Items with Index Term: mark-up

Number of items: 65.

Abdel-Razek, R H (1987) Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences. PhD thesis, Loughborough University, UK.

Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.

Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193

Al-Barghouthi, M T (2010) Capturing tacit knowledge in the construction industry in Saudi Arabia. DM thesis, University of Phoenix, USA.

Anvuur, A M and Kumaraswamy, M K (2010) Promises, pitfalls and shortfalls of the guaranteed maximum price approach: A comparative case study. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ball, M; Farshchi, M and Grilli, M (2000) Competition and the persistence of profits in the UK construction industry. Construction Management and Economics, 18(7), pp. 733-745. ISSN 01446193

Ballesteros-Pérez, P; González-Cruz, M C; Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(9), pp. 752-770. ISSN 01446193

Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X

Cattell, D W; Bowen, P A and Kaka, A P (2010) The risks of unbalanced bidding. Construction Management and Economics, 28(4), pp. 333-344. ISSN 1466433X

Cattell, D W; Bowen, P A and Kaka, A R (2008) A simplified unbalanced bidding model. Construction Management and Economics, 26(12), pp. 1283-1290. ISSN 1466433X

Cheng, T-m (1996) Impact of front-end loading on construction project cash-flows: A mathematical approach for determination of unit prices in bidding. PhD thesis, Purdue University, USA.

Christodoulou, S (2010) Bid mark-up selection using artificial neural networks and an entropy metric. Engineering, Construction and Architectural Management, 17(4), pp. 424-439. ISSN 0969-9988

Christodoulou, S E (2008) A bid-unbalancing method for lowering a contractor's financial risk. Construction Management and Economics, 26(12), pp. 1291-1302. ISSN 1466433X

Conradie, D C U (2001) The use of software systems to implement case-based reasoning enabled intelligent components for architectural briefing and design. SkoglDr thesis, University of Pretoria, South Africa.

Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(2), pp. 115-125. ISSN 01446193

Decarolis, F (2009) When the highest bidder loses the auction: Theory and evidence from public procurement. PhD thesis, University of Chicago, USA.

Dulaimi, M F and Shan, H G (2002) The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore. Construction Management and Economics, 20(7), pp. 601-610. ISSN 01446193

Flanagan, R and Norman, G (1985) Sealed bid auctions: An application to the building industry. Construction Management and Economics, 3(2), pp. 145-161. ISSN 01446193

Hartono, B and Yap, C M (2011) Understanding risky bidding: A prospect-contingent perspective. Construction Management and Economics, 29(6), pp. 579-593. ISSN 1466433X

Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering. PhD thesis, Aston University, UK.

Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), pp. 53-75. ISSN 1366-4387

Jefferies, D and Schweber, L (2022) Professional judgement: An institutional logic approach to contractor tender pricing. Buildings & Cities, 3(1), pp. 518-533. ISSN 2632-6655

Kim, H J and Reinschmidt, K F (2006) A dynamic competition model for construction contractors. Construction Management and Economics, 24(9), pp. 955-965. ISSN 1466433X

Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.

Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(1-2), pp. 69-81. ISSN 0969-9988

Li, H and Love, P E D (1997) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(2), pp. 169-176. ISSN 01446193

Li, H; Shen, L Y and Love, P E D (1999) Ann-based mark-up estimation system with self-explanatory capacities. Journal of Construction Engineering and Management, 125(3), pp. 185-189. ISSN 0733-9364

Ling, F Y Y (2005) Global factors affecting margin-size of construction projects. Journal of Construction Research, 6(1), pp. 91-106. ISSN 1609-9451

Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193

Lo, H P and Lam, M-L (2001) A bidding strategy using multivariate distribution. Journal of Financial Management of Property and Construction, 6(3), pp. 155-165. ISSN 1366-4387

Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.

Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Nourah, B T K (2013) Development of strategic mark up decision by contractors in Saudi Arabia. PhD thesis, University of Manchester, UK.

Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Oo, B L (2016) On the external validity of construction bidding experiment. Construction Economics and Building, 16(1), pp. 64-75. ISSN 2204-9029

Oo, B L; Drew, D and Lo, H (2007) Modelling contractors' mark-up behaviour in different construction markets. Engineering, Construction and Architectural Management, 14(5), pp. 447-462. ISSN 0969-9988

Oo, B L; Drew, D S and Lo, H P (2010) Modeling the heterogeneity in contractors' mark-up behavior. Journal of Construction Engineering and Management, 136(7), pp. 720-729. ISSN 0733-9364

Oo, B L; Lim, B T H and Runeson, G (2023) Mark-up on construction projects: what have we learnt in the last 20 years? Engineering, Construction and Architectural Management, 30(9), pp. 4319-4338. ISSN 0969-9988

Perera, B A K S; Wijewickrama, M K C S; Ranaweera, W R S C and Gamage, I S W (2021) Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka. International Journal of Construction Management, 21(8), pp. 769-783. ISSN 1562-3599

Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.

Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Salama, M; Al-Sharif, F; Kaka, A P and Leishman, C (2006) Cost modelling for standardised design projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Santoso, D S and Bourpanus, N (2019) Moving to e-bidding: Examining the changes in the bidding process and the bid mark-up decisions of Thai contractors. Journal of Financial Management of Property and Construction, 24(1), pp. 2-18. ISSN 1366-4387

Shash, A A and Abdul-Hadi, N H (1992) Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(5), pp. 415-429. ISSN 01446193

Shash, A A and Abdul-Hadi, N H (1993) The effect of contractor size on mark-up size decision in Saudi Arabia. Construction Management and Economics, 11(6), pp. 421-429. ISSN 01446193

Skitmore, M (2008) First and second price independent values sealed bid procurement auctions: Some scalar equilibrium results. Construction Management and Economics, 26(8), pp. 785-801. ISSN 1466433X

Soo, A and Oo, B L (2014) The effect of construction demand on contract auctions: An experiment. Engineering, Construction and Architectural Management, 21(3), pp. 276-290. ISSN 0969-9988

Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.

Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Tran, Hanh Van (2013) Contractor internal profiling of owners. PhD thesis, University of New South Wales, Australia.

Uher, T E and Runeson, G (1984) Pre-tender and post-tender negotiations in Australia. Construction Management and Economics, 2(3), pp. 185-192. ISSN 01446193

Urquhart, S; Whyte, A and Lloyd, N (2017) The development of a more efficient internal tender procedure framework for Australian construction contractors. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Wang, H; Hamilton, A; Song, Y and Tah, J (2007) Implementation of a data integration service for building and urban planning. Architectural Engineering and Design Management, 3(3), pp. 195-208. ISSN 1745-2007

Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering. PhD thesis, University of Liverpool, UK.

Wanous, M; Boussabaine, A H and Lewis, J (1998) Tendering factors considered by Syrian contractors. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Wanous, M; Boussabaine, A H and Lewis, J (1999) A qualitative bidding model. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Wanous, M; Boussabaine, H and Lewis, J (2004) A neurofuzzy decision-support model for mark-up estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong, J T Y and Hui, E C M (2006) Construction project risks: Further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(4), pp. 425-438. ISSN 01446193

Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(1), pp. 77-84. ISSN 01446193

Zhang, Y; Oo, B L and Lim, B T H (2023) Factors affecting contractors' bid or no-bid and mark-up decisions: A case of the jilin province, China. Construction Innovation, 23(5), pp. 1232-1254. ISSN 1471-4175

de Valence, Gerard and Runeson, Goran (2015) Graham Ive and the methodology of construction economics. Construction Management and Economics, 33(2), pp. 126-133. ISSN 01446193

This list was generated on Sat Aug 22 01:45:04 2026 UTC.