Items with Index Term: main contractor

Number of items: 211.

Adjei, S D; Ankrah, N A; Ndekugri, I and Searle, D (2018) Sustainable construction and demolition waste management: Comparison of corporate and project level drivers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.

Alnaggar, Ahmed Mohamed Mohamed Moustafa (2022) Digital transformation in asset management organisations: towards a data driven approach for life cycle asset management. PhD thesis, University College London, UK.

Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(1), pp. 397-423. ISSN 0969-9988

Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.

Ameen, J R M; Neale, R H and Abrahamson, M (2003) An application of regression analysis to quantify a claim for increased costs. Construction Management and Economics, 21(2), pp. 159-165. ISSN 01446193

Amirtash, P; Majid Parchami, J and Jelodar, M B (2021) Integration of project management services for international engineering, procurement and construction projects. Built Environment Project and Asset Management, 11(2), pp. 330-349. ISSN 2044-124X

Amoah, C and Pretorius, L (2020) Evaluation of the impact of risk management on project performance in small construction firms in South Africa: The case study of construction systems. Journal of Engineering, Design and Technology, 18(3), pp. 611-634. ISSN 1726-0531

Ankrah, N A; Proverbs, D and Debrah, Y (2009) Factors influencing the culture of a construction project organisation: An empirical investigation. Engineering, Construction and Architectural Management, 16(1), pp. 26-47. ISSN 0969-9988

Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.

Barnes, L R and Croker, N (2013) The relevance of the ISO 26000 social responsibility issues to the Hong Kong construction industry. Construction Economics and Building, 13(3), pp. 37-50. ISSN 2204-9029

Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Benhaim, M and Birchall, D W (1998) Interfirm relationships within the construction industry: A comparative study between France and the UK. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bin Asad, S.; Purushothaman, M. B. and Poshdar, M. (2026) Interactions of factors affecting the implementation of integrated project delivery in the New Zealand construction industry: A system dynamics and network analysis approach. Construction Management and Economics, 44(6), pp. 453-479. ISSN 0144-6193

Blay-Armah A, R A (2013) The impact of varying asset specificities of subcontractors on relationships development in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bostan, B. B.; Çavka, H. B.; Citipitioglu, A. M. and Pehlivan, D. Z. (2026) Retrospective BIM performance analysis based on construction big data. Engineering, Construction and Architectural Management, 33(7), pp. 5991-6013. ISSN 0969-9988

Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Bresnen, M J; Ford, J R; Bryman, A E; Keil, E T; Beardsworth, A D and Wray, K (1986) Labour recruitment strategies and selection practices on construction sites. Construction Management and Economics, 4(1), pp. 37-55. ISSN 01446193

Broft, Rafaella; Badi, Sulafa M and Pryke, Stephen David (2016) Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(2), pp. 187-204. ISSN 2044-124X

Brooker, P (1997) Factors which impact on the choice of alternative dispute resolution in the construction industry. PhD thesis, Oxford Brookes University, UK.

Buckley, A M (2022) The impact of corporate social responsibility on construction workers. DProf thesis, London Metropolitan University, UK.

Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(2), pp. 192-210. ISSN 0969-9988

Chan, D W M; Chan, A P C; Lam, P T I and Wong, J M W (2010) Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction. Journal of Construction Engineering and Management, 136(5), pp. 495-507. ISSN 0733-9364

Chen, Z; Li, H; Shen, Q and Xu, W (2004) An empirical model for decision-making on ISO 14000 acceptance in the Shanghai construction industry. Construction Management and Economics, 22(1), pp. 55-73. ISSN 01446193

Cheng, E W L; li, H; Fang, D P and Xie, F (2004) Construction safety management: An exploratory study from China. Construction Innovation, 4(4), pp. 229-241. ISSN 1471-4175

Chua, D K H and Godinot, M (2006) Use of a WBS matrix to improve interface management in projects. Journal of Construction Engineering and Management, 132(1), pp. 67-79. ISSN 0733-9364

Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193

Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193

Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.

Crompton, L (2016) A standardised incorporated partnering model for the UK construction industry. PhD thesis, University of Central Lancashire, UK.

