Items with Index Term: level of detail
Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.
Abideen, Dania Khairy (2024) A framework for integrating building information modelling with operations and maintenance for buildings. PhD thesis, University of Manchester, UK.
Abouelkhier, N; Shawky, D and Marzouk, M (2022) Evaluating distance perception for architecture design alternatives in immersive virtual environment: A comparative study. Construction Innovation, 22(2), pp. 205-221. ISSN 1471-4175
Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193
Atasoy, G (2013) Visualizing and interacting with construction project performance information. PhD thesis, Carnegie Mellon University, USA.
Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods. PhD thesis, University of Bath, UK.
Baba, A (2013) Developing a decision support framework for low carbon housing design and delivery in the UK. PhD thesis, University of the West of England, Bristol, UK.
Baba, A; Mahjoubi, L; Olomoilaiye, P and Booth, C (2013) Decision support framework for low impact housing design in the UK. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Betts, M P (1987) Coordinated information retrieval for building contractors' tendering. PhD thesis, Polytechnic of the South Bank, UK.
Bittner, Ksenia (2020) Building information extraction and refinement from vhr satellite imagery using deep learning techniques. PhD thesis, Osnabrück University, Germany.
Blyth, K; Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(2), pp. 329-347. ISSN 1609-9451
Brockmann, C; Brezinski, H and Erbe, A (2016) Innovation in construction megaprojects. Journal of Construction Engineering and Management, 142(11): 04016059, ISSN 0733-9364
Bruhns, H and Wyatt, P (2011) A data framework for measuring the energy consumption of the non-domestic building stock. Building Research & Information, 39(3), pp. 211-226. ISSN 0961-3218
Butkovic, B (2019) A framework for developing 4D level-of-detail on construction projects. PhD thesis, University of Wolverhampton, UK.
Carr, R I (1989) Cost-estimating principles. Journal of Construction Engineering and Management, 115(4), pp. 545-551. ISSN 0733-9364
Chang, S; Castro-Lacouture, D and Yamagata, Y (2020) Estimating building electricity performance gaps with internet of things data using Bayesian multilevel additive modeling. Journal of Construction Engineering and Management, 146(12): 05020017, ISSN 0733-9364
Chunduri, S (2014) Development of planning and design phases of an integrative building lifecycle process model for advanced energy retrofit projects. PhD thesis, Pennsylvania State University, USA.
Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.
Colley, J G (2011) An exploration of competitive advantage in the plasterboard industry. PhD thesis, University of Nottingham, UK.
Collinge, W H (2025) Advancing social practice understandings of digital innovation delivery in construction project management. Engineering, Construction and Architectural Management, 32(7), pp. 4611-4630. ISSN 0969-9988
Dicks, E P (2023) Analysis of risk identification and relationships for major engineering and construction transportation projects. PhD thesis, University of Colorado at Boulder, USA.
Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.
Dudhee, V and Vukovic, V (2023) Building information model visualisation in augmented reality. Smart and Sustainable Built Environment, 12(4), pp. 919-934. ISSN 2046-6099
Forbes, D R; Smith, S D and Horner, R M W (2008) A comparison of techniques for identifying risks in sustainability assessment of housing. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Gao, J (2011) A characterization framework to document and compare BIM implementations on construction projects. PhD thesis, Stanford University, USA.
Ghadiminia, N (2021) Integration of cybersecurity in BIM-enabled facilities management organisations. PhD thesis, Birmingham City University, UK.
Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364
Hendrickson, Thomas Peter (2013) Carbon and water resource management for water distribution systems. PhD thesis, University of California, USA.
Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364
Huang, J (2025) Structure-aware 3D building reconstruction. PhD thesis, Delft University of Technology, Netherlands.
Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.
Jeong, E; Jang, J; Kim, T W and Lee, S (2025) Divide-and-conquer-based stratified models for predicting precast concrete installation times. Journal of Construction Engineering and Management, 151(9): 05025011, ISSN 0733-9364
Johnsson, H; Janols, H and Stehn, L (2006) 3D computer visualization in timber construction: some important parameters. Architectural Engineering and Design Management, 2(3), pp. 161-175. ISSN 1745-2007
Kamel Hedayat Abad, M E (2017) Integration and interoperability of building envelope information and energy modeling. PhD thesis, Pennsylvania State University, USA.
Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.
Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.
Koo, B and Fischer, M (2000) Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management, 126(4), pp. 251-260. ISSN 0733-9364
Kuntz, K A (1994) A construction crew evaluation model to improve craft productivity. PhD thesis, Pennsylvania State University, USA.
Leblanc, H (2012) Knowledge mapping and process modelling to develop a sustainability-related knowledge management strategy for Scottish housing association planned works. PhD thesis, Glasgow Caledonian University, UK.
