Items with Index Term: interface problem
Al Mousli, M H and El-Sayegh, S M (2016) Assessment of the design-construction interface problems in the UAE. Architectural Engineering and Design Management, 12(5), pp. 353-366. ISSN 1745-2007
Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099
Chritamara, S and Ogunlana, S O (2001) Problems experienced on design and build projects in Thailand. Journal of Construction Procurement, 7(1), pp. 73-93. ISSN 1358-9180
Enshassi, A; Arain, F and Tayeh, B (2012) Major causes of problems between contractors and subcontractors in the Gaza Strip. Journal of Financial Management of Property and Construction, 17(1), pp. 92-112. ISSN 1366-4387
Manoj, G and Shivaji, C Y (2010) Design interface management of airport projects. International Journal of Construction Management, 10(3), pp. 29-44. ISSN 1562-3599
Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499
McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.
Pavitt, T C and Gibb, A G F (1999) Managing organizational interfaces in the cladding supply chain: Initial results from expert interviews. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Pavitt, T C and Gibb, A G F (2003) Interface management within construction: In particular, building facade. Journal of Construction Engineering and Management, 129(1), pp. 8-15. ISSN 0733-9364
Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.
Sha'ar, K. Z.; Assaf, S. A.; Bambang, T.; Babsail, M. and Fattah, A. M. A. E. (2017) Design-construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599
Sha'ar, K Z; Assaf, S A; Bambang, T; Babsail, M and Fattah, A M A E (2017) Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599
Weshah, N A (2015) Developing an interface management (im) model for construction projects. PhD thesis, University of Calgary, Canada.
Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.
Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599
Up a level