Items with Index Term: judgment

Number of items: 306.

Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England. PhD thesis, University of Strathclyde, UK.

Abdalla, S B; Mushtaha, E; Rashid, M; Opoku, A; Hamad, R; Dweiri, F and Elmualim, A (2023) Pre-design CSFs (critical success factors) of building projects for dubai's development boom. Built Environment Project and Asset Management, 13(3), pp. 359-374. ISSN 2044-124X

Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.

Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work. PhD thesis, University of Michigan, USA.

Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364

Abu Dabous, S (2008) A decision support methodology for rehabilitation management of concrete bridges. PhD thesis, Concordia University, Canada.

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis. PhD thesis, Brunel University, UK.

Adamtey, S and Kereri, J O (2023) Risk management in residential projects in the United States: Implementation status, evaluation techniques and barriers. Journal of Engineering, Design and Technology, 21(5), pp. 1481-1500. ISSN 1726-0531

Adegoriola, M I; Lai, J H K; Yung, E H K and Chan, E H W (2024) Development of a significant index model for assessing heritage building maintenance management challenges. Engineering, Construction and Architectural Management, 31(8), pp. 3398-3428. ISSN 0969-9988

Afzal, F; Yunfei, S; Sajid, M and Afzal, F (2020) Integrated priority decision index for risk assessment in chaos: Cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(4), pp. 825-849. ISSN 0969-9988

Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364

Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.

Al-Ameen, H A (2012) Antitrust: the person-centred approach. PhD thesis, Swansea University, UK.

Al-Dughaither, K A (1996) International construction financing strategies: Influential factors and decision-making. PhD thesis, Carnegie Mellon University, USA.

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.

Al-Humaidi, H M (2016) Construction projects bid or not bid approach using the fuzzy technique for order preference by similarity FTOPSIS method. Journal of Construction Engineering and Management, 142(12): 04016068, ISSN 0733-9364

Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988

Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.

Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.

Alexander, D; Hallowell, M and Gambatese, J (2017) Precursors of construction fatalities. I: Iterative experiment to test the predictive validity of human judgment. Journal of Construction Engineering and Management, 143(7): 04017023, ISSN 0733-9364

Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364

Almalki, M; Salman, B; Salem, O and Ammoury, M (2026) A decision-support framework for accelerated wastewater pipeline construction: Integrating economic, social, environmental, and technical criteria. Journal of Construction Engineering and Management, 152(3): 04025263, ISSN 0733-9364

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Alqasmi, Khalaf (2019) An investigation of unethical practices in the Saudi Arabian construction industry. PhD thesis, RMIT University, Australia.

Alshawi, M; Engström, S and Hedgren, E (2012) Sustaining inertia? Construction clients' decision-making and information-processing approach to industrialized building innovations. Construction Innovation, 12(4), pp. 393-413. ISSN 1471-4175

Altan, E and Işık, Z (2024) Digital twins in lean construction: A neutrosophic AHP – BOCR analysis approach. Engineering, Construction and Architectural Management, 31(12), pp. 5029-5056. ISSN 0969-9988

Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.

Andrić, J M; Wang, J; Zou, P X W; Zhang, J and Zhong, R (2019) Fuzzy logic-based method for risk assessment of belt and road infrastructure projects. Journal of Construction Engineering and Management, 145(12): 4019082, ISSN 0733-9364

Antino, P (2021) Interpreting the Party Wall etc Act 1996 and the implications for building below ground. PhD thesis, Anglia Ruskin University, UK.

Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.

Arroyo, P; Tommelein, I D and Ballard, G (2015) Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design. Journal of Construction Engineering and Management, 141(1): 04014063, ISSN 0733-9364

Asli, R A; Wedawatta, G; Hedges, P and Park, K (2016) Building environmental assessment scheme for residential building in Brunei. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry. PhD thesis, University of Alberta, Canada.

Aydin, Y C and Mirzaei, P A (2022) A novel mathematical model to measure individuals' perception of the symmetry level of building facades. Architectural Engineering and Design Management, 18(3), pp. 261-278. ISSN 1745-2007

Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364

Badawy, M.; Ibrahim, A.; Hamdy, K. and Aljohani, A. (2026) A comparative analysis of barriers to prefabricated construction adoption in emerging economies: A dual fuzzy-cb-SEM and PLS-SEM approach. International Journal of Construction Management, 26(9), pp. 1978-1998. ISSN 1562-3599

Bai, L; Wang, Z; Wang, H; Huang, N and Shi, H (2021) Prediction of multiproject resource conflict risk via an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 2857-2883. ISSN 0969-9988

Bai, L; Zhao, X; Kang, S; Ma, Y and Zhang, B (2025) Dynamic assessment of stakeholder conflict risk for R&D project portfolios. Engineering, Construction and Architectural Management, 32(4), pp. 2342-2368. ISSN 0969-9988

Bakheet, M T (1995) Contractors' risk assessment system. PhD thesis, Georgia Institute of Technology, USA.

Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training. PhD thesis, Iowa State University, USA.

Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364

Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.

Beauregard, M A (2019) Maintaining performance evidence-based educational facility management through a decision-support tool leveraging prior empirical research. PhD thesis, Arizona State University, USA.

Besiktepe, D (2021) Multi-criteria decision-making approach for building maintenance in facility management. PhD thesis, Colorado State University, USA.

