Items with Index Term: litigation
Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Adigbo, F A (2020) Stakeholder engagement and construction project performance in Ghana. PhD thesis, Northcentral University, USA.
Agapiou, A (2022) Briefing: The role of the technology and construction court in alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 61-64. ISSN 1751-4304
Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.
Al-Bahar, J F (1988) Risk management in construction projects: A systematic analytical approach for contractors. PhD thesis, University of California, Berkeley, USA.
Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599
Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.
Al-Gahtani, K S (2009) Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2), pp. 88-95. ISSN 0733-9364
Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599
Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system. PhD thesis, University of Southampton, UK.
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Alshahrani, S (2017) Development the a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alshahrani, S A A D (2017) Development of a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499
Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364
Ankrah, N A (2007) An investigation into the impact of culture on construction project performance. PhD thesis, University of Wolverhampton, UK.
Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364
Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364
Aslan, V Z (2012) Financial implications of engineering decisions. PhD thesis, Texas A&M University, USA.
Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Atuahene, B T; Kanjanabootra, S and Gajendran, T (2022) Preliminary benefits of big data in the construction industry: a case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 67-77. ISSN 17514304
Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.
Bouwer, K A (2016) Building disappointment: the limits and potential of tort liability for energy efficiency problems in domestic buildings. PhD thesis, University College London, UK.
Brilakis, I (2005) Content based integration of construction site images in AEC/FM model based systems. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Brooker, P (1997) Factors which impact on the choice of alternative dispute resolution in the construction industry. PhD thesis, Oxford Brookes University, UK.
Brooker, P (2009) Criteria for the appropriate use of mediation in construction disputes: Judicial statements in the English technology and construction court. International Journal of Law in the Built Environment, 1(1), pp. 82-97. ISSN 1756-1450
Brooker, P and Lavers, A (1997) Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Construction Management and Economics, 15(6), pp. 519-526. ISSN 01446193
Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364
Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.
Burrell, P A (2017) Structural errors and failures in construction: is knowledge hidden? PhD thesis, Anglia Ruskin University, UK.
Caiden, D (2017) Engineering expert witness work: What the lawyers require. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 181-185. ISSN 17514304
Chan, C H F (2010) To talk or to fight? Collective effects of strategic, cultural, and institutional factors on investors' renegotiation approach in public-private concessions. PhD thesis, Stanford University, USA.
Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364
Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364
Chang, S H (2013) Evaluating essential liabilities on design professionals under earthquake's impact: Taiwan experience. Engineering, Construction and Architectural Management, 20(2), pp. 181-194. ISSN 0969-9988
Chapman, M (2016) Litigation following UK Water Resources Act section 110 appeal. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 85-90. ISSN 17514304
Chapman, P H J (2009) Dispute boards on major infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 7-16. ISSN 17514312
Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders. PhD thesis, University of Wisconsin - Madison, USA.
Cheung, S O and Suen, H C H (2002) A multi-attribute utility model for dispute resolution strategy selection. Construction Management and Economics, 20(7), pp. 557-568. ISSN 01446193
Cheung, S O; Suen, H C H and Lam, T I (2002) Fundamentals of alternative dispute resolution processes in construction. Journal of Construction Engineering and Management, 128(5), pp. 409-417. ISSN 0733-9364
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Chong, H Y and Zin, R M (2012) Selection of dispute resolution methods: Factor analysis approach. Engineering, Construction and Architectural Management, 19(4), pp. 428-443. ISSN 0969-9988
Coggins, Jeremy Keith (2012) A proposal for harmonisation of security of payment legislation in the Australian building and construction industry. PhD thesis, University of Adelaide, Australia.
Col Debella, D and Ries, R (2006) Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11), pp. 1131-1138. ISSN 0733-9364
Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.
Cuervo, J C and Pheng, L S (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(2), pp. 147-162. ISSN 01446193
Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364
Diekmann, J E and Kim, M P (1992) Superchange: Expert system for analysis of changes claims. Journal of Construction Engineering and Management, 118(2), pp. 399-411. ISSN 0733-9364
Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.
