Items with Index Term: market condition

Number of items: 121.

Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193

Arditi, D; Koksal, A and Kale, S (2000) Business failures in the construction industry. Engineering, Construction and Architectural Management, 7(2), pp. 120-132. ISSN 0969-9988

Arneson, E (2018) Construction capacity: How regional construction supply chains respond to disruptions. PhD thesis, University of Colorado at Boulder, USA.

Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.

Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364

Bashir, Adnan (2022) The role of control modes in the performance of Australian and Pakistani construction projects. PhD thesis, University of Sydney, Australia.

Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Berends, T C (2007) Contracting economics of large engineering and construction projects. PhD thesis, Delft University of Technology, Netherlands.

Bigdellou, S and Chen, Q (2026) Quantification of economic influences on technology adoption and diffusion in the construction industry. International Journal of Construction Management, 26(4), pp. 621-638. ISSN 1562-3599

Birgonul, M T and Ozdogan, I D (2001) Risks borne by foreign contractors doing business in Turkey. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Buzzelli, M D (2001) The Canadian urban housebuilding industry: Firm size structure and production methods in Ontario, 1945–2000. PhD thesis, McMaster University, Canada.

Cariaga, I and El-Diraby, T E (2013) Assessing the market potential for housing construction products in Mexico. Journal of Construction Engineering and Management, 139(6), pp. 717-725. ISSN 0733-9364

Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193

Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. PhD thesis, George Mason University, USA.

Choi, C Y; Ryu, K R and Shahandashti, M (2021) Predicting city-level construction cost index using linear forecasting models. Journal of Construction Engineering and Management, 147(2): 0001973, ISSN 0733-9364

Choi, J O; Shrestha, B K; Kwak, Y H and Shane, J (2022) Exploring the benefits and trade-offs of design standardization in capital projects. Engineering, Construction and Architectural Management, 29(3), pp. 1169-1193. ISSN 0969-9988

Deep, S (2021) Influence of ‘power’ and ‘dependence’ attributes on main contractor and sub-contractor collaboration in construction projects. PhD thesis, University of Newcastle, Australia.

Dehbandi, R and Mottaki, Z (2026) A comparative analysis of housing quality rating systems: Insights for contextual adaptation and policy development. Building Research & Information, 54(3), pp. 330-344. ISSN 0961-3218

Doan, D. T.; Albsoul, H.; Shobha, A. R.; GhaffarianHoseini, A. and Ghaffarianhoseini, A. (2026) An integrated challenge-strategy framework for construction waste management in New Zealand: Behavioural and organisational challenges and strategies. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

Dulaimi, M F; Ling, F Y Y; Ofori, G and De Silva, N (2002) Enhancing integration and innovation in construction. Building Research & Information, 30(4), pp. 237-247. ISSN 0961-3218

Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(4), pp. 444-468. ISSN 0969-9988

Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Elkliny, A.; Mahmoudi, A.; Deng, X. and Gaber, M. M. (2026) Data-driven identification of critical skills for international construction supply chain management practitioners. Engineering, Construction and Architectural Management, pp. 1-31. ISSN 0969-9988

Elkliny, A.; Mahmoudi, A.; Deng, X. and Gaber, M. M. (2026) Data-driven identification of critical skills for international construction supply chain management practitioners. Engineering, Construction and Architectural Management, pp. 1-31. ISSN 0969-9988

Elnady, Ahmed Abdelrady Okasha Mohamed (2023) An integrated framework for balancing contractor's workload versus capacity using system dynamics. PhD thesis, University of Alberta, Canada.

Fang, M and Long, F (2009) A preliminary look at effects of asset-backed securitization on shareholders. Journal of Financial Management of Property and Construction, 14(3), pp. 248-256. ISSN 1366-4387

Farooghi, F (2020) The effect of natural disasters on construction labor wage fluctuations: A spatial difference-in-difference analysis. PhD thesis, University of Texas at Arlington, USA.

Fatani, A A (1994) Factors influencing the success and failure of British construction companies working in joint ventures with Saudi partners. PhD thesis, Loughborough University, UK.