Bhagat, G and Jha, K N (2023) Stage-wise evaluation of integrity risks in public works procurement in India. International Journal of Construction Management, 23(16), pp. 2818-2829. ISSN 1562-3599

Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Birnie, J W (1993) A behavioural study using decision analysis of building cost prediction by chartered quantity surveyors. PhD thesis, Ulster University, UK.

Blackman, I Q and Picken, D H (2010) Height and construction costs of residential high-rise buildings in Shanghai. Journal of Construction Engineering and Management, 136(11), pp. 1169-1180. ISSN 0733-9364

Blanche, K G (1996) Personal and professional characteristics, perceptions of barriers, and strategies of women in different levels of the superintendency. EdD thesis, University of Maryland, College Park, USA.

Bogusz, B (2013) Regulating public/private interests in town and village greens. International Journal of Law in the Built Environment, 5(1), pp. 21-39. ISSN 17561469

Bond, S and Dermisi, S (2017) Using GIS to measure the impact of the Canterbury earthquakes on house prices in Christchurch, NZ. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 123-138. ISSN 1759-5916

Bostancioglu, E (2021) Double skin façade assessment by fuzzy AHP and comparison with AHP. Architectural Engineering and Design Management, 17(1-2), pp. 110-130. ISSN 1745-2007

Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.

Brown, R (2009) Legal incoherence and the extra-constitutional law of regulatory takings: The Canadian experience. International Journal of Law in the Built Environment, 1(3), pp. 179-193. ISSN 1756-1450

Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.

Cassar, R and Martin, H (2016) How to choose a project manager under uncertainty. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Chakhrit, A and Chennoufi, M (2023) Failure mode, effects and criticality analysis improvement by using new criticality assessment and prioritization based approach. Journal of Engineering, Design and Technology, 21(5), pp. 1545-1567. ISSN 1726-0531

Champion, R (2011) A consideration of recovery of prolongation costs in a construction context. International Journal of Law in the Built Environment, 3(3), pp. 237-251. ISSN 1756-1450

Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chang, S H (2013) Evaluating essential liabilities on design professionals under earthquake's impact: Taiwan experience. Engineering, Construction and Architectural Management, 20(2), pp. 181-194. ISSN 0969-9988

Chen, X; Ding, Y; Cory, C A; Hu, Y; Wu, K J and Feng, X (2021) A decision support model for subcontractor selection using a hybrid approach of QFD and AHP-improved grey correlation analysis. Engineering, Construction and Architectural Management, 28(6), pp. 1780-1806. ISSN 0969-9988

Cheng, E W L; Li, H and Fox, P (2007) Job performance dimensions for improving final project outcomes. Journal of Construction Engineering and Management, 133(8), pp. 592-599. ISSN 0733-9364

Chetwin, M (2011) Comparative analysis of some aspects of assessment of damages for contractual breaches in England and Wales, Australia and New Zealand. International Journal of Law in the Built Environment, 3(2), pp. 113-125. ISSN 1756-1450

Choi, H H; Cho, H N and Seo, J W (2004) Risk assessment methodology for underground construction projects. Journal of Construction Engineering and Management, 130(2), pp. 258-272. ISSN 0733-9364

Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(1), pp. 3-11. ISSN 1466433X

Coelho Maran, A C (2010) Multicriteria decision support system to delineate water resources planning and management regions. PhD thesis, Colorado State University, USA.

Craig, R W and Barnes, W C (2007) Professional employees' exposure to risk of negligence claims from the client. Construction Management and Economics, 25(7), pp. 811-819. ISSN 1466433X

Dalal, J; Mohapatra, P K J and Mitra, G C (2010) Prioritization of rural roads: AHP in group decision. Engineering, Construction and Architectural Management, 17(2), pp. 135-158. ISSN 0969-9988

Dawson, P J (1997) A hierarchical approach to the management of construction project risk. PhD thesis, University of Nottingham, UK.

Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.

Diekmann, J E and Featherman, W D (1998) Assessing cost uncertainty: Lessons from environmental restoration projects. Journal of Construction Engineering and Management, 124(6), pp. 445-451. ISSN 0733-9364

Diekmann, J E and Kim, M P (1992) Superchange: Expert system for analysis of changes claims. Journal of Construction Engineering and Management, 118(2), pp. 399-411. ISSN 0733-9364

Ding, Z; Nie, W; Tam, V W Y and Illankoon, C (2025) Consumer purchase intention for extrinsic and intrinsic cues of construction and demolition waste recycled products. Engineering, Construction and Architectural Management, 32(6), pp. 3565-3586. ISSN 0969-9988

Dixon, M (2013) Title by registration or conquest: Interpreting the Land Registration Act 2002 in England and Wales. International Journal of Law in the Built Environment, 5(3), pp. 194-206. ISSN 17561469

Do, Q; Moriyani, M A; Le, C and Le, T (2023) Cost-weighted tf-idf: A novel approach for measuring highway project similarity based on pay items' cost composition and term frequency. Journal of Construction Engineering and Management, 149(8): 04023069, ISSN 0733-9364

Dominguez, D (2008) Handling future uncertainty: Strategic planning for the infrastructure sector. DSc thesis, ETH Zürich, Switzerland.

Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel company v. John laing. Construction Management and Economics, 25(7), pp. 701-708. ISSN 1466433X

Doukakis, J P (2024) A case study of a mechanics of solids course in civil engineering education. PhD thesis, Rutgers The State University of New Jersey, USA.

