Items with Index Term: interactive system
Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.
Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.
Fenis, S M; Diekmann, J E and Huang, P Y (1995) A GIS-based pipeline planning system. Engineering, Construction and Architectural Management, 2(3), pp. 227-238. ISSN 0969-9988
Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364
Mahdavinejad, M; Bemanian, M; Abolvardi, G and Elhamian, S M (2012) Analyzing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 133-147. ISSN 1759-5916
Pooladvand, S; Taghaddos, H; Eslami, A; Nekouvaght Tak, A and Hermann, U (2021) Evaluating mobile crane lift operations using an interactive virtual reality system. Journal of Construction Engineering and Management, 147(11): 04021154, ISSN 0733-9364
Ren, S (1997) GIS-based tools for earthquake risk assessment of point and spatially distributed lifeline systems. PhD thesis, State University of New York at Buffalo, USA.
Sirimewan, Diani Chamathya (2025) Optimising construction and demolition waste handling using computer vision techniques. PhD thesis, Monash University, Australia.
Tavakoli, A (1985) Productivity analysis of construction operations. Journal of Construction Engineering and Management, 111(1), pp. 31-39. ISSN 0733-9364
Wang, F.; Zhou, J. and Zheng, X. (2026) Identification of hydraulic engineering construction accident causes using instruction tuning and structured prompting in large language models. Journal of Construction Engineering and Management, 152(8): 04026122, ISSN 0733-9364
Up a level