Items with Index Term: information flow
Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.
Abdulhadi, N H (1997) Simulation as a tool for re-engineering construction processes. PhD thesis, University of Colorado at Boulder, USA.
Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.
Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.
Ahuja, Vanita (2007) It enhanced communication protocols for building project management by small and medium enterprises in the Indian construction industry. PhD thesis, Queensland University of Technology, Australia.
Akinci, B; Kiziltas, S; Ergen, E; Karaesmen, I Z and Keceli, F (2006) Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study. Journal of Construction Engineering and Management, 132(11), pp. 1148-1157. ISSN 0733-9364
Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.
Alaboud, N S M (2016) Development of a framework to enhance communication practice for site-based construction workers in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Alizadehsalehi, S and Yitmen, I (2023) Digital twin-based progress monitoring management model through reality capture to extended reality technologies (drx). Smart and Sustainable Built Environment, 12(1), pp. 200-236. ISSN 2046-6099
Alsafouri, S (2017) Information technology and human factors to enhance design and constructability review processes in construction. PhD thesis, Arizona State University, USA.
Amiri Ara, R; Paardenkooper, K and van Duin, R (2022) A new blockchain system design to improve the supply chain of engineering, procurement and construction (EPC) companies: a case study in the oil and gas sector. Journal of Engineering, Design and Technology, 20(4), pp. 887-913. ISSN 1726-0531
Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193
Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.
Bajar, K; Kamat, A; Shanker, S and Barve, A (2024) Blockchain technology: A catalyst for reverse logistics of the automobile industry. Smart and Sustainable Built Environment, 13(1), pp. 133-178. ISSN 2046-6099
Bajjou, M S and Chafi, A (2025) Developing and validating a new conceptual model for successful implementation of lean construction: SEM analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1581-1620. ISSN 0969-9988
Baldwin, A N; Austin, S A; Hassan, T M and Thorpe, A (1999) Modelling information flow during the conceptual and schematic stages of building design. Construction Management and Economics, 17(2), pp. 155-167. ISSN 01446193
Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Banerjee, A and Nayaka, R R (2022) A comprehensive overview on BIM-integrated cyber physical system architectures and practices in the architecture, engineering and construction industry. Construction Innovation, 22(4), pp. 727-748. ISSN 1471-4175
Bartley, T; McMahon, C and Denton, S (2016) Information flows in highway project delivery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Bayhan, H G (2025) Transaction costs in construction project team communications: Language model and network science applications. PhD thesis, Michigan State University, USA.
Binsarra, F A (2016) Uncovering the structure and the dynamic of information propagation in building. PhD thesis, University of Liverpool, UK.
Brady, D A (2014) Using visual management to improve transparency in planning and control in construction. PhD thesis, University of Salford, UK.
Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.
Castillo, T; Herrera, R F and Alarcón, L F (2023) The quality of small social networks and their performance in architecture design offices. Journal of Construction Engineering and Management, 149(2): 04022162, ISSN 0733-9364
Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Che Wan Putra, C W F (1998) CAPE construction application protocol for data transfer: a building data model. PhD thesis, University of Salford, UK.
Chen, B (2018) Contribution of process-technology fit to IT business value: the case of BIM in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.
Chen, Y (2008) Using mobile computing for construction site information management. PhD thesis, University of Newcastle upon Tyne, UK.
Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.
Cheung, S O; Yiu, T W and Lam, M C (2013) Interweaving trust and communication with project performance. Journal of Construction Engineering and Management, 139(8), pp. 941-950. ISSN 0733-9364
Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.
Choong, Yi (2006) A mapping approach to investigating information and communication technology implementation during the building design process. PhD thesis, RMIT University, Australia.
Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.
Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364
Da Rocha, C G; Kemmer, S L and Meneses, L (2016) Managing customization strategies to reduce workflow variations in house building projects. Journal of Construction Engineering and Management, 142(8): 5016005, ISSN 0733-9364
Dalla Valle, Anna (2019) Environment-driven change management in AEC firms: Life cycle perspective in practice. PhD thesis, Politecnico di Milano, Italy.
Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193
Darby, S (2008) Energy feedback in buildings: Improving the infrastructure for demand reduction. Building Research & Information, 36(5), pp. 499-508. ISSN 0961-3218
Davidson, C H (1997) The building centres: CIB's information allies: A strategy for improving information flow: upstream and downstream. Building Research & Information, 25(5), pp. 313-317. ISSN 0961-3218
De Souza, D V S (2015) A conceptual framework and best practices for designing and improving construction supply chains. PhD thesis, University of Salford, UK.
Demian, P and Walters, D (2014) The advantages of information management through building information modelling. Construction Management and Economics, 32(12), pp. 1153-1165. ISSN 01446193
Donyavi, S and Flanagan, R (2011) Tracking and positioning technology and its applications for supply chain materials for small and medium enterprises (SMEs) on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Du, Q (2009) Integrated decision-making in the cladding supply chain. PhD thesis, University of Bath, UK.
Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.
Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364
Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364
Dzokoto, F K (2016) Information behaviour of construction project actors. PhD thesis, Loughborough University, UK.
El Debs, L C; Brunese, P S and Shaurette, M (2018) Use of concept maps to illustrate barriers to construction industry inter-organizational communication: A comparative view from students and professionals. International Journal of Construction Education and Research, 14(2), pp. 77-94. ISSN 1557-8771
Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities. PhD thesis, Pennsylvania State University, USA.
Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. PhD thesis, Carnegie Mellon University, USA.
Ergen, E and Akinci, B (2008) Formalization of the flow of component-related information in precast concrete supply chains. Journal of Construction Engineering and Management, 134(2), pp. 112-121. ISSN 0733-9364
Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.
Gana, V F G (2018) Soft Landings based Design Management as a tool to enhance Sustainability: a case study of non-residential buildings in the UK. PhD thesis, University of Kent, UK.
Gaur, S and Tawalare, A (2024) Assessing the implications of BIM on sustainability of construction projects through design risk management. Built Environment Project and Asset Management, 14(3), pp. 470-489. ISSN 2044-124X
George, R (2007) Information flow to support front end planning. PhD thesis, Clemson University, USA.
Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.
Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.
Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(2), pp. 52-68. ISSN 1358-9180
Gong, J (2009) An object recognition, tracking, and contextual reasoning based video interpretation methodology for rapid productivity analysis of construction operations. PhD thesis, University of Texas at Austin, USA.
Haji Md Yusof, I (2019) Development of lean design process for building construction projects. PhD thesis, University of Birmingham, UK.
Hassan, T M (1996) Simulating information flow to assist building design management. PhD thesis, Loughborough University, UK.
Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.
Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(1), pp. 35-49. ISSN 1466433X
Herrera, R F; Mourgues, C; Alarcón, L F and Pellicer, E (2020) Understanding interactions between design team members of construction projects using social network analysis. Journal of Construction Engineering and Management, 146(6): 04020053, ISSN 0733-9364
Herrera Valencia, R F (2020) Impact of BIM/lean on the interaction of construction project design teams. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.
Hesse, K A (2006) Development of information communication technologies in construction project management: The relationship between theory and technology and its application to the construction industry, including a retrospective on the development of technology that demonstrates how theory was altered and how practice was influenced. PhD thesis, University College London, UK.
Hooper, M and Ekholm, A (2012) A BIM-Info delivery protocol. Construction Economics and Building, 12(4), pp. 39-52. ISSN 2204-9029
Hosseini, M H; Aibinu, A; Chileshe, N and Arashpour, M (2017) Eleven years of arcom: Bibliometric mapping of studies published between 2005 and 2016. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Jafar Ramaji, I (2016) An integrated building information modeling (BIM) framework for multi-story modular buildings. PhD thesis, Pennsylvania State University, USA.
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.
Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning. PhD thesis, University of Wisconsin - Madison, USA.
Jayasuriya, Sajani (2018) A systematic stakeholder management framework for managing public private partnership projects in Australia. PhD thesis, RMIT University, Australia.