Dulung, A Z A (2007) Computer aided decision support system for the selection of subcontractors in building refurbishment works. PhD thesis, National University of Singapore, Singapore.

Durdyev, S; Mohandes, S R; Mahdiyar, A and Ismail, S (2022) What drives clients to purchase green building? The cybernetic fuzzy analytic hierarchy process approach. Engineering, Construction and Architectural Management, 29(10), pp. 4015-4039. ISSN 0969-9988

Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.

Ehoff Jr., C E (1992) Removed from scheduled maintenance: An inquiry into the problems threatening the survival of United States elevator manufacturers. PhD thesis, Golden Gate University, USA.

Ekstrom, M A (2002) Accounting for rater credibility when evaluating construction industry service providers. PhD thesis, Stanford University, USA.

El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.

Elbarkouky, M M G; Fayek, A R; Siraj, N B and Sadeghi, N (2016) Fuzzy arithmetic risk analysis approach to determine construction project contingency. Journal of Construction Engineering and Management, 142(12): 04016070, ISSN 0733-9364

English, J and Abrahams, S (2015) Inclusion of HIV/AIDS awareness in core curricula for construction economics and management students. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Erdis, E; Genç, O and Aydınlı, S (2021) Mobbing on construction professionals: Causes, consequences, and precautions. International Journal of Construction Management, 21(10), pp. 987-996. ISSN 1562-3599

Erfani, A (2023) Data-driven risk modeling for infrastructure projects using artificial intelligence techniques. PhD thesis, University of Maryland, College Park, USA.

Erfani, A; Ma, Z; Cui, Q and Baecher, G B (2023) Ex post project risk assessment: Method and empirical study. Journal of Construction Engineering and Management, 149(2): 04022174, ISSN 0733-9364

Espada, R; Apan, A and McDougall, K (2017) Vulnerability assessment of urban community and critical infrastructures for integrated flood risk management and climate adaptation strategies. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 375-411. ISSN 1759-5916

Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

Fu, J; Tian, H; Song, L; Li, M; Bai, S and Ren, Q (2021) Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Engineering, Construction and Architectural Management, 28(7), pp. 2023-2041. ISSN 0969-9988

Fujino, T (1994) The development of a method for investigating construction site accidents using fuzzy fault tree analysis. PhD thesis, Ohio State University, USA.

Fung, I W H and Tam, V W Y (2013) Occupational health and safety of older construction workers (aged 55 or above): Their difficulties, needs, behaviour and suitability. International Journal of Construction Management, 13(3), pp. 15-34. ISSN 1562-3599

Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructive investment decisions. Construction Management and Economics, 22(4), pp. 373-383. ISSN 01446193

Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.

Ghafoori, M and Abdallah, M (2025) Multi-criteria decision support model for material and supplier selection in the construction industry. International Journal of Construction Management, 25(4), pp. 409-418. ISSN 1562-3599

Ghansah, F A and Lu, W (2025) Cyber-physical systems and digital twins for "cognitive building" in the construction industry. Construction Innovation, 25(3), pp. 787-818. ISSN 1471-4175

Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988

Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364

Goodarzi, M (2021) A post-construction evaluation of long-term success in LEED-certified residential communities. PhD thesis, Michigan State University, USA.

Goswami, M; Singh, J and Kumar, V (2016) An enterprise based decision support system for engineering aggregate selection: A case study. Journal of Engineering, Design and Technology, 14(4), pp. 851-873.

Goyal, S; Routroy, S and Singhal, A (2019) Analyzing environment sustainability enablers using fuzzy DEMATEL for an Indian steel manufacturing company. Journal of Engineering, Design and Technology, 17(2), pp. 300-329. ISSN 1726-0531

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.

Gunhan, S and Arditi, D (2005) International expansion decision for construction companies. Journal of Construction Engineering and Management, 131(8), pp. 928-937. ISSN 0733-9364

Gunhan, S M (2003) Foreign market entry decision model for construction companies. PhD thesis, Illinois Institute of Technology, USA.

Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364

Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.

Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(2), pp. 171-192. ISSN 1609-9451

Hashemi, H; Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management, 137(8), pp. 600-608. ISSN 0733-9364

Hashim, H M; Ng, Y G; Talib, O and Md Tamrin, S B (2019) Content validation of flood disaster preparedness action (FDPA) items among small and medium enterprises (SME) business. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 2-13. ISSN 1759-5916

He, S; Li, J; Li, M and Antwi-Afari, M F (2026) Modeling and analyzing workers' hazard perception in construction equipment operations: A hierarchical Bayesian cognitive modeling approach integrating multisource data. Journal of Construction Engineering and Management, 152(5): 04026054, ISSN 0733-9364

He, C; Liu, M; Hsiang, S M; Pierce, N; Megahed, S and Godfrey, A (2025) An ontological knowledge-driven smart contract framework for implicit bridge preservation decision making. Journal of Construction Engineering and Management, 151(4): 04025008, ISSN 0733-9364

He, X; Liu, R and Anumba, C J (2021) Data-driven insights on the knowledge gaps of conceptual cost estimation modeling. Journal of Construction Engineering and Management, 147(2): 04020165, ISSN 0733-9364

Hedgren, E and Stehn, L (2014) The impact of clients' decision-making on their adoption of industrialized building. Construction Management and Economics, 32(1-2), pp. 126-145. ISSN 01446193

Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364

Herrera-Pérez, V.; Rubio-Romero, J. C.; Fuertes, A.; Salguero-Caparrós, F. and del Carmen Pardo-Ferreira, M. (2026) Investigating the impact of medication consumption on crane-related occupational health and safety risks in construction projects. Journal of Construction Engineering and Management, 152(8): 04026116, ISSN 0733-9364

Herrmann, M R; Brumby, D P; Oreszczyn, T and Gilbert, X M P (2018) Does data visualization affect users' understanding of electricity consumption? Building Research & Information, 46(3), pp. 238-250. ISSN 0961-3218

Hetherton, T and Charlson, J (2015) When statutes collide: Potential recovery of own party adjudication costs. International Journal of Law in the Built Environment, 7(3), pp. 214-230. ISSN 1756-1450

Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hinze, J (2005) Use of trench boxes for worker protection. Journal of Construction Engineering and Management, 131(4), pp. 494-500. ISSN 0733-9364

Holt, G D (1995) A methodology for predicting the performance of construction contractors. PhD thesis, University of Wolverhampton, UK.

Hosny, O; Nassar, K and Esmail, Y (2013) Prequalification of Egyptian construction contractors using fuzzy-AHP models. Engineering, Construction and Architectural Management, 20(4), pp. 381-405. ISSN 0969-9988

Hosseini, M H; Aibinu, A; Chileshe, N and Arashpour, M (2017) Eleven years of arcom: Bibliometric mapping of studies published between 2005 and 2016. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Hua, X; Zhang, S; Shi, X and Zhang, Y (2025) Differences in risk analysis between workers and managers: Study from the perspective of neuroscience. Journal of Construction Engineering and Management, 151(7): 04025079, ISSN 0733-9364

Huang, X; Zhang, J; Meng, X; Wang, R; Li, J; Tao, X; Yang, Z and Li, L (2025) Verifiable safety path planning: Utilizing planar analysis for improved lifting operations. Journal of Construction Engineering and Management, 151(9): 04025123, ISSN 0733-9364

Husam, S; Laishram, B and Johari, S (2024) Determining the extent of attributes contributing to gender inclusion of workers in the construction industry. Journal of Construction Engineering and Management, 150(10): 04024145, ISSN 0733-9364

Ibrahim, A.; Badawy, M. and Hamdy, K. (2026) Modeling interdependent constraints on modular construction: A constraint theory and fuzzy-PLS-SEM approach for developing countries. Journal of Engineering, Design and Technology, 24(3), pp. 734-754. ISSN 1726-0531

Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.

Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364

Jafarzadeh, R; Ingham, J M; Wilkinson, S; González, V and Aghakouchak, A A (2014) Application of artificial neural network methodology for predicting seismic retrofit construction costs. Journal of Construction Engineering and Management, 140(2): 04013044, ISSN 0733-9364

Jelodar, M B; Yiu, T W and Wilkinson, S (2016) Relationship-quality judgment model for construction project procurement: A conjoint measurement. Journal of Construction Engineering and Management, 142(7): 4016012, ISSN 0733-9364

Jones III, R C (1991) An economic analysis of national society of professional engineers versus United States. PhD thesis, University of California, Los Angeles, USA.

Kagan, H A; Leary, D J and Pratter, G E K (1986) Design engineers' responsibilities during construction. Journal of Construction Engineering and Management, 112(3), pp. 394-402. ISSN 0733-9364

Kangari, R and Bakheet, M (2001) Construction surety bonding. Journal of Construction Engineering and Management, 127(3), pp. 232-238. ISSN 0733-9364

Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2661-2686. ISSN 0969-9988

Khallaf, R; Naderpajouh, N and Hastak, M (2018) A systematic approach to develop risk registry frameworks for complex projects. Built Environment Project and Asset Management, 8(4), pp. 334-347. ISSN 2044-124X

Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708

Kim, D. H. and Jeong, J. H. (2026) Development of a decision-making framework to prioritize expressway pavement sections for large-scale repairs. Journal of Construction Engineering and Management, 152(8): 04026106, ISSN 0733-9364

Ko, T; Lee, J and David Jeong, H (2024) Project requirements prioritization through NLP-driven classification and adjusted work items analysis. Journal of Construction Engineering and Management, 150(3): 04023171, ISSN 0733-9364

Kog, Y C and Loh, P K (2012) Critical success factors for different components of construction projects. Journal of Construction Engineering and Management, 138(4), pp. 520-528. ISSN 0733-9364

Komendantova, N; Scolobig, A; Garcia-Aristizabal, A; Monfort, D and Fleming, K (2016) Multi-risk approach and urban resilience. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 114-132. ISSN 1759-5916

Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.

Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.

Kwon, N; Song, K; Lee, H S; Kim, J and Park, M (2018) Construction noise risk assessment model focusing on construction equipment. Journal of Construction Engineering and Management, 144(6): 04018034, ISSN 0733-9364

Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.

Lappalainen, E; Uusitalo, P; Seppänen, O; Peltokorpi, A; Ainamo, A and Reinbold, A (2024) User experiences of situational awareness systems in infrastructure construction. Construction Management and Economics, 42(11-12), pp. 1012-1025. ISSN 01446193

Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364

Lei, Z; Han, S; Bouferguène, A; Taghaddos, H; Hermann, U and Al-Hussein, M (2015) Algorithm for mobile crane walking path planning in congested industrial plants. Journal of Construction Engineering and Management, 141(2): 05014016, ISSN 0733-9364

Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.

Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364

Leung, M y; Wong, M k and Oloke, D (2003) Coping behaviours of construction estimators in stress management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Li, X.; Lin, M.; Chen, J. and Jim, C. Y. (2026) A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models. Engineering, Construction and Architectural Management, 33(7), pp. 5645-5674. ISSN 0969-9988

Li, D; Zhou, H; Zhou, S; Huang, G; Ma, X; Zhao, Y; Wang, W and Ng, S T (2025) An eye-tracking-based approach to evaluate the usability of government portal websites in pilot smart cities. Engineering, Construction and Architectural Management, 32(4), pp. 2369-2396. ISSN 0969-9988

Li, G; Chen, C; Zhang, G and Martek, I (2020) Bid/no-bid decision factors for Chinese international contractors in international construction projects. Engineering, Construction and Architectural Management, 27(7), pp. 1619-1643. ISSN 0969-9988

Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.

Li, X; Zhang, Z; Jim, C Y; Lai, J and Chen, X (2023) Owner-based benefit evaluation of bim applications in China's engineering projects. Engineering, Construction and Architectural Management, 30(9), pp. 4387-4414. ISSN 0969-9988

Li, Y; Nie, X and Chen, S (2007) Fuzzy approach to prequalifying construction contractors. Journal of Construction Engineering and Management, 133(1), pp. 40-49. ISSN 0733-9364

Liang, Houhao (2024) Unmanned ground vehicle-driven indoor monitoring: Enhancing routine data acquisition and on-site deployment. PhD thesis, National University of Singapore, Singapore.

Lo, T Y J (2021) Innovation management in the construction industry: Innovation performance indicators for AECOO organizations. PhD thesis, Stanford University, USA.

Long, W; Wang, X; Liang, Y and Ye, K (2023) Characteristics of collusive practices in bidding: Mixed methods study in China. Journal of Construction Engineering and Management, 149(6): 04023030, ISSN 0733-9364

Lyu, H M; Sun, W J; Shen, S L and Zhou, A N (2020) Risk assessment using a new consulting process in fuzzy AHP. Journal of Construction Engineering and Management, 146(3): 04019112, ISSN 0733-9364

Mahammedi, C.; Mahdjoubi, L.; Booth, C.; Butt, T. E. and Al-mhdawi, M. K. S. (2026) The design and validation of a decision support system (DSS) for the preliminary risk assessment of brownfield sites (prabs). Smart and Sustainable Built Environment, 15(3), pp. 1255-1276. ISSN 2046-6099

Mahdavi, A; Mino-Rodriguez, I; Berger, C; Martínez-Muñoz, I and Wagner, A (2025) An exploration of experts' views on the relative importance of indoor-environmental quality parameters. Building Research & Information, 53(1-2), pp. 3-18. ISSN 0961-3218

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mak, S W K (1992) Risk management in construction: A study of subjective judgments. PhD thesis, London, External, UK.

Mak, S W K; Choy, L H T and ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(2), pp. 92-105. ISSN 1471-4175

Maleyeff, J.; Dande, K.; Srivichaiin, K. and Weidman, D. (2026) Decision support for sustainable building modifications to mitigate climate risk. Construction Innovation, pp. 1-26. ISSN 1471-4175

Marshall, H (2012) Adjudication enforcement: Partial final determinations and insolvency. International Journal of Law in the Built Environment, 4(1), pp. 60-74. ISSN 1756-1450

Martinez, J C (2010) Methodology for conducting discrete-event simulation studies in construction engineering and management. Journal of Construction Engineering and Management, 136(1), pp. 3-16. ISSN 0733-9364

Marzouk, M and Hassouna, M (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation, 19(4), pp. 614-628. ISSN 1471-4175

Mei, X; Zhou, X; Xu, F and Zhang, Z (2023) Human intrusion detection in static hazardous areas at construction sites: Deep learning-based method. Journal of Construction Engineering and Management, 149(1): 04022142, ISSN 0733-9364

Migliaccio, G C; Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous quality improvement techniques for data collection in asset management systems. Journal of Construction Engineering and Management, 140(4): B4013008, ISSN 0733-9364

Milner, A (2011) Contract interpretation: Potential for relaxing the exclusionary rule. International Journal of Law in the Built Environment, 3(3), pp. 205-221. ISSN 1756-1450

Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.

Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599

Mohan, S (1990) Expert systems applications in construction management and engineering. Journal of Construction Engineering and Management, 116(1), pp. 87-99. ISSN 0733-9364

Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364

Morad, A A and Beliveau, Y J (1991) Knowledge-based planning system. Journal of Construction Engineering and Management, 117(1), pp. 1-12. ISSN 0733-9364

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175

Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.

Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.

Munaif, M A (1995) Multiple criteria decision-making in contractor selection and evaluation of construction bids in Saudi Arabia. PhD thesis, University of Missouri - Rolla, USA.

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.