Deep, S (2021) Influence of ‘power’ and ‘dependence’ attributes on main contractor and sub-contractor collaboration in construction projects. PhD thesis, University of Newcastle, Australia.

Deep, S; Gajendran, T; Jefferies, M; Uggina, V S and Patil, S (2024) Influence of subcontractors' "strategic capabilities" on "power", "dependence" and "collaboration": An empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(2), pp. 571-592. ISSN 0969-9988

Desta, S; Root, D and Diederichs, C J (2006) The practice of project management office (PMO) concept within the German architect, engineer, contractor (AEC) sector. Journal of Engineering, Design and Technology, 4(1), pp. 46-59. ISSN 1726-0531

Didla, N R (2018) Evaluation of the impact of quality risk management on quality performance in the UAE construction projects. PhD thesis, Heriot-Watt University, UK.

Dulung, A Z A (2007) Computer aided decision support system for the selection of subcontractors in building refurbishment works. PhD thesis, National University of Singapore, Singapore.

Duncan, R I and Mortimer, J (2007) Race equality and procurement: An investigation into the impact of race equality policy on the procurement of black and minority ethnic (BME) contractors and consultants in the welsh social housing sector. Construction Management and Economics, 25(12), pp. 1283-1293. ISSN 1466433X

Ekeskär, A; Havenvid, M I and Gustavsson, T K (2019) Horizontal inter-organizational collaboration: The case of third-party logistics. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ekeskär, A; Havenvid, M I; Karrbom Gustavsson, T and Eriksson, P E (2022) Construction logistics in a multi-project context: Coopetition among main contractors and the role of third-party logistics providers. Construction Management and Economics, 40(1), pp. 25-40. ISSN 01446193

Ekeskär, A and Rudberg, M (2016) Third-party logistics in construction: The case of a large hospital project. Construction Management and Economics, 34(3), pp. 174-191. ISSN 01446193

Elnaas, E (2014) The decision to use off-site manufacturing systems for house-building projects in the UK. PhD thesis, University of Brighton, UK.

Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387

Emuze, F (2018) Foreseeing countermeasures for construction safety violations in South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Enshassi, A; Arain, F M and Tayeh, B (2010) Subcontractor prequalification practices in Palestine. International Journal of Construction Management, 10(4), pp. 45-74. ISSN 1562-3599

Eom, C S J; Yun, S H and Paek, J H (2008) Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), pp. 842-851. ISSN 0733-9364

Ewuga, D and Adesi, M (2023) Integrating sustainability practices into the Irish construction supply chain: Main contractors' perspective. Built Environment Project and Asset Management, 13(1), pp. 105-122. ISSN 2044-124X

Faisol, N; Dainty, A R J and Price, A D F (2006) Perceptions of construction organisations on developing successful inter-organisational relationships. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Farag, F; McDermott, P and Huelin, C A (2016) The development of an activity zone conceptual framework to improve social value implementation in construction projects using human activity systems. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Fewings, P and Hodgson, P (2005) Collaboration and learning: A business integration model. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Francis, M; Ramachandra, T and Rotimi, J O B (2016) Strategies to minimise the effects of delayed payments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 199-207. ISSN 17514304

Fredriksson, A; Kjellsdotter Ivert, L and Naz, F (2025) Creating logistics service value in construction: A quest of coordinating modules in a loosely coupled system. Construction Management and Economics, 43(6), pp. 428-445. ISSN 0144-6193

Gaafar, H K and Perry, J G (1999) Strategies for insuring subcontracted works. Construction Management and Economics, 17(3), pp. 383-391. ISSN 01446193

Gao, R; Chan, A P C; Utama, W P and Zahoor, H (2017) Workers' perceptions of safety climate in international construction projects: Effects of nationality, religious belief, and employment mode. Journal of Construction Engineering and Management, 143(4): 04016117, ISSN 0733-9364

Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.

