Items with Index Term: linear scheduling
Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364
Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364
Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364
Arditi, D and Albulak, M Z (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management, 112(3), pp. 411-424. ISSN 0733-9364
Arditi, D; Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(4), pp. 353-364. ISSN 01446193
Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988
Bakry, I; Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(6), pp. 782-800. ISSN 0969-9988
Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193
Chrzanowski, E N and Johnston, D W (1986) Application of linear scheduling. Journal of Construction Engineering and Management, 112(4), pp. 476-491. ISSN 0733-9364
Cole, L J R (1991) Construction scheduling: Principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4), pp. 579-588. ISSN 0733-9364
Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.
Damci, A (2022) Revisiting the concept of natural rhythm of production in line of balance scheduling. International Journal of Construction Management, 22(12), pp. 2335-2344. ISSN 1562-3599
Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.
Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364
Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304
Handa, V K and Barcia, R M (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, 112(3), pp. 387-393. ISSN 0733-9364
Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control. PhD thesis, Iowa State University, USA.
Harmelink, D J (2001) Linear scheduling model: Float characteristics. Journal of Construction Engineering and Management, 127(4), pp. 255-260. ISSN 0733-9364
Harmelink, D J and Rowings, J E (1998) Linear scheduling model: Development of controlling activity path. Journal of Construction Engineering and Management, 124(4), pp. 263-268. ISSN 0733-9364
Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193
Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 0969-9988
Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599
Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988
Huang, R Y and Halpin, D W (2000) Graphically based lp modelling for linear scheduling analysis: The polo system. Engineering, Construction and Architectural Management, 7(1), pp. 41-51. ISSN 0969-9988
Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988
Kallantzis, A; Soldatos, J and Lambropoulos, S (2007) Linear versus network scheduling: A critical path comparison. Journal of Construction Engineering and Management, 133(7), pp. 483-491. ISSN 0733-9364
Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X
Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364
Lucko, G and Gattei, G (2016) Line-of-balance against linear scheduling: Critical comparison. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 26-44. ISSN 17514304
Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.
Mattila, K G and Abraham, D M (1998) Linear scheduling: Past research efforts and future directions. Engineering, Construction and Architectural Management, 5(3), pp. 294-303. ISSN 0969-9988
Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364
Mattila, K G and Park, A (2003) Comparison of linear scheduling model and repetitive scheduling method. Journal of Construction Engineering and Management, 129(1), pp. 56-64. ISSN 0733-9364
Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499
Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(1), pp. 77-93. ISSN 1562-3599
Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364
Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364
Russell, A D and Wong, W C M (1993) New generation of planning structures. Journal of Construction Engineering and Management, 119(2), pp. 196-214. ISSN 0733-9364
Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(7), pp. 1294-1320. ISSN 0969-9988
Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175
Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364
Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.
Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X
Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364
Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599
Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.
Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.
Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364
Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.
Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364
Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and vertical logic scheduling for multistory projects. Journal of Construction Engineering and Management, 120(4), pp. 875-892. ISSN 0733-9364
Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.
Tokdemir, O B; Arditi, D and Balcik, C (2006) ALISS: Advanced linear scheduling system. Construction Management and Economics, 24(12), pp. 1253-1267. ISSN 1466433X
Triana-Granados, K V; Bernard, I R; Merlin, A; Lucko, G and Ballesteros-Pérez, P (2024) Graphical delay tracking for linear and repetitive schedules. Journal of Construction Engineering and Management, 150(8): 04024090, ISSN 0733-9364
Wang, C H and Huang, Y C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), pp. 5-16. ISSN 01446193
Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.
Yamín, R A and Harmelink, D J (2001) Comparison of linear scheduling model (LSM) and critical path method (CPM). Journal of Construction Engineering and Management, 127(5), pp. 374-381. ISSN 0733-9364
zhao, X. and lu, R. (2025) Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling. Engineering, Construction and Architectural Management, 33(5), pp. 4019-4045. ISSN 0969-9988
Up a level