Ndekugri, I; Silverio, A K and Mason, J (2024) Enforcing payment obligations under construction contracts by insolvency proceedings. Journal of Financial Management of Property and Construction, 29(3), pp. 372-387. ISSN 1366-4387

Negash, Y T and Hassan, A M (2020) Construction project success under uncertainty: Interrelations among the external environment, intellectual capital, and project attributes. Journal of Construction Engineering and Management, 146(10): 05020012, ISSN 0733-9364

Nguyen, P H D; Tran, D Q and Lines, B C (2020) Empirical inference system for highway project delivery selection using fuzzy pattern recognition. Journal of Construction Engineering and Management, 146(12): 04020141, ISSN 0733-9364

Nguyen, T H; Shehab, T and Gao, Z (2008) Selecting an architecture-engineering team by using fuzzy set theory. Engineering, Construction and Architectural Management, 15(3), pp. 282-298. ISSN 0969-9988

Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708

Nguyen, V U (1985) Tender evaluation by fuzzy sets. Journal of Construction Engineering and Management, 111(3), pp. 231-243. ISSN 0733-9364

Nordin, A (2013) Constructing component-based systems directly from requirements using incremental composition. PhD thesis, University of Manchester, UK.

Nyongesa, H O; Musumba, G W and Chileshe, N (2017) Partner selection and performance evaluation framework for a construction-related virtual enterprise: A multi-agent systems approach. Architectural Engineering and Design Management, 13(5), pp. 344-364. ISSN 1745-2007

Okudan, O; Budayan, C and Dikmen, I (2020) Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Okudan, O; Budayan, C and Dikmen, I (2021) Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Osuolale, M. D.; Ajisomo, T. and Felkner, J. (2026) Quantifying barriers to sustainable material adoption in emerging markets using fuzzy synthetic evaluation. Smart and Sustainable Built Environment, pp. 1-32. ISSN 2046-6099

Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387

Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988

Panthi, K; Ahmed, S M and Ogunlana, S O (2009) Contingency estimation for construction projects through risk analysis. International Journal of Construction Education and Research, 5(2), pp. 79-94. ISSN 1557-8771

Park, S-B (2003) Study of multicriteria decision-making: Development of a decision model to determine when to conduct nighttime construction road work. PhD thesis, Oregon State University, USA.

Patel, D A; Kikani, K D and Jha, K N (2016) Hazard assessment using consistent fuzzy preference relations approach. Journal of Construction Engineering and Management, 142(12): 04016067, ISSN 0733-9364

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364

Paz, J C; Rozenboim, D; Cuadros, Á; Cano, S and Escobar, J W (2018) A simulation-based scheduling methodology for construction projects considering the potential impacts of delay risks. Construction Economics and Building, 18(2), pp. 41-69. ISSN 2204-9029

Perng, Y-H (1988) An intelligent system approach for construction risk identification. PhD thesis, University of Texas at Austin, USA.

Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.

Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(4), pp. 445-462. ISSN 1471-4175

Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988

Pratt, N (2015) The "by right" defence in village green registration. International Journal of Law in the Built Environment, 7(2), pp. 96-110. ISSN 1756-1450

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364

Qi, L; Zhai, H and Shuang, Q (2026) Attention-driven multiobject tracking for proactive fall safety management in construction. Journal of Construction Engineering and Management, 152(5): 04026052, ISSN 0733-9364

Qiu, W; Ma, P; Peng, Q; Zhao, L; Liu, L and Zhou, F (2024) An evaluation method for multisource information fusion in tunneling water inrush disasters. Journal of Construction Engineering and Management, 150(10): 04024133, ISSN 0733-9364

Quanjel, E M C J (2013) Collaborative design support: workshops to stimulate interaction and knowledge exchange between practitioners. PhD thesis, Eindhoven University of Technology, Netherlands.

Ramzanpour, M; Sharghi, A; Nourtaghani, A and Saleh Sedghpour, B (2023) The reduction of low-income housing stigma with facade features; low- and medium-sized cities. Architectural Engineering and Design Management, 19(3), pp. 250-266. ISSN 1745-2007

Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364

Rostami, A; Sommerville, J; Wong, I L and Lee, C (2014) Using appropriate tools and techniques for risk identification in UK construction's SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Rostamnezhad, M; Nasirzadeh, F; Khanzadi, M; Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: A case study of highway project. Engineering, Construction and Architectural Management, 27(7), pp. 1595-1618. ISSN 0969-9988

Roupé, M (2013) Development and implementations of virtual reality for decision-making in urban planning and building design. PhD thesis, Chalmers University of Technology, Sweden.

Russell, A D; Tran, N and Staub-French, S (2014) Searching for value: Construction strategy exploration and linear planning. Construction Management and Economics, 32(6), pp. 520-547. ISSN 01446193

Russell, J S (1988) A knowledge-based system approach to the contractor prequalification process. PhD thesis, Purdue University, USA.

Sadeghi, M; Mahmoudi, A and Deng, X (2023) Blockchain technology in construction organizations: Risk assessment using trapezoidal fuzzy ordinal priority approach. Engineering, Construction and Architectural Management, 30(7), pp. 2767-2793. ISSN 0969-9988

Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.

Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.

Salvatierra-Garrido, J (2012) Conceptualising value for construction: experience from social housing projects in Chile. PhD thesis, Loughborough University, UK.

Sandberg, R; Räisänen, C; Löwstedt, M and Raidén, A B (2016) Exploring the work practices of site managers as processes of embodiment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Sangiorgio, V; Uva, G and Fatiguso, F (2018) Optimized AHP to overcome limits in weight calculation: Building performance application. Journal of Construction Engineering and Management, 144(2): 04017101, ISSN 0733-9364

Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.

Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),

Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.

