Items with Index Term: key performance indicator

Number of items: 227.

Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.

AbouMoemen, A A (2022) A BIM maturity-KPI assessment framework for a UK public sector local authority client. PhD thesis, University of Salford, UK.

Abu Samra, S; Ahmed, M; Hammad, A and Zayed, T (2018) Multiobjective framework for managing municipal integrated infrastructure. Journal of Construction Engineering and Management, 144(1): 04017091, ISSN 0733-9364

Aggor, K K (2017) Relationship between budget and project success factors in the Ghanaian building construction sector. PhD thesis, Walden University, USA.

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Akinnola, P (2021) Improving project performance on construction projects through stakeholder management-an action research inquiry. PhD thesis, University of Liverpool, UK.

Al-Hashimy, H N H; Yao, J; Pitchay, A A and Hussein, W N (2026) Leveraging computerized accounting information systems for sustainable construction: The role of digital practices, eco-innovation, and organizational sustainability culture in enhancing project performance. Journal of Construction Engineering and Management, 152(5): 04026042, ISSN 0733-9364

Aliyu, A A (2014) Product stewardship as a novel sustainability pathway for the UK precast concrete industry. PhD thesis, Loughborough University, UK.

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry. PhD thesis, Brunel University, UK.

Alsamarraie, M M; Yousif, O S and Ghazali, F E M (2025) Procurement integrity: Best practices for PPP projects in Iraq and Malaysia. Construction Economics and Building, 25(3-4), pp. 289-310. ISSN 2204-9029

Alsamarraie, M M and Ghazali, F (2023) Evaluation of organizational procurement performance for public construction projects: Systematic review. International Journal of Construction Management, 23(14), pp. 2499-2508. ISSN 1562-3599

Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364

Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.

Alsulamy, S; Wamuziri, S and Taylor, M (2012) Evaluation of key metrics for measurement of project performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Amarkhil, Q and Elwakil, E (2021) Constraints and opportunities facing construction organization in post-conflict condition in Afghanistan. Journal of Financial Management of Property and Construction, 26(3), pp. 301-318. ISSN 1366-4387

Amarkhil, Q and Elwakil, E (2022) Construction organization success strategy in post-conflict environment. International Journal of Construction Management, 22(4), pp. 701-710. ISSN 1562-3599

Ameyaw, E E; Edwards, D J; Kumar, B; Thurairajah, N; Owusu-Manu, D G and Oppong, G D (2023) Critical factors influencing adoption of blockchain-enabled smart contracts in construction projects. Journal of Construction Engineering and Management, 149(3): 04023003, ISSN 0733-9364

Amos, D; Au-Yong, C P and Musa, Z N (2020) Developing key performance indicators for hospital facilities management services: A developing country perspective. Engineering, Construction and Architectural Management, 27(9), pp. 2715-2735. ISSN 0969-9988

Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988

Anjomshoa, E (2024) Key performance indicators of construction companies in branding products and construction projects for success in a competitive environment in Iran. Engineering, Construction and Architectural Management, 31(5), pp. 2151-2175. ISSN 0969-9988

Ansell, M; Evans, R; Holmes, M; Price, A and Pasquire, C (2009) Collaborative working in highways major maintenance projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 59-67. ISSN 17514312

Anthony Jnr, B (2025) Sustainable mobility governance in smart cities for urban policy development: A scoping review and conceptual model. Smart and Sustainable Built Environment, 14(3), pp. 649-671. ISSN 2046-6099

Awad, R (2018) Investigation into the effectiveness of construction interventions on the performance of emergency departments within NSW and QLD Health. PhD thesis, University of Newcastle, Australia.

Aziz, Z; Alzaabi, E and Syazli Fathi, M (2023) Prioritisation of resilience criteria and performance indicators for road emergencies crisis response: An analytic hierarchy process (AHP) approach. Journal of Financial Management of Property and Construction, 28(2), pp. 178-205. ISSN 1366-4387

Babar, S; Thaheem, M J and Ayub, B (2017) Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3): 04016104, ISSN 0733-9364

Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ball, M and Chambers, M (2009) An incentivisation scheme for a major transportation infrastructure project in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Bapat, H; Sarkar, D and Gujar, R (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India. International Journal of Construction Management, 23(12), pp. 2077-2086. ISSN 1562-3599

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.

