Items with Index Term: lean construction

Number of items: 377.

Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abdullahi, A L (2016) Ethnomimicry: the development of a conceptual model of the Nigerian practice of the end-of-life management of buildings. PhD thesis, University of Huddersfield, UK.

Abusalem, O (2020) Towards last planner system implementation in Gaza Strip, Palestine. International Journal of Construction Management, 20(5), pp. 367-384. ISSN 1562-3599

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.

Ahmed, S; Hossain, M M and Haq, I (2021) Implementation of lean construction in the construction industry in Bangladesh: Awareness, benefits and challenges. International Journal of Building Pathology and Adaptation, 39(2), pp. 368-406. ISSN 23984708

Ahmed, S and Sobuz, M H R (2020) Challenges of implementing lean construction in the construction industry in Bangladesh. Smart and Sustainable Built Environment, 9(2), pp. 174-207. ISSN 2046-6099

Aka, A; Isah, A D; Salisu, O I and Bello, A O (2025) Students’ perception of strategies for effective lean knowledge in future Nigerian construction industry. Construction Innovation, 25(4), pp. 1171-1187. ISSN 1471-4175

Akter, J; Datta, S D; Islam, M; Tayeh, B A; Sraboni, S A and Das, N (2025) Assessment and analysis of the effects of implementing building information modelling as a lean management tool in construction management. International Journal of Building Pathology and Adaptation, 43(4), pp. 877-894. ISSN 2398-4708

Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.

Al Taie, Mohsin Shareef (2022) Applications of lean in construction: Benefits from using the Last Planner system. PhD thesis, Liberty University, USA.

Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.

Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.

Al-Sasi, B O (2007) A lean approach to capacity management in construction. PhD thesis, University of Southampton, UK.

AlSehaimi, A (2011) Improving construction planning practice in Saudi Arabia by means of lean construction principles and techniques. PhD thesis, University of Salford, UK.

Albalkhy, W and Sweis, R (2022) Assessing lean construction conformance amongst the second-grade Jordanian construction contractors. International Journal of Construction Management, 22(5), pp. 900-912. ISSN 1562-3599

Alhalafi, M (2021) Develop a lean project management framework for the construction companies in order to improve the time and cost efficiencies of their construction operations. PhD thesis, De Montfort University, UK.

Ali, S A A; Arun, C and Krishnamurthy, K (2021) Re-defining flow in construction process for facilitating the identification and quantification of generic overruns existing in construction industry today. International Journal of Construction Management, 21(2), pp. 113-130. ISSN 1562-3599

Alinaitwe, H M (2009) Prioritising lean construction barriers in Uganda's construction industry. Journal of Construction in Developing Countries, 14(1), pp. 15-30. ISSN 1823-6499

Aliu, J and Aigbavboa, C (2023) Reviewing the trends of construction education research in the last decade: A bibliometric analysis. International Journal of Construction Management, 23(9), pp. 1571-1580. ISSN 1562-3599

Alsdorf, M; Koch, C and Sander, D (2006) Coaching at the building site: A feasibility study. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Alsehaimi, A O; Fazenda, P T and Koskela, L (2014) Improving construction management practice with the last planner system: A case study. Engineering, Construction and Architectural Management, 21(1), pp. 51-64. ISSN 0969-9988

Altan, E and Işık, Z (2024) Digital twins in lean construction: A neutrosophic AHP – BOCR analysis approach. Engineering, Construction and Architectural Management, 31(12), pp. 5029-5056. ISSN 0969-9988

Alves, T d C L; Milberg, C and Walsh, K D (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(5), pp. 512-525. ISSN 0969-9988

Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364

Ankomah, E N; Ayarkwa, J and Agyekum, K (2020) Status of lean construction implementation among small and medium building contractors (SMBCs) in Ghana. Journal of Engineering, Design and Technology, 18(6), pp. 1691-1709. ISSN 1726-0531

Ansell, M (2009) A study of a collaborative framework arrangement for highways renewals schemes. EngD thesis, Loughborough University, UK.

Antunes, R; González, V A; Walsh, K; Rojas, O; O'Sullivan, M and Odeh, I (2018) Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3): 04017118, ISSN 0733-9364

Arayici, Y; Tokdemir, O B and Kassem, M (2023) A quantitative, evidence-based analysis of correlations between lean construction and building information modelling. Smart and Sustainable Built Environment, 12(5), pp. 975-1001. ISSN 2046-6099

Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218

Arroyo, P; Tommelein, I D and Ballard, G (2015) Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design. Journal of Construction Engineering and Management, 141(1): 04014063, ISSN 0733-9364

Asadian, E; Azeez, S; Leicht, R M and Asadi, S (2024) Exploring the barriers to women in construction and the opportunities presented through lean. Journal of Construction Engineering and Management, 150(5): 04024029, ISSN 0733-9364

Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.

Aslam, M; Baffoe-Twum, E and Malik, S (2024) Benchmarking lean construction conformance in Pakistan's construction industry. Engineering, Construction and Architectural Management, 31(5), pp. 2077-2100. ISSN 0969-9988

Aslam, M; Gao, Z and Smith, G (2021) Development of lean approaching sustainability tools (LAST) matrix for achieving integrated lean and sustainable construction. Construction Economics and Building, 21(3), pp. 176-197. ISSN 2204-9029

Aslam, M; Gao, Z and Smith, G (2022) Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, 22(8), pp. 1559-1570. ISSN 1562-3599

Aziz, N M and Zainon, N (2023) Driving factors for lean-BIM implementation in Malaysia's construction industry: Qualitative interview-based study. Smart and Sustainable Built Environment, 12(4), pp. 872-891. ISSN 2046-6099

Babalola, H I and Aliu, J O (2026) Lean construction practices for enhancing project delivery in the construction industry: Examining the beneficial outcomes. International Journal of Construction Management, 26(6), pp. 1097-1111. ISSN 1562-3599

Bajjou, M S and Chafi, A (2026) Enhancing environmental sustainability through lean construction principles: An industry-based SEM analysis. Engineering, Construction and Architectural Management, 33(1), pp. 171-206. ISSN 0969-9988

Bajjou, M S and Chafi, A (2018) Lean construction implementation in the Moroccan construction industry: Awareness, benefits and barriers. Journal of Engineering, Design and Technology, 16(4), pp. 533-556. ISSN 1726-0531

Bajjou, M S and Chafi, A (2022) Exploring the critical waste factors affecting construction projects. Engineering, Construction and Architectural Management, 29(6), pp. 2268-2299. ISSN 0969-9988

Bajjou, M S and Chafi, A (2025) Developing and validating a new conceptual model for successful implementation of lean construction: SEM analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1581-1620. ISSN 0969-9988

Balina, C M (2002) Using labor productivity data to evaluate the application of lean principles to the concrete construction process. PhD thesis, Pennsylvania State University, USA.

Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades. PhD thesis, University of California, Berkeley, USA.

Bashir, A M (2013) A framework for utilising lean construction strategies to promote safety on construction sites. PhD thesis, University of Wolverhampton, UK.

Bashir, A M; Suresh, S; Proverbs, D and Gameson, R (2011) A critical, theoretical, review of the impacts of lean construction tools in reducing accidents on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Bassioni, H A (2004) A framework for measuring business performance in construction contracting organisations. PhD thesis, Loughborough University, UK.

Benachio, G L F; Freitas, M D C D and Tavares, S F (2021) Interactions between lean construction principles and circular economy practices for the construction industry. Journal of Construction Engineering and Management, 147(7): 04021068, ISSN 0733-9364

Bhatnagar, S; Jacob, G; Devkar, G; Rybkowski, Z K; Arefazar, Y and Obulam, R (2023) A systematic review of lean simulation games in the construction industry. Architectural Engineering and Design Management, 19(6), pp. 701-719. ISSN 1745-2007

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Bidarianzadeh, G R and Fortune, C J (2002) Lean thinking and the delivery of sustainable construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Bilge, E Ç and Yaman, H (2022) Research trends analysis using text mining in construction management: 2000–2020. Engineering, Construction and Architectural Management, 29(8), pp. 3210-3233. ISSN 0969-9988

Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175

Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.

Bradford, C W (2017) The impact of the systematic incorporation of tolerances on gypsum board installation. PhD thesis, Indiana State University, USA.

Brady, D A (2014) Using visual management to improve transparency in planning and control in construction. PhD thesis, University of Salford, UK.

Brady, D A; Tzortzopoulos, P; Rooke, J; Formoso, C T and Tezel, A (2018) Improving transparency in construction management: A visual planning and control model. Engineering, Construction and Architectural Management, 25(10), pp. 1277-1297. ISSN 0969-9988

Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X

Brodetskaia, I; Sacks, R and Shapira, A (2013) Stabilizing production flow of interior and finishing works with reentrant flow in building construction. Journal of Construction Engineering and Management, 139(6), pp. 665-674. ISSN 0733-9364

Brooks, T; Bruen, J and Curran, M (2020) The value of 'non-value adding' activity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X

Buhamdan, S; Alwisy, A; Bouferguene, A and Al-Hussein, M (2019) Novel approach to overcoming discontinuity in knowledge: Application in value-adding frameworks in construction industry. Journal of Construction Engineering and Management, 145(8): 04019045, ISSN 0733-9364

Bygballe, L E; Endresen, M and Fålun, S (2018) The role of formal and informal mechanisms in implementing lean principles in construction projects. Engineering, Construction and Architectural Management, 25(10), pp. 1322-1338. ISSN 0969-9988

Castillo, G; Alarcón, L F and González, V A (2015) Implementing lean production in copper mining development projects: Case study. Journal of Construction Engineering and Management, 141(1): 05014013, ISSN 0733-9364

Che Ibrahim, C K I and Aaltonen, K (2025) The evolution of project alliancing in construction: Insights from a two-decade bibliometric review. Construction Management and Economics, 43(12), pp. 1022-1044. ISSN 0144-6193

Chew, A T W and Ling, F Y Y (2002) Increasing Singapore's construction productivity through construction process re-engineering. Journal of Construction Research, 3(1), pp. 123-45. ISSN 1609-9451

Chiozzi, Maria Alma (2020) A collaborative contracting framework supported by BIM and lean. PhD thesis, Queensland University of Technology, Australia.

Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.

Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.

Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364

Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364

Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364

Corley, J and Deasley, P (2003) Factors affecting teamworking in construction service delivery projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Costin, G; Nakai Kidd, A; Simon, T and Edwards, D J (2019) Collaborative procurement and private-sector housebuilding and refurbishment works: A pilot study investigation of the UK. International Journal of Building Pathology and Adaptation, 37(5), pp. 699-717. ISSN 23984708

Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193

Daniel, E I and Oshodi, O (2023) Lean-offsite-simulation nexus for housing construction: A state-of-the-art review of the existing knowledge. Construction Innovation, 23(5), pp. 994-1017. ISSN 1471-4175

Daniel, E I; Oshodi, O; Dabara, D and Dimka, N (2024) Towards closing the housing gap in the UK: Exploration of the influencing factors and the way forward. Construction Innovation, 24(4), pp. 965-985. ISSN 1471-4175

Daniel, E I; Pasquire, C and Dickens, G (2014) Social perspective of planning in construction: The UK experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Dauber, V F (2001) Classical lean constructs and their transferability to the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(1), pp. 50-67. ISSN 1471-4175

Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193

Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices. PhD thesis, Purdue University, USA.

Dehdasht, G; Ferwati, M S; Mohandes, S R; El-Sabek, L and Edwards, D J (2023) Towards expediting the implementation of sustainable and successful lean paradigm for construction projects: A hybrid of dematel and SNA approach. Engineering, Construction and Architectural Management, 30(9), pp. 4294-4318. ISSN 0969-9988

Demir, S; Bryde, D J; Fearon, D J and Ochieng, E G (2012) Re- conceptualising agile for lean construction: The case for "agilean" project management. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Demir, S T (2013) AgiLean PM: a unifiying strategic framework to manage construction projects. PhD thesis, Liverpool John Moores University, UK.

Demirkesen, S; Sadikoglu, E and Jayamanne, E (2021) Assessing psychological safety in lean construction projects in the United States. Construction Economics and Building, 21(3), pp. 159-175. ISSN 2204-9029

Deng, Y; Gan, V J L; Das, M; Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for construction supply chain management. Journal of Construction Engineering and Management, 145(4): 04019016, ISSN 0733-9364

Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988

Dumrak, J and Zarghami, S A (2025) The role of artificial intelligence in lean construction management. Engineering, Construction and Architectural Management, 32(1), pp. 131-155. ISSN 0969-9988

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

Egbele-Okoro, K U (2020) Examining health and safety through the Lean thinking lens: the case of the Nigerian construction industry. PhD thesis, University of Huddersfield, UK.