El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387
Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ezulike, E I and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(2), pp. 144-149. ISSN 0969-9988
Fawzy, O N (1991) The development of the architectural working drawing from the descriptive to the prescriptive: A study in architectural communication. PhD thesis, University of Pennsylvania, USA.
Fenn, F P (1999) An aetiology of construction disputes. PhD thesis, University of Manchester, UK.
Fisher, W H (2017) The use of arbitration in the construction industry in England and Wales: an evaluation of its continuing role following the Arbitration Act 1996. PhD thesis, University of Wolverhampton, UK.
Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364
Gaafar, H K (1997) Risk allocations in standard forms of engineering and construction contract. PhD thesis, University of Birmingham, UK.
Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.
Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.
Gill, A; Gray, J; Skitmore, M and Callaghan, S (2015) Comparison of the effects of litigation and adr in South-East Queensland. International Journal of Construction Management, 15(3), pp. 254-263. ISSN 1562-3599
Gill, G N (2014) Environmental protection and developmental interests: A case study of the River Yamuna and the Commonwealth Games, Delhi, 2010. International Journal of Law in the Built Environment, 6(1-2), pp. 69-90. ISSN 1756-1450
Glagola, C R and Sheedy, W M (2002) Partnering on defense contracts. Journal of Construction Engineering and Management, 128(2), pp. 127-138. ISSN 0733-9364
Gould, N (1998) Alternative dispute resolution in the UK construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Griffey, T (2011) Black power's labor politics: The united construction workers association and Title VII law in the 1970s. PhD thesis, University of Washington, USA.
Gunning, J G and Hanna, J I C (2001) The application of risk management principles to crisis management in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Gupta, R; Shah, M N and Mandal, S N (2023) Emerging paradigm for land records in India. Smart and Sustainable Built Environment, 12(5), pp. 963-974. ISSN 2046-6099
Gurgun, A P and Koc, K (2020) Contractor prequalification for green buildings: Evidence from Turkey. Engineering, Construction and Architectural Management, 27(6), pp. 1377-1400. ISSN 0969-9988
Harmon, K M J (2003) Dispute review boards and construction conflicts: Attitudes and opinions of construction industry members. PhD thesis, Nova Southeastern University, USA.
Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.
Harvey, E (2019) Rethinking construction safety. PhD thesis, Loughborough University, UK.
Hassan, F U; Le, T and Lv, X (2021) Addressing legal and contractual matters in construction using natural language processing: A critical review. Journal of Construction Engineering and Management, 147(9): 03121004, ISSN 0733-9364
Hinze, J and Olbina, S (2009) Empirical analysis of the learning curve principle in prestressed concrete piles. Journal of Construction Engineering and Management, 135(5), pp. 425-431. ISSN 0733-9364
Hinze, J and Wiegand, F (1992) Role of designers in construction worker safety. Journal of Construction Engineering and Management, 118(4), pp. 677-684. ISSN 0733-9364
Ho, S P and Liu, L Y (2004) Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), pp. 94-104. ISSN 0733-9364
Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708
Huang, J (2020) Infrastructure, the economy and policy. PhD thesis, University of Oxford, UK.
Ibbs, W; Nguyen, L D and Simonian, L (2011) Concurrent delays and apportionment of damages. Journal of Construction Engineering and Management, 137(2), pp. 119-126. ISSN 0733-9364
Jackson, J T (1990) Technical specifications' effect on construction. Journal of Construction Engineering and Management, 116(3), pp. 463-467. ISSN 0733-9364
Jagannathan, M and Delhi, V S K (2022) Identifying focus areas to decode the decision to litigate contractual disputes in construction. Engineering, Construction and Architectural Management, 29(8), pp. 2976-2998. ISSN 0969-9988
Jagannathan, M and Delhi, V S K (2023) Decoding a construction organisation's tendency to litigate: An understanding through financial statements. Built Environment Project and Asset Management, 13(3), pp. 453-470. ISSN 2044-124X
Jagannathan, M and Delhi, V S K (2023) Paths leading contractual disputes to litigation. Built Environment Project and Asset Management, 13(6), pp. 846-861. ISSN 2044-124X
Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175
Jarratt, A (2015) Mediation insights: Practical ways to shape the outcome. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 130-134. ISSN 17514304
Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364
Kartam, S (1999) Generic methodology for analyzing delay claims. Journal of Construction Engineering and Management, 125(6), pp. 409-419. ISSN 0733-9364
Kashiwagi, D and Byfield, R (2002) State of Utah performance information procurement system tests. Journal of Construction Engineering and Management, 128(4), pp. 338-347. ISSN 0733-9364
Kashiwagi, D T (2002) Application of information measurement theory (IMT) to construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364
Kilian, J J and Gibson, G E (2005) Construction litigation for the U.S. Naval facilities engineering command, 1982-2002. Journal of Construction Engineering and Management, 131(9), pp. 945-952. ISSN 0733-9364
Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.