Bassioni, H A (2004) A framework for measuring business performance in construction contracting organisations. PhD thesis, Loughborough University, UK.

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Besklubova, S; Zhong, R Y and Tan, B Q (2025) An integrated model of a prefabrication hub feasibility assessment: A Hong Kong case. International Journal of Construction Management, 25(11), pp. 1300-1312. ISSN 1562-3599

Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364

Bingol, B N and Polat, G (2020) Framework for evaluating quality performances of subcontractors: Case of Turkish contractors. Journal of Construction in Developing Countries, 25(1), pp. 163-179. ISSN 1823-6499

Brand, M C and Uher, T (2010) Follow-up empirical study of the performance of the New South Wales construction industry security of payment legislation. International Journal of Law in the Built Environment, 2(1), pp. 7-25. ISSN 1756-1450

Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.

Butcher, D C A and Sheehan, M J (2010) Excellent contractor performance in the UK construction industry. Engineering, Construction and Architectural Management, 17(1), pp. 35-45. ISSN 0969-9988

Castillo, T; Alarcón, L F and Salvatierra, J L (2018) Effects of last planner system practices on social networks and the performance of construction projects. Journal of Construction Engineering and Management, 144(3): 04017120, ISSN 0733-9364

Castillo Campoverde, T O (2018) Multidimensional analysis of the interaction between the organization, management pratices and performance in construction. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Chan, A P C; Scott, D and Chan, A P L (2004) Factors affecting the success of a construction project. Journal of Construction Engineering and Management, 130(1), pp. 153-155. ISSN 0733-9364

Chen, L and Manley, K (2014) Validation of an instrument to measure governance and performance on collaborative infrastructure projects. Journal of Construction Engineering and Management, 140(5): 04014006, ISSN 0733-9364

Chesworth, B (2015) Is the concept of zero harm an achievable goal? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Cleary, J (2024) Data driven insights into building project performance and outcomes through advanced data analytics. PhD thesis, Arizona State University, USA.

Conzatti, A; Fosas De Pando, D; Chater, B and Coley, D (2025) Are simple models for natural ventilation suitable for shelter design? Buildings & Cities, 6(1), pp. 158-181. ISSN 2632-6655

Cooper, J; Lee, A and Jones, K (2020) Sustainable built asset management performance indicators and attributes: A UK social housing case study example. International Journal of Building Pathology and Adaptation, 38(3), pp. 508-522. ISSN 23984708

Cox, R F; Issa, R R A and Ahrens, D (2003) Management's perception of key performance indicators for construction. Journal of Construction Engineering and Management, 129(2), pp. 142-151. ISSN 0733-9364

Dahalan, N H; Rahman, R A; Ahmad, S W and Che Ibrahim, C K I (2025) Public monitoring of environmental management plan implementation in road construction projects: Key performance indicators. Journal of Engineering, Design and Technology, 23(3), pp. 766-791. ISSN 1726-0531

Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Public assessment for environmental management plan implementation: Comparative study of performance indicators of road and highway construction projects. Journal of Construction Engineering and Management, 150(7): 05024006, ISSN 0733-9364

Dang, C N and Le-Hoai, L (2016) Critical success factors for implementation process of design-build projects in Vietnam. Journal of Engineering, Design and Technology, 14(1), pp. 17-32.

Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988

Dawood, N; Sikka, S; Marasini, R and Dean, J (2006) Development of key performance indicators to establish the benefits of 4D planning. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Deep, A; Nayyer, M I and Annamalai, T R (2025) When sauce for the goose is not sauce for the gander—the divergent impact of transparency law in infrastructure procurement: Evidence from EPC and PPP road projects in India. Construction Management and Economics, 43(11), pp. 922-937. ISSN 0144-6193

Deng, F (2015) Performance measurement system: attributes, effects and context in UK construction firms. PhD thesis, University College London, UK.

Ding, Z; Zuo, J; Wang, J and Zillante, G (2016) Searching for niche market for engineering consultants: Case of regional supervision systems in China. Engineering, Construction and Architectural Management, 23(5), pp. 622-637. ISSN 0969-9988

Doukari, O; Kassem, M; Scoditti, E; Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: The case of three demonstration sites in different European countries. Construction Innovation, 24(1), pp. 365-383. ISSN 1471-4175

Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ekyalimpa, Ronald (2015) A distributed simulation approach for contractor company performance management in the construction industry. PhD thesis, University of Alberta, Canada.

