Items with Index Term: information processing
Alnuaimi, N T; Chatha, K A and Abdallah, S (2025) Role of big data analytics and information processing capabilities in enhancing transparency and accountability in e-procurement applications. Journal of Engineering, Design and Technology, 23(5), pp. 1729-1750. ISSN 1726-0531
Alruwaythi, O (2017) Influence of engineering information format, demographics, and spatial cognition on craft worker performance. PhD thesis, University of Colorado at Boulder, USA.
Alruwaythi, O F (2017) Influence of engineering information format, demografics and spatial cognition on craft worker performance. PhD thesis, University of Colorado at Boulder, USA.
An, Mi Sun (2024) Framework for interactive, individualized feedback design to improve thinking skills in construction education. PhD thesis, Texas A&M University, USA.
Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.
Baker, T O (2021) An investigation into pricing anomalies and the influence of information processing constraints on forecasts derived from sports betting markets. PhD thesis, University of Southampton, UK.
Brown, C J (1985) A critical analysis of the application of management information systems in the civil engineering construction industry in South Africa. DBA thesis, University of Pretoria, South Africa.
Cao, T.; Zhang, L. and Qian, Q. (2026) For a rainy day: Preventing the escalation of threats into interorganizational relationship conflict through emotional regulation and boundary-spanning roles. Journal of Construction Engineering and Management, 152(7): 04026096, ISSN 0733-9364
Chang, A S and Tien, C C (2006) Quantifying uncertainty and equivocality in engineering projects. Construction Management and Economics, 24(2), pp. 171-184. ISSN 01446193
Chen, B (2018) Contribution of process-technology fit to IT business value: the case of BIM in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Duong, A. T. B.; Ta, T. D.; Truong, D. Q.; Hoang, T. G.; Pham, H.; Hoang, T. H. and Truong Quang, H. (2026) Direct and indirect effect of risk on construction supply chain in disruption era: A service-oriented view. Engineering, Construction and Architectural Management, 33(4), pp. 2995-3024. ISSN 0969-9988
Fenis, S M; Diekmann, J E and Huang, P Y (1995) A GIS-based pipeline planning system. Engineering, Construction and Architectural Management, 2(3), pp. 227-238. ISSN 0969-9988
Ford, D N (2002) Achieving multiple project objectives through contingency management. Journal of Construction Engineering and Management, 128(1), pp. 30-39. ISSN 0733-9364
Gacasan, E M P; Wiggins, M W and Searle, B J (2016) The role of cues in expert project manager sensemaking. Construction Management and Economics, 34(7-8), pp. 492-507. ISSN 01446193
Goodrum, P M (2001) The impact of equipment technology on productivity in the United States construction industry. PhD thesis, University of Texas at Austin, USA.
Goodrum, P M and Gangwar, M (2004) The relationship between changes in equipment technology and wages in the US construction industry. Construction Management and Economics, 22(3), pp. 291-301. ISSN 01446193
Goodrum, P M and Haas, C T (2002) Partial factor productivity and equipment technology change at activity level in U.S. Construction industry. Journal of Construction Engineering and Management, 128(6), pp. 463-472. ISSN 0733-9364
Gowri, K (1990) Knowledge-based system approach to building envelope design. PhD thesis, Concordia University, Canada.
Haksever, A M (1998) Information overload in construction project management. PhD thesis, University of Reading, UK.
Han, Y.; Shen, L. and Yang, J. (2026) Minor adjustments lead to significant improvements: Influence mechanism of construction safety sign information transmission efficiency in the Mandarin context based on information coding processing. Engineering, Construction and Architectural Management, ISSN 0969-9988
Hedgren, E and Stehn, L (2014) The impact of clients' decision-making on their adoption of industrialized building. Construction Management and Economics, 32(1-2), pp. 126-145. ISSN 01446193
Hesse, K A (2006) Development of information communication technologies in construction project management: The relationship between theory and technology and its application to the construction industry, including a retrospective on the development of technology that demonstrates how theory was altered and how practice was influenced. PhD thesis, University College London, UK.
Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures. PhD thesis, Stanford University, USA.
