Items with Index Term: linear programming
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.
Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599
Al-Ibrahim, A (2006) Optimizing roof maintenance and replacement decisions. PhD thesis, North Carolina State University, USA.
Al-Otaibi, S (2021) Assessing the impact of transport investment and railway accessibility on economic productivity. PhD thesis, Loughborough University, UK.
Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.
Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Amiri, R; Majrouhi Sardroud, J and Momenaei Kermani, V (2023) Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model. Engineering, Construction and Architectural Management, 30(4), pp. 1444-1462. ISSN 0969-9988
Ariaratnam, S T and MacLeod, C W (2002) Financial outlay modeling for a local sewer rehabilitation strategy. Journal of Construction Engineering and Management, 128(6), pp. 486-495. ISSN 0733-9364
Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.
Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599
Atiq Ur Rehman, M.; Khan, S. A. and Chaabane, A. (2026) An integrated decision support model for early planning in off-site construction projects. Journal of Construction Engineering and Management, 152(9): 04026142, ISSN 0733-9364
Bakatjan, S; Arikan, M and Tiong, R L K (2003) Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Engineering and Management, 129(1), pp. 89-97. ISSN 0733-9364
Barbosa, P S F and Pimentel, P R (2001) A linear programming model for cash flow management in the Brazilian construction industry. Construction Management and Economics, 19(5), pp. 469-479. ISSN 01446193
Begić, H; Galić, M and Klanšek, U (2024) Active BIM system for optimized multi-project ready-mix-concrete delivery. Engineering, Construction and Architectural Management, 31(12), pp. 5057-5084. ISSN 0969-9988
Bogenberger, C; Dell'Amico, M; Fuellerer, G; Hoefinger, G; Iori, M; Novellani, S and Panicucci, B (2015) Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6): 05015003, ISSN 0733-9364
Bowles, G; Dagpunar, J S and Gow, H (1997) Financial management of planned maintenance for housing associations. Construction Management and Economics, 15(4), pp. 315-326. ISSN 01446193
Bowles, Graeme (1995) Annual sinking fund modelling for housing association major repairs provision. PhD thesis, Abertay University, UK.
Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), pp. 369-391. ISSN 2044-124X
Cheng, T-m (1996) Impact of front-end loading on construction project cash-flows: A mathematical approach for determination of unit prices in bidding. PhD thesis, Purdue University, USA.
Coşkunoḡlu, O (1984) Optimal probabilistic compression of PERT networks. Journal of Construction Engineering and Management, 110(4), pp. 437-446. ISSN 0733-9364
Cusack, M M (1981) Time cost models: their use in decision making in the construction industry, with particular reference to the use of the microcomputer. PhD thesis, University of Bath, UK.
Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(2), pp. 91-104. ISSN 01446193
De Athayde Prata, B; Pitombeira-Neto, A R and De Moraes Sales, C J (2015) An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, 141(10): 04015029, ISSN 0733-9364
De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364
Easa, S M (1987) Earthwork allocations with nonconstant unit costs. Journal of Construction Engineering and Management, 113(1), pp. 34-50. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2000) D-sub: Decision support system for subcontracting construction works. Journal of Construction Engineering and Management, 126(3), pp. 191-199. ISSN 0733-9364
Elmasry, M; Zayed, T and Hawari, A (2019) Multi-objective optimization model for inspection scheduling of sewer pipelines. Journal of Construction Engineering and Management, 145(2): 04018129, ISSN 0733-9364
Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.
Ghafoori, M and Abdallah, M (2022) Simulation-based optimization model to minimize equivalent annual cost of existing buildings. Journal of Construction Engineering and Management, 148(2): 04021202, ISSN 0733-9364
Gomar, J E; Haas, C T and Morton, D P (2002) Assignment and allocation optimization of partially multiskilled workforce. Journal of Construction Engineering and Management, 128(2), pp. 103-109. ISSN 0733-9364
Gori, E (1996) Portfolio selection of capital investment projects in the Durban Metropolitan Region. Construction Management and Economics, 14(5), pp. 451-456. ISSN 01446193
Green, S D (1989) Tendering: Optimization and rationality. Construction Management and Economics, 7(1), pp. 53-63. ISSN 01446193
Guikema, S D (2003) Optimal resource allocation in an engineering design team with asymmetric information. PhD thesis, Stanford University, USA.