Flanagan, R and Norman, G (1985) Sealed bid auctions: An application to the building industry. Construction Management and Economics, 3(2), pp. 145-161. ISSN 01446193

Gawlitta, M and Kleinow, J (2015) Analysis of infrastructure financing by debt funds in the EU. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 12-21. ISSN 17514304

Gruneberg, S and Murdoch, I (2011) Specialist contractors' views: Testing the NSCC State of Trade Quarterly Report results against market conditions. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Hatamleh, M T; Hiyassat, M; Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(1), pp. 113-131. ISSN 0969-9988

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Hui, E C M and Ivan, I M H (2008) A risk-based option pricing strategy for property valuation: An empirical study in Hong Kong. Journal of Financial Management of Property and Construction, 13(1), pp. 48-59. ISSN 1366-4387

Hui, E C M and Ng, I (2009) Price discovery of property markets in Shenzhen and Hong Kong. Construction Management and Economics, 27(12), pp. 1175-1196. ISSN 1466433X

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Imriyas, K; Low, S P; Teo, A L and Chan, S L (2008) Premium-rating model for workers' compensation insurance in construction. Journal of Construction Engineering and Management, 134(8), pp. 601-617. ISSN 0733-9364

Imriyas, K; Pheng, L S and Teo, E A L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(6), pp. 563-584. ISSN 1466433X

Imriyas, K; Pheng, L S and Teo, E A L (2007) A fuzzy knowledge-based system for premium rating of workers' compensation insurance for building projects. Construction Management and Economics, 25(11), pp. 1177-1195. ISSN 01446193

Isik, Z; Arditi, D; Dilmen, I and Talat Birgonul, M (2010) The role of exogenous factors in the strategic performance of construction companies. Engineering, Construction and Architectural Management, 17(2), pp. 119-134. ISSN 0969-9988

Jaafari, A and Schub, A (1990) Surviving failures: Lessons from field study. Journal of Construction Engineering and Management, 116(1), pp. 68-86. ISSN 0733-9364

Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.

Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364

Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9): 04025134, ISSN 0733-9364

Kamardeen, I (2007) A fuzzy knowledge-based system for premium-rating of workers' compensation insurance for construction projects. PhD thesis, National University of Singapore, Singapore.

Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364

Kim, J and Philips, P (2012) Determinants of quits and dismissals on a long-lasting unionized industrial construction project. Journal of Construction Engineering and Management, 138(5), pp. 661-669. ISSN 0733-9364

Kissi, E; Adjei-Kumi, T; Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(3), pp. 252-268. ISSN 1366-4387

Knight, T and Boyd, D (2009) Researching property development in interesting times. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lau, C H (2019) The global trading activities of consulting engineering firms: managing risk and geographical choice. PhD thesis, University of Oxford, UK.

Lessing, J and Brege, S (2018) Industrialized building companies' business models: Multiple case study of Swedish and North American companies. Journal of Construction Engineering and Management, 144(2): 05017019, ISSN 0733-9364

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.

Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X

Li, Y; Maxwell, D W and Moehler, R (2025) Facilitating platform-based business model innovation in construction start-ups: A dynamic capability perspective. Construction Management and Economics, 43(10), pp. 864-881. ISSN 0144-6193

Lim, B T H; Oo, B L and Ling, F (2010) The survival strategies of Singapore contractors in prolonged recession. Engineering, Construction and Architectural Management, 17(4), pp. 387-403. ISSN 0969-9988

Lim, L J W and Ling, F Y Y (2012) Human resource practices of contractors that lead to job satisfaction of professional staff. Engineering, Construction and Architectural Management, 19(1), pp. 101-118. ISSN 0969-9988

Lochau-Emden, G H (1983) A manufacturers' exchange as a source of information for strategic management and an economic stabilising aid in the building and construction sector: A theoretical and empirical study. DBA thesis, University of Pretoria, South Africa.

Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.

Luo, J; Gale, A and He, X (2001) Investing in the Chinese construction industry via joint ventures. Building Research & Information, 29(4), pp. 277-285. ISSN 0961-3218

Manley, K and Chen, L (2015) Collaborative learning model of infrastructure construction: A capability perspective. Construction Innovation, 15(3), pp. 355-377. ISSN 1471-4175

McCarty, J; Scott, A and Rysanek, A (2021) Determining the retrofit viability of Vancouver's single-detached homes: An expert elicitation. Buildings & Cities, 2(1), pp. 354-377. ISSN 2632-6655

Membah, J and Asa, E (2015) Estimating cost for transportation tunnel projects: A systematic literature review. International Journal of Construction Management, 15(3), pp. 196-218. ISSN 1562-3599

Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand. PhD thesis, University of Minnesota, USA.