Ghanbaripour, A. N.; Sher, W. and Yousefi, A. (2020) Critical success factors for subway construction projects–main contractors' perspectives. International Journal of Construction Management, 20(3), pp. 177-195. ISSN 1562-3599

Ghanbaripour, A N; Sher, W and Yousefi, A (2020) Critical success factors for subway construction projects: main contractors' perspectives. International Journal of Construction Management, 20(3), pp. 177-195. ISSN 1562-3599

Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gosling, J and Naim, M M (2009) Coping with project uncertainty in construction supply chains. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Greenwood, D (2001) Subcontract procurement: are relationships changing? Construction Management and Economics, 19(1), pp. 5-7. ISSN 01446193

Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387

Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Greenwood, D J (2001) Power and proximity: A study of subcontract formation in the UK building industry. PhD thesis, University of Reading, UK.

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Gruneberg, S and Murdoch, I (2011) Specialist contractors' views: Testing the NSCC State of Trade Quarterly Report results against market conditions. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gunasekera, S (2013) The development of a framework for assessing the integration of construction supply chains. PhD thesis, Ulster University, UK.

Haizelden, J; Marasini, R and Daniel, E (2019) An analysis of diversity management in the construction industry: A case study of a main contractor. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Hall, M and Tomkins, C (2001) A cost of quality analysis of building project: Towards a complete methodology for design and build. Construction Management and Economics, 19(7), pp. 727-740. ISSN 01446193

Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors. PhD thesis, Heriot-Watt University, UK.

Happalad, M M; Bosch Sijtsema, P M; Claeson Jonsson, C and Sundquist, V (2026) Cross-industry innovation: Exploring the dynamics of an innovation network in construction. Construction Management and Economics, 44(3), pp. 183-199. ISSN 0144-6193

Hardie, M; Miller, G; Manley, K and McFallan, S (2006) Innovation performance and its impact on profitability among different sectors in the Australian construction industry. Construction Economics and Building, 6(1), pp. 1-11. ISSN 2204-9029

Hartmann, A; Ling, F Y Y and Tan, J S H (2009) Relative importance of subcontractor selection criteria: Evidence from Singapore. Journal of Construction Engineering and Management, 135(9), pp. 826-832. ISSN 0733-9364

Hartwell, J (2018) Construction organisation structure and innovation adoption. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Hasantha, M L; Waidyasekara, A S and Victar, H C (2025) Evaluation of time allocated for bid preparation in national competitive bidding in the Sri Lankan construction industry. Engineering, Construction and Architectural Management, 32(7), pp. 4310-4337. ISSN 0969-9988

Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.

Hatmoko, J U D and Scott, S (2006) Simulating the impact of supply chain management practice on construction project performance. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ho, P H K (2013) Forecasting the manpower demand for quantity surveyors in Hong Kong. Construction Economics and Building, 13(3), pp. 1-12. ISSN 2204-9029

Hong Loh, W and Ofori, G (2000) Effect of registration on performance of construction subcontractors in Singapore. Engineering, Construction and Architectural Management, 7(1), pp. 29-40. ISSN 0969-9988

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175

Idoro, G I and Okun, B O (2009) Evaluating the contribution of project team members to time-overrun in Nigerian federal government projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Jalali, A; Hidzir, N I; Jaafar, M and Dahalan, N (2020) Factors that trigger bullying amongst subcontractors toward intention to quit in the construction projects. Built Environment Project and Asset Management, 10(1), pp. 140-152. ISSN 2044-124X

Janné, M and Fredriksson, A (2019) Construction logistics governing guidelines in urban development projects. Construction Innovation, 19(1), pp. 89-109. ISSN 1471-4175

Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(4), pp. 334-345. ISSN 0969-9988

Kadan, R; Omotayo, T S; Boateng, P; Nani, G and Wilson, M (2024) The application of Bayesian network analysis in demystifying construction project subcontracting complexities for developing countries. Journal of Financial Management of Property and Construction, 29(3), pp. 444-469. ISSN 1366-4387

Kamat, K J (2003) Decision making and negotiation: Establishing social order on a construction site. PhD thesis, University of Birmingham, UK.