El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the middle East. International Journal of Construction Education and Research, 14(2), pp. 118-40. ISSN 1557-8771

El-Sabek, L M and McCabe, B Y (2018) Framework for managing integration challenges of last planner system in IMPs. Journal of Construction Engineering and Management, 144(5): 04018022, ISSN 0733-9364

Elsayegh, A (2021) Collaborative planning in the construction industry: A holistic framework for assessing collaborative planning practices and predicting project performance. PhD thesis, Missouri University of Science and Technology, USA.

Elsayegh, A and El-Adaway, I H (2021) Holistic study and analysis of factors affecting collaborative planning in construction. Journal of Construction Engineering and Management, 147(4): 04021023, ISSN 0733-9364

Emuze, F; Smallwood, J and Han, S (2014) Factors contributing to non-value adding activities in South African construction. Journal of Engineering, Design and Technology, 12(2), pp. 223-243. ISSN 1726-0531

Enshassi, A; Saleh, N and Mohamed, S (2019) Application level of lean construction techniques in reducing accidents in construction projects. Journal of Financial Management of Property and Construction, 24(3), pp. 274-293. ISSN 1366-4387

Enshassi, A; Saleh, N and Mohamed, S (2021) Barriers to the application of lean construction techniques concerning safety improvement in construction projects. International Journal of Construction Management, 21(10), pp. 1044-1060. ISSN 1562-3599

Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.

Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531

Evans, M; Farrell, P; Elbeltagi, E and Dion, H (2023) Barriers to integrating lean construction and integrated project delivery (IPD) on construction megaprojects towards the global integrated delivery (gid) in multinational organisations: Lean IPD&gid transformative initiatives. Journal of Engineering, Design and Technology, 21(3), pp. 778-818. ISSN 1726-0531

Evans, M; Farrell, P; Mashali, A and Zewein, W (2021) Critical success factors for adopting building information modelling (BIM) and lean construction practices on construction mega-projects: A Delphi survey. Journal of Engineering, Design and Technology, 19(2), pp. 537-556. ISSN 1726-0531

Evans, M; Farrell, P; Zewein, W and Mashali, A (2021) Analysis framework for the interactions between building information modelling (BIM) and lean construction on construction mega-projects. Journal of Engineering, Design and Technology, 19(6), pp. 1451-1471. ISSN 1726-0531

Ezzeddine, A; Shehab, L; Srour, I; Power, W; Zankoul, E and Freiha, E (2023) Ccc_implementing the construction control room on a fast-paced project: The case study of the beirut port explosion. International Journal of Construction Management, 23(5), pp. 745-755. ISSN 1562-3599

Fang, Y and Gao, S (2026) Construction 4.0 technology and lean construction ambidexterity capability in China's construction industry: A sociotechnical systems perspective. Construction Innovation, 26(3), pp. 653-673. ISSN 1471-4175

Fang, Y; Daniel, E I and Li, S (2021) Conceptual framework for lean construction ambidexterity in project-based organizations. Construction Management and Economics, 39(10), pp. 824-838. ISSN 01446193

Fapohunda, J A (2009) Operational framework for optimal utilisation of construction resources during the production process. PhD thesis, Sheffield Hallam University, UK.

Farouk, A M and Rahman, R A (2025) Integrated applications of building information modeling in project cost management: A systematic review. Journal of Engineering, Design and Technology, 23(1), pp. 287-305. ISSN 1726-0531

Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007

Forman, M (2010) Lean construction and health and safety on site: Analysed in a planning and empowerment perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Forman, M (2013) Inertia and change: Lean construction and health and safety work on construction sites. Construction Management and Economics, 31(6), pp. 647-660. ISSN 1466433X

Formoso, C T; Santos, A D and Powell, J A (2002) An exploratory study on the applicability of process transparency in construction sites. Journal of Construction Research, 3(1), pp. 35-54. ISSN 1609-9451

Gambatese, J A; Pestana, C and Lee, H W (2017) Alignment between lean principles and practices and worker safety behavior. Journal of Construction Engineering and Management, 143(1): 04016083, ISSN 0733-9364

Gao, S (2013) The toyota way model: An implementation framework for large Chinese construction firms. PhD thesis, National University of Singapore, Singapore.

Gao, S; Jin, R and Lu, W (2020) Design for manufacture and assembly in construction: A review. Building Research & Information, 48(5), pp. 538-550. ISSN 0961-3218

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

Garnett, N A (2001) Changing construction performance using lean construction: An action research approach. PhD thesis, University of Reading, UK.

Gerth, R; Boqvist, A; Bjelkemyr, M and Lindberg, B (2013) Design for construction: Utilizing production experiences in development. Construction Management and Economics, 31(2), pp. 135-150. ISSN 1466433X

Ghosh, S and Burghart, J (2021) Lean construction: Experience of us contractors. International Journal of Construction Education and Research, 17(2), pp. 133-153. ISSN 1557-8771

Ghosh, S and Robson, K F (2015) Analyzing the empire state building project from the perspective of lean delivery system: A descriptive case study. International Journal of Construction Education and Research, 11(4), pp. 257-267. ISSN 1557-8771

Gil, N (2022) Megaprojects: A meandering journey towards a theory of purpose, value creation and value distribution. Construction Management and Economics, 40(7-8), pp. 562-584. ISSN 01446193

Gil, N; Tommelein, I D; Kirkendall, R L and Ballard, G (2001) Leveraging specialty-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 355-367. ISSN 0969-9988

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Ginigaddara, B; Gajendran, T and Beard, C (2025) A critical review of quantity surveying education in an offsite construction perspective: strategies for up-skilling. Construction Innovation, 25(4), pp. 1058-1084. ISSN 1471-4175

Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Green, S D (1998) The technocratic totalitarianism of construction process improvement: A critical perspective. Engineering, Construction and Architectural Management, 5(4), pp. 376-386. ISSN 0969-9988

Green, S D (2002) The human resource management implications of lean construction: critical perspectives and conceptual chasms. Journal of Construction Research, 3(1), pp. 147-165. ISSN 1609-9451

Green, S D; Harty, C; Elmualim, A A; Larsen, G D and Kao, C C (2008) On the discourse of construction competitiveness. Building Research & Information, 36(5), pp. 426-435. ISSN 0961-3218

Green, S D and May, S C (2003) Re-engineering construction: Going against the grain. Building Research & Information, 31(2), pp. 97-106. ISSN 0961-3218

Green, S D and May, S C (2005) Lean construction: Arenas of enactment, models of diffusion and the meaning of 'leanness'. Building Research & Information, 33(6), pp. 498-511. ISSN 0961-3218

Gupta, P and Elhag, T (2025) Applicability of lean techniques and processes on improving sustainability in construction projects. Built Environment Project and Asset Management, 15(2), pp. 247-270. ISSN 2044-124X

Gusmao Brissi, S and Debs, L (2024) Principles for adopting offsite construction in design and construction companies focused on multifamily projects in the USA. Engineering, Construction and Architectural Management, 31(11), pp. 4308-4329. ISSN 0969-9988

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Unlocking productivity: Revealing waste and hidden disturbances impacting mep workers. Journal of Construction Engineering and Management, 150(9): 04024108, ISSN 0733-9364

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Task planning and control in construction: Revealing workers as early and late planners. Construction Management and Economics, 42(5), pp. 431-450. ISSN 01446193

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.