Hua, X; Zhang, S; Shi, X and Zhang, Y (2025) Differences in risk analysis between workers and managers: Study from the perspective of neuroscience. Journal of Construction Engineering and Management, 151(7): 04025079, ISSN 0733-9364
Hua, Y (2017) Cultural dynamics of information communication technology (ICT) adoption in construction. PhD thesis, University of Hong Kong, Hong Kong.
Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry. PhD thesis, Nottingham Trent University, UK.
Kang, F; Shi, Y; Li, J and Zhang, H (2025) Exploring the impacts of leader anger expressions on employee boundary-spanning behavior in construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7217-7235. ISSN 0969-9988
Kang, F; Shi, Y; Li, J and Zhang, H (2025) Impacts of leader anger expressions on newcomer proactive career behavior and work alienation in the construction industry. Engineering, Construction and Architectural Management, 32(6), pp. 3659-3678. ISSN 0969-9988
Kim, C S and Liu, L Y (2007) Cost information model for managing multiple projects. Journal of Construction Engineering and Management, 133(12), pp. 966-974. ISSN 0733-9364
Levander, E; Engström, S; Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(7), pp. 753-764. ISSN 1466433X
Li, H and Love, P E D (1998) Developing a theory of construction problem solving. Construction Management and Economics, 16(6), pp. 721-727. ISSN 01446193
Li, I H Y (2012) The relationship of cultural incongruence and information processing in facilities management in the public health care sector. PhD thesis, University of Hong Kong, Hong Kong.
Li, Y I H; Fellows, R F and Liu, A M M (2008) Directional interaction of organizational culture and structure through information processing theory. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Liang, H; Shi, X; Liu, K and Cong, W (2023) Construction worker response to unsafe coworker behavior: The mediating roles of safety silence and role stress and the moderating role of psychological contract of safety. Journal of Construction Engineering and Management, 149(3): 04022180, ISSN 0733-9364
Liu, Z and Wang, N (2026) The effects of emerging digital technologies on construction project resilience: The mediating role of relational governance. Building Research & Information, 54(1), pp. 118-134. ISSN 0961-3218
Liu, S (2016) An investigation of how information processing impacts boundary spanning activities in managing construction design changes from the perspective of contractors. PhD thesis, University of Hong Kong, Hong Kong.
Mahamadu, A M; Manu, P; Mahdjoubi, L; Booth, C; Aigbavboa, C and Abanda, F H (2020) The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 24-48. ISSN 0969-9988
Mahdjoubi, L (2001) An investigation of computer-generated architectural representations on design decision-tasks. PhD thesis, University of Newcastle upon Tyne, UK.
Meng, Q; Liu, W; Li, Z; Chong, H Y and Li, K (2026) Mindful leadership and construction workers' safety citizenship behavior: A moderated mediation model of team psychological safety, participative safety self-efficacy, and leader-member exchange. Journal of Construction Engineering and Management, 152(2): 04025244, ISSN 0733-9364
Mondragon Solis, Fernando Alberto (2013) Jobsite information processing: Cognitive analysis of construction field managers and applications. PhD thesis, University of Texas at Austin, USA.
Niu, S and Pan, W (2016) Perspectives and practices of collaborative energy design technologies for closing the building energy performance gap. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Oduori, M and Mbuya, T (2009) Wire rope selection for manual winch application. Journal of Engineering, Design and Technology, 7(2), pp. 207-222. ISSN 1726-0531
Pan, J; Anumba, C J and Ren, Z (2004) Potential application of the semantic web in construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Parvar, J; Lowe, D; Emsley, M and Duff, A R (2000) Neural networks as a decision support system for the decision to bid process. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Pietroforte, R (1997) Communication and governance in the building process. Construction Management and Economics, 15(1), pp. 71-82. ISSN 01446193
Poirier, E A; Forgues, D and Staub-French, S (2017) Understanding the impact of BIM on collaboration: A Canadian case study. Building Research & Information, 45(6), pp. 681-695. ISSN 0961-3218
Ramanayaka, C D E; Olatunji, O A and Weerasuriya, A U (2022) Motivating immersive BIM uptake through user attitude: Analysis of initial solution using design science approach. Built Environment Project and Asset Management, 12(4), pp. 630-648. ISSN 2044-124X
Sampson Mamphweli, N and Leroy Meyer, E (2013) Performance monitoring system for a biomass gasifier. Journal of Engineering, Design and Technology, 11(1), pp. 7-18. ISSN 1726-0531
Shi, Y (2020) A working memory investigation of immersive visualization technologies on construction task performance. PhD thesis, University of Florida, USA.
Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Siddiquei, A N; Ahmad, S; Badar, K and Asmi, F (2024) How and when creativity thrives in construction projects: A study of leader's humor. Engineering, Construction and Architectural Management, 31(8), pp. 3377-3397. ISSN 0969-9988
Sinha, S (2006) Skill based framework for measuring complexity of construction projects. PhD thesis, University of Strathclyde, UK.
Smits, W; van Buiten, M and Hartmann, T (2017) Yield-to-BIM: Impacts of BIM maturity on project performance. Building Research & Information, 45(3), pp. 336-346. ISSN 0961-3218
Spencer, Carolyn (2004) Cognitive schemata and project manager regulation of unplanned change: Categorical analysis of structured interview reports. PhD thesis, Griffith University, Australia.
Tang, Y and Yao, H (2023) Watch out for the hidden costs of subcontracting in construction projects: The impacts of subcontractor dispersion. Journal of Construction Engineering and Management, 149(11): 04023113, ISSN 0733-9364
Tenah, K A (1984) Management information organization and routing. Journal of Construction Engineering and Management, 110(1), pp. 101-118. ISSN 0733-9364
Tesfagaber, G (2004) Application of PSL to construction process information specification and exchange. PhD thesis, Loughborough University, UK.
Thabet, W and Lucas, J (2017) Asset data handover for a large educational institution: Case-study approach. Journal of Construction Engineering and Management, 143(11): 05017017, ISSN 0733-9364
Voordijk, H (2001) A cost-benefit analysis of tracking and tracing systems in road construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Wang, P; Haron, N A; Law, T H; Ales@Alias, A H and Qi, Y (2025) Unveiling the mechanisms between project manager leadership competencies and team performance: An empirical study. Journal of Engineering, Design and Technology, 23(6), pp. 1979-2004. ISSN 1726-0531
Wang, D; Huang, R; Qiao, Y; Sheng, Z; Li, K and Zhao, L (2023) How perceived leader-member exchange differentiation affects construction workers' safety citizenship behavior: Organizational identity and felt safety responsibility as mediators. Journal of Construction Engineering and Management, 149(11): 04023110, ISSN 0733-9364
Wang, J; Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(5): 04024028, ISSN 0733-9364
Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451
Wijewickrama, M. K. C. S.; Chileshe, N.; Rameezdeen, R. and Ochoa, J. J. (2026) Application of a Bayesian belief network-based information processing model for quality assurance in demolition waste reverse logistics: Insights from two case studies. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988
Wijewickrama, M K C S; Chileshe, N; Rameezdeen, R and Ochoa, J J (2025) Information processing model for quality assurance in reverse logistics supply chains of demolition waste. Engineering, Construction and Architectural Management, 32(13), pp. 193-212. ISSN 0969-9988
Xu, Y; Wu, H; Chi, M; Lee, C Y; Chong, H Y and Skitmore, M (2026) Blockchain-enabled value co-creation in construction projects: Evidence from a moderated mediation model in China. Building Research & Information, 54(2), pp. 198-215. ISSN 0961-3218
Yu, M.; Zhao, J.; Lin, H. and Yuan, M. (2026) Keep company with the wolf, learn to howl: The impact of self-focused collective moral judgment on the misconduct of creative members in construction projects. Journal of Construction Engineering and Management, 152(7): 04026085, ISSN 0733-9364
Zhang, R (2014) Task characteristics, coordination modes and design coordination performance, an information processing perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
de Souza-Daw, T; Ross, R; Nhan, T D; Hung, L A; Trung, N D Q; Chau, L H; Phuong, H M; Ngoc, L H and Nkhoma, M (2015) Design and evaluation of a low-cost street-level image capturing vehicle for south-east Asia. Journal of Engineering, Design and Technology, 13(4), pp. 579-595.
van den Berg, M; Voordijk, H and Adriaanse, A (2020) Information processing for end-of-life coordination: a multiple-case study. Construction Innovation, 20(4), pp. 647-671. ISSN 1471-4175
Up a level