Ming, C S; Runeson, G and Skitmore, M (1996) Changes in profit as market conditions change: An historical study of a building firm. Construction Management and Economics, 14(3), pp. 253-264. ISSN 01446193

Mohammed, Miswan Abdul Hakim (1994) An investigation into firms' strategies and their financial performance in the UK construction industry. PhD thesis, University College London, UK.

Mollaoglu, S; Chergia, C; Ergen, E and Syal, M (2016) Diffusion of green building guidelines as innovation in developing countries. Construction Innovation, 16(1), pp. 11-29. ISSN 1471-4175

Moorhead, Matthew (2019) Feasibility analysis in the pre-commitment stages of the property development process: An examination of uncertainty, risk and heuristic bias in management decision making Processes During the Pre‐commitment Stages of the Property Development Process in Australia. PhD thesis, Bond University, Australia.

Morton, R R (1982) The speculative housebuilding industry in the nineteen seventies. PhD thesis, University of Liverpool, UK.

Mostafavi, A (2013) Ex-ante assessment of financial innovation policies in infrastructure system-of-systems. PhD thesis, Purdue University, USA.

Naim, M and Barlow, J (2003) An innovative supply chain strategy for customized housing. Construction Management and Economics, 21(6), pp. 593-602. ISSN 01446193

Najafi, M.; Rahimian, F.; Zaki Abdelaziz, Y.; Poppe, J. and Rodriguez Trejo, S. (2026) User-side regime dynamics and design-use misalignments in circular construction transitions. Engineering, Construction and Architectural Management, pp. 1-33. ISSN 0969-9988

Nesan, L J (2005) Factors influencing tacit knowledge in construction. Construction Economics and Building, 5(1), pp. 48-57. ISSN 2204-9029

Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193

Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(2), pp. 106-119. ISSN 1471-4175

Ngai, S C; Drew, D S; Lo, H P and Skitmore, M (2002) A theoretical framework for determining the minimum number of bidders in construction bidding competitions. Construction Management and Economics, 20(6), pp. 473-482. ISSN 01446193

Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Oo, B L; Drew, D and Lo, H (2007) Modelling contractors' mark-up behaviour in different construction markets. Engineering, Construction and Architectural Management, 14(5), pp. 447-462. ISSN 0969-9988

Oo, B L; Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(4), pp. 387-398. ISSN 1466433X

Oo, B L; Drew, D S and Lo, H P (2008) Heterogeneous approach to modeling contractors' decision-to-bid strategies. Journal of Construction Engineering and Management, 134(10), pp. 766-775. ISSN 0733-9364

Oo, B L; Drew, D S and Lo, H P (2010) Modeling the heterogeneity in contractors' mark-up behavior. Journal of Construction Engineering and Management, 136(7), pp. 720-729. ISSN 0733-9364

Osman, I I (2002) Performance measures for contracting companies: a study of the Arab Contractors Company. PhD thesis, Loughborough University, UK.

Pan, W (2010) Strategies for managing innovation in UK housebuilding. Engineering, Construction and Architectural Management, 17(1), pp. 78-88. ISSN 0969-9988

Rawlinson, S and Raftery, J (1997) Price stability and the business cycle: UK construction bidding patterns 1970-91. Construction Management and Economics, 15(1), pp. 5-18. ISSN 01446193

Regan, M; Smith, J and Love, P E D (2011) Impact of the capital market collapse on public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 137(1), pp. 6-16. ISSN 0733-9364

Runeson, G r (1996) Models of construction price determination: A comparative appraisal. PhD thesis, Queensland University of Technology, Australia.

Runeson, K G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(1), pp. 49-55. ISSN 01446193

Sarshar, M; Murat Tanyer, A; Aouad, G and Underwood, J (2002) A vision for construction IT 2005 2010: Two case studies. Engineering, Construction and Architectural Management, 9(2), pp. 152-160. ISSN 0969-9988

Shen, L Y; Li, Q M; Drew, D and Shen, Q P (2004) Awarding construction contracts on multicriteria basis in China. Journal of Construction Engineering and Management, 130(3), pp. 385-393. ISSN 0733-9364

Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.