Lau, E and Rowlinson, S (2005) The value base of trust for the construction industry. Journal of Construction Procurement, 11(1),
Lavers, A P (1986) Professional negligence in the property-related professions. PhD thesis, National University of Singapore, Singapore.
Lessani, A (2016) Decision analysis in construction claims. PhD thesis, University of Maryland, College Park, USA.
Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(2), pp. 1-6. ISSN 2204-9029
Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599
London, K A and Cadman, K (2009) Impact of a fragmented regulatory environment on sustainable urban development design management. Architectural Engineering and Design Management, 5(1-2), pp. 5-23. ISSN 1745-2007
Lord, W E and Gray, T E (2011) Cost benefit analysis approach to global claims. International Journal of Law in the Built Environment, 3(3), pp. 222-236. ISSN 1756-1450
Love, P; Davis, P; Ellis, J and Cheung, S O (2010) Dispute causation: Identification of pathogenic influences in construction. Engineering, Construction and Architectural Management, 17(4), pp. 404-423. ISSN 0969-9988
Love, P E D; Manual, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(4), pp. 505-517. ISSN 01446193
Ma, A (2009) Engineer's role in resolving disputes in offshore projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 191-196. ISSN 17514312
Mackenzie, D I (2010) A review of project controls in the UK and methodologies to improve the processes. DProf thesis, Teesside University, UK.
Madenli, O; Atasoy, G and Dikmen, I (2026) Identification and categorization of defects in construction specifications utilizing natural language processing. Journal of Construction Engineering and Management, 152(5): 04026044, ISSN 0733-9364
Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771
Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.
Marquardt, G (2017) Economic analysis of contract choice, feelings of entitlement and contract enforcement in relationships governed by incomplete contracts. PhD thesis, University of Edinburgh, UK.
Martínez Alonso, Wilfrido (2024) An NLP approach to understand construction long text. PhD thesis, Stanford University, USA.
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988
McWilliam, Sarah (2022) Global value chain governance dynamics: A co-evolutionary perspective on the transition from relational to modular governance in construction. PhD thesis, University of Sydney, Australia.
Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364
Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364
Nallaperuma-Arachchige, W; Hadiwattege, C and Hulathdoowage, N D (2023) Conflicts with external stakeholders in irrigation construction projects in Sri Lanka: A narrative analysis. International Journal of Construction Management, 23(15), pp. 2570-2582. ISSN 1562-3599
Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X
Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364
Ndekugri, I; Daeche, H and Zhou, D (2013) The project insurance option in infrastructure procurement. Engineering, Construction and Architectural Management, 20(3), pp. 267-289. ISSN 0969-9988
Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193
Ndekugri, I and Russell, V (2006) Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Engineering, Construction and Architectural Management, 13(4), pp. 380-395. ISSN 0969-9988
Nguyen, L D and Ibbs, W (2008) Flora: New forensic schedule analysis technique. Journal of Construction Engineering and Management, 134(7), pp. 483-491. ISSN 0733-9364
Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.
Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects. PhD thesis, Indiana State University, USA.
Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387
Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.
Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.
Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.
Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599
Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.
Pulket, T and Arditi, D (2009) Construction litigation prediction system using ant colony optimization. Construction Management and Economics, 27(3), pp. 241-251. ISSN 1466433X
Reinschmidt, K F; Griffis, F H and Bronner, P L (1991) Integration of engineering, design, and construction. Journal of Construction Engineering and Management, 117(4), pp. 756-772. ISSN 0733-9364
Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.