Hajj, C E; Jawad, D and Montes, G M (2021) Analysis of a construction innovative solution from the perspective of an information system theory. Journal of Construction Engineering and Management, 147(9): 03121003, ISSN 0733-9364

Hall, D M (2017) The early stages of integrated project delivery: Institutionalization and impact on adoption of systemic innovations. PhD thesis, Stanford University, USA.

Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364

Haronian, E and Sacks, R (2021) Production control in earthworks: Concepts and metrics. Journal of Construction Engineering and Management, 147(10): 04021127, ISSN 0733-9364

Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364

Hassan, M E (2013) Assessing the impact of lean/integrated project delivery system on final project success. PhD thesis, George Mason University, USA.

Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(1), pp. 19-30. ISSN 1366-4387

Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.

Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364

Howell, G A (2011) New operating system for project management: Consequences and opportunities. Journal of Construction Engineering and Management, 137, pp. 882-886. ISSN 0733-9364

Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364

Höök, M and Stehn, L (2008) Applicability of lean principles and practices in industrialized housing production. Construction Management and Economics, 26(10), pp. 1091-1100. ISSN 1466433X

Idrissi Gartoumi, K; Aboussaleh, M and Zaki, S (2024) Implementing lean construction to improve quality and megaproject construction: A case study. Journal of Financial Management of Property and Construction, 29(1), pp. 1-22. ISSN 1366-4387

Igwe, C; Hammad, A and Nasiri, F (2022) Influence of lean construction wastes on the transformation-flow-value process of construction. International Journal of Construction Management, 22(13), pp. 2598-2604. ISSN 1562-3599

Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988

Ikuma, L H; Nahmens, I and James, J (2011) Use of safety and lean integrated kaizen to improve performance in modular homebuilding. Journal of Construction Engineering and Management, 137(7), pp. 551-560. ISSN 0733-9364

Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364

Innella, Filomena (2020) Performance of building modules production and transportation. PhD thesis, Monash University, Australia.

Jacobs, G F (2010) Review of lean construction conference proceedings and relationship to the Toyota production system framework. PhD thesis, Colorado State University, USA.

Jacobs, Y L (2024) Barriers to the implementation of lean construction in South Africa. PhD thesis, University of Pretoria, South Africa.

Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.

Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175

Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Jayanetti, J. K. D. D. T.; Fernando, M. H.; Ranadewa, K. A. T. O. and Perera, B. A. K. S. (2026) Fusion of machine learning to enhance the adaptability of lean construction maturity models (lcmms). Journal of Engineering, Design and Technology, 24(5), pp. 1298-1321. ISSN 1726-0531

Jiang, L; Zhong, H; Chen, J; Cheng, J; Chen, S; Gong, Z; Lun, Z; Zhang, J and Su, Z (2023) Study on the construction workforce management based on lean construction in the context of COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3310-3329. ISSN 0969-9988

Jiang, X; Zhou, H; Li, M; Lu, K; Lyu, S; Omrani, S and Skitmore, M (2024) Sustainable construction projects management in the AEC industry: Analysis and visualization. International Journal of Construction Management, 24(4), pp. 384-399. ISSN 1562-3599

Johansen, D E and Greenwood, D J (1999) Hard, soft or lean? Planning on medium-sized construction projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Johansen, E (2002) The application of a pilot pull planning system to construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Johansen, J B; Jensen, P A and Thuesen, C (2017) Maturity model for strategic collaboration in sustainable building renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.

Jolly Cyril, E (2026) Mediating effect of innovation on the relationship between project financing and construction cost efficiency: Innovation integrated cost efficiency perspective. Journal of Construction Engineering and Management, 152(1): 04025226, ISSN 0733-9364

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Josephson, P E and Bjorkman, L (2013) Why do work sampling studies in construction? The case of plumbing work in Scandinavia. Engineering, Construction and Architectural Management, 20(6), pp. 589-603. ISSN 0969-9988

Jowett, B; Edwards, D J and Kassem, M (2024) Field BIM and mobile BIM technologies: A requirements taxonomy and its interactions with construction management functions. Construction Innovation, 24(1), pp. 134-163. ISSN 1471-4175

Jowett, B R (2023) A framework for the implementation of mobile BIM technology at project and organisational level supporting lean construction approaches. PhD thesis, University of Northumbria at Newcastle, UK.

Jørgensen, B and Emmitt, S (2008) Lost in transition: The transfer of lean manufacturing to construction. Engineering, Construction and Architectural Management, 15(4), pp. 383-398. ISSN 0969-9988

Jørgensen, B; Emmitt, S and Bonke, S (2004) Studying cultural issues: The implementation of facilitated process-orientated cooperation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Jørgensen, K and Rasmussen, G M G (2009) Critical events in construction process. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.

Kenley, R (2019) CME forum: A response to "construction flow index: A metric of production flow quality in construction". Construction Management and Economics, 37(2), pp. 112-119. ISSN 01446193

Keskiniva, K; Saari, A and Junnonen, J M (2023) Suggestions for takt production subcontract clauses: A conceptual study. Construction Innovation, 23(2), pp. 425-442. ISSN 1471-4175

Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.

Khanapure, V U and Shastri, S S (2024) A sustainable-lean implementation methodology: A catalyst for sustainability enhancement of high-rise residential projects. Engineering, Construction and Architectural Management, 31(7), pp. 2585-2603. ISSN 0969-9988

Khanh, H D and Kim, S Y (2015) Development of waste occurrence level indicator in Vietnam construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 715-731. ISSN 0969-9988

Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.