Kennedy, P; Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and subcontractors. Construction Management and Economics, 15(6), pp. 527-537. ISSN 01446193

Keskiniva, K; Saari, A and Junnonen, J M (2023) Suggestions for takt production subcontract clauses: A conceptual study. Construction Innovation, 23(2), pp. 425-442. ISSN 1471-4175

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, L; Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(1),

Kheni, N A; Gibb, A G F and Dainty, A R J (2006) The management of construction site health and safety by small and medium-sized construction businesses in developing countries: A Ghana case study. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

King, A P (2008) Enhancing the effectiveness of design and build tendering. PhD thesis, Sheffield Hallam University, UK.

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach. PhD thesis, Nottingham Trent University, UK.

Konukcu, S (2011) A knowledge chain framework for construction supply chains. PhD thesis, Loughborough University, UK.

Kwawu, W E K (2009) Relational contracting in the UK construction sector. PhD thesis, University of Reading, UK.

Kärnä, S and Junnonen, J-M (2017) Designers' performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(1), pp. 154-169. ISSN 0969-9988

Lai, L W C (2000) The Coasian market-firm dichotomy and subcontracting in the construction industry. Construction Management and Economics, 18(3), pp. 355-362. ISSN 01446193

Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.

Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.

Le, P L; Jarroudi, I; Dao, T M and Chaabane, A (2021) Integrated construction supply chain: An optimal decision-making model with third-party logistics partnership. Construction Management and Economics, 39(2), pp. 133-155. ISSN 01446193

Lee, F K S (2016) Construction contractor selection criteria: the effects of relational norms, price and prequalification. PhD thesis, University of Reading, UK.

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lee, J M; Anumba, C J; Gibb, A G and Agbasi, E (2002) The current status of the cladding sector and its opportunities for computer-integrated manufacture (CIM). In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Lehtiranta, L; Kärnä, S; Junnonen, J M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(6), pp. 463-475. ISSN 1466433X

Lenard, D (1999) Future challenges in construction management: creating a symbiotic learning environment. Journal of Construction Procurement, 5(2), pp. 197-210. ISSN 1358-9180

Lim, K H (2006) Causal model for management of subcontractors in waste minimization. PhD thesis, National University of Singapore, Singapore.

Ling, F Y Y and Khoo, W W (2016) Improving relationships in project teams in Malaysia. Built Environment Project and Asset Management, 6(3), pp. 284-301. ISSN 2044-124X

Lingard, H (1995) Safety in Hong Kong's construction industry: changing worker behaviour. PhD thesis, University of Hong Kong, Hong Kong.

Lordsleem Junior, Alberto Casado (2002) Methodology for subcontractor companies management capacitation. PhD thesis, Universidade de São Paulo, Brazil.

Lu, W; Ye, K; Flanagan, R and Jewell, C (2014) Nexus between contracting and construction professional service businesses: Empirical evidence from international market. Journal of Construction Engineering and Management, 140(2): 04013049, ISSN 0733-9364

Ludwig, M (2011) Learning in the construction industry an analysis based on the activity theory. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Mambwe, M; Mwanaumo, E M; Phiri, F and Chabota, K (2020) The construction subcontracting policy framework for developing local contractors capacities in Zambia. Journal of Construction Business and Management, 4(1), pp. 60-70. ISSN 2521-0165

Manu, E (2014) Supply chain management practices in construction and inter-organisational trust dynamics. PhD thesis, University of Wolverhampton, UK.

Mason, J R (2007) The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(5), pp. 519-527. ISSN 1466433X

Mat Zin, R (2006) A case study of management control. A construction project: Issues of transaction costs and trust. PhD thesis, University of Manchester, UK.

Matthews, J; Tyler, A and Thorpe, A (1996) Pre-construction project partnering: Developing the process. Engineering, Construction and Architectural Management, 3(1-2), pp. 117-131. ISSN 0969-9988

Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.

May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988

Mayouf, M and Gilligan, C (2024) Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction. Journal of Financial Management of Property and Construction, 29(1), pp. 168-192. ISSN 1366-4387

Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), pp. 471-484. ISSN 1466433X

McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.

McCarthy, C (2021) Towards behavioural equality: the impact of employee perception of justice on employee attitudes towards company equality approaches in large UK main contractor companies. PhD thesis, Loughborough University, UK.