Elhegazy, H; Ebid, A; Mahdi, I; Haggag, S and Abdul-Rashied, I (2021) Implementing QFD in decision making for selecting the optimal structural system for buildings. Construction Innovation, 21(2), pp. 345-360. ISSN 1471-4175

Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.

Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.

Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531

Farrokhshad, M; Chan, P W and Blackwell, P (2016) Opening up risk management through goffman's dramaturgical approach. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Fayek, A R and Golabchi, A (2022) Framework for identification of performance metrics for research and development collaborations: Construction innovation centre. Built Environment Project and Asset Management, 12(5), pp. 837-852. ISSN 2044-124X

Fernie, S; Leiringer, R and Thorpe, T (2006) Change in construction: A critical perspective. Building Research & Information, 34(2), pp. 91-103. ISSN 0961-3218

Galotti, V (2025) An exploration of design-build risk and project profitability in the architecture, engineering and construction sector. PhD thesis, University of Colorado at Boulder, USA.

George, K M (2019) Key performance indicators' effects on public sector infrastructure project efficiency in Grenada. DPA thesis, Walden University, USA.

Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099

Ghanbaripour, Amir (2020) Improving the project delivery success of Australian construction project management practice. PhD thesis, Bond University, Australia.

Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988

Good, Tammy L (2023) Manager performance on public construction projects: A descriptive analysis study. DBA thesis, Keiser University (Florida), USA.

Gosling, J; Naim, M; Towill, D; Abouarghoub, W and Moone, B (2015) Supplier development initiatives and their impact on the consistency of project performance. Construction Management and Economics, 33(5-6), pp. 390-403. ISSN 01446193

Gosling, J; Naim, M; Towill, D and Moone, B (2014) The impact of supplier development initiatives on key performance indicators. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Gottsche, J; Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(1), pp. 46-60. ISSN 01446193

Gruneberg, S and Murdoch, I (2011) Specialist contractors' views: Testing the NSCC State of Trade Quarterly Report results against market conditions. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gunduz, M and Al-Naimi, N H (2022) Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management, 29(5), pp. 2073-2105. ISSN 0969-9988

Gunduz, M; Naji, K and Maki, O (2025) A framework for evaluating campus facility management performance in light of project critical success factors using a multidimensional fuzzy logic approach. Engineering, Construction and Architectural Management, 32(3), pp. 1715-1738. ISSN 0969-9988

Gunduz, M; Sirin, O and Al Nawaiseh, H M (2024) Assessment of critical project success factors for management of pavement construction using the Delphi approach. Journal of Construction Engineering and Management, 150(4): 04024020, ISSN 0733-9364

Gyadu-Asiedu, W (2009) Assessing construction project performance in Ghana: modelling practitioners' and clients perspectives. PhD thesis, Eindhoven University of Technology, Netherlands.

Haponava, T and Al-Jibouri, S (2010) Influence of process performance during the construction stage on achieving end-project goals. Construction Management and Economics, 28(8), pp. 853-869. ISSN 1466433X

Hasanain, F A (2022) A BIM-Mostadam plug-in design and evaluation model. PhD thesis, University of Florida, USA.

Hassanain, M A; Sanni-Anibire, M O; Mahmoud, A S and Hamida, M B (2020) Design guidelines for the functional efficiency of laboratory facilities. Architectural Engineering and Design Management, 16(2), pp. 115-130. ISSN 1745-2007

He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193

He, Q; Wang, T; Chan, A P C and Xu, J (2021) Developing a list of key performance indictors for benchmarking the success of construction megaprojects. Journal of Construction Engineering and Management, 147(2): 04020164, ISSN 0733-9364

Horta, I M; Camanho, A S and Da Costa, J M (2010) Performance assessment of construction companies integrating key performance indicators and data envelopment analysis. Journal of Construction Engineering and Management, 136(5), pp. 581-594. ISSN 0733-9364

Horta, I M; Camanho, A S and Lima, A F (2013) Design of performance assessment system for selection of contractors in construction industry e-marketplaces. Journal of Construction Engineering and Management, 139(8), pp. 910-917. ISSN 0733-9364

Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364

Huynh, T T M; Dang, C N; Le-Hoai, L; Pham, A D and Nguyen, T D (2020) Proposing a strategy map for coastal urban project success using the balanced scorecard method. Engineering, Construction and Architectural Management, 27(10), pp. 2993-3030. ISSN 0969-9988

Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988

Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X

Issa, D (2016) Understanding performance measurement in private prisons: A complexity perspective approach. PhD thesis, University of Manchester, UK.

Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988

Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(4), pp. 334-345. ISSN 0969-9988

Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.

Jonsson, H and Rudberg, M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Construction Innovation, 17(3), pp. 381-403. ISSN 1471-4175

Kaluarachchi, Y and Jones, K (2004) Improving the delivery of social housing in UK- using the Amphion initiative as a case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kaluarachchi, Y D and Jones, K (2007) Monitoring of a strategic partnering process: The Amphion experience. Construction Management and Economics, 25(10), pp. 1053-1061. ISSN 1466433X

Khanzadi, M; Sheikhkhoshkar, M and Banihashemi, S (2020) BIM applications toward key performance indicators of construction projects in Iran. International Journal of Construction Management, 20(4), pp. 305-320. ISSN 1562-3599

Killingsworth, J; Mehany, M H and Kim, J (2021) Using accounting ratios to measure construction industry lag. Journal of Financial Management of Property and Construction, 26(2), pp. 181-200. ISSN 1366-4387

Kirkham, R J and Boussabaine, A H (2000) Developing a framework for whole of life costing in the national health service estate. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kismet, B and Colakoglu, M B (2026) Developing a building-scale circularity indicator through fuzzy analytical hierarchy process and gini index-based circularity calculation methods. International Journal of Construction Management, 26(6), pp. 994-1016. ISSN 1562-3599

Kumaraswamy, M; Mahesh, G; Mahalingam, A; Loganathan, S and Kalidindi, S N (2017) Developing a clients' charter and construction project KPIs to direct and drive industry improvements. Built Environment Project and Asset Management, 7(3), pp. 253-270. ISSN 2044-124X

Lam, T Y M and Gale, K S (2026) Construction framework process: A qualitative investigation of behaviour change drivers and project outcomes. Construction Innovation, 26(1), pp. 83-96. ISSN 1471-4175

Lam, T Y M (2022) Driving sustainable construction development through post-contract key performance indicators and drivers. Smart and Sustainable Built Environment, 11(3), pp. 483-499. ISSN 2046-6099

Langston, C (2013) Development of generic key performance indicators for PMBOK® using a 3D project integration model. Construction Economics and Building, 13(4), pp. 78-91. ISSN 2204-9029

Langston, C (2014) Construction efficiency: A tale of two developed countries. Engineering, Construction and Architectural Management, 21(3), pp. 320-335. ISSN 0969-9988

Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988

Lavy, S; Garcia, J A; Scinto, P and Dixit, M K (2014) Key performance indicators for facility performance assessment: Simulation of core indicators. Construction Management and Economics, 32(12), pp. 1183-1204. ISSN 01446193

Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: A case study. Construction Management and Economics, 22(1), pp. 25-34. ISSN 01446193

Le Masurier, J W (2001) Developing the observational method as a systematic approach to uncertainty management. PhD thesis, University of Bristol, UK.

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lees, M A (2009) Measuring the value of engagement between higher education and industry and practice in the built environment. PhD thesis, University of Salford, UK.

Lemma, M; Tarsi, M and Carbonari, A (2025) Development of a framework to track life safety levels of occupants in the event of a fire in buildings. Architectural Engineering and Design Management, 21(4), pp. 681-704. ISSN 1745-2007

Lin, G (2009) Measuring the performance of value management studies in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lin, G; Shen, G Q; Sun, M and Kelly, J (2011) Identification of key performance indicators for measuring the performance of value management studies in construction. Journal of Construction Engineering and Management, 137(9), pp. 698-706. ISSN 0733-9364