Kifokeris, D (2021) Variants of Swedish lean construction practices reported in research: Systematic literature review and critical analysis. Journal of Construction Engineering and Management, 147(7), ISSN 0733-9364

Kifokeris, D; Bahnariu, B and Koch, C (2022) A mapping of Swedish lean construction variants in practice: Review and survey. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Kifokeris, D and Koch, C (2020) Swedish lean construction practices identified in the last decade of research. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kifokeris, D and Löwstedt, M (2021) Lost and found in translation: Top-down decoupling and bottom-up recoupling of strategies and practices in construction production. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Kifokeris, D and Tezel, A (2025) Blockchain and lean construction: An exploration of bidirectional synergies and interactions. Architectural Engineering and Design Management, 21(1), pp. 171-189. ISSN 1745-2007

Kifokeris, D; Tjell, J; Viklund-Tallgren, M; Farah, L N and Roupé, M (2020) Challenges in the digital transformation of lean design methods: A case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kim, D (2002) Exploratory study of lean construction: Assessment of lean implementation. PhD thesis, University of Texas at Austin, USA.

Kim, Y-W (2002) The implications of a new production paradigm for project cost control. PhD thesis, University of California, Berkeley, USA.

Klous, Jason D (2026) Investigating the role of the language action perspective in improving communication and collaboration in lean construction teams. PhD thesis, Nottingham Trent University, UK.

Koch, C (2004) Operations management on the construction site: Developing a human resource and knowledge oriented alternative to lean construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Koch, C and Simonsen, R (2006) Operations strategy and innovation? A contractor implementing lean. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koseoglu, O and Nurtan-Gunes, E T (2018) Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), pp. 1298-1321. ISSN 0969-9988

Koskela, L and Ballard, G (2006) Should project management be based on theories of economics or production? Building Research & Information, 34(2), pp. 154-163. ISSN 0961-3218

Koskela, L and Ballard, G (2012) Is production outside management? Building Research & Information, 40(6), pp. 724-737. ISSN 0961-3218

Koskela, L; Ferrantelli, A; Niiranen, J; Pikas, E and Dave, B (2019) Epistemological explanation of lean construction. Journal of Construction Engineering and Management, 145(2): 04018131, ISSN 0733-9364

Koskela, L; Huovila, P and Leinonene, J (2002) Design management in building construction: From theory to practice. Journal of Construction Research, 3(1), pp. 1-16. ISSN 1609-9451

Kwawu, W and Hughes, W P (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Labib, Y A M (2017) Lean framework for assessing construction logistics in Jordan. PhD thesis, University of Salford, UK.

Li, H; Guo, H L; Li, Y and Skitmore, M (2012) From IKEA model to the lean construction concept: A solution to implementation. International Journal of Construction Management, 12(4), pp. 47-63. ISSN 1562-3599

Li, X K; Wang, X M and Lei, L (2020) The application of an ANP-fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(2), pp. 356-384. ISSN 0969-9988

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(1), pp. 106-133. ISSN 1471-4175

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2025) A guideline for BIM and lean integrated construction practice. Smart and Sustainable Built Environment, 14(4), pp. 1264-1291. ISSN 2046-6099

Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599

Liu, G; Ma, Z; Li, J; Li, S; Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(6): 04024051, ISSN 0733-9364

Liu, R and Fischer, M (2025) A context taxonomy for construction field crew members. Journal of Construction Engineering and Management, 151(3): 04024214, ISSN 0733-9364

Lohne, J; Torp, O; Andersen, B; Aslesen, S; Bygballe, L; Bølviken, T; Drevland, F; Engebø, A; Fosse, R; Holm, H T; Hunn, L K; Kalsaas, B T; Klakegg, O J; Knotten, V; Kristensen, K H; Olsson, N O E; Rolstadås, A; Skaar, J; Svalestuen, F; Vaagen, H; Wondimu, P and Laedre, O (2022) The emergence of lean construction in the Norwegian AEC industry. Construction Management and Economics, 40(7-8), pp. 585-597. ISSN 01446193

London, B C K and Gajendran, T (2010) Diffusing cultural awareness and maturity in lean managed organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Low, S P (2012) Strategic development of the built environment through international construction, quality and productivity management. DSc thesis, University of Birmingham, UK.

Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007

Luo, J; Zhang, H and Sher, W (2021) A mixed method for measuring incompatibilities between manufacturing approaches and off-site construction. Engineering, Construction and Architectural Management, 28(9), pp. 2516-2548. ISSN 0969-9988

Lühr, G J; Bosch-Rekveldt, M and Radujković, M (2023) The last-planner-system's impact on project culture. Journal of Engineering, Design and Technology, 21(5), pp. 1303-1322. ISSN 1726-0531

Ma, X; Chan, A P C; Wu, H; Xiong, F and Dong, N (2018) Achieving leanness with BIM-based integrated data management in a built environment project. Construction Innovation, 18(4), pp. 469-487. ISSN 1471-4175

Mahalingam, A; Yadav, A K and Varaprasad, J (2015) Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases. Journal of Construction Engineering and Management, 141(7): 5015006, ISSN 0733-9364

Mahboubi Niazmandi, M; Moussavi, P; Ahmadi Bonakdar, Z; Shakiba, A; Sedaeesoula, R; Mohammadzade Esfahani Nezhad, S and Oke, A E (2025) Synergistic effects of building information modelling and lean construction: A conceptual model for enhancing productivity in construction projects. International Journal of Construction Management, 25(13), pp. 1552-1569. ISSN 1562-3599

Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175

Majava, J; Haapasalo, H and Aaltonen, K (2019) Elaborating factors affecting visual control in a big room. Construction Innovation, 19(1), pp. 34-47. ISSN 1471-4175

Malaeb, Z and Hamzeh, F R (2022) IPD-inspired framework for measuring stakeholder integration in public-private partnerships. Construction Innovation, 22(1), pp. 160-184. ISSN 1471-4175

Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.

Mao, X and Zhang, X (2008) Construction process reengineering by integrating lean principles and computer simulation techniques. Journal of Construction Engineering and Management, 134(5), pp. 371-381. ISSN 0733-9364

Maraqa, M J; Sacks, R and Spatari, S (2021) Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projects. Engineering, Construction and Architectural Management, 28(8), pp. 2176-2198. ISSN 0969-9988

Marsh, D; Bryde, D and Graham, A (2014) Perceptions of the value and viability of implementing lean construction with business information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Martinez, E; Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation, 19(4), pp. 570-593. ISSN 1471-4175

Martinez, J G; Yeung, T; Sacks, R; Shahaf, Y and Sharoni, L O (2023) Situational awareness in construction using a serious game. Journal of Construction Engineering and Management, 149(3): 04022183, ISSN 0733-9364

Marwan, A E (2019) Integrating building information modeling to project management consultants' role and practice in UAE. PhD thesis, Heriot-Watt University, UK.

