Items with Index Term: manufacturing process

Number of items: 64.

Adel Ahmadian, A (2020) Computational design for cooperative robotic assembly of nonstandard timber frame buildings. DSc thesis, ETH Zürich, Switzerland.

Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.

Al-Bazi, A and Dawood, N (2018) Simulation-based optimisation using simulated annealing for crew allocation in the precast industry. Architectural Engineering and Design Management, 14(1-2), pp. 109-126. ISSN 1745-2007

Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.

Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175

Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531

Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988

Amarasinghe, Sam (2025) Performance optimizing for precast concrete construction. PhD thesis, Queensland University of Technology, Australia.

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.

Campbell, K; Clegg, D R; Perera, T; Stephenson, P and Stevens, A (1997) Simulation in the construction industry: A case-study review. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Castriotto, Caio Magalhães (2023) Reciprocal link a new connection system for reciprocal frame structures developed by algorithmic modeling and digital fabrication. PhD thesis, Universidade Estadual de Campinas, Brazil.

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Eufrasio Espinosa, R M (2015) A visio-spatial life cycle energy model of building materials within a bioregional context: Mapping the embodied energy of fired clay bricks in Cuitzeo, Mexico. PhD thesis, University of Sheffield, UK.

Faccio, M; Gamberi, M; Nedaei, M and Pilati, F (2018) Technical and economic modelling and evaluation of a water distribution system equipped with an autoclave for industrial production applications. Journal of Engineering, Design and Technology, 16(3), pp. 342-359. ISSN 1726-0531

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Fore, S and Mbohwa, C (2015) Greening manufacturing practices in a continuous process industry: Case study of a cement manufacturing company. Journal of Engineering, Design and Technology, 13(1), pp. 94-122.

Gamal, A; Nashaat, B; Shahda, M M and Nosier, S R (2024) Ten questions concerning the integration of digital fabrication techniques into the architectural design process. Architectural Engineering and Design Management, 20(1), pp. 120-149. ISSN 1745-2007

Gann, D M (1996) Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction Management and Economics, 14(5), pp. 437-450. ISSN 01446193

García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.

Goulding, J S; Pour Rahimian, F; Arif, M and Sharp, M D (2015) New offsite production and business models in construction: Priorities for the future research agenda. Architectural Engineering and Design Management, 11(3), pp. 163-184. ISSN 1745-2007

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Hassan, A; Purnomo, M R A and Anugerah, A R (2020) Fuzzy-analytical-hierarchy process in failure mode and effect analysis (FMEA) to identify process failure in the warehouse of a cement industry. Journal of Engineering, Design and Technology, 18(2), pp. 378-388. ISSN 1726-0531

Henriksen, T; Lo, S and Knaack, U (2016) The impact of a new mould system as part of a novel manufacturing process for complex geometry thin-walled gfrc. Architectural Engineering and Design Management, 12(3), pp. 231-249. ISSN 1745-2007

Hong, Z; Hong, Y; Cai, H; Abraham, D M; Zhang, J and Dunston, P S (2025) BIM-based framework for in-plant quality control of precast concrete manufacturing. Journal of Construction Engineering and Management, 151(12): 05025017, ISSN 0733-9364

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hyde, R (2023) An investigation into the relationship between technical design, fabrication process and material development for the production of thin, lightweight, high-performance concrete cladding components for the construction of beautiful, durable and resilient building envelopes. PhD thesis, Queen's University Belfast, UK.

Itoya, E (2012) Carbon emissions evaluation for highway management and maintenance. EngD thesis, Loughborough University, UK.

Jaiganesh, V and Prakasan, K (2016) Comparison of flow behaviour in pressurized gating systems using water models and numerical simulation. Journal of Engineering, Design and Technology, 14(3), pp. 652-674.