Shafei, H; Rahman, R A; Lee, Y S and Che Ibrahim, C K I (2025) Implications of construction 4.0 technologies to enhancing well-being: A fuzzy TOPSIS evaluation. Construction Innovation, 25(1), pp. 131-165. ISSN 1471-4175

Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.

Shapira, A; Simcha, M and Goldenberg, M (2012) Integrative model for quantitative evaluation of safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 138(11), pp. 1281-1293. ISSN 0733-9364

Shehab, T and Noureddine, A (2014) Prioritization model for rehabilitation of public school buildings in California. International Journal of Construction Education and Research, 10(1), pp. 58-75. ISSN 1557-8771

Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364

Shin, K-C (2000) Identification of critical dispute characteristics (CDCs) during construction project operations. PhD thesis, Georgia Institute of Technology, USA.

Sinclair, S (2016) Designing + (dis)assembling disputes: an ethnography of disputes & lawyers in the construction industry. PhD thesis, University of Westminster, UK.

Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 0969-9988

Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364

Skibniewski, M J and Chao, L C (1992) Evaluation of advanced construction technology with AHP method. Journal of Construction Engineering and Management, 118(3), pp. 577-593. ISSN 0733-9364

Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364

Sohoni, P; Ghaffar, A and Jha, K N (2017) Cost optimisation for high-rise buildings considering number of levels of shores and reshores. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364

Sun, N.; Wang, J. and Liao, P. C. (2026) EEG-based neural mechanisms of confidence and metacognition in construction safety hazard recognition. Journal of Construction Engineering and Management, 152(8): 04026127, ISSN 0733-9364

Sun, R; Yan, Q; Zhang, C; Qiao, M and Ren, J (2025) Comprehensive evaluation of grouting effectiveness combining qualitative on-site tests and improved fuzzy integration with entropy weight method: Case study of a mountain tunnel. Journal of Construction Engineering and Management, 151(4): 04025020, ISSN 0733-9364

Tam, C M; Tong, T K L and Lau, C T (2003) ELECTRE III in evaluating performance of construction plants: Case study on concrete vibrators. Construction Innovation, 3(1), pp. 45-61. ISSN 1471-4175

Tam, C M; Tong, T K L; Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), pp. 245-254. ISSN 01446193

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Tan, Y (2006) A case-based reasoning approach to improve risk identification in construction projects. PhD thesis, University of Leeds, UK.

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tang, W; Qiang, M; Duffield, C F; Young, D M and Lu, Y (2007) Risk management in the Chinese construction industry. Journal of Construction Engineering and Management, 133(12), pp. 944-956. ISSN 0733-9364

Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364

Taroun, A (2012) Decision support system (DSS) for construction project risk analysis and evaluation via evidential reasoning (ER). PhD thesis, University of Manchester, UK.

Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364

Thomson, D (2011) A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success. Construction Management and Economics, 29(1), pp. 69-82. ISSN 1466433X

Thörnqvist, C and Woolfson, C (2012) When tender turns tough: Posted workers and the tendering regime in the Swedish construction industry. Construction Management and Economics, 30(7), pp. 525-533. ISSN 1466433X

Tian, S; Abdalla, A; Zhang, G; Tang, Y and Cao, X (2025) Pathways of construction dispute formation in China: A DEMATEL, AISM, and MICMAC-based approach. Journal of Construction Engineering and Management, 151(10): 05025013, ISSN 0733-9364

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364

Tsai, H; Wang, L and Lin, L (2007) A study on improving the ranking procedure for determining the most advantageous tender. Construction Management and Economics, 25(5), pp. 545-554. ISSN 1466433X

Tsai, H; Wang, L C and Lee, J W (2006) Exploration of ranking method of group decision making. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X

Uher, T and Brand, M (2007) A comparative analysis of the operation of 'compulsory rapid adjudication' in New South Wales and New Zealand. Construction Management and Economics, 25(7), pp. 765-775. ISSN 1466433X

Utomo, C and Rahmawati, Y (2020) Agreement options for negotiation on material location decision of housing development. Construction Innovation, 20(2), pp. 209-222. ISSN 1471-4175

Valentin, W S and Vorster, F S (2012) Understanding construction project failure in Southern Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 19-26. ISSN 17514312

Verzobio, A (2020) Supporting rational decision-making in civil engineering. PhD thesis, University of Strathclyde, UK.

Vijayakumar, A.; Mahmood, M. N.; Gurmu, A.; Kamardeen, I. and Alam, S. (2025) Causal relationships among social sustainability indicators for freeways. Construction Innovation, 26(5), pp. 1413-1442. ISSN 1471-4175

Walls, D B (2013) World-class safety program. PhD thesis, Dallas Baptist University, USA.

Wang, J; Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(5): 04024028, ISSN 0733-9364

Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387

Watt, David (2012) Critical contractor selection factors for major projects. PhD thesis, University of New South Wales, Australia.