Shikweni, S (2018) Talent management in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988

Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), pp. 127-157. ISSN 1471-4175

Shrestha, K J; Jeong, H D and Gransberg, D D (2017) Multidimensional highway construction cost indexes using dynamic item basket. Journal of Construction Engineering and Management, 143(8): 04017036, ISSN 0733-9364

Singh, A. K.; Mohandes, S. R.; Awuzie, B. O.; Omotayo, T.; Kumar, V. R. P. and Kidd, C. (2026) A roadmap for overcoming barriers to implementation of blockchain-enabled smart contracts in sustainable construction projects. Smart and Sustainable Built Environment, 15(2), pp. 570-596. ISSN 2046-6099

Skitmore, M and Smyth, H (2007) Pricing construction work: A marketing viewpoint. Construction Management and Economics, 25(6), pp. 619-630. ISSN 1466433X

Smith, J P; Miller, K; Christofferson, J and Hutchings, M (2011) Best practices for dealing with price volatility in utah's residential construction market. International Journal of Construction Education and Research, 7(3), pp. 210-225. ISSN 1557-8771

Smithwick, J B; Schleifer, T C; Sawyer, J T and Sullivan, K T (2019) Quantifying the impact of the great recession on the AEC industry: A call to reevaluate home office overhead costs. International Journal of Construction Education and Research, 15(3), pp. 198-215. ISSN 1557-8771

Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.

Stanford, M S and Molenaar, K R (2018) Influence of simplified procurement methods on competition for public sector construction. Journal of Construction Engineering and Management, 144(2): 04017105, ISSN 0733-9364

Sturts, C S (2001) Value-bidding: An integrative approach utilizing conjoint analysis and classical bidding theory. PhD thesis, Columbia University, USA.

Sturts, C S and Griffis, F H (2005) Addressing pricing: Value bidding for engineers and consultants. Journal of Construction Engineering and Management, 131(6), pp. 621-630. ISSN 0733-9364

Taylor, T R B; Uddin, M; Goodrum, P M; McCoy, A and Shan, Y (2012) Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1360-1369. ISSN 0733-9364

Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.

Walters, J P; Kaminsky, J and Huepe, C (2018) Factors influencing household solar adoption in Santiago, Chile. Journal of Construction Engineering and Management, 144(6): 05018004, ISSN 0733-9364

Wang, Zhuoyuan (2019) Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.

Wei, L; Krizek, R J and Hadavi, A (1999) Effects of high prequalification requirements. Construction Management and Economics, 17(5), pp. 603-612. ISSN 01446193

Weidman, J E; Miller, K R; Christofferson, J P and Newitt, J S (2011) Best practices for dealing with price volatility in commercial construction. International Journal of Construction Education and Research, 7(4), pp. 276-293. ISSN 1557-8771

Whittaker, S and Jespersen, K (2022) Stretching or conforming? Financing urban climate change adaptation in Copenhagen. Buildings & Cities, 3(1), pp. 974-999. ISSN 2632-6655

Wright, J A (2005) An assessment of competitive advantage and market opportunities of UK construction companies operating in Europe. PhD thesis, University of Leeds, UK.

Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.

Zekri, M M and Razali, M N (2020) Volatility dynamics of Malaysian listed property companies within the Asian public property markets by using a switching regime approach. Journal of Financial Management of Property and Construction, 25(1), pp. 5-39. ISSN 1366-4387

Zhang, K.; Shaheen, Q. H. and Cui, Q. (2026) Understanding structured project finance for US transportation public-private partnerships: What maximizes financing capacity? Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Zhang, P; Sing, M C P; Chan, A P C and Liu, H J (2026) Utilizing deep learning for the extraction of cost risk factors from project risk registers: Enhancing contingency estimation. Journal of Construction Engineering and Management, 152(5): 04026049, ISSN 0733-9364

van Nguyen, M V and Duy Ha, K (2025) Investigation of factors affecting the readiness for the adoption of sustainable building materials. Engineering, Construction and Architectural Management, 32(8), pp. 5578-5608. ISSN 0969-9988

This list was generated on Sat Aug 22 02:12:25 2026 UTC.