Jian, I Y; Chan, E H W and Yao, T Y P (2021) ICT as a solution for the revitalization of public open space in private developments. Built Environment Project and Asset Management, 11(3), pp. 440-453. ISSN 2044-124X
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.
Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175
Kedir, F; Hall, D M; Brantvall, S; Lessing, J; Hollberg, A and Soman, R K (2024) Circular information flows in industrialized housing construction: The case of a multi-family housing product platform in Sweden. Construction Innovation, 24(5), pp. 1354-1379. ISSN 1471-4175
Kedir, F N (2022) The performance and potential of industrialized construction for resource-efficient housing construction: A multi-scalar approach across product, system, and context. DSc thesis, ETH Zürich, Switzerland.
Khan, K I A (2016) Management of information complexity using system dynamics for small and medium-sized enterprises (SMEs) on construction projects. PhD thesis, University of Reading, UK.
Khan, K I A; Flanagan, R and Lu, S L (2015) Managing the complexity of information flow for construction small and medium-sized enterprises (csmes) using system dynamics and collaborative technologies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Khan, K I A; Flanagan, R and Lu, S-L (2016) Managing information complexity using system dynamics on construction projects. Construction Management and Economics, 34(3), pp. 192-204. ISSN 0144-6193
Kim, J J and William Ibbs, C (1995) Work-package-process model for piping construction. Journal of Construction Engineering and Management, 121(4), pp. 381-387. ISSN 0733-9364
Koseoglu, O O and Nielsen, Y (2005) Mobile computing in construction projects; assessing feasibility. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(2), pp. 88-98. ISSN 1358-9180
Kurwi, S; Demian, P; Hassan, T M and Blay, K B (2022) A process model for collaboration at the design stage of rail project delivery. Journal of Construction Engineering and Management, 148(10): 04022105, ISSN 0733-9364
Kwofie, T E; Adinyira, E and Fugar, F (2016) Modelling the effect of housing design unit contract packaging on mass housing project team communication performance. Journal of Construction in Developing Countries, 21(1), pp. 35-50. ISSN 1823-6499
Kwofie, T E; Ohis Aigbavboa, C and Thwala, W D (2019) Communication performance challenges in PPP projects: Cases of Ghana and South Africa. Built Environment Project and Asset Management, 9(5), pp. 628-641. ISSN 2044-124X
Le, Y; Wang, Y; Luo, C and Peng, Y (2013) Integration of financial and contract management on the Shanghai Expo construction program. Journal of Construction Engineering and Management, 139(6), pp. 738-748. ISSN 0733-9364
Lee, G (2004) A new formal and analytical process to product modeling (PPM) method and its application to the precast concrete industry. PhD thesis, Georgia Institute of Technology, USA.
Lee, J M; Anumba, C J; Gibb, A G and Agbasi, E (2002) The current status of the cladding sector and its opportunities for computer-integrated manufacture (CIM). In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Lewis, T (1998) Electronic data interchange in the construction industry. PhD thesis, Loughborough University, UK.
Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.
Liang, Y (2006) Integrated IT systems for construction site management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Lockley, S R; Watson, R and Shaaban, S (2002) Managing e-commerce in construction: Revolution or e-business as usual? Engineering, Construction and Architectural Management, 9(3), pp. 232-240. ISSN 0969-9988
Loosemore, M (1996) Crisis management in building projects: a longitudinal investigation of communication and behaviour patterns within a grounded theory framework. PhD thesis, University of Reading, UK.
Lopes, J and Ribeiro, F L (2001) Working out a rational institutional framework for the development of the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Loria Arcila, J H (2002) Major issues impacting affordable housing developments in Mexico. PhD thesis, Georgia Institute of Technology, USA.
