) A concrete mixing system: market analysis, design and testing. PhD thesis, Loughborough University, UK.

Purnomo, M R A; Anugerah, A R; Aulia, S F and Azzam, A (2021) A novel optimisation model in the collaborative supply chain with production time capacity consideration. Journal of Engineering, Design and Technology, 19(3), pp. 647-658. ISSN 1726-0531

Qi, J K; Yang, J Y; Oliver Hoon Leh, L; Edwards, R and Jamalunlaili, A (2021) Thermal comfort prediction of air-conditioned and passively cooled engineering testing centres in a higher educational institution using CFD. Smart and Sustainable Built Environment, 10(1), pp. 18-36. ISSN 2046-6099

Qureshi, A H; Alaloul, W S; Wing, W K; Saad, S; Alzubi, K M and Musarat, M A (2024) Factors affecting the implementation of automated progress monitoring of rebar using vision-based technologies. Construction Innovation, 24(3), pp. 770-789. ISSN 1471-4175

Radebe, T B; Huan, Z and Baloyi, J (2021) Simulation of eutectic plates in medium refrigerated transport. Journal of Engineering, Design and Technology, 19(1), pp. 62-80. ISSN 1726-0531

Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings. PhD thesis, Oklahoma State University, USA.

Ramadan, R; Ghanem, H; Khatib, J M and ElKordi, A M (2025) Effect of plant-based natural fibers on the mechanical properties and volume change of cement paste. International Journal of Building Pathology and Adaptation, 43(4), pp. 693-711. ISSN 2398-4708

Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364

Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Exploring the barriers for implementing waste trading practices in the construction industry in Australia. Built Environment Project and Asset Management, 11(4), pp. 559-576. ISSN 2044-124X

Rayhan, D S A and Bhuiyan, I U (2025) A framework for evaluation of construction and demolition waste management alternatives using MCDA techniques in the context of Dhaka City. International Journal of Construction Management, 25(4), pp. 481-493. ISSN 1562-3599

Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(1), pp. 77-93. ISSN 1562-3599

Revadigar, S P (1996) Automated analysis of building seismic records. PhD thesis, University of Houston, USA.

Robinson, H S (2000) A critical systems approach to infrastructure investment and resource management in developing countries. PhD thesis, London South Bank University, UK.

Rockett, P and Hathway, E A (2017) Model-predictive control for non-domestic buildings: A critical review and prospects. Building Research & Information, 45(5), pp. 556-571. ISSN 0961-3218

Rodriguez-Ramos, W E (1982) Quantitative techniques for construction site layout planning. PhD thesis, University of Florida, USA.

Samuel, D (2014) Predicting significant contract risks at the tender evaluation stage. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 100-107. ISSN 17514304

Sarihi, M; Shahhosseini, V and Banki, M T (2020) Multiskilled project management workforce assignment across multiple projects regarding competency. Journal of Construction Engineering and Management, 146(12): 04020134, ISSN 0733-9364

Seboni, L and Tutesigensi, A (2015) A mathematical model for allocating project managers to projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Selinger, S (1983) Economic service life of building construction equipment. Journal of Construction Engineering and Management, 109(4), pp. 398-405. ISSN 0733-9364

Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364

Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.

Shah, K L (1969) Techniques for estimating construction costs of waste treatment plants. PhD thesis, University of Oklahoma, USA.

Shehadeh, A; Alshboul, O and Hamedat, O (2022) Risk assessment model for optimal gain-pain share ratio in target cost contract for construction projects. Journal of Construction Engineering and Management, 148(2): 04021197, ISSN 0733-9364

Shehadeh, Ali (2019) Multi-objective optimization for construction equipment fleet selection and management in highway construction projects based on time, cost, and quality objectives. PhD thesis, University of Central Florida, USA.

Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364

Shi, J J (1999) Mathematical models for maximizing aggregate plant production. Journal of Construction Engineering and Management, 125(1), pp. 53-60. ISSN 0733-9364

Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364

Sing, C P; Love, P E D and Tarn, C M (2012) Multiplier model for forecasting manpower demand. Journal of Construction Engineering and Management, 138(10), pp. 1161-1168. ISSN 0733-9364

Sing, M C P; Fung, I W H; Edwards, D J and Liu, H (2022) Dynamic construction site layout planning: An application of branch and bond algorithm. International Journal of Building Pathology and Adaptation, 40(4), pp. 523-538. ISSN 23984708

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.