Liu, W; Chan, A P C; Debrah, C and Darko, A (2026) Evaluating project success for emergency healthcare infrastructure based on the cloud matter-element model. Journal of Construction Engineering and Management, 152(5): 04026038, ISSN 0733-9364

Liu, W; Chan, A P C; Chan, M W; Darko, A and Oppong, G D (2025) Key performance indicators for hospital planning and construction: A systematic review and meta-analysis. Engineering, Construction and Architectural Management, 32(5), pp. 3375-3406. ISSN 0969-9988

Lonsdale, J and Lucas, C (2019) The influence of key performance indicators on relationship and performance of joint venture construction projects in the UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Lützkendorf, T and Lorenz, D (2005) Sustainable property investment: Valuing sustainable buildings through property performance assessment. Building Research & Information, 33(3), pp. 212-234. ISSN 0961-3218

Ma, Y (2011) A semiotic framework for buildings performance assessment. PhD thesis, University of Reading, UK.

Madushika, W H S; Perera, B A K S; Ekanayake, B J and Shen, G Q P (2020) Key performance indicators of value management in the Sri Lankan construction industry. International Journal of Construction Management, 20(2), pp. 157-168. ISSN 1562-3599

Mahmoud, A S; Sanni-Anibire, M O; Hassanain, M A and Ahmed, W (2019) Key performance indicators for the evaluation of academic and research laboratory facilities. International Journal of Building Pathology and Adaptation, 37(2), pp. 208-230. ISSN 23984708

Mahmoud, S Y and Scott, S (2002) The development and use of key performance indicators by the UK construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Mani, S.; Karunasena, G.; Hosseini, M. R. and Hasan, A. (2026) Building circularity performance model: A weighted multi-level assessment framework aligned with ISO standards. Smart and Sustainable Built Environment, ISSN 2046-6099

Mansour, H; Aminudin, E; Omar, B and Al-Sarayreh, A (2022) Development of an impact-on-performance index (ipi) for construction projects in Malaysia: A Delphi study. International Journal of Construction Management, 22(11), pp. 2003-2012. ISSN 1562-3599

Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): An application in precast concrete building products industry. Construction Innovation, 6(2), pp. 97-120. ISSN 1471-4175

Marocco, M; Cacciaguerra, E and Garofolo, I (2024) An operational framework for implementing digital systems in public administrations' processes in the design phase. Architectural Engineering and Design Management, 20(3), pp. 411-430. ISSN 1745-2007

Marx, H J (2011) Key performance indicators measuring contractor satisfaction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Masood, R; Roy, K; Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(6): 04024044, ISSN 0733-9364

Mbugua, L M (2000) A methodology for evaluating the business performance of UK construction companies. PhD thesis, University of Wolverhampton, UK.

Mbugua, L M; Holt, G D and Olomolaiye, P O (2000) An evaluation of international frameworks for business self-assessment and their application in UK construction. Journal of Financial Management of Property and Construction, 5(3), pp. 135-147. ISSN 1366-4387

Mellado, F; Lou, E C W and Becerra, C L C (2020) Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement. Engineering, Construction and Architectural Management, 27(2), pp. 579-608. ISSN 0969-9988

Mladenovic, G; Vajdic, N; Wündsch, B and Temeljotov-Salaj, A (2013) Use of key performance indicators for PPP transport projects to meet stakeholders' performance objectives. Built Environment Project and Asset Management, 3(2), pp. 228-249. ISSN 2044-124X

Mohammad Ahmad, A; Rodriguez Trejo, S; Hafeez, M A; Dawood, N; Kassem, M and Naji, K K (2023) Drivers for energy analysis towards a BIM-enabled information flow. Smart and Sustainable Built Environment, 12(3), pp. 507-533. ISSN 2046-6099

Moussa, A; Ezzeldin, M and El-Dakhakhni, W (2025) Machine learning and optimization strategies for infrastructure projects risk management. Construction Management and Economics, 43(8), pp. 557-582. ISSN 0144-6193

Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.

