Items with Index Term: materials management

Number of items: 64.

Al-Otaibi, N T N H (1995) A knowledge-based systems approach to materials management for large construction projects. PhD thesis, University of Toronto, Canada.

Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.

Alkaabi, J A (1994) Improved materials management using automatic identification techniques. PhD thesis, Loughborough University, UK.

Alzohbi, M G M (2015) A framework for evaluating material management performance in Jordanian concrete building projects. PhD thesis, Sheffield Hallam University, UK.

Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.

Bell, L C and Stukhart, G (1986) Attributes of materials management systems. Journal of Construction Engineering and Management, 112(1), pp. 14-21. ISSN 0733-9364

Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364

Dardouri, S; BuHamdan, S; Al Balkhy, W; Dakhli, Z; Danel, T and Lafhaj, Z (2023) RFID platform for construction materials management. International Journal of Construction Management, 23(14), pp. 2509-2519. ISSN 1562-3599

Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(2), pp. 17-28. ISSN 1366-4387

Dawood, N N; Hobbs, B and Fanning, A (1999) Standardization of brickwork construction: Process identification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

De Venny, A S (1999) Recycling of demolished masonry rubble. PhD thesis, Edinburgh Napier University, UK.

Dharmapalan, V; O'Brien, W J; Morrice, D and Jung, M (2021) Assessment of visibility in industrial construction projects: A viewpoint from supply chain stakeholders. Construction Innovation, 21(4), pp. 782-799. ISSN 1471-4175

Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599

Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.

Donyavi, S and Flanagan, R (2009) The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Donyavi, S and Flanagan, R (2011) Tracking and positioning technology and its applications for supply chain materials for small and medium enterprises (SMEs) on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Donyavi, S; Flanagan, R; Assadi-Langroudi, A and Parisi, L (2024) Understanding the complexity of materials procurement in construction projects to build a conceptual framework influencing supply chain management of msmes. International Journal of Construction Management, 24(2), pp. 177-186. ISSN 1562-3599

Edward Back, W and Bell, L C (1995) Quantifying process benefits of electronic data management technologies. Journal of Construction Engineering and Management, 121(4), pp. 415-421. ISSN 0733-9364

Elzarka, H M and Bell, L C (1995) Object-oriented methodology for materials-management systems. Journal of Construction Engineering and Management, 121(4), pp. 438-445. ISSN 0733-9364

Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.

Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.

Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.

Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gurmu, A T (2019) Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects. Journal of Construction Engineering and Management, 145(2): 4018139, ISSN 0733-9364

Gurmu, A T (2020) Construction materials management practices enhancing labour productivity in multi-storey building projects. International Journal of Construction Management, 20(1), pp. 77-86. ISSN 1562-3599

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

He, R (2023) Modeling of sustainable materials management systems: Hybrid science-based, data-driven approaches. PhD thesis, Carnegie Mellon University, USA.

Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599

Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.

Kasim, N B; Anumba, C J and Dainty, A R J (2005) Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lindén, S and Josephson, P E (2013) In-housing or out-sourcing on-site materials handling in housing? Journal of Engineering, Design and Technology, 11(1), pp. 90-106. ISSN 1726-0531

London, K; Kenley, R and Agapiou, A (1998) Theoretical supply chain network modelling in the building industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Maauf, N A A (2021) The development of a framework to improve materials management on Libyan construction sites. PhD thesis, University of Salford, UK.

Machete, S M (1997) Waste management in construction sites of emerging contractors in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Majrouhi Sardroud, J (2011) Assessment and development of radio frequency identification applications for effective management of construction activities. PhD thesis, Kingston University, UK.

Muehlhausen, F B (1988) Development of the materials management model for construction management curriculum development and a method to translate model information into instruction. PhD thesis, Purdue University, USA.

Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.

Muya, M; Price, A D F and Thorpe, A (1997) Construction materials supply logistics. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X

Niskanen, T (1993) Accident risks and preventive measures in materials handling at construction sites. DrTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Nwankwo, D C (2023) Improving approaches to material inventory management in construction industry in the UK. DBA thesis, University of Wales Trinity Saint David, UK.

Oduori, M and Mbuya, T (2009) Wire rope selection for manual winch application. Journal of Engineering, Design and Technology, 7(2), pp. 207-222. ISSN 1726-0531

Onubi, H O; Yusof, N and Hassan, A S (2020) Effects of green construction on project's economic performance. Journal of Financial Management of Property and Construction, 25(3), pp. 331-346. ISSN 1366-4387

Onubi, H O; Yusof, N A and Hassan, A S (2019) Green site practices and environmental performance: How project complexity moderates the relationship. Construction Economics and Building, 19(1), pp. 75-95. ISSN 2204-9029

Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175

Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.

Plemmons, J K (1995) Materials management process measures and benchmarking in the industrial construction industry. PhD thesis, Clemson University, USA.

Polat, G (2009) Simulation-based efficiency assessment approach for rebar supply chains in Turkey. Construction Innovation, 9(1), pp. 101-121. ISSN 1471-4175

Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193

Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364

Rajput, B; Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), pp. 1240-1248. ISSN 1562-3599

Sabharwal, A; Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(1), pp. 58-71. ISSN 1471-4175

Saidu, I; Shakantu, W; Adamu, A and Anugwo, I (2017) A bespoke approach for relating material waste to cost overrun in the construction indsutry. Journal of Construction Business and Management, 1(1), pp. 39-52. ISSN 2521-0165

Sanusi, K O and Oliver, G J (2009) Effects of grain size on mechanical properties of nanostructured copper alloy by severe plastic deformation (SPD) process. Journal of Engineering, Design and Technology, 7(3), pp. 335-341. ISSN 1726-0531

Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.

Stukhart, G and Cook, E L (1990) Bar-code standardization in industrial construction. Journal of Construction Engineering and Management, 116(3), pp. 416-431. ISSN 0733-9364

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Tavakoli, A and Kakalia, A (1993) MMS: A materials management system. Construction Management and Economics, 11(2), pp. 143-148. ISSN 01446193

Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.

Yang, J (2001) A decision support system for material routing in construction sites. PhD thesis, University of Wolverhampton, UK.

ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175

This list was generated on Sat Aug 22 02:00:26 2026 UTC.