McKillop, R; Hare, B and Lawani, K (2022) Evaluating the health and safety practices of construction small and medium-sized enterprise leaders. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Meldrum, A (2009) Measuring worker engagement as an aspect of health and safety performance in the construction industry: towards a best practice tool. PhD thesis, Glasgow Caledonian University, UK.

Meldrum, A; Hare, B and Cameron, I (2009) Road testing a health and safety worker engagement tool-kit in the construction industry. Engineering, Construction and Architectural Management, 16(6), pp. 612-632. ISSN 0969-9988

Meng, X and Brown, A (2018) Innovation in construction firms of different sizes: Drivers and strategies. Engineering, Construction and Architectural Management, 25(9), pp. 1210-1225. ISSN 0969-9988

Miller, C J M; Packham, G A and Thomas, B C (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? Journal of Construction Research, 3(01), 67–82. Journal of Construction Research, ISSN 1609-9451

Millett, S J; Dainty, A R J and Briscoe, G H (2001) Client procurement strategies: A cross-sectoral analysis. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Millett, S J; Dainty, A R J; Briscoe, G H and Neale, R H (2000) Towards an integrated construction supply network: Sub-contractors perspectives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.

Mitchell, A; Frame, I; Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(3), pp. 297-311. ISSN 0969-9988

Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029

Motawa, I and Kaka, A (2008) Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(2), pp. 1-10. ISSN 2204-9029

Murray, M (2003) Building perceptions with metaphors: A study of the communication and decision making behaviour of construction professionals within projects. PhD thesis, University of Strathclyde, UK.

Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),

Ng, A K W and Price, A D F (2002) Optimizing the performance of sub-contractors in building construction projects in Hong Kong. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ng, A K W and Price, A D F (2005) Assessing the impact of main contractor's site co-ordination on sub-contractors' performance in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ng, A K W and Price, A D F (2010) Optimizing the time performance of subcontractors in building projects. Construction Economics and Building, 10(1-2), pp. 90-102. ISSN 2204-9029

Ng, K-W A (2009) Improving main contractors' site coordination in the Hong Kong building projects. PhD thesis, Loughborough University, UK.

Ng, S T and Tang, Z (2008) Delineating the predominant criteria for subcontractor appraisal and their latent relationships. Construction Management and Economics, 26(3), pp. 249-259. ISSN 1466433X

Nielsen, L-H K; Akanmu, A and Anumba, C J (2015) Comparative analysis of back-to-back subcontracts in the construction and telecommunications industries. Built Environment Project and Asset Management, 5(4), pp. 446-460. ISSN 2044-124X

Nikolov, A (2022) Exploring pathways for improving the supply chain integration of infrastructure projects. PhD thesis, University of Warwick, UK.

Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Ofori, G and Lean Chan, S (2000) Growth paths of construction enterprises in Singapore, 1980-98. Engineering, Construction and Architectural Management, 7(3), pp. 307-321. ISSN 0969-9988

Omotayo, T S; Danvers-Watson, O and Oyegoke, A S (2023) Subcontractor trust issues on payment and valuation practices in UK private projects. Journal of Financial Management of Property and Construction, 28(1), pp. 64-90. ISSN 1366-4387

Oviedo-Haito, R J; Jiménez, J; Cardoso, F F and Pellicer, E (2014) Survival factors for subcontractors in economic downturns. Journal of Construction Engineering and Management, 140(3): 4013056, ISSN 0733-9364

Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(3), pp. 286-302. ISSN 1366-4387

Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.

Pan, W; Sidwell, R and Soetanto, R (2009) A longitudinal investigation into utilising crosswall construction for multi-storey residential buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Pasqual, I R and Ekanayake, L (2025) Win–win approach to subcontracting in building construction: Sri Lankan perspective. Construction Economics and Building, 25(3-4), pp. 339-357. ISSN 2204-9029

Powmya, A; Nazirah, Z A and Nurul Sakina, M A (2023) Determination of contractor strategies in delivering construction projects in Oman. Journal of Construction in Developing Countries, 28(1), pp. 293-316. ISSN 1823-6499

Pryke, S and Pearson, S (2006) Project governance: Case studies on financial incentives. Building Research & Information, 34(6), pp. 534-545. ISSN 0961-3218

Puolitaival, T; Kähkönen, K and Kestle, L (2023) The framing of construction management responsibilities in job advertisements in the UK and the USA. Construction Management and Economics, 41(4), pp. 307-321. ISSN 01446193

Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.