Müller, C C and Elzomor, M (2025) Fostering a sustainable built environment by preparing a construction engineering workforce with sustainability key performance indicators. Journal of Construction Engineering and Management, 151(6): 04025056, ISSN 0733-9364

Naji, K; Gunduz, M and Salat, F (2021) Assessment of preconstruction factors in sustainable project management performance. Engineering, Construction and Architectural Management, 28(10), pp. 3060-3077. ISSN 0969-9988

Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364

Naji, K K; Gunduz, M and Maki, O (2023) Development of a campus facility management operational framework using a modified Delphi method. Journal of Construction Engineering and Management, 149(7): 04023052, ISSN 0733-9364

Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364

Naveed, F and Khan, K I A (2022) Investigating the influence of information complexity on construction quality: A systems thinking approach. Engineering, Construction and Architectural Management, 29(3), pp. 1427-1448. ISSN 0969-9988

Ngacho, C (2013) An assessment of the performance of public sector construction projects: An empirical study of projects funded under constituency development fund (CDF) in Western Province Kenya. PhD thesis, University of Delhi, India.

Noktehdan, M; Shahbazpour, M; Zare, M R and Wilkinson, S (2019) Innovation management and construction phases in infrastructure projects. Journal of Construction Engineering and Management, 145(2): 04018135, ISSN 0733-9364

Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165

Ofori, G (2001) Indicators for measuring construction industry development in developing countries. Building Research & Information, 29(1), pp. 40-50. ISSN 0961-3218

Ogwueleka, A C and Udoudoh, F P (2018) The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(3), pp. 247-259. ISSN 1562-3599

Okeke, R.; Garuba, B. and Orji, F. (2025) The role of team temporal leadership in driving construction project success: A meta-analytical review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 82-107. ISSN 1751-4304

Okoroh, M I; Goulding, J S and Walker, S (2006) Outsourcing local authorities housing stocks. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Okudan, O; Budayan, C and Dikmen, I (2020) Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Okudan, O; Budayan, C and Dikmen, I (2021) Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Olatunde, N A; Fidelis, I M; Awodele, I A and Adebayo, B O (2024) Stakeholders prioritization of key performance indicators on public and private tertiary educational projects in Osun State, Nigeria. International Journal of Building Pathology and Adaptation, 42(5), pp. 881-892. ISSN 2398-4708

O’Connell, S; Reynders, G; Seri, F; Sterling, R and Keane, M M (2020) A standardised flexibility assessment methodology for demand response. International Journal of Building Pathology and Adaptation, 38(1), pp. 20-37. ISSN 23984708

Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.

Palaneeswaran, E and Kumaraswamy, M M (2003) Knowledge mining of information sources for research in construction management. Journal of Construction Engineering and Management, 129(2), pp. 182-191. ISSN 0733-9364

Perera, B A K S; Perera, C S R and Jayalath, C (2022) Contractor’s perspective on key performance indicators of cost control in Asian, middle eastern, and European construction projects. International Journal of Construction Education and Research, 18(3), pp. 217-233. ISSN 1557-8771

Phillips, S; Dainty, A and Price, A (2007) The development of a tender analysis support tool for use in social housing best value procurement. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Phillips, S; Martin, J; Dainty, A and Price, A (2007) Uncertainty in best value decision making. Journal of Financial Management of Property and Construction, 12(2), pp. 63-72. ISSN 1366-4387

Ping, T; Pan, W and Zhang, Z (2025) Developing a systematic performance measurement framework for benchmarking steel modular building construction. Engineering, Construction and Architectural Management, 32(3), pp. 1837-1856. ISSN 0969-9988

Praharaj, S and Han, H (2019) Building a typology of the 100 smart cities in India. Smart and Sustainable Built Environment, 8(5), pp. 400-414. ISSN 2046-6099

Praticò, F G and Giunta, M (2018) Proposal of a key performance indicator for railway track based on LCC and rams analyses. Journal of Construction Engineering and Management, 144(2): 04017104, ISSN 0733-9364

Rathnayake, A and Middleton, C (2023) Systematic review of the literature on construction productivity. Journal of Construction Engineering and Management, 149(6): 03123005, ISSN 0733-9364

Raval, P; Sarkar, D and Solanki, A (2026) A comparative analysis of the application of fuzzy ANP and fuzzy TOPSIS methods for integrated building information modelling (BIM) and blockchain adoption in the construction sector. International Journal of Construction Management, 26(4), pp. 694-717. ISSN 1562-3599

Raval, P and Sarkar, D (2025) Evaluation and optimization of key performance indicators affecting adoption of the building information modeling and blockchain technology in Indian construction sector through fuzzy TOPSIS and genetic algorithm. International Journal of Construction Management, 25(9), pp. 981-995. ISSN 1562-3599

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction. DEng thesis, George Washington University, USA.