Wijetunge, J (2010) Assessment of potential tsunamigenic seismic hazard to Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 207-220. ISSN 1759-5916

Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364

Wu, L; Mohamed, E; Jafari, P and Abourizk, S (2023) Machine learning-based Bayesian framework for interval estimate of unsafe-event prediction in construction. Journal of Construction Engineering and Management, 149(11): 04023118, ISSN 0733-9364

Xia, N; Zhong, R; Wu, C; Wang, X and Wang, S (2017) Assessment of stakeholder-related risks in construction projects: Integrated analyses of risk attributes and stakeholder influences. Journal of Construction Engineering and Management, 143(8): 04017030, ISSN 0733-9364

Xu, Y; Chan, A P C and Yeung, J F Y (2010) Developing a fuzzy risk allocation model for PPP projects in China. Journal of Construction Engineering and Management, 136(8), pp. 894-903. ISSN 0733-9364

Yang, J; Shen, P Q; Bourne, L; Ho, C M F and Xue, X (2011) A typology of operational approaches for stakeholder analysis and engagement. Construction Management and Economics, 29(2), pp. 145-162. ISSN 1466433X

Yap, J B H; Abdul-Rahman, H and Wang, C (2018) Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. Journal of Construction Engineering and Management, 144(5): 4018025, ISSN 0733-9364

Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364

Yevu, S K; Yu, A T W; Darko, A and Addy, M N (2021) Evaluation model for influences of driving forces for electronic procurement systems application in Ghanaian construction projects. Journal of Construction Engineering and Management, 147(8): 04021076, ISSN 0733-9364

Yitmen, I; Al-Musaed, A and Yücelgazi, F (2022) Anp model for evaluating the performance of adaptive façade systems in complex commercial buildings. Engineering, Construction and Architectural Management, 29(1), pp. 431-455. ISSN 0969-9988

You, X (2010) Risk analysis in tunneling with imprecise probabilities. PhD thesis, University of Texas at Austin, USA.

Yu, M.; Zhao, J.; Lin, H. and Yuan, M. (2026) Keep company with the wolf, learn to howl: The impact of self-focused collective moral judgment on the misconduct of creative members in construction projects. Journal of Construction Engineering and Management, 152(7): 04026085, ISSN 0733-9364

Yuan, M; Wang, X; Zhang, Z; Lin, H and Yu, M (2024) How does collective moral judgment focus on the self-induce deviant behavior of construction workers? A multilevel investigation. Engineering, Construction and Architectural Management, 31(12), pp. 4809-4830. ISSN 0969-9988

Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531

Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.

Zarghami, S A and Zwikael, O (2024) Buffer allocation in construction projects: a disruption mitigation approach. Engineering, Construction and Architectural Management, 31(10), pp. 3946-3972. ISSN 0969-9988

Zhang, S; Bao, Z; Yu, X; Shi, X; Wang, B and Zhang, Y (2026) How safety knowledge impacts construction workers' risk perception: ERP study. Journal of Construction Engineering and Management, 152(1): 04025234, ISSN 0733-9364

Zhang, J; Li, H; Xia, B; Skitmore, M; Pu, S; Deng, Q and Jin, W (2021) Development of a market-oriented efqm excellence model for analyzing the implementation of quality management in developing countries. International Journal of Construction Management, 21(9), pp. 884-909. ISSN 1562-3599

Zhang, M; Xue, X; Luo, T; Li, M and Tang, X (2024) The supportability evaluation of cross-regional major infrastructure projects based on the combination weighting of the game theory-cloud model. Engineering, Construction and Architectural Management, 31(9), pp. 3679-3705. ISSN 0969-9988

Zhang, P; Lingard, H; Blismas, N; Wakefield, R and Kleiner, B (2015) Work-health and safety-risk perceptions of construction-industry stakeholders using photograph-based q methodology. Journal of Construction Engineering and Management, 141(5): 04014093, ISSN 0733-9364

Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364

Zhao, X; Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(3), pp. 369-384. ISSN 0969-9988

Zhao, X; Wu, P and Wang, X (2018) Risk paths in BIM adoption: Empirical study of China. Engineering, Construction and Architectural Management, 25(9), pp. 1170-1187. ISSN 0969-9988

Zhou, S; Wang, H; Ng, S T; Li, D; Xie, S; Chen, K and Wang, W (2025) Building a construction law knowledge repository to enhance general-purpose large language model performance on domain question-answering: A case of China. Engineering, Construction and Architectural Management, 32(13), pp. 518-546. ISSN 0969-9988

Zhou, Y; Liu, J; Pu, X and Ding, Y (2025) Signaling game analysis of transfer mechanisms of PPP projects: Considering investors' moral hazard and adverse selection behavior. Journal of Construction Engineering and Management, 151(5): 04025030, ISSN 0733-9364

Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.

Zhu, L; Wei, X and Liang, R (2024) Navigating uncertainty: Optimizing contractor selection for megaprojects in group decision-making with multiple criteria. Journal of Construction Engineering and Management, 150(11): 04024157, ISSN 0733-9364

Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.

Zhu, Y; Brigham, J C and Fascetti, A (2025) Lidar-rgb data fusion for four-dimensional uav-based monitoring of reinforced concrete bridge construction: Case study of the fern hollow bridge reconstruction. Journal of Construction Engineering and Management, 151(1): 05024016, ISSN 0733-9364

Zong, Z; Long, T; Ou, Y and Zhang, S (2025) Dual-path influence of risk perception on construction workers' safety participation and the moderating role of mindfulness. Journal of Construction Engineering and Management, 151(1): 04024194, ISSN 0733-9364

de Silva, C (2012) Health and safety: Teaching law, educating for prevention. International Journal of Law in the Built Environment, 4(3), pp. 233-246. ISSN 17561469

Çalışkan, E B (2022) A data-driven requirement elicitation system for pre-project stage. PhD thesis, Middle East Technical University, Turkey.

This list was generated on Sat Aug 22 01:35:34 2026 UTC.