Siu, M F F; Lu, M and Abourizk, S (2016) Resource supply-demand matching scheduling approach for construction workface planning. Journal of Construction Engineering and Management, 142(1): 04015048, ISSN 0733-9364

Sobuz, M H R; Meraz, M M; Saha, A; Akid, A S M; Hasan, N M S; Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(3), pp. 718-738. ISSN 1726-0531

Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364

Song, J; Haas, C T and Caldas, C H (2006) Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132(9), pp. 911-918. ISSN 0733-9364

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.

Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.

Taneja, L and Bolia, N B (2018) Pedestrian control measures for efficient emergency response management in mass gatherings. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 273-290. ISSN 1759-5916

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193

Tang, Y H and Ogunlana, S O (2003) Modelling the dynamic perfomance of a construction organization. Construction Management and Economics, 21(2), pp. 127-136. ISSN 01446193

Tangwe, S L; Simon, M and Meyer, E L (2017) Prediction of coefficient of performance and simulation design of an air-source heat pump water heater. Journal of Engineering, Design and Technology, 15(3), pp. 378-394.

Tatari, O and Kucukvar, M (2012) Eco-efficiency of construction materials: Data envelopment analysis. Journal of Construction Engineering and Management, 138(6), pp. 733-741. ISSN 0733-9364

Thomas, H R; Mathews, C T and Ward, J G (1986) Learning curve models of construction productivity. Journal of Construction Engineering and Management, 112(2), pp. 245-258. ISSN 0733-9364

Toladun, Olawale (2025) Sustainable procurement of infrastructure projects in the Australian construction industry: The perceptions of consultants. PhD thesis, University of New South Wales, Australia.

Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364

Touran, A (2010) Probabilistic approach for budgeting in portfolio of projects. Journal of Construction Engineering and Management, 136(3), pp. 361-366. ISSN 0733-9364

Tucker, S N (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), pp. 179-188. ISSN 01446193

Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193

Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364

Turkoglu, H; Arditi, D and Polat, G (2025) Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects. Construction Management and Economics, 43(9), pp. 704-722. ISSN 0144-6193

Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988

Vatterott, A G (2018) A multi-skilled approach to property maintenance considering temporal, spatial and resource constraints. PhD thesis, University of Missouri - Saint Louis, USA.

Vaziri, K (2006) Program planning under uncertainty. PhD thesis, Cornell University, USA.

Venegas C, P and Alarcón C, L F (1997) Selecting long-term strategies for construction firms. Journal of Construction Engineering and Management, 123(4), pp. 388-398. ISSN 0733-9364

Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364

Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175

Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.

Woju, U W and Balu, A S (2020) Fuzzy uncertainty and its applications in reinforced concrete structures. Journal of Engineering, Design and Technology, 18(5), pp. 1175-1191. ISSN 1726-0531

Wu, H; Sun, X and Wu, Y (2022) Methods for probability distributions estimation of indoor environmental parameters and long-term IEQ assessment. Building Research & Information, 50(7), pp. 771-791. ISSN 0961-3218

Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364

Xu, J and Zeng, Z (2011) Applying optimal control model to dynamic equipment allocation problem: Case study of concrete-faced rockfill dam construction project. Journal of Construction Engineering and Management, 137(7), pp. 536-550. ISSN 0733-9364

Yahya, K and Boussabaine, A H (2004) Developing a framework for assessing eco-costs of construction site activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Yan, C (2006) Risk management strategy of construction projects in China. PhD thesis, University of Bedfordshire, UK.

Yi, H (2022) 4D-printed parametric façade in architecture: Prototyping a self-shaping skin using programmable two-way shape memory composite (twsmc). Engineering, Construction and Architectural Management, 29(10), pp. 4132-4152. ISSN 0969-9988

Yizhe, T and Youjie, L (1992) Unbalanced bidding on contracts with. Variation trends in client-provided quantities. Construction Management and Economics, 10(1), pp. 69-80. ISSN 01446193

Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988

Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.

Zhang, X (2006) Toward innovative and efficient infrastructure delivery. PhD thesis, University of Alberta, Canada.

Zhong, Y; Ling, F Y Y and Wu, P (2017) Using multiple attribute value technique for the selection of structural frame material to achieve sustainability and constructability. Journal of Construction Engineering and Management, 143(2): 04016098, ISSN 0733-9364

Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364

Zhou, W (2023) Condition state-based decision making in evolving systems: Applications in asset management and delivery. PhD thesis, George Mason University, USA.

Zou, X and Rong, Z (2025) Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), pp. 2397-2429. ISSN 0969-9988

Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988

Şahin, A U (2025) The disastrousness of asylum: Syrian asylum seekers and their impact on disastrousness in the kahramanmaraş earthquakes. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 363-377. ISSN 1759-5908

This list was generated on Sat Aug 22 01:50:03 2026 UTC.