Lo Prete, Matteo (2013) Synergies between management and valorization of cultural heritage through models based on BIM technologies. PhD thesis, Politecnico di Milano, Italy.
Mahadkar, S; Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(2), pp. 127-145. ISSN 2044-124X
Makarfi Ibrahim, Y; Kaka, A; Aouad, G and Kagioglou, M (2009) Framework for a generic work breakdown structure for building projects. Construction Innovation, 9(4), pp. 388-405. ISSN 1471-4175
Mamun, M T (2021) Development of a governance framework for delivery of collaborative and security-minded BIM projects. PhD thesis, University of Salford, UK.
Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.
Mastrolembo Ventura, Silvia (2019) The role of virtual reality in digitally-enabled design review: Procedural guidelines for the effective implementation of immersive virtual environments for usability-focused analysis. PhD thesis, Politecnico di Milano, Italy.
Matel, E; Vahdatikhaki, F; Hosseinyalamdary, S; Evers, T and Voordijk, H (2022) An artificial neural network approach for cost estimation of engineering services. International Journal of Construction Management, 22(7), pp. 1274-1287. ISSN 1562-3599
Mayouf, M; Gerges, M and Cox, S (2019) 5D BIM: an investigation into the integration of quantity surveyors within the BIM process. Journal of Engineering, Design and Technology, 17(3), pp. 537-553. ISSN 1726-0531
Mendes, J M; Tavares, A O and Santos, P P (2020) Social vulnerability and local level assessments: A new approach for planning. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 15-43. ISSN 1759-5916
Musselwhite D, G B (2024) An analysis of activity-level predictability from UK construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Nassar, K M and Hegab, M Y (2006) Developing a complexity measure for project schedules. Journal of Construction Engineering and Management, 132(6), pp. 554-561. ISSN 0733-9364
Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708
Olugboyega, O and Aina, O O (2018) Examination of the levels of development of building information models in the Nigerian construction industry. Journal of Construction Business and Management, 2(2), pp. 1-14. ISSN 2521-0165
Padala, S P S; Maheswari, J U and Hirani, H (2022) Identification and classification of change causes and effects in construction projects. International Journal of Construction Management, 22(14), pp. 2788-2807. ISSN 1562-3599
Park, J. and Moon, S. (2026) Advancing BIM adoption in infrastructure: Addressing standard development, geographic coordinate systems, and common data environment. International Journal of Construction Management, 26(8), pp. 1584-1598. ISSN 1562-3599
Pradhan, A R (2009) An approach for fusing data from multiple sources to support construction productivity analyses. PhD thesis, Carnegie Mellon University, USA.
Pryke, S D (2004) Analysing construction project coalitions: Exploring the application of social network analysis. Construction Management and Economics, 22(8), pp. 787-797. ISSN 01446193
Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364
Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364
Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites. PhD thesis, Carnegie Mellon University, USA.
Schamne, Annelise Nairne (2022) Building information modeling in construction waste management: Proposal of a conceptual model in the IFC standard. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.
Shafiq, M T and Lockley, S R (2022) Application of signature-based matching for IFC model comparison. International Journal of Construction Management, 22(9), pp. 1765-1774. ISSN 1562-3599
Song, M H (2019) Formalization of smallest workface boundary (SWFB): Toward generating and operating level of development (LOD) 400-based daily bill of materials (BOM). PhD thesis, Stanford University, USA.
Spennemann, D H R (2025) Removal or preservation in place? A review of the conservation management options for asbestos cement sheeting in heritage properties. International Journal of Building Pathology and Adaptation, 43(6), pp. 1406-1422. ISSN 2398-4708
Stojanovic, V; Falconer, R; Blackwood, D; Paterson, G; Fleming, M and Bell, S (2014) Interactive visualisation of heat loss and gain for early-stage energy appraisal of the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364
Treloar, G J; Love, P E D; Faniran, O O and Iyer-Raniga, U (2000) A hybrid life cycle assessment method for construction. Construction Management and Economics, 18(1), pp. 5-9. ISSN 01446193
Turner, Aidan (2022) Detecting the early essence of 'modern' project management: An historic case study approach (hms barham, 1912-1915). PhD thesis, University of the West of England, Bristol, UK.
Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(2), pp. 702-715. ISSN 0969-9988
Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.
Watson, N (2016) Developing material selection strategies to improve the embodied impacts of buildings. EngD thesis, University of Bath, UK.
Wong, J-M (2008) Extending performance-based design methods by applying structural engineering design patterns. PhD thesis, University of California, Berkeley, USA.
Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.
Up a level