Lostuvali, B; Alves, T C L and Modrich, R U (2014) Learning from the cathedral hill hospital project during the design and preconstruction phases. International Journal of Construction Education and Research, 10(3), pp. 160-180. ISSN 1557-8771
Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988
M.E. Sepasgozar, S; Shirowzhan, S and Loosemore, M (2021) Information asymmetries between vendors and customers in the advanced construction technology diffusion process. Construction Innovation, 21(4), pp. 857-874. ISSN 1471-4175
Maheswari, J U; Varghese, K and Sridharan, T (2006) Application of dependency structure matrix for activity sequencing in concurrent engineering projects. Journal of Construction Engineering and Management, 132(5), pp. 482-490. ISSN 0733-9364
Majava, J; Haapasalo, H and Aaltonen, K (2019) Elaborating factors affecting visual control in a big room. Construction Innovation, 19(1), pp. 34-47. ISSN 1471-4175
Martinez, J G; Yeung, T; Sacks, R; Shahaf, Y and Sharoni, L O (2023) Situational awareness in construction using a serious game. Journal of Construction Engineering and Management, 149(3): 04022183, ISSN 0733-9364
Marzouk, M and Enaba, M (2019) Analyzing project data in BIM with descriptive analytics to improve project performance. Built Environment Project and Asset Management, 9(4), pp. 476-488. ISSN 2044-124X
Maseko, L and Root, D (2021) Collaborative risk management within the design phase of green buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Matarneh, S; Danso-Amoako, M; Al-Bizri, S; Gaterell, M and Matarneh, R (2019) BIM-based facilities information: Streamlining the information exchange process. Journal of Engineering, Design and Technology, 17(6), pp. 1304-1322. ISSN 1726-0531
Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.
Maund, K; Gajendran, T and Brewer, G (2014) Examining the barriers to successful onsite construction environmental management operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Meng, F and Cao, X (2025) An intelligent framework for rework risk identification in prefabricated construction processes based on compliance checking. Engineering, Construction and Architectural Management, 32(8), pp. 5066-5098. ISSN 0969-9988
Moffatt, S and Kohler, N (2008) Conceptualizing the built environment as a social-ecological system. Building Research & Information, 36(3), pp. 248-268. ISSN 0961-3218
Moghaddam, S.; Dashti, M. S.; Alvanchi, A. and Khanzadi, M. (2026) An integrated BIM-based augmented reality framework for improving facility maintenance management. Engineering, Construction and Architectural Management, 33(3), pp. 2007-2047. ISSN 0969-9988
Mohammad Ahmad, A; Rodriguez Trejo, S; Hafeez, M A; Dawood, N; Kassem, M and Naji, K K (2023) Drivers for energy analysis towards a BIM-enabled information flow. Smart and Sustainable Built Environment, 12(3), pp. 507-533. ISSN 2046-6099
Mollasalehi, S (2022) The benefits of BIM use to improve information flow: making the design process more leaner. PhD thesis, University of Salford, UK.
Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180
Moscati, A and Engström, S (2019) Digitalization and industrialization: Exploration of the current and future challenges in the Swedish built environment sector. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Mostafa, S and Chileshe, N (2018) Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia. Architectural Engineering and Design Management, 14(1-2), pp. 139-157. ISSN 1745-2007
Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle. PhD thesis, University of the West of England, Bristol, UK.
Nasrallah, W F and Bou-Matar, R (2008) Exponential, gamma, and power law distributions in information flow on a construction site. Journal of Construction Engineering and Management, 134(6), pp. 442-450. ISSN 0733-9364
Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.
Naveed, F and Khan, K I A (2022) Investigating the influence of information complexity on construction quality: A systems thinking approach. Engineering, Construction and Architectural Management, 29(3), pp. 1427-1448. ISSN 0969-9988
Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(4), pp. 273-294. ISSN 01446193
Newton, A J (1995) The planning and management of detailed building design. PhD thesis, Loughborough University, UK.