Ryan, C.; Spillane, J. P. and Bradley, J. G. (2025) The jurisdiction of adjudicators under the construction contracts act 2013: A case review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 7-15. ISSN 1751-4304
Ryan, C; Spillane, J P and Bradley, J G (2023) Legal issues facing adjudication in the Irish construction industry: A discussion. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Saeb, A; Danuri, M S M; Mohamed, O and Zakaria, N (2021) A mechanism for dispute resolution in the Iranian construction industry. Journal of Construction in Developing Countries, 26(1), pp. 205-226. ISSN 1823-6499
Salami, B A; Ajayi, S O and Oyegoke, A S (2023) Tackling the impacts of covid-19 on construction projects: An exploration of contractual dispute avoidance measures adopted by construction firms. International Journal of Construction Management, 23(7), pp. 1196-1204. ISSN 1562-3599
Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599
She, Ling-Ye (2014) Understanding the conditions of trust between governance and management within project alliancing. PhD thesis, University of Melbourne, Australia.
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Shiers, D; Lavers, A and Keeping, M (2007) Indicators of the impact of environmental factors on UK construction law: Developments in the new millennium. Construction Management and Economics, 25(7), pp. 821-829. ISSN 1466433X
Shin, K-C (2000) Identification of critical dispute characteristics (CDCs) during construction project operations. PhD thesis, Georgia Institute of Technology, USA.
Sidoli, J S (2021) Disputing in the built environment. PhD thesis, Open University, UK.
Sidoli del Ceno, J (2014) Compulsory mediation: Civil justice, human rights and proportionality. International Journal of Law in the Built Environment, 6(3), pp. 286-299. ISSN 1756-1450
Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175
Soltani, Z (2018) Investigating the persuasiveness of forensic information models for jurors in construction disputes. PhD thesis, Texas A&M University, USA.
Standinger, M L (2000) The evaluation of time claims in construction projects. PhD thesis, Loughborough University, UK.
Sturts Dossick, C and Schunk, T K (2007) Subcontractor schedule control method. Journal of Construction Engineering and Management, 133(3), pp. 262-265. ISSN 0733-9364
Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity. PhD thesis, University of California, Berkeley, USA.
Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364
Thilakarathne, N; Rathnasinghe, A P; Kulatunga, U; Thurairajah, N and Weerasinghe, L (2023) An investigation of the conflict management strategies in international construction joint ventures of Sri Lanka. Journal of Financial Management of Property and Construction, 28(3), pp. 273-292. ISSN 1366-4387
Valentin, V (2011) Impact assessment of inter-organizational dynamics on the performance metrics of capital-intensive projects. PhD thesis, Purdue University, USA.
Wall, R; Ankrah, N and Charlson, J (2016) An investigation into the different styles of the lawyer and construction specialist when mediating construction disputes. International Journal of Law in the Built Environment, 8(2), pp. 137-160. ISSN 1756-1450
Ward, P and Jefferies, M (2014) Are Australian standard forms of construction contract capable of dealing with the issue of extensions of time efficiently and effectively? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Williams, P J and Williams, A M (2016) Sustainability and planning law in Australia: Achievements and challenges. International Journal of Law in the Built Environment, 8(3), pp. 226-242. ISSN 1756-1450
Wong, K-w K (2014) Integrative approach to addressing societal needs in infrastructure development projects. PhD thesis, University of Hong Kong, Hong Kong.
Woods, U (2016) Adverse possession and boundary disputes: Lessons for Ireland from abroad. International Journal of Law in the Built Environment, 8(1), pp. 56-79. ISSN 1756-1450
Wright, J (2009) Mediation and dispute boards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 175-179. ISSN 17514312
Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599
Zhong, B; Shen, L; Pan, X; Zhong, X and He, W (2024) Dispute classification and analysis: Deep learning-based text mining for construction contract management. Journal of Construction Engineering and Management, 150(1): 04023151, ISSN 0733-9364