Hammad, A W A; Tam, V W Y and Haddad, A N (2025) A bi-level mixed integer non-linear programming model to solve the billboard location problem in cities. International Journal of Construction Management, 25(16), pp. 1929-1937. ISSN 1562-3599
Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193
Hamour, O A A R (1978) Project selection and planning in developing countries. PhD thesis, Swansea University, UK.
Hijazi, A M (1989) Simulation analysis of linear construction processes. PhD thesis, Purdue University, USA.
Holtzhower, D L (2015) Decision model to optimize wastewater treatment in the built environment. PhD thesis, University of Florida, USA.
Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.
Huang, C and Wong, C K (2017) Discretized cell modeling for optimal facility layout plans of unequal and irregular facilities. Journal of Construction Engineering and Management, 143(1): 04016082, ISSN 0733-9364
Huang, R Y and Halpin, D W (2000) Graphically based lp modelling for linear scheduling analysis: The polo system. Engineering, Construction and Architectural Management, 7(1), pp. 41-51. ISSN 0969-9988
Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364
Irving, P A (2016) Explicating excessive financial resource allocation by building control in achieving regulatory conformity in domestic extensions. PhD thesis, University of Salford, UK.
Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599
Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.
Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364
Jiang, Y (1990) The development of performance prediction and optimization models for bridge management systems. PhD thesis, Purdue University, USA.
Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), pp. 170-186. ISSN 2046-6099
Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.
Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364
Ketabi, A B and Heravi, G (2022) Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(2), pp. 643-668. ISSN 0969-9988
Khalili, A and Chua, D K (2014) Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of Construction Engineering and Management, 140(2): 04013052, ISSN 0733-9364
Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364
Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.
Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.
Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988
Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.
Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Li, Q; Jiang, M; Tao, S; Hao, J and Chong, H Y (2023) The integrated problem of construction project scheduling and multiskilled staff assignment with learning effect. Journal of Construction Engineering and Management, 149(8): 04023064, ISSN 0733-9364
Liang, R; Li, R and Chong, H Y (2023) Decision-making model for evaluating joint venture contractors in construction of complex infrastructure megaprojects. Journal of Construction Engineering and Management, 149(9): 04023071, ISSN 0733-9364
Lin, Y-S (1996) Optimal design and probabilistic evaluation of fire egress systems. PhD thesis, Duke University, USA.
Liu, C and Lu, M (2015) Optimizing earthmoving job planning based on evaluation of temporary haul road networks design for mass earthworks projects. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193
Mahmoodi, A. and Easa, S. M. (2026) A multi-objective matheuristic framework for sustainable truck-UAV last-mile delivery in smart urban built environments. Smart and Sustainable Built Environment, pp. 1-48. ISSN 2046-6099
Makrigeorgis, C N (1991) Development of an optimal durability-based highway cost allocation model. PhD thesis, Texas A&M University, USA.
Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451
Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid genetic algorithm and linear programming for bulldozer emissions and fuel-consumption management using continuously variable transmission. Journal of Construction Engineering and Management, 144(7): 04018053, ISSN 0733-9364
Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.
Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364
Mohamad Karimi, S; Jamshid Mousavi, S; Kaveh, A and Afshar, A (2007) Fuzzy optimization model for earthwork allocations with imprecise parameters. Journal of Construction Engineering and Management, 133(2), pp. 181-190. ISSN 0733-9364
Montemanni, R; Toklu, N E; Toklu, S C and Toklu, Y C (2012) Aggregate blending via robust linear programming. Journal of Construction Engineering and Management, 138(2), pp. 188-196. ISSN 0733-9364
Moselhi, O and Alshibani, A (2009) Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), pp. 948-954. ISSN 0733-9364
Moussourakis, J and Haksever, C (2010) Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2), pp. 251-259. ISSN 0733-9364
Naples, L M (1996) Outcomes-based evaluation for educational programs in engineering: A focus on the construction industry's needs. PhD thesis, Carnegie Mellon University, USA.