Nielsen, Y and Sayar, T (2001) Web-based information flow modelling in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Nielsen, Y and Özbay, F O (2000) Information flow models for large scale public projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Nielson, Y and Erdogan, B (2003) Expanding the envelope of visualization for communication in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364
Niu, Y; Anumba, C and Lu, W (2019) Taxonomy and deployment framework for emerging pervasive technologies in construction projects. Journal of Construction Engineering and Management, 145(5): 04019028, ISSN 0733-9364
Niu, Y; Lu, W; Liu, D; Chen, K C; Anumba, C A and Huang, G G (2017) An sco-enabled logistics and supply chain-management system in construction. Journal of Construction Engineering and Management, 143(3): 04016103, ISSN 0733-9364
Niu, Y; Nwagboso, C; Proverbs, D and Olomolaiye, P (2004) Developing supply chain integration in building technologies cluster. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
O'Brien, S (2022) Critical infrastructure organisation management: an analysis of the transition to the Industry 4.0 era. PhD thesis, University of Cambridge, UK.
Ozaki, R (2003) Customer-focused approaches to innovation in housebuilding. Construction Management and Economics, 21(6), pp. 557-564. ISSN 01446193
Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.
Pereira, Lucas Melchiori (2019) The organizational influence on design quality of built environment. PhD thesis, Universidade de São Paulo, Brazil.
Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager. PhD thesis, Pennsylvania State University, USA.
Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.
Poortman, E R and Norbert M. Bons, H (1994) Information for the management of the building? Materials flow. Engineering, Construction and Architectural Management, 1(2), pp. 139-146. ISSN 0969-9988
Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.
Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364
Safari, K and Ghandehariun, S (2026) An integrative BIM-based life cycle assessment framework to address uncertainties: A mixed-methods study under real construction project context. International Journal of Construction Management, 26(1), pp. 54-75. ISSN 1562-3599
Saka, N (2011) An assessment of the level of adoption of e-business practices by Nigerian construction contractors. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.
Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Sayed Suleiman, R (2019) Understanding site offices challenges to communicate and exchange information using technology in UK: main contractor perspective. PhD thesis, University of Salford, UK.
Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Siriwardena, M L (2015) Organisational learning in construction: a framework from the process improvement perspective. PhD thesis, University of Salford, UK.
Sobotka, A (2000) Simulation modelling for logistics re-engineering in the construction company. Construction Management and Economics, 18(2), pp. 183-195. ISSN 01446193
Soltanmohammadlou, Nazi (2025) A sociotechnical system for earthmoving equipment safety in Australian construction sites. PhD thesis, Queensland University of Technology, Australia.
Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364
Souza, Flávia Rodrigues de (2015) The design management process into real estate developers companies. PhD thesis, Universidade de São Paulo, Brazil.
Straub, M (2014) A new framework for designing and developing cost-effective logistic chains for long items. PhD thesis, University of Gloucestershire, UK.
Sullivan, K T; Kashiwagi, D; Savicky, J; Kashiwagi, M; Egbu, C and Chang, C K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(2), pp. 267-284. ISSN 0969-9988
Swan, W; Cooper, R; McDermott, P and Wood, G (2001) A review of social network analysis for the IMI Trust in Construction Project. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Tang, Y (2006) Evolutionary and customer-oriented building design process. PhD thesis, Loughborough University, UK.
Tenah, K A (1984) Management information organization and routing. Journal of Construction Engineering and Management, 110(1), pp. 101-118. ISSN 0733-9364
Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364
Tezel, B A (2011) Visual management: an exploration of the concept and its implementation in construction. PhD thesis, University of Salford, UK.
Thorpe, T (1992) Information flow in house building organisations. PhD thesis, Loughborough University, UK.
Thorpe, T and Mead, S (2001) Project-specific web sites: Friend or foe? Journal of Construction Engineering and Management, 127(5), pp. 406-413. ISSN 0733-9364
Thunberg M, P F (2013) A logistics framework for improving construction supply chain performance. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(2), pp. 71-82. ISSN 1471-4175
Torkanfar, Navid (2025) Blockchain-enabled digitalized trust in construction industry: Reforming trust and collaboration through technology. PhD thesis, University of Toronto, Canada.
Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Architectural Engineering and Design Management, 7(2), pp. 85-101. ISSN 1745-2007
Tripathi, K K (2018) Critical success factors for construction organizations in India. PhD thesis, Indian Institute of Technology Delhi, India.
Tripathi, K K and Jha, K N (2019) An empirical study on factors leading to the success of construction organizations in India. International Journal of Construction Management, 19(3), pp. 222-239. ISSN 1562-3599
Underwood, J (1995) Integrating design and construction to improve constructability through an effective usage of IT. PhD thesis, University of Salford, UK.
Uusitalo, P; Lappalainen, E; Seppänen, O; Pikas, E; Peltokorpi, A; Menzhinskii, N and Piitulainen, M (2021) To trust or not to trust: Is trust a prerequisite for solving design quality problems? Construction Management and Economics, 39(4), pp. 279-297. ISSN 01446193
Uusitalo, P; Seppänen, O; Peltokorpi, A and Olivieri, H (2019) Solving design management problems using lean design management: The role of trust. Engineering, Construction and Architectural Management, 26(7), pp. 1387-1405. ISSN 0969-9988
Vestin, A (2020) Smart manufacturing for the wooden single-family house industry. PhD thesis, Jönköping University, Sweden.
Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.
Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364
Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.
Weldu, Y W (2016) Automated generation and visualization of initial construction schedules from building information models. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Wenchi, S; Wang, J; Wang, X and Chong, H Y (2015) An application of value stream mapping for turnaround maintenance in oil and gas industry: Case study and lessions learned. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451
Wiesweg, N; Schäpers, P; Bernhold, T and Hartmann, T (2024) On the challenges of inter-organisational data in real estate: The role of knowledge sharing. Engineering, Construction and Architectural Management, 31(1), pp. 247-263. ISSN 0969-9988
Wijekoon, K (2020) Optimising the adoption of building information modeliing (BIM) in facilities mnagement (FM): A model for value enhancement. PhD thesis, Liverpool John Moores University, UK.
Wijekoon, K A D N C (2019) Optimising the adoption of building information modelling (BIM) in facilities management (FM): A model for value enhancement. PhD thesis, Liverpool John Moores University, UK.
Wijekoon, K A D N C (2020) Optimising the adoption of building information modelling in facilities management: a model for value enhancement. PhD thesis, Liverpool John Moores University, UK.
Wong, K D (1993) An integrated information system for Hong Kong construction contractors. PhD thesis, Loughborough University, UK.
Wu, C; Brookes, N; Unterhitzenberger, C and Olson, N (2023) The role of lean information flows in disaster construction projects: Exploring the UK's COVID Surge hospital projects. Construction Management and Economics, 41(10), pp. 840-858. ISSN 01446193
Wu, Lingzi (2021) Enhancing data-driven applications in construction. PhD thesis, University of Alberta, Canada.
Xu, J (2001) CAD-based integrated simulation environment (CAD-ise). PhD thesis, University of Alberta, Canada.
Yin, H (2026) Construction project information system management framework strategy based on version control and collaboration. International Journal of Construction Management, 26(6), pp. 1033-1058. ISSN 1562-3599
Yu, Yifei (2024) Circular construction ecosystems: Designing a circularity information platform for the built environment. PhD thesis, University of Twente, Netherlands.
Zhang, Y; Wang, J; Ahmad, R and Li, X (2022) Integrating lean production strategies, virtual reality technique and building information modeling method for mass customization in cabinet manufacturing. Engineering, Construction and Architectural Management, 29(10), pp. 3970-3996. ISSN 0969-9988
Zhao, Z Y; Lv, Q L; Zuo, J and Zillante, G (2010) Prediction system for change management in construction project. Journal of Construction Engineering and Management, 136(6), pp. 659-669. ISSN 0733-9364
af Hällström, A and Bosch-Sijtsema, P (2021) The dark side of collaboration: The risks of strong ties in collaborative project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
e Silva, H B G (2024) Mitigating information asymmetry in the 5g era: Unveiling practices that restrict users' internet access. PhD thesis, Universidade do Porto, Portugal.
Up a level