McGrath-Champ, S and Rosewarne, S (2009) Organizational change in Australian building and construction: Rethinking a unilinear 'leaning' discourse. Construction Management and Economics, 27(11), pp. 1111-1128. ISSN 1466433X

Memarian, B (2012) Development of high reliability construction work systems: Lessons from production practices of high performance work crews. PhD thesis, Arizona State University, USA.

Milberg, C T (2006) Application of tolerance management to civil systems. PhD thesis, University of California, Berkeley, USA.

Milberg, C T and Tommelein, I D (2020) Methods for managing tolerance compatibility: Windows in cast-in-place concrete. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364

Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451

Miller, C J M; Packham, G A and Thomas, B C (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? Journal of Construction Research, 3(01), 67–82. Journal of Construction Research, ISSN 1609-9451

Milner, Philip E (2025) A phenomenological study of lean labor method adoption in commercial construction projects. DBA thesis, California Southern University, USA.

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement. PhD thesis, University of Alberta, Canada.

Mohamed, A H (2016) Lean construction as an innovative approach for minimising risks in mega-Construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Mohammadi, A; Igwe, C; Amador-Jimenez, L and Nasiri, F (2020) Applying lean construction principles in road maintenance planning and scheduling. International Journal of Construction Management, 22(12), pp. 2364-2374. ISSN 1562-3599

Mollasalehi, S (2022) The benefits of BIM use to improve information flow: making the design process more leaner. PhD thesis, University of Salford, UK.

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.

Moradi, S and Sormunen, P (2023) Revisiting the concept of waste and its causes in construction from analytical and conceptual perspectives. Construction Management and Economics, 41(8), pp. 621-633. ISSN 01446193

Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029

Moyo, T and Chigara, B (2023) Barriers to lean construction implementation in Zimbabwe. Journal of Engineering, Design and Technology, 21(3), pp. 733-757. ISSN 1726-0531

Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.

Musa, M M; Saleh, I M; Ibrahim, Y and Dandajeh, M A (2023) Assessment of awareness and barriers to the application of lean construction techniques in kano state, Nigeria. Journal of Construction Business and Management, 6(1), pp. 33-42. ISSN 2521-0165

Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.

Nassri, S; Talebi, S; Elghaish, F; Koohestani, K; McIlwaine, S; Hosseini, M R; Poshdar, M and Kagioglou, M (2023) Labor waste in housing construction projects: An empirical study. Smart and Sustainable Built Environment, 12(2), pp. 325-340. ISSN 2046-6099

Nesensohn, C; Bryde, D; Ochieng, E and Fearon, D (2014) Maturity and maturity models in lean construction. Construction Economics and Building, 14(1), pp. 45-59. ISSN 2204-9029

Nesensohn C, B D J and Fearon D J, O E G (2013) Combining lean construction with maturity models. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Neve, H H; Wandahl, S; Kaeseler, S M and Tandrup, A (2017) Integrating IPD and exploring potentials. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175

Nguyen, Q N; Bui, N D N and Bui, D N (2026) Assessing lean construction principles for reducing environmental impact and enhancing cost efficiency and productivity in earthwork operations in Vietnam. Construction Economics and Building, 26(1), ISSN 2204-9029

Ninan, J; Mantha, B R K and Kesavan, B (2025) Human-centred cybersecurity for critical infrastructure: The case of the Florida water plant hack. Engineering, Construction and Architectural Management, 32(13), pp. 547-569. ISSN 0969-9988

Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(3), pp. 622-639. ISSN 1471-4175

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Ogunbiyi, O; Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88-107. ISSN 1471-4175

Ogunbiyi, O E (2014) Implementation of the lean approach in sustainable construction: a conceptual framework. PhD thesis, University of Central Lancashire, UK.

Okafor, C C; Ani, U S and Ugwu, O (2022) Evaluation of supply chain management lapses in nigeria’s construction industry. International Journal of Construction Education and Research, 18(2), pp. 103-122. ISSN 1557-8771

Omer, M M; Rahman, R A; Fauzi, M A and Almutairi, S (2025) Key competencies for identifying construction activities that produce recyclable materials: A competency gap analysis. Built Environment Project and Asset Management, 15(3), pp. 699-716. ISSN 2044-124X

Omotayo, T S; Awuzie, B and Lovelin, O (2023) Synergising continuous improvement with circular economy for advancing innovation in the construction sector: A text mining approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Orstavik, F and Harty, C (2017) The unexplored brutality of performance recipes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ouma, L A; Castronovo, F; Rupinder, K and Leicht, R (2026) Assessment instrument for lean journeys in integrated project delivery: Lean learning health assessment (llha). Engineering, Construction and Architectural Management, 33(15), pp. 47-71. ISSN 0969-9988

Pan, W and Pan, M (2023) Rethinking lean synergistically in practice for construction industry improvements. Engineering, Construction and Architectural Management, 30(7), pp. 2669-2690. ISSN 0969-9988

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Pandithawatta, T P W S I; Zainudeen, N and Perera, C S R (2020) An integrated approach of lean-green construction: Sri Lankan perspective. Built Environment Project and Asset Management, 10(2), pp. 200-214. ISSN 2044-124X

Parameswaran, A and Ranadewa, K A T O (2024) Learning-to-learn sand cone model integrated lean learning framework for construction industry. Smart and Sustainable Built Environment, 13(4), pp. 856-882. ISSN 2046-6099

Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X

Pasquire, C; Ballard, G; Zimina, D and Pasquire, C L (2011) Applying lean thinking in commercial management. Journal of Financial Management of Property and Construction, 16(1), pp. 64-72. ISSN 1366-4387

Pasquire, C and Salvatierra-Garrido, J (2011) Introducing the concept of first and last value to aid lean design: Learning from social housing projects in Chile. Architectural Engineering and Design Management, 7(2), pp. 128-138. ISSN 1745-2007

Patching, A; Skitmore, M; Rusch, R and Lester, D (2024) Case study of the collaborative design of an integrated BIM, IPD and lean university education program. International Journal of Construction Management, 24(7), pp. 799-808. ISSN 1562-3599

Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988

Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), pp. 102-23. ISSN 1557-8771

Polat, F and Demirkesen, S (2025) Measuring the impact of lean implementation on BIM and project success: Case of construction firms. Engineering, Construction and Architectural Management, 32(9), pp. 5839-5862. ISSN 0969-9988

Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X

Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029

Power, W; Sinnott, D and Lynch, P (2022) Accelerating construction project delivery using agile's integrated system of principles and methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029

Pratama, L A (2023) Immersive visualization intervention on pull planning. PhD thesis, University of Washington, USA.