Narayana, N S S (1976) Engineering production function and choice of technique. PhD thesis, Indian Statistical Institute - Kolkata, India.
Nascimento, C R S M S; Almeida-Filho, A T and Perez Palha, R (2025) A TOPSIS-based framework for construction projects' portfolio selection in the public sector. Engineering, Construction and Architectural Management, 32(4), pp. 2553-2570. ISSN 0969-9988
Nassar, K and Hosny, O (2012) Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), pp. 931-942. ISSN 0733-9364
Navon, R; Arkin, H and Burg, I (1997) Economic evaluation of HVAC systems with ice storage designed using an optimization technique. Construction Management and Economics, 15(5), pp. 429-439. ISSN 01446193
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Osman, A E (2006) Life cycle optimization model for integrated cogeneration and energy systems applications in buildings. PhD thesis, University of Pittsburgh, USA.
Ozbek, M E; de la Garza, J M and Triantis, K (2012) Efficiency measurement of the maintenance of paved lanes using data envelopment analysis. Construction Management and Economics, 30(11), pp. 995-1009. ISSN 1466433X
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A; Tripathi, K K and Jha, K N (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1924-1945. ISSN 0969-9988
Parvaneh, F and El-Sayegh, S M (2016) Project selection using the combined approach of AHP and LP. Journal of Financial Management of Property and Construction, 21(1), pp. 39-53. ISSN 1366-4387
Perera, S (1983) Resource sharing in linear construction. Journal of Construction Engineering and Management, 109(1), pp. 102-111. ISSN 0733-9364
Petkov, I (2022) Optimal decarbonization conditions for buildings & districts: A model-based techno-economic perspective. DSc thesis, ETH Zürich, Switzerland.
Quinn, J T (1991) Analysis of optimal and nearly optimal plans for multipurpose river projects. PhD thesis, Harvard University, USA.
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Salem, O; Shahin, A and Khalifa, Y (2007) Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models. Journal of Construction Engineering and Management, 133(12), pp. 982-992. ISSN 0733-9364
Siu, M F F; Lu, M and Abourizk, S (2016) Resource supply-demand matching scheduling approach for construction workface planning. Journal of Construction Engineering and Management, 142(1): 04015048, ISSN 0733-9364
Soleimani, N (2022) Earthquake risk to civil infrastructure systems. PhD thesis, University of Delaware, USA.
Son, J and Mattila, K G (2004) Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Management, 130(6), pp. 887-894. ISSN 0733-9364
Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364
Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. PhD thesis, University of Texas at Austin, USA.
Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364
Tan, Y and Shen, L (2010) A fuzzy competence requirement (FCR) model for competitive bidding strategy. Construction Innovation, 10(1), pp. 75-88. ISSN 1471-4175
Tao, S; Yu, J; Zhu, J; Chen, S and Li, X (2026) Precast component production scheduling considering outsourcing and multiskilled resources. Journal of Construction Engineering and Management, 152(5): 04026040, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364
Tatari, O and Kucukvar, M (2012) Eco-efficiency of construction materials: Data envelopment analysis. Journal of Construction Engineering and Management, 138(6), pp. 733-741. ISSN 0733-9364
Tsimberdonis, A I and Murphree, E L (1994) Equipment management through operational failure costs. Journal of Construction Engineering and Management, 120(3), pp. 522-535. ISSN 0733-9364
Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364
Xu, J; Shi, Y and Zhao, S (2019) Reverse logistics network-based multiperiod optimization for construction and demolition waste disposal. Journal of Construction Engineering and Management, 145(2): 04018124, ISSN 0733-9364
Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364
Yizhe, T and Youjie, L (1992) Unbalanced bidding on contracts with. Variation trends in client-provided quantities. Construction Management and Economics, 10(1), pp. 69-80. ISSN 01446193
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364
Zhou, Y; Wang, D; Liu, G; Wang, J and Li, K (2017) A method for tenant selection of China's construction industrial parks through industrial symbiosis. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.
Up a level