Raina, P (2015) An examination of the retention practice in the New Zealand construction industry. PhD thesis, Auckland University of Technology, New Zealand.

Razak, N A (2024) Development of safety leading and lagging indicators framework for contractor selection in construction projects. PhD thesis, University of Manchester, UK.

Razmdoost, K and Mills, G (2016) Towards a service-led relationship in project-based firms. Construction Management and Economics, 34(4-5), pp. 317-334. ISSN 01446193

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Robson, A; Boyd, D and Thurairajah, N (2015) Are contractors' cost accounting practices up to the job of establishing improvement in site operations? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193

Russell, E F (2020) Leading role or bit player? Main contractors, supply chain and sustainable construction. PhD thesis, University of Surrey, UK.

S Nmez, M; Yang, J B and Holt, G D (2001) Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8(3), pp. 198-210. ISSN 0969-9988

Said, H; Rajagopalan, A and Hall, D M (2025) Longitudinal analysis of interorganizational collaborative networks of cross-laminated timber (CLT) construction. Construction Innovation, 25(6), pp. 1840-1864. ISSN 1471-4175

Salam, M; Killen, C and Forsythe, P (2025) Assessing interdisciplinary collaboration in the detailed design phase of construction projects: applying practice-based inter-organisational theories. International Journal of Construction Management, 25(2), pp. 238-247. ISSN 1562-3599

Salcedo, R T B and Straub, A (2016) The role of the architect using integrated contracts for social housing renovation projects. Journal of Engineering, Design and Technology, 14(4), pp. 802-817.

Salminen, S (1995) Serious occupational accidents in the construction industry. Construction Management and Economics, 13(4), pp. 299-306. ISSN 01446193

Sayed Suleiman, R (2019) Understanding site offices challenges to communicate and exchange information using technology in UK: main contractor perspective. PhD thesis, University of Salford, UK.

Scott, Denis James (2025) A proof of concept of a project bank account (PBA) blockchain payment application for the construction industry. PhD thesis, University College London, UK.

Seed, L (2015) The dynamics of BIM adoption: a mixed methods study of BIM as an innovation within the United Kingdom construction industry. PhD thesis, University of Huddersfield, UK.

Sherratt, F; Ivory, C; Sherratt, S and Crawley, S (2022) Organizing construction work: A digital and cooperative way forwards for micro-projects. Building Research & Information, 50(5), pp. 559-573. ISSN 0961-3218

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Enablers for the adoption and use of BIM in main contractor companies in the UK. Engineering, Construction and Architectural Management, 30(4), pp. 1726-1745. ISSN 0969-9988

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Leading UK construction companies’ strategies to tackle BIM training and skills challenges. International Journal of Construction Education and Research, 19(4), pp. 383-404. ISSN 1557-8771

Sing, M C P; Edwards, D J; Leung, A W T; Liu, H and Roberts, C J (2022) A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques. Engineering, Construction and Architectural Management, 29(9), pp. 3754-3774. ISSN 0969-9988

Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364

Skinnarland, S (2013) Use of progression planning tools in developing collaborative main contractor-subcontractor relationships in Norway. PhD thesis, Heriot-Watt University, UK.

Smyth, H (2016) The business development manager as a value creation worker. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Smyth, H; Duryan, M and Kusuma, I (2019) Service design for marketing in construction: Tactical implementation in the "business development management". Built Environment Project and Asset Management, 9(1), pp. 87-99. ISSN 2044-124X

Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X

Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Empirical evaluation of structural frame performance criteria: Realizing the potential of hybrid concrete construction. Journal of Construction Engineering and Management, 132(3), pp. 278-290. ISSN 0733-9364

Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Stewardson, A; Edwards, D J; Asamoah, E; Aigbavboa, C O; Lai, J H K and El-Gohary, H (2023) The late payment epidemic in UK construction. Journal of Financial Management of Property and Construction, 28(3), pp. 374-397. ISSN 1366-4387

Sulaiman, N F (2002) The development of a dual phase approach to embracing a total quality culture in the Malaysian construction industry. PhD thesis, Glasgow Caledonian University, UK.

