Items with Index Term: lowest tender
Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.
Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.
Elhag, T M S and Boussabaine, A H (1998) An artificial neural system for cost estimation of construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(2), pp. 157-180. ISSN 01446193
Holt, G D; Proverbs, D G and Whitehouse, L (2001) A survey of public sector procurement in England. Journal of Construction Procurement, 7(1), pp. 3-10. ISSN 1358-9180
Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.
Park, S H (2009) Whole life performance tender evaluation for design-build in the Korean public sector. PhD thesis, University of Reading, UK.
Vassallo, J M (2007) Implementation of quality criteria in tendering and regulating infrastructure management contracts. Journal of Construction Engineering and Management, 133(8), pp. 553-561. ISSN 0733-9364
Yu, W D; Chang, H K; Hsu, Y Y; Cheng, S T and Wang, K W (2020) Pretendering decision model for contractor selection of public procurement projects. Journal of Construction Engineering and Management, 146(11): 04020126, ISSN 0733-9364
Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.
Zhang, L; Cheng, J and Fan, W (2016) Party selection for integrated project delivery based on interorganizational transactive memory system. Journal of Construction Engineering and Management, 142(3): 04015089, ISSN 0733-9364
Up a level