Jansson, G; Söderholm, E and Johnsson, H (2008) Design process organisation at industrial house builders: A case study of two timber housing companies in Sweden. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Jayakrishna, K; Girubha, R J and Vinodh, S (2016) Comparison of sustainability characteristics of conventional and CNC turning processes: A case study. Journal of Engineering, Design and Technology, 14(3), pp. 422-445.

Jayaram, S (2009) Development of payload housing for temperature and pressure control of bio fuel cells for space applications. Journal of Engineering, Design and Technology, 7(3), pp. 323-334. ISSN 1726-0531

Johnsson, H and Meiling, J H (2009) Defects in offsite construction: Timber module prefabrication. Construction Management and Economics, 27(7), pp. 667-681. ISSN 1466433X

Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.

Jones, Barry Kenneth (1998) A model for collaborative engineering in the construction industry. PhD thesis, University of Southampton, UK.

Kagioglou, M (1999) Adapting manufacturing project processes into construction: a methodology. PhD thesis, University of Salford, UK.

Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.

Kordestani Ghalenoei, N; Babaeian Jelodar, M; Paes, D and Sutrisna, M (2024) Challenges of offsite construction and BIM implementation: Providing a framework for integration in New Zealand. Smart and Sustainable Built Environment, 13(4), pp. 780-808. ISSN 2046-6099

Madson, K M; Franz, B; Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(6), pp. 1299-1314. ISSN 0969-9988

Madunic, M (2008) Choosing a project team: The effects of interdependence and prior transacting in engineering, procurement and construction (EPC) projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.

Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364

Meiling, J and Johnsson, H (2008) Feedback in industrialised housing: Why does it not happen? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Msomi, V and Oliver, G J (2016) Smart morphing based on shape memory alloy plate. Journal of Engineering, Design and Technology, 14(3), pp. 475-488.

Murtaza, M B (1993) A decision support model integrating neural networks and an expert system for construction modularization. PhD thesis, University of Houston, USA.

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Onitiri, M A and Adedayo, S M (2015) Compressive behaviour of polypropylene filled with iron ore tailings. Journal of Engineering, Design and Technology, 13(2), pp. 198-212.

Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X

Pokharel, H K (2023) Improving quality: Exploring ceramic water filters in developing communities. PhD thesis, University of Rhode Island, USA.

Rosso, S (2007) Environmental life-cycle of domestic kitchen refurbishment. PhD thesis, University of Brighton, UK.

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.

Soltani, M; Aouag, H and Mouss, M D (2020) An integrated framework using VSM, AHP and TOPSIS for simplifying the sustainability improvement process in a complex manufacturing process. Journal of Engineering, Design and Technology, 18(1), pp. 211-229. ISSN 1726-0531

Sutrisna, M; Ramanayaka, C D D and Goulding, J S (2018) Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), pp. 381-397. ISSN 1745-2007

Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(8), pp. 885-896. ISSN 1466433X

Taylor, M D (2022) A definition and valuation of the UK offsite construction sector: Ten years on. International Journal of Construction Management, 22(15), pp. 2877-2885. ISSN 1562-3599

Tesfagaber, G (2004) Application of PSL to construction process information specification and exchange. PhD thesis, Loughborough University, UK.

Wang, L-H (2005) Vertical process integration in design and manufacturing of hardwood products. PhD thesis, University of Missouri - Columbia, USA.

Wasim, M; Vaz Serra, P and Ngo, T D (2022) Design for manufacturing and assembly for sustainable, quick and cost-effective prefabricated construction–a review. International Journal of Construction Management, 22(15), pp. 3014-3022. ISSN 1562-3599

Wee, T P Y (2019) Product planning of manufactured construction products. PhD thesis, Imperial College London, UK.

Xiong, R (2024) Human-machine adaptation in lean waste elimination for customized building manufacturing systems. PhD thesis, Carnegie Mellon University, USA.

Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.

Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988

Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.

This list was generated on Sun Aug 23 01:58:23 2026 UTC.