Riel, Paul E (2015) Campus planners' preferences for residence hall project delivery methods. EdD thesis, University of North Florida, USA.

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2001) Linking knowledge management strategy to business performance in construction organizations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Rodriguez-Labajos, L; Thomson, C and O'Brien, G (2016) Exploring the attributes and KPIs adopted by international healthcare providers to measure the performance of their estates at the strategic level. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Rooney P, A R (2013) A case study of changing procurement practices on delivery of highways projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Salvado, F; de Almeida, N M and Azevedo, Á V E (2019) Historical analysis of the economic life-cycle performance of public school buildings. Building Research & Information, 47(7), pp. 813-832. ISSN 0961-3218

Salvatierra, J L; Gálvez, M Á; Bastías, F; Castillo, T; Herrera, R F and Alarcón, L F (2019) Developing a benchmarking system for architecture design firms. Engineering, Construction and Architectural Management, 26(1), pp. 139-152. ISSN 0969-9988

Saradara, S M; Lara, J C F; Swarnakar, V; Rauf, A; Qureshi, R; Fadel, M E and Khalfan, M M A (2024) Construction and demolition waste management in the United Arab Emirates through the 3R principle. Engineering, Construction and Architectural Management, 31(13), pp. 430-454. ISSN 0969-9988

Sarhan, S and Fox, A (2013) Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Construction Economics and Building, 13(1), pp. 23-35. ISSN 2204-9029

Sarkar, D and Solanki, A (2024) Application of Internet of Things and Cloud Computing for Evaluation of Key Performance Indicators for Indian Construction Projects through Consistent Fuzzy Preference Relations Approach. Journal of Construction in Developing Countries, 29(2), pp. 83-115. ISSN 1823-6499

Sebastian, R; Claeson-Jonsson, C and Di Giulio, R (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(4), pp. 394-409. ISSN 1471-4175

Seraphim, D l (2006) Implementing TQM principles in a construction company in the UAE. PhD thesis, University of South Wales, UK.

Sezer, A A (2013) Indicators of environmental and productivity performance for building refurbishment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X

Sharp, M and Jones, K (2012) Perceived inefficiency in social housing maintenance. Construction Innovation, 12(4), pp. 414-428. ISSN 1471-4175

Shi, X.; Ke, Y.; Wu, X.; Gong, X. and Zhang, J. (2026) How performance-based are China's public-private partnership road projects? A KPI framework and scoring method. Built Environment Project and Asset Management, 14, pp. 1-21. ISSN 2044-124X

Shohet, I M (2003) Building evaluation methodology for setting maintenance priorities in hospital buildings. Construction Management and Economics, 21(7), pp. 681-692. ISSN 01446193

Shohet, I M (2006) Key performance indicators for strategic healthcare facilities maintenance. Journal of Construction Engineering and Management, 132(4), pp. 345-352. ISSN 0733-9364

Shohet, I M; Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(2), pp. 219-228. ISSN 01446193

Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.

Simon, M (2010) The commitment to corporate social responsibility of construction companies in the United Kingdom and Germany. PhD thesis, University of Dundee, UK.

Skibniewski, M J and Ghosh, S (2009) Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. Journal of Construction Engineering and Management, 135(10), pp. 965-978. ISSN 0733-9364

Smits, W; van Buiten, M and Hartmann, T (2017) Yield-to-BIM: Impacts of BIM maturity on project performance. Building Research & Information, 45(3), pp. 336-346. ISSN 0961-3218

Solanki, A; Sarkar, D and Kapdi, P (2024) Evaluation of key performance indicators of internet of things and cloud computing for infrastructure projects in Gujarat, India through consistent fuzzy preference relations approach. International Journal of Construction Management, 24(7), pp. 707-721. ISSN 1562-3599

Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.

Straub, A D (2010) Competences of maintenance service suppliers servicing end-customers. Construction Management and Economics, 28(11), pp. 1187-1195. ISSN 1466433X

Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction. PhD thesis, University of Florida, USA.

Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.

Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Tennant, S (2007) Site management teams and project performance in the UK construction industry. PhD thesis, University of Strathclyde, UK.

Tennant, S and Langford, D (2005) Construction management teams & project performance: A diagnostic toolkit. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tennant, S and Langford, D (2006) Team performance measurement: Let's reward teamwork. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Tennant, S and Langford, D (2008) The construction project balanced scorecard. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Thomas, Douglas N (2015) The increase of timber use in residential construction in Australia: Towards a sustainable residential development model. PhD thesis, University of Technology Sydney, Australia.

Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X

Ugwu, O O and Haupt, T C (2005) Key performance indicators for infrastructure sustainability: a comparative study between Hong Kong and South Africa. Journal of Engineering, Design and Technology, 3(1), pp. 30-43. ISSN 1726-0531

Williams T, W M R P (2013) Target cost contracts: Adopting innovative incentive mechanisms to improve the project delivery process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Winch, G M and Carr, B (2001) Processes, maps and protocols: Understanding the shape of the construction process. Construction Management and Economics, 19(5), pp. 519-531. ISSN 01446193

Wong, K. K. W.; Chan, J. H. L. and Ng, T. S. T. (2025) KPIs for engineering and construction contract of new engineering contract in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 29-40. ISSN 1751-4304

Wu, Chee Shien Jeremy (2008) A comparative study of three international construction firms: Knowledge management infrastructures for optimising organisations' learning. PhD thesis, University of Sydney, Australia.

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Ye, Z; Kapogiannis, G; Tang, S; Zhang, Z; Jimenez-Bescos, C and Yang, T (2025) Influence of an integrated value-based asset condition assessment in built asset management. Construction Innovation, 25(2), pp. 248-269. ISSN 1471-4175

Yeung, F Y (2007) Developing a partnering performance index (PPI) for construction projects: A fuzzy set theory approach. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X

Yeung, J F Y; Chan, A P C; Chan, D W M; Chiang, Y H and Yang, H (2013) Developing a benchmarking model for construction projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), pp. 705-716. ISSN 0733-9364

Yeung, J F Y; Chan, A P C; Chan, D W M and Li, L K (2007) Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics, 25(12), pp. 1219-1237. ISSN 1466433X

Yeung, J F Y; Chan, D W M; Chan, J H L and Lok, K L (2023) Development of a composite project performance index for the New Engineering Contract (necppi) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 23(16), pp. 2804-2817. ISSN 1562-3599

Yu, T W (2007) A value management framework for systematic identification and precise representation of client requirements in the briefing process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yuan, J; Li, X; Ke, Y; Xu, W; Xu, Z and Skibniewski, M (2020) Developing a building information modeling-based performance management system for public-private partnerships. Engineering, Construction and Architectural Management, 27(8), pp. 1727-1762. ISSN 0969-9988

Yuan, J; Zeng, A Y; Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money. Construction Management and Economics, 27(3), pp. 253-270. ISSN 1466433X

Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.

Zhang, Y; Lei, Z; Han, S; Bouferguene, A and Al-Hussein, M (2020) Process-oriented framework to improve modular and offsite construction manufacturing performance. Journal of Construction Engineering and Management, 146(9): 04020116, ISSN 0733-9364

Zhou, L (2009) Achieving sustainable development through the private finance initiative procurement process. PhD thesis, Oxford Brookes University, UK.

Zhou, L; Keivani, R and Kurul, E (2013) Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(3), pp. 232-250. ISSN 1366-4387

Zuppa, D (2009) Model for developing trust in construction management. PhD thesis, University of Florida, USA.

af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

de Pinho Matos, Raquel Valente (2024) Building condition assessment applied to public buildings. PhD thesis, Universidade de Aveiro, Portugal.

e Silva, H B G (2024) Mitigating information asymmetry in the 5g era: Unveiling practices that restrict users' internet access. PhD thesis, Universidade do Porto, Portugal.

van Niekerk, J; Wium, J and de Koker, N (2022) The value of data from construction project site meeting minutes in predicting project duration. Built Environment Project and Asset Management, 12(5), pp. 738-753. ISSN 2044-124X

This list was generated on Sat Aug 22 01:27:59 2026 UTC.