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364

Pérez, C T and Costa, D (2018) Developing a taxonomy of transportation waste in construction production processes. Built Environment Project and Asset Management, 8(5), pp. 434-448. ISSN 2044-124X

Rad, Mahyar Habibi (2022) Impact of lean construction on contractor performance and organisational resilience in post-disaster infrastructure projects. PhD thesis, University of New South Wales, Australia.

Raisbeck, P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(1), pp. 216-228. ISSN 0969-9988

Ramani, P V and Lingan, L K (2022) Developing a lean model to reduce the design process cost of gas insulated switchgear foundation using value stream mapping–a case study. International Journal of Construction Management, 22(4), pp. 669-677. ISSN 1562-3599

Ranadewa, K; Sandanayake, Y G and Siriwardena, M (2021) Enabling lean through human capacity building: An investigation of small and medium contractors. Built Environment Project and Asset Management, 11(4), pp. 594-610. ISSN 2044-124X

Rashidian, S; Drogemuller, R and Omrani, S (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. Architectural Engineering and Design Management, 20(6), pp. 1454-1470. ISSN 1745-2007

Rashidian, S; Drogemuller, R; Omrani, S and Banakar, F (2024) A review of the interrelationships and characteristics of building information modeling, integrated project delivery and lean construction maturity models. Smart and Sustainable Built Environment, 13(3), pp. 584-608. ISSN 2046-6099

Rashidian, Sara (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. PhD thesis, Queensland University of Technology, Australia.

Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), pp. 63-85. ISSN 1823-6499

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175

Rooke, J A; Koskela, L and Seymour, D (2007) Producing things or production flows? Ontological assumptions in the thinking of managers and professionals in construction. Construction Management and Economics, 25(10), pp. 1077-1085. ISSN 1466433X

Rosenbaum, S; Toledo, M and González, V (2014) Improving environmental and production performance in construction projects using value-stream mapping: Case study. Journal of Construction Engineering and Management, 140(2): 04013045, ISSN 0733-9364

Rosli, M F; Muhammad Tamyez, P F and Zahari, A R (2023) The effects of suitability and acceptability of lean principles in the flow of waste management on construction project performance. International Journal of Construction Management, 23(1), pp. 114-125. ISSN 1562-3599

Rozenfeld, O; Sacks, R and Rosenfeld, Y (2009) 'Chaste': Construction hazard assessment with spatial and temporal exposure. Construction Management and Economics, 27(7), pp. 625-638. ISSN 1466433X

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Rybkowski, Z K; Arroyo, P and Parrish, K (2022) Assessment of current target value design practices: Consistencies and inconsistencies of application. Construction Management and Economics, 40(7-8), pp. 598-617. ISSN 01446193

Sacks, R (2016) What constitutes good production flow in construction? Construction Management and Economics, 34(9), pp. 641-656. ISSN 01446193

Sacks, R; Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(7), pp. 529-539. ISSN 0733-9364

Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364

Sacks, R and Harel, M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(8), pp. 869-881. ISSN 1466433X

Sacks, R; Koskela, L; Dave, B A and Owen, R (2010) Interaction of lean and building information modeling in construction. Journal of Construction Engineering and Management, 136(9), pp. 968-980. ISSN 0733-9364

Sacks, R and Partouche, R (2010) Empire State Building project: Archetype of "mass construction". Journal of Construction Engineering and Management, 136(6), pp. 702-710. ISSN 0733-9364

Sacks, R; Rozenfeld, O and Rosenfeld, Y (2009) Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management, 135(8), pp. 726-736. ISSN 0733-9364

Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193

Sacks, R; Treckmann, M and Rozenfeld, O (2009) Visualization of work flow to support lean construction. Journal of Construction Engineering and Management, 135(12), pp. 1307-1315. ISSN 0733-9364

Sage, D; Dainty, A and Brookes, N (2012) A strategy-as-practice exploration of lean construction strategizing. Building Research & Information, 40(2), pp. 221-230. ISSN 0961-3218

Saini, M (2015) A framework for transferring and sharing tacit knowledge in construction supply chains within lean and agile processes. PhD thesis, University of Salford, UK.

Saini, M; Arif, M and Kulonda, D J (2018) Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes. Construction Innovation, 18(1), pp. 64-89. ISSN 1471-4175

Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175

Salvatierra-Garrido, J (2012) Conceptualising value for construction: experience from social housing projects in Chile. PhD thesis, Loughborough University, UK.

Sarden, Y and Stehn, L (2006) Industrialisation as a tool for reducing uncertainty in construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sarhan, J; Xia, B; Fawzia, S; Karim, A and Olanipekun, A (2018) Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry. Construction Innovation, 18(2), pp. 246-272. ISSN 1471-4175

Sarhan, J G; Xia, B; Fawzia, S and Karim, A (2017) Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69. ISSN 2204-9029

Sarhan, J G; Xia, B; Fawzia, S; Karim, A; Olanipekun, A O and Coffey, V (2020) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry. Engineering, Construction and Architectural Management, 27(1), pp. 1-23. ISSN 0969-9988

Sarhan, Jamil Ghazi I (2018) Development of a lean construction framework for the Saudi Arabian construction industry. PhD thesis, Queensland University of Technology, Australia.

Sarhan, S and Fox, A (2013) Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Construction Economics and Building, 13(1), pp. 23-35. ISSN 2204-9029

Sarhan, S and Pretlove, S (2021) Lean and sustainable construction: State of the art and future directions. Construction Economics and Building, 21(3), pp. 1-10. ISSN 2204-9029

Sari, K (2019) A framework for lean implementation in infrastructure construction in the UK. PhD thesis, University of Salford, UK.

Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.

Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364

Seymour, D; Shammas-Toma, M and Clark, L (1997) Limitations of the use of tolerances for communicating design requirements to site. Engineering, Construction and Architectural Management, 4(1), pp. 3-22. ISSN 0969-9988

Shammas-Toma, M; Seymour, D and Clark, L (1998) Obstacles to implementing total quality management in the UK construction industry. Construction Management and Economics, 16(2), pp. 177-192. ISSN 01446193

Sheikhkhoshkar, M; Bril El Haouzi, H; Aubry, A and Hamzeh, F (2024) An advanced exploration of functionalities as the underlying principles of construction control metrics. Smart and Sustainable Built Environment, 13(3), pp. 644-676. ISSN 2046-6099

Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364

Shewchuk, J P and Guo, C (2012) Panel stacking, panel sequencing, and stack locating in residential construction: Lean approach. Journal of Construction Engineering and Management, 138(9), pp. 1006-1016. ISSN 0733-9364

Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599

Shurrab, J and Hussain, M (2018) An empirical study of the impact of lean on the performance of the construction industry in UAE. Journal of Engineering, Design and Technology, 16(5), pp. 694-710. ISSN 1726-0531

Silva, E N; Brasil de Brito Mello, L C and Pinto, G O (2023) Challenges for lean construction adoption in the Brazilian industry: A study in construction companies, universities and class organizations. Construction Innovation, 23(5), pp. 1130-1150. ISSN 1471-4175

Silva, Edson Neves da (2021) Proposal for a management system integrating the principles of lean construction with the aspects of quality, safety, environment and occupational health management, focusing on small civil construction companies. PhD thesis, Universidade Federal Fluminense, Brazil.

Simu, K and Lidelöw, H (2019) Middle managers' perceptions of operations strategies at construction contractors. Construction Management and Economics, 37(6), pp. 351-366. ISSN 01446193

Singh, A (2002) Lean engineering for mass housing: Design, manufacture and site erection. Journal of Construction Research, 3(1), pp. 97-122. ISSN 1609-9451

Singh, A; Kumar, V; Mittal, A and Verma, P (2024) Identifying critical challenges to lean construction adoption. Construction Innovation, 24(1), pp. 67-105. ISSN 1471-4175

Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364

Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.

Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599

Sweis, G J; Hiyassat, M and Al-Hroub, F F (2016) Assessing lean conformance by first-grade contractors in the Jordanian construction industry. Construction Innovation, 16(4), pp. 446-459. ISSN 1471-4175

Tawfiq, O H (2007) Doing contracting differently. PhD thesis, University of Bristol, UK.

Tezel, A and Aziz, Z (2017) Benefits of visual management in construction: Cases from the transportation sector in England. Construction Innovation, 17(2), pp. 125-157. ISSN 1471-4175

Tezel, A and Aziz, Z (2017) Visual management in highways construction and maintenance in England. Engineering, Construction and Architectural Management, 24(3), pp. 486-513. ISSN 0969-9988

Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364

Thomas, H R; Horman, M J; Minchin Jr, R E and Chen, D (2003) Improving labor flow reliability for better productivity as lean construction principle. Journal of Construction Engineering and Management, 129(3), pp. 251-261. ISSN 0733-9364

Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364

Tommelein, I D (2015) Journey toward lean construction: Pursuing a paradigm shift in the AEC industry. Journal of Construction Engineering and Management, 141(6): 04015005, ISSN 0733-9364

Tommelein, I D (2022) Work density method for takt planning of construction processes with nonrepetitive work. Journal of Construction Engineering and Management, 148(12): 04022134, ISSN 0733-9364

Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Architectural Engineering and Design Management, 7(2), pp. 85-101. ISSN 1745-2007

Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364

Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364

Unnikrishnan, S and Sudhakumar, J (2025) Identification of wastes and its causes in Indian construction industry based on lean construction practices. International Journal of Construction Management, 25(5), pp. 562-571. ISSN 1562-3599

Venu Jaya, S.; Swarnakar, V.; Acquaye, A.; Khalfan, M. and El Fadel, M. (2026) Unlocking 3r-driven value engineering potential in sustainable construction: An empirical analysis of drivers, challenges, benefits, tools and techniques. Journal of Engineering, Design and Technology, 24(6), ISSN 1726-0531

Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364

Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029

Wang, J; Shou, W; Wang, X and Wu, P (2016) Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction. Construction Management and Economics, 34(12), pp. 859-874. ISSN 01446193

Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.

Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364

Wang, Y; Thangasamy, V K; Tiong, R L K and Zhang, L (2022) Improved workflow for precast element design based on BIM and lean construction. Journal of Construction Engineering and Management, 148(8): 04022065, ISSN 0733-9364

Warcup, R (2015) Successful paths to becoming a lean organization in the construction industry. PhD thesis, Utah State University, USA.

Ward, S A (2015) Critical success factors for lean construction intervention. PhD thesis, University of Dundee, UK.

Watkins, M; Mukherjee, A; Onder, N and Mattila, K (2009) Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. Journal of Construction Engineering and Management, 135(7), pp. 657-667. ISSN 0733-9364

Winch, G M (2003) Models of manufacturing and the construction process: The genesis of re-engineering construction. Building Research & Information, 31(2), pp. 107-118. ISSN 0961-3218

Winch, G M (2006) Towards a theory of construction as production by projects. Building Research & Information, 34(2), pp. 164-174. ISSN 0961-3218

Wolbers, M; Evans, R J E; Holmes, M; Pasquire, C L and Price, A D F (2005) Construction management and lean thinking in highways maintenance. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Xiao, L; Mokhtar, N A and Sulaiman, M K A M (2025) Enhancing profitability and cost efficiency in China's construction industry. Construction Economics and Building, 25(3-4), pp. 1-21. ISSN 2204-9029

Yang, X L (2010) Research on general contracter and subcontractor cooperative management in construction. PhD thesis, Harbin Institute of Technology, China.

Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(6): 04024048, ISSN 0733-9364

Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364

Yuan, Z; Chang, Y; Chen, Y; Wang, Y; Huang, W and Chen, C (2024) Simulating and optimizing precast wall lifting in prefabricated building construction. Engineering, Construction and Architectural Management, 31(6), pp. 2437-2456. ISSN 0969-9988

Yuan, Z; Fang, Y; Hong, J; Zhang, Q; Zhang, Z and Ni, G (2022) Coupling relationship between capabilities and benefits of lean construction for precast buildings from a multivariable moderation perspective. Journal of Construction Engineering and Management, 148(5): 04022011, ISSN 0733-9364

Yuan, Z; Li, Z; Lei, Z; Yang, Y; Zhang, W; Lin, W and Cao, L (2025) Enhancing the production performance of prefabricated buildings through the integrated optimization of precast component layout and worker allocation. Journal of Construction Engineering and Management, 151(2): 04024200, ISSN 0733-9364

Yusof, I H M; An, M and Barghi, M H (2015) Integration of lean construction considerations into design process of construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Zeng, N; Ye, X; Liu, Y and König, M (2024) BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment. Engineering, Construction and Architectural Management, 31(8), pp. 3069-3096. ISSN 0969-9988

Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality. PhD thesis, University of Bath, UK.

Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599

Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364

Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.

This list was generated on Sat Aug 22 02:06:05 2026 UTC.