Swai, L (2022) Development of a conceptual framework for enhancing payment practices in the UK construction industry. PhD thesis, Coventry University, UK.

Sözen, Z and Kayahan, O (2001) Correlates of the length of the relationship between main and specialist trade contractors in the construction industry. Construction Management and Economics, 19(2), pp. 131-133. ISSN 01446193

Taggart, M; Koskela, L K and Rooke, J A (2014) An improvement strategy for the defects and rework management process within an SME: An action research approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531

Tan, Y; Xue, B and Cheung, Y T (2017) Relationships between main contractors and subcontractors and their impacts on main contractor competitiveness: An empirical study in Hong Kong. Journal of Construction Engineering and Management, 143(7): 05017007, ISSN 0733-9364

Taylor, M D (2003) Economic appraisal and risk analysis of construction automation. PhD thesis, Edinburgh Napier University, UK.

Tehranchi, H (2008) Stakeholders' attitudes to systematic risk management in infrastructure projects: A comparative study of projects in Iran and Sweden. PhD thesis, University of Reading, UK.

Tennant, S and Fernie, S (2012) The commercial currency of construction framework agreements. Building Research & Information, 40(2), pp. 209-220. ISSN 0961-3218

Thorpe, A; Dainty, A R J and Hatfield, H (2003) The realities of being preferred: Specialist subcontractor perspectives on restricted tender list membership. Journal of Construction Procurement, 9(1), pp. 47-55. ISSN 1358-9180

Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.

Thurnell, D and Lee, I (2009) Subcontractors perceptions regarding bid shopping in auckland, New Zealand. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Tsang, W-C (2021) Safety violations of the construction workers in Hong Kong: quantitative and qualitative analysis of the dynamics. PhD thesis, University of Hong Kong, Hong Kong.

Wah, T K (2018) Legal analysis of construction defect claims within common law jurisdictions for Malaysia. PhD thesis, University of Malaya, Malaysia.

Wang, J (2020) Building information modeling (BIM) localization: tackling the "last mile" problem in BIM adoption. PhD thesis, University of Hong Kong, Hong Kong.

Wang, Zhuoyuan (2019) Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.

Watts, G (2024) Authenticity and negativism: Social value in UK construction. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Watts, G; Dainty, A and Fernie, S (2015) Making sense of CSR in construction: Do contractor and client perceptions align? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Watts, G; Dainty, A and Fernie, S (2019) Measuring social value in UK construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Wong, C H; Holt, G D and Harris, P T (1999) UK construction clients' opinions of the contractor selection process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Wong, M O; Zhang, Z and Pan, W (2024) Multiuser virtual reality-enabled collaborative heavy lift planning in construction. Journal of Construction Engineering and Management, 150(4): 04024022, ISSN 0733-9364

Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), pp. 317-325. ISSN 01446193

Wu, H; Zhang, P; Li, H; Zhong, B; Guo, S; Fung, I W H and Lee, Y Y (2024) Blockchain impact on construction quality management and its adoption analysis: A game theory-based method. Journal of Construction Engineering and Management, 150(6): 04024039, ISSN 0733-9364

Xu, Jing (2019) The value of trust in construction supply chains. PhD thesis, University College London, UK.

Ye, K; Shen, L and Tan, Y (2010) Response strategies to the competition in the Chinese construction market. Construction Management and Economics, 28(2), pp. 115-124. ISSN 1466433X

Yisa, S B (1995) A methodology for evaluating the marketing function in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: New methodology and old problems. Construction Management and Economics, 29(7), pp. 653-658. ISSN 1466433X

Zhou, L and Lowe, D J (2004) Incorporating sustainable construction into PFI projects: An analysis of financial incentives and associated risks. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

This list was generated on Sat Aug 22